Loading...
ITEM 3.9D Pay Estimate #2 C W HouleTY OF 06ezo MINNESOTA <01, DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner November 27, 2017 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.9D AGENDA ITEM DETAILS RECOMMENDATION: Approve Pay Estimate #2 in the amount of $29,490.95 to C. W. Houle, Inc. for work completed on the Lefebvre Creek Greenway Trail. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FICATION: A portion of the Lefebvre Creek Greenway Trail is located on land deeded to the City as part of the original Crimson Ponds West development. With the progression of the Boulder Creek project and the completion of the Lefebvre Creek Greenway within Boulder Creek, a trail connection from 75 1h St south has been constructed with this project. During construction of the trail, depths of top soil and water table issues were encountered. To ensure a stable trail bed for longevity of the trail, additional topsoil needed to be removed and in one area where water table was encountered pit run and fabric was added to strengthen the trail bed. This caused items 3, 4 & 5 to increase above plan quantities. Currently, this trail is completed to the stage where proof of turf establishment is all that is left (5% is being retained to ensure proper turf establishment in spring). The project had a November 15 th completion deadline but has been substantially completed. The original quote accepted by council is $74,497.80. With changes required due to poor soils as described above, the final is anticipated to be $82,137.70. SUPPORTING DOCUMENTS ATTACHED: 0 Pay Estimate #2 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #2 to C. W. Houle, Inc. in the amount of $29,490.95 for work completed on the Lefebvre Creek Greenway Trail. BUDGET INFORMATION FUNDING: BUDGETED: 203 — Park Development Yes PAY ESTIMATE -42 CITY OF OTSEGO Lefevbre, Creek G reenway Trail November 16, 2017 Honorable Mayor & City Council City of OW606 13400 90th Woet Otsego, MN 55330 RE: Lefevbre Creek Greenway Trail Contractor: O.W. Houle. lnc� Gmtradt Arnount: $74,497,80 Award Date- July 24, 2017 - Completion Date: November 15, 2017 Deer Honorable Mayor and Council Members: The following work has b6an completed on the above -referenced project by C.W. Houle, Ino. nm NO. ram DESORIPTION F-sTwwrm QUANTITY UNIT CONTPACT UNIT PIRME CONTRACTANOUNT USED TO DATE kXTENSION 1 Mobilization I LS $ 500.00 $ 500.00 1 500.00 2 Remove Curb and G_uUer 16 LF. a; 20.00 320.00 24 S 480.00 3 Common Excavkon (P) 585 Cy $ 12.30 7,195.60 974 $ 11,980.20 4 Anamate Base Class.3 or 4 1.152 TON 12.60 S 14,515.20 1.489 $ 18.761AO 5 Aqgnata Base Class 6 556 TON S 21-00 $ 11'676� 00 855.5 17,965.50 6 DRe 8P 12.5 WearIng Course Kodure R,B) 247 TON 8680 S 21,439.60 237 $ �0,571.60 7 Concrete Curb & Gutter Design 1361a 32 LF $ 35.00 $ 1,120.00 24 $ 840-00, 8 4" Concrete Sidewalk 717 SY $ 76.00 S 1,292M 13 $ 988.00 9 ITnincated Domes 40 SF $ 62.00 $ 2,480.00 40 $ 2,480.00 10 Silt Fence, Type MS 2,893 LF 1$ 1.50 S 4,339.50 1.9341$ 2,901.00 11 Storm D�ain Inlet Prop-.pt�Jon 10 EA $ 265.00 $ 2,650.00 01 f 12 a tabiliw-dConstruction Exit 2 ILS I's jj5q.00 $ 13 Turf Pstablishment I I I LS 1 $ 4.670.001$ 4.670.OD I 11s 4,670. Total Quote $ 74,07.80 $ 82,137,70 QUOTE 74,497.80 $ 82,137.70 TOTAL $ 82,137.70 Total Work Completed to Date $ 82,137.70 LESS 6% RETAINAGF: $ 4,106.89 LESS PAY ESTIMATE #1, $ 48,09.1;7 WE RECOMMEND PAYMENT OR $ 29,490.94 APPROVALS- CONTPAOTOR: O.W. HOULE, IN6. Certification by Contractor: I rtfly th t all I and amounts are correct for the vork completed to date, Signe ,, W d: Title: CAS - Date It 12JO 1 ENGINEER; HAKANSONANDERSO N Cortifloation by Engineer: We ommo payment for mnrk and quantities as shov,", Signed OWNER: CITY OF OTSEGO ot726 pe�xls PE - 1