Loading...
ITEM 6.2 Resolution 13-45lTr- y O Ot eego P4 1 NNE SO TA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT' REQUEST R: MEETING DATE: Public Works Ron Wagner, City Engineer August 12., 2013 PRESENTER(s): REVIEWED BY: ITEM 9: Ron Wagner,. City Engineer Lori Johnson, City Administrator 6.2 AGENDA ITEM DETAILS RECOMMENDATION - No appeals of the assessment were received and the acquisition of over half of the easements has occurred since the assessment hearing was held. Therefore City Staff recommends approval of a 0 resolution awarding the contract for LaBeaux Avenue Improvement to Fehn Companies in the amount of $1831048.82. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes I No BACKGROUNDIJUSTIFICATION: An Assessment Hearing was held on June 24th and an assessment amount was set at $4,371.68. The City has had an appraiser determine an appropriate offer for the purchase of a portion of Mr. Slavik's land for the purpose of constructing a cul-de-sac at the southern end of the project. Most drainage and utility easements have been obtained in order to replace driveway culverts and provide proper drainage. The re -grading of the ditch is necessary to minimize future frost boll issues with the street. Since this portion of the work is not assessed and is to be paid for from the Otsego Creek fund the City has had the residents provide the required easements at no cost. Staff anticipates the need to negotiate a change order with Fehn Companies for the purpose of constructing a bus stop access sidewalk. This is estimated to cost less than $2,500. A letter requesting the sidewalk must be submitted by the school district and transportation company before this part of the project is constructed. Staff recommends using the collector street fund for a portion of the funding, as the removal of 75th Street access to CSAH 19 and changing it to a cul-de-sac and the 77 1h Street (CSAH 19) intersection improvements could both be considered collector street improvements. The removal of 75th Street access provides proper spacing onto CSAH 19 and the improvement to 77th Street (CSAH 19) intersection improves 77th Street which acts as a minor collector for the area. The cost of the two collector improvement portions of the project combine to cost $31,000. If the contract is not awarded at this council meeting, the project would require rebidding to go forward as the bids will have expired. The project cost summary is attached. SUPPORTING DOCUMENTS: X ATTACHED El NONE List: Bid Tab Plan Set Resolution 2013-45 Awarding Contract Project Cost Summary as of 8-1-2013 Motion: Motion to Approve Resolution 