Loading...
ITEM 3.1_Eng ReportIHakanson MIAnderson ENGINEERING REVIEW Residential Subdivision for the City of Otsego by Hakanson Anderson Review No. I Submitted to: Honorable Mayor and City Council cc: Adam Flaherty, City Administrator Tami Loff, City Clerk Dan Licht, City Planner Andy MacArthur, City Attorney Mike Suel, D.R. Horton, Inc. Robert Olson, Westwood Professional Services, Inc. Reviewed by: Ronald J. Wagner, P.E. Brent M. Larson, P.E. Cody Sylvester, E.I.T. Date: November 15, 2017 Proposed Development: Emerson Pointe Street Location A portion of the NE 1/a of the SE 1/a Section 27, T121, R23. Of Property: West of Quaday Avenue NE and North of 72nd Street NE. Applicant: Mike Suel Developer: D.R. Horton, Inc. 20860 Kenbridge Court, Suite 100 Lakeville, MN 55044 Owners of Record: D.R. Horton, Inc. Purpose: Emerson Pointe is a proposed 50 single-family low density residential lot development on approximately 20 acres in the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer, and public streets typical of an urban setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency, Wright Soil and Water Conservation District. Permits Required: NPDES, Minnesota Department of Health (water), (but not limited to) Minnesota Pollution Control Agency (sanitary sewer), and Wright County TABLE OF CONTENTS INFORMATION AVAILABLE EXISTING CONDITIONS SUBDIVISION CONFIGURATION, LOT SIZE, DENSITY PRELIMINARY PLAT/STREET/TRAFFIC PRELIMINARY GRADING, DRAINAGE, AND EROSION CONTROL PLAN PRELIMINARY UTILITY PLAY SURFACE WATER MANAGEMENT WETLANDS ENVIRONMENTAL SUMMARY AND/OR RECOMMENDATION PAGE 2 S:\Municipal\Aotsego23xx\2339\ot2339 RVW1.docx INFORMATION AVAILABLE Preliminary Plans for Emerson Pointe, dated 10/24/17, by Westwood Professional Services, Inc. Storm Water Management for Emerson Pointe, dated 10/23/17, by Westwood Professional Services, Inc. Wetland Determination Report, dated 9/19/17, by Westwood Professional Services, Inc. Geotechnical Report for Emerson Pointe, dated 6/27/17, by Braun Intertec Corporation Additional Information Minnesota Rules, Chapter 4410 — EAW Requirement City of Otsego Engineering Manual City of Otsego Zoning and Subdivision Ordinances National Wetland Inventory Map PAGE 3 S:\Municipal\Aotsego23xx\2339\ot2339 RVW1.docx EXISTING CONDITIONS Existing zoning classifications for land in and abutting the subdivision shall be shown on the plan. (21-6-2.13.2.) 2. The limits of the Shoreland Overlay District shall be shown on the plan. 3. Label the size and elevations of existing storm sewer, water and sanitary or any other underground facility within 150 feet of the proposed plat. (21-6-2.B.5.) See attached as - built plans for utilities along Kadler Avenue. 4. Existing 100 -year flood elevations shall be shown on the plan. (21-6-2.B.9.) SUBDIVISION CONFIGURATION, LOT SIZE, DENSITY Emerson Pointe will be the first subdivision in this area of Quaday Avenue and does not tie into any existing developments. The current configuration appears to provide reasonable street and utility connection locations for developing future adjacent properties. The developer shall continue work with City staff develop an acceptable configuration. 6. R-5 zoning district requires a minimum lot width of 90' for corner lots (20-66-6.A). Some corner lots do not meet this minimum. PRELIMINARY PLAT/STREETS/TRAFFIC Street shall be named according to the Wright County street naming system as follows; a. Street 1 —Parson Avenue NE b. Street 2 — Parson Court NE c. Street 3 — 74th Street NE d. Street 4 — Parrish Avenue NE e. Street 5 — 74th Street NE 8. Provide horizontal curve information for all streets. Alll vertical and horizontal curves shall meet 30 mph design speed requirements. Street 1 at Sta 13+50 does not meet this requirement. (min K = 19 for crest and 37 for sag curves). 9. A temporary cul-de-sac will be required at the north end of Street 4. 10. Concrete valley gutters are required across all intersections with less than 1% cross slope. 11. Provide the Otsego Standard Plate 112 for a Local Residential Urban Street — 9 Ton. Indicate which sections recommended R -value the streets are to be designed to. PAGE 4 S:\Municipal\Aotsego23xx\2339\ot2339 RVW1.doex PRELIMINARY GRADING, DRAINAGE, AND EROSION CONTROL PLAN 12. The grading plan and street profiles depict Street 4 ending approximately 12 feet below the existing ground elevation. The profile shows this street continuing to the west at 2% creating even more significant cuts. Provide verification that this street is a feasible option for developing the adjacent property. 13. The grading plans show grading onto the property to the west. Written permission from the adjacent property owner shall be provided to allow this. 14. 4' berm(s)s shall be provided in the rear yards along Quaday Avenue. 15. The rear yards of Lots 1-4, Block 3 flow into Quaday Avenue? 16. The proposed contours shall be labeled. PRELIMINARY UTILITY PLAN 17. A connection to the existing watermain on the east side of Quaday Avenue at the intersection of Quaday Avenue and Street 1 is required. This will need to be done by directionally drilling under Quaday Avenue. 18. A watermain loop shall be provided between Lots 5 and 6, and Lots 20 and 21, Block 4. 19. A watermain stub shall be provided to the south property line along the west property line of Lot 25, Block 4. 20. Hydrant coverage of 250' radius is necessary. Lot 4, Block 2 and Lots 14 and 15, Block 4 do not meet this requirement. 21. Ground water was encountered 7' below existing surface in geotechnical report. Final plans shall note which, if any, hydrants will need to be plugged. SURFACE WATER MANAGEMENT 22. It appears that the post -development offsite discharge rates are at or less than pre - development per City requirements. It also appears that the site will meet the required infiltration rates as required by the City and NPDES permit. The location of the groundwater elevation may need further evaluation with respect to the infiltration area. 23. Storm sewer design and hydrology is still under review, any additional comments will follow. WETLANDS 24. The Wetland Determination Report, dated 9/19/17, has been received and under review. PAGE 5 S:\Municipal\Aotsego23xx\2339\ot2339 RVW1.docx ENVIRONMENTAL 25. A statement certifying the environmental condition of the site including the presence of any hazardous substance as defined in Minnesota Statutes 115B.02, Subd 8 is required. SUMMARY AND/OR RECOMMENDATION Contingent upon the above items being addressed we recommend revise and resubmit. PAGE 6 S:\MunicipaMotsego23xx\2339\ot2339 RVW1.docx