Loading...
Street Maintenance Summary2018 through 2028 Street Maintenance Summary (With Fog Over Seal Coat Only) YEAR SEAL COAT FOG SEAL TRAFFIC CONTROL** OVERHEAD 10% - (ENG, LEGAL, ADMIN) CRACK FILL STRIPING 50% PER year PREVENTATIVE MAINTENANCE (PATCHING) TOTAL 2018 $440,969 $59,177.79 $94,684 $59,483 $76,500 $36,106 $63,000 $829,920 2019 $316,685 $45,462.05 $72,739 $43,489 $78,030 $37,189 $64,890 $658,484 2020 $695,391 $88,524.80 $141,640 $92,556 $79,591 $38,305 $66,837 $1,202,843 2021 $244,968 $57,065.81 $91,305 $39,334 $81,182 $39,454 $68,842 $622,151 2022 $290,066 $39,969.81 $63,952 $39,399 $82,806 $40,638 $70,907 $627,737 2023 $182,212 $24,359.88 $38,976 $24,555 $84,462 $41,857 $73,034 $469,456 2024 $273,320 $41,163.66 $65,862 $38,035 $86,151 $43,112 $75,225 $622,869 2025 $580,336 $65,905.64 $105,449 $75,169 $87,874 $44,406 $77,482 $1,036,622 2026 $423,587 $48,104.53 $76,967 $54,866 $89,632 $45,738 $79,807 $818,701 2027 $1,127,909 $128,090.57 $204,945 $146,094 $91,425 $47,110 $82,201 $1,827,774 2028 $187,509 $23,638.04 $37,821 $24,897 $93,253 $48,523 $84,667 $500,308 11 year expense $9,216,865 1 3% per year is added for inflation for all prices except using 2% for Crack Filling 160% add this percentage of Fog Seal cost for traffic control. Based on the average Traffic Control bid prices in 2015 and 2016 :og & yr 2, Fog and Sea I Coat every 7 years STREET TYPE 0 1 2 3 4 5 6 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 1 25 1 26 1 27 1 28 1 29 1 30 31 1 32 1 33 1 34 1 35 1 36 1 37 1 38 1 39 1 40 1 41 1 42 1 43 1 44 1 45 46 1 47 1 48 1 49 1 50 .ocal New IF IF 11 IF FIG 1 1 117 1 1 IF I I IF 117OG 1 1 117 1 1 IF 1 1 117 1 FIG I EVALUATION OVERLAY IF IF IF C,7 FIG EVALUATE RECONSTRUCT IOG SEAL SEAL SEAL I I SEAL .ollector New IF IF IF IF FIG IF IF IF I FIG IF I I IF I I IF IFOG EVALUATION OVERLAY IF I IF IF IF FIG EVALUATE RECONSTRUCT FOG SEAL I I SEAL SEALI I SEAL SC = Seal Coat FG = Fog Seal CF = Crack Fill SAMunicipal\A0TSEG0\387 (Road Maintenance)\ROADWAY MGMT PLAN\2018\10 yr Plan(CF 2yrs) (2018-2028).xls