2013-45 Awarding Contract for the LaBeaux Avenue Improvement Project to Fehn Companies for the amount of $183,048.82 OR Motion to discontinue the process BUDGET IWORIVIATION FUNDING: Assessment 408 - Otsego Creek Fund 209 —Street Reconstruction Fund 403 — Collector Street Fund ACTION TAKEN BUDGETED: Z YES oNO a A PPR VED AS REQ U EST E D n DENIED oTABLED Ei OTHER (List changes) COMMENTS: BID TABULATION CITY OF OTSEGO La B ea ux Aven tio Improv me nts Bids opened I -M p.m., June 4, 2013. There were 4 b'A�s received, as shown herein. Bid Schedule "A" -Road Construction Fahr comp:nies Hardfives, Inc. Midwest Civil ConsLruction I LLC Northdale Constructoin Co., Inc. ITEM NO. I ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UMT PRICE EXTENSION WIT PRICE EXTENSION 1 moalLIZATION 0.2 LUMP SUM $13,000-00 $2,800.00 $35,535.90 $7.107-18 $20,000.00 $4,000-00 $26,500,00 55,300m 2 REMOVE BITUMINOUS PAVEMENT 682 SQ YD $2.50 $1.705.00 $2.68 $1,527,76 S3-20 52J82-40 $4.25 VA98-50 3 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 194 LIN FT $3,50 5679.00 $3,75 $727.50 $4.30 $834,20 $3-85 $746-90 4 SELECT BORROW (LV) - PIT RUN 335 CU YD $9,80 $3,283.1]0 $10.50 $3'517.50 $14.00 54.690.00 $21.5E1 $7.202-50 5 SUBGRADE PREPARATiON 37 ROAD STA $50,00 $1,850,00 $53,56 $1,981.72 $300-00 $11,100.00 $325.00 $12,025.00 6 AGGREGATE BASE CLASS 5 1.276 TON $10,75 $13,717.170 $17.14 $21,870,64 $19-50 $24.882-00 $16'50 $21,054.00 7 AGGREGATE SHOULDERING CLASS 2 178 TON $30-00 $5.340.00 $38-86 $6.917,08 $26.010 $4.628-00 $32.00 55,696-00 8 MILL BITUMINOUS SURFACE (2) 31 SQ YD $16.69 $486-39 $53.67 $1.663.77 $15-00 $465,00 $16-06 $497,06 9 BITUMINOUS MATERIAL FOR TACK COAT 370 GALLONS $3.02 $1,117.40 $5.08 $1.879-60 $3.00 $1,110-00 $3.10 $1.147.00 10 TYPE L WEARING COURSE MIXTURE (B) 572 TON 5 1A4 $41,287.68 - S89.06 $46,408,32 $59.00 $39,648,00 $62.90 $42,268-80 11 TYPE LV3 NON "U-ARING COURSE MIXTURE (B) 900 TON $52.28 $47,052,00 $63,64 557,278.00 $50.00 $45.000-00 $53.52 $48,168M 12 IADJUST VALVE 6 EACH $150,00 $900.00 $214-23 $1,285,38 $550.00 $3,300-00 $245,00 $1,470.00 13 ADJUST HYDRANT 4 EACH $650.00 (JI $2.600'02 $696-25 $2.785.00 $850-00 $3,400.00 $649-09 $2.59036 .14 TRAFFIC CONTROL -1 LUMP SUM $4.725.00 $4.725-0 Ot $4.820.17 $4.820.17 $7.500-00, $7,500.001 $8,837,50 $8.837.50 Total Bid Schedule "An 5127,342.47 $160.067-62 $152,739-60 $159.908-42 Bid Schedule W - Storm Sewer Con stru otion Fohn Companies Hardr&es, Inc. Afidwes t Civil Corns true lion L L C North dale Cons tractor' Co., in o. ITEM NO. ITEM MSCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTr=NSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRWE EXTENSION 15 MOBILIZATION 0.8 LUMP SUM $13.000m 510,400,00 $6,333.86 $5.067.09 $20,000-00 $16.000,00 $26,500,00 $21,200.00 16 REMOVE METAL CULVERTS 440 LIN FT WOO $2,640.00 $6,43 S2,829,20 $9.00 $3.960-014 $5.75 $2,530.00 17 REMOVE PLASTIC CULVERTS 25 UN FT $6.00 $150-00 5 ,43 $160.75 $9.00 $225.00 $6-75 V65.75 W REMOVE CONCRETE WALL I -SQ ya $10100 $100.00 $107.11 $107.11 $150,00 $150.00 $350.00 $350,00 19 REMOVE CONCRETE APRON 2 EACH $75,00 5150.00 $80-34 $160.68 $180.00 $360,00 $275.00 $550,00 20 REMOVE M ETAL APRO IN 22 EACH $25.00 $550-00 $26,78 $589.16 $50-00 $ijono $75,00 $1,650.00 21 REMOVE PLASTIC APRON 2 EACH $25-00 $50.00 $26.78 $53,56 $75.00 $150-00 $75.00 $150-00 22 REMOVE SIGN TYPE C 8 EACH $37M 5296-00 $37,49 $299.92 535M $280.00 $37-63 $301,04 23 SALVAGE B 0 U L D ER WALL 29 LIN FT $10,00 $290-00 $10.71 $310-59 $14,00 $408.00 $20,00 $580.00 24 SALVAGE FENCE 20 LIN FT $5-00 $100.00 $5-36 $107-20 $14.00 $280-00 $23.00 $460-00 25 SALVAGE CONCRETE PIPE STORM SEWER 68 LIN FT $10.00 MOM $10-71 $728,28 $22,00 $1.496.00 $12-50 $860,00 26 SALVAGE SIGN I EACH $37.00 $37-00 $37.49 $37.49 $3500 $35,00 $37-63 $37.63 27 SALVAGE MAIL BOX AND SUPPORT ig EACH $20,00 $380,001 $20-351 $3 .65 $100.00 $1.900-001 $23.001 $437,00 ol 3 8 9b -dt a b.)d s B I D TAS U LAT ION BT- I OF2 BID TABULATION CITY OF OTSEGO LaBeaux Avenue Improvements at369b,1dtab.AsBID TABULATION BT -2 OF 2 Fohn Companies Hardriyes, Inc. Alidwe s t Civil Cons fruc Uon L LC North da to Com frije to;n C*�, la o. Bid Schedule N3' -Slorm Sewer Construction - C*ntinued ITEM I I NO. ITEM DESCRIPTION ESTIMATED QUANTiTy UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRiCE EXTENSION UNIT PRICE EXTENSION 28 SALVAGE CONCRETE APRON - 2 EACH $50.00 $100.00 $53-56 $107,12 $215.00 $430.00 $275-00 $55D.00 29 COMMON EXCAVATION (e) 1.310 CU Y() $10-86 $14.226-610 $11.63 $15,235,30 $9.00 $11.790.00 $12.50 $16,375-00 30 HAUL & STOCKPILE EXCESS MATER AL (EV) 795 CU YO $6.00 $4.770-00 $6.43 $6,111,85 $17-00 $13,515.00 $15.50 $12.322.50 31 15h CM PIPE APRON 22 EACH $125-00 $2,760.40 5133-89 $2,945-58 $160.00 $3,300,00 $218-49 $4.806.78 32 15'p RC PIPE CULVERT DESIGN 3006 CLASS V 68 LIN FT $36,00 $2,44800 $38.56 $2,622-08 $80MI $5,440.00 $41.87 $2,847-16 33 HNSTALL SALVAGED 18 RC PIPE CULVERT 64 LIN FT $30.00 $1,920,0D $32.13 $2.056.32 $30-00 $1.920-00 $25.00 $1,600.00 34 15H RC APRON 4 EACH $300.00 $1.200.00 $321-35 51.285A0 $1,100.00 $4.400-00 $759-07 $3.036-28 35 INSTALL SALVAGED CONCRETE APRON 2 EACH $100-00 $200.00 $107.12 $214-24 $360.00 $720,00 $349-97 $699-94 36 15" CM PIPE CULVERT 257 LIN FT $26.001 $6.602-00 $27.85 $7,157.45 $65-00 $16,705-00 $35,47 $9,115.79 37 INSTALL MAIL BOX AND SUPPORT 19 EACH $32.00 $603.00 $32-13 $610.47 $100.00 Si.900,00 $332-00 $6,308,00 38 INSTALL LANDSCAPE ROCK I SQ YD $150.00 $ 150.00 $160.67 MOW $300,00 $300-00 $100.00 $100,00 39 INSTALL SALVAGED SIGN 1 EACH $100.00 $100.00 $133,90 $133,90 $125.00 $125.00 $150.00 $150-00 40 SILT FENCE, TYPE MACHINE SLICED 425 LIN FT $2,751 $1.168-75 $3.60 $1,530.0(1 $2-25 5956-25 $5.50 $2,337.50 41 SEEDING 2-4 ACRE $500.00 $1,200,00 $530-23 $1,272.55 $200,00 5480,00 $2,956-25 $7,095.00 42 SEED MIXTURE 25D 75 LBS $4-00 $300.00 $3-21 5240.75 $3.00 $225.00 $5-38 $403-50 43 SEED MIXTURE 270 168 LBS $5.00 $840-00 $3,51 $589,68 53,00 $50-4.00 $10,75 $1,806.00 44 MULCH MATERIAL TYPE 1 -5 TON $100M $500'00 $910-50 $4,552-50 $175.00 $875.00 $591-25 $2.956_25 45 FERTILIZER TYPE 3 720 L138 $720.001 $O.BO $576-001 $0,60E- $432.00 $2,15 $1.548-00 Total Bid Schedule "a' $55.706-35 $57,239.54 $90.359-25 $103.322.12 SUMMARY OF BIDDING,. Fehr Companies Hardfives, Inc. Midwes t Civil Construction L L C Northdale Consfrucioin Co., Inc. Total Base Did Schedule A through B $193,048,82 $217,30'7.16 $243.098-85 $263.230.E4 Error in calculations- at369b,1dtab.AsBID TABULATION BT -2 OF 2 M LABEAUX AVENUE IMPROVEMENTS CONSTRUCTION PLANS FOR SHAPE AND PAVE PROJECT CITY OF TSEGO PROJECT #13-03 lliHal nson Anderson Circ! Eno'',iers *rrd Luj',,J Surveic-m 3601 Thurston Mo., "ka, W.-masofa SSW3 763-427-586D FAX 763-427-0520 PROJECT LOCATION k�fp I I %/ [- %/ 1 17 L- %j ki WRIGHT COUNTY, MINNESOTA GOVERNING SPECIFICATIONS THE 2005 ED111014 OF THE V NINF50TA DEPARTIVERT OF TRANSFORTATION "STANDARD SPECIFICATIO45 FOR CONISTRUCTION' SHALL APPLY. ALL FEDERAL, STATE AND LOCAL Lr v$, FsEWLAT*NS, AND ORDNANCES SHALL EE COVFUED WIIH LN THE CONSIRUCTION OF TH15 PROJECT. WORK SHALL CO."FOMA TO THE STANDARD UTlUTY SPECIFICATIONS AS FUSUSHED v "fi;i ury EN SNEERS ASWCA1710N OF W14NES-OTA, 1999 RMS!04. ALL TRAFFIC COkfTROL DEVICES AND S!GWNG SHJLLL CO} FORD 10 THE WN VVTCH INCLUDIN1, THE 2007 TEUnRARY TRAFFIC COqTkOL ZOINE LAYOUTS riELD VANVAL- ALL REQUAEVENIS Or THE MJECT VAKVAL FOR LAREAUX AVENUE lVPROVEMCHTS DATEO 5/13/13 (CfTY PROJECT NO. 113-03). THE SUILWAFACE UTILITY INFORWATI04 HA TH-S PLASI IS UTILITY QUALITY LEVEL D. WS QUALJTlr LEVEL WAS DETERVNED ACCORD'LliG TO THE MI)EII-INES OF Cl/A5CE 38-02, FNTFFLFD 'STANVAISV MDELINES FOR THE COMMON AND 11)[PiCT'10A 0i MSTIN(34 SUBSURFACE ulnuty DATA." 5rc SPECIF)CAIDONS, I hveby c"fy lhul MTs piom, or rep. -M was prtpersd tq me or undor mi d'rect iLponli ' ',m and 111-ior1 I o,,* o dj4j Ilictnsid Pruffss'000l Erliriler- urider lhip lov.5 of lhe Stote of Vlnrk�%00. 26052 DATE _5/8/15 FONALD J. WAGNER, P.E. Lfc, M HAKAKSON ANDEIZ304 DMONI EhJ SEER bALTE Fig 0 t4y7 1200 SCALE IN FUT SHEET 1 OF 38 SHEETS OT359 SHEET INDEX TMS FLkN CONTAINS 38 SHEETS I 71ITLI SHEET 2-4 ESTIVATED OLPAWIIIES AND DEMLS 5-7 REVOYAL PLAN 8-10 TRALFFIC C014TROL FLAN 11-13 SIRE" C4INSTRUCT.104 PLA -14 14-16 17 DUCH & CULVERT PROFILES STREET CULVERT PROFILES $8-2b 21-21 EROS!Oq CONTROL PLAN 515MCIPE PLk.4 THE SUILWAFACE UTILITY INFORWATI04 HA TH-S PLASI IS UTILITY QUALITY LEVEL D. WS QUALJTlr LEVEL WAS DETERVNED ACCORD'LliG TO THE MI)EII-INES OF Cl/A5CE 38-02, FNTFFLFD 'STANVAISV MDELINES FOR THE COMMON AND 11)[PiCT'10A 0i MSTIN(34 SUBSURFACE ulnuty DATA." 5rc SPECIF)CAIDONS, I hveby c"fy lhul MTs piom, or rep. -M was prtpersd tq me or undor mi d'rect iLponli ' ',m and 111-ior1 I o,,* o dj4j Ilictnsid Pruffss'000l Erliriler- urider lhip lov.5 of lhe Stote of Vlnrk�%00. 26052 DATE _5/8/15 FONALD J. WAGNER, P.E. Lfc, M HAKAKSON ANDEIZ304 DMONI EhJ SEER bALTE Fig 0 t4y7 1200 SCALE IN FUT SHEET 1 OF 38 SHEETS OT359 VAs ES VAPAFS VAJEs I' CLASS 2 V C LAS$ 2 AGGREGATE AGORICATZ ;2% 2% U LDI ll 2% 2K SHOULDfR St-IOULOER �7 4.-1 -1.5' TYPE IV4 CrITLIVANOUS YEAR COURSE 150159) (LVA E'l 50 �5 9) 'A r TACK COAT �,L TACK OAT 2.0- TT FE LVS GiTUVIMS NON VEAR COURE (LVL'J 6 3 5 0 3 0 3) 3' AVO, CLASS 5 VdJERIAL FOR SHAPiNG G) TYPICAL SECTION CUL—DE—SAC TO STA 10+00 NO SCALE PROPOSED GROW.'D EXISTWO EX4STI%1q'G 0904JHD GROV.41) GROUND I' CLASS 2 AGORECATE29 V CLASS 2 Ari�RFLGAIE 2N SHOULOE R GROUND 0GRISOTUINGDV N 23% SHOULDER :f DIM4 L)ITCH b rTCH fTCH A-1 &OTT044 A- I SL LV4 EIIUV 'OUS WEAR COURSE PROPOSED GROUND TYPE LV4 UJUVA'OLIS WEAR COJXSE (LV6 E4 50 3 5 B) —TACK COAT 3' DITCH PikOPOSED (LINE450351#) .2,D" T)Pi LV3 SITUVINIOUS NONI (LVNW35D308) BOTTOM GROUN10 TACK Co,LT 2.04 TYPE LYS GIT0A NOUS NOR 'iEAR COURSE (m 0x350303) 3" AV8. CLASS 5 VATMAL 11701 SHAPNG TYPICAL SECTION LADCALJX AVENUE STA 10+DO TO 13+00 NO SCALE VAs ES VAPAFS VAJEs I' CLASS 2 V C LAS$ 2 AGGREGATE AGORICATZ ;2% 2% U LDI ll 2% 2K SHOULDfR St-IOULOER �7 4.-1 -1.5' TYPE IV4 CrITLIVANOUS YEAR COURSE 150159) (LVA E'l 50 �5 9) 'A r TACK COAT �,L TACK OAT 2.0- TT FE LVS GiTUVIMS NON VEAR COURE (LVL'J 6 3 5 0 3 0 3) 3' AVO, CLASS 5 VdJERIAL FOR SHAPiNG G) TYPICAL SECTION CUL—DE—SAC TO STA 10+00 NO SCALE TYPICAL SECTION LADEAUX AVENUE STA 13+00 TO 36+00 ND SCALIE CVL—DE—SAC DETAIL NO SCALE REFERENCE NOTES: (D AGGREGATE BASE SMALL BE 8' TWCK 114 PLACES WHERE NO GRAVEL WAS IN PLACE PR OR TO START OF CONSTRUC71104 OR W-)4EAE MUCK EXCAVATION IS REQ RED. PATE REYPS.'014 I Putte cm. -Ill t-1 Fh 57me'car'%-. cr ri;;,t wim ErA3 P. LYS AF,�) LVA I H. f -L.NESSES AND LPKTL,;Cg Fr;F:rmj ff r* Or 4 J rry CFTO-1 C -J !�-al I R J'FV Hakanson And erson c� a d-11 UeLf-lfl Fttfitf,_of U-'rmw u-Jkr ff-s lems TYPICAL SECTIONS 3 of "I SI -21 cl M Qill Engfri-Lwi and Lond 5urvcgofs LABEAUX AVENUE OF E _v3601 Thursion Ave., Anoka. Wnnia-itu 55305 JAR 763-427-5851) FAX 75,1-427-0520 X3 B fr_lkJLV. w I j�N'-f P, V. CiTf OF OTSEGO. V.�.NESGTA % iq w.hcu —kvc.c Q rn STREET & DRAINAGE IMPROVEMENTS Y-iLls D14 PROFOSED EXISTWO GROV.41) GROUND —F CLkSS 2 AGGREGATE V CLASS 2— AGGREGATE 2% SHOULDER 2�t 0GRISOTUINGDV N SHOULDER L)ITCH b rTCH fTCH &OTT044 A- I TIC)W LV4 EIIUV 'OUS WEAR COURSE PROPOSED GROUND (LV6 E4 50 3 5 B) —TACK COAT ',SEAR .2,D" T)Pi LV3 SITUVINIOUS NONI (LVNW35D308) COURSE TYPICAL SECTION LADEAUX AVENUE STA 13+00 TO 36+00 ND SCALIE CVL—DE—SAC DETAIL NO SCALE REFERENCE NOTES: (D AGGREGATE BASE SMALL BE 8' TWCK 114 PLACES WHERE NO GRAVEL WAS IN PLACE PR OR TO START OF CONSTRUC71104 OR W-)4EAE MUCK EXCAVATION IS REQ RED. PATE REYPS.'014 I Putte cm. -Ill t-1 Fh 57me'car'%-. cr ri;;,t wim ErA3 P. LYS AF,�) LVA I H. f -L.NESSES AND LPKTL,;Cg Fr;F:rmj ff r* Or 4 J rry CFTO-1 C -J !�-al I R J'FV Hakanson And erson c� a d-11 UeLf-lfl Fttfitf,_of U-'rmw u-Jkr ff-s lems TYPICAL SECTIONS 3 of "I SI -21 cl M Qill Engfri-Lwi and Lond 5urvcgofs LABEAUX AVENUE OF E _v3601 Thursion Ave., Anoka. Wnnia-itu 55305 JAR 763-427-5851) FAX 75,1-427-0520 X3 B fr_lkJLV. w I j�N'-f P, V. CiTf OF OTSEGO. V.�.NESGTA % iq w.hcu —kvc.c Q rn STREET & DRAINAGE IMPROVEMENTS Y-iLls D14 RESOLUTION NO. 2013-45 RESOLUTION ACCEPTING BID WHEREAS, pursuant to an advertisement for bids for the construction of City of Otsego, LaBeaux Avenue Improvements, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Total Base Bid Fehn Companies $1831048.82 Hai -drives, Inc. $217,307.16 Midwest Civil Construction, LLC $243A8.85 Northdale Construction Co., Inc. $263$230.54 AND WHEREAS, it appears that Fehn Companies of Albertville, Minnesota is the lowest responsible bidder, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO MINNESOTA: 1 . The mayor and clerk are hereby authorized and directed to enter into a contract with Fehn Companies of Albertville, Minnesota in the name of the City of Otsego for the LaBeaux Avenue Improvements, according to the plans and specifications therefore approved by the city council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the city council this 12th day of August, 2013. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tam Loff , Clerk M89ReACCEPT 8!0 -Project Cost Construction Streets Storm Sewