Loading...
MSA Projects SummaryState Aid ‐ CIP Year Fund Balance Project Estimated Cost Projected Revenue 70th St SA Reimbursement #7 ($430,779) 85th St (Page to 84th St) Reclaim ($365,000) 85th St (Nashua Ave to McIver Ave) &  Maciver  Ave (80th to 85th) Design ($100,000) 85th St (Nashua Ave to Mason Ave) ROW ($775,000) 85th St (Nashua Ave to McIver Ave) &  Maciver  Ave (80th to 85th) Construction ($2,000,000) 85th St (Nashua Ave to Mason Ave)Design,  Observation, Staking and Contract Admin ($500,000) 2019 ($1,985,657)85th St (Nashua Ave to McIver Ave) &  Maciver  Ave (80th to 85th) Construction ($2,100,000)$620,434 2020 ($3,465,223)85th St (Nashua Ave to McIver Ave) &  Maciver  Ave (80th to 85th) Construction ($200,000)$651,456 2021 ($3,013,767)85th St (Nashua Ave to Page Ave)  Microsurface ($140,000)$684,029 2022 ($2,469,738)No Scheduled Project Yet $0 $718,230 2024 ($1,004,548)No Scheduled Project Yet $0 $776,838 2025 ($227,711)No Scheduled Project Yet $0 $807,911 2026 $580,201 Queens Ave Reclaim ($300,000)$840,228 2027 $1,120,428 Assumption on revenue of 5% increase per year based on population growth of City through 2022 then 4% Project Costs of projects inflated for inflation at a rate of 3% per year **  City is allowed to advance encumber upto 5 times their annual allotment ~  2,954,448.75$                       2018 ($76,547)$590,890 2017 $1,004,749 $589,483 2023 ($1,751,508)No Scheduled Project Yet $0 $746,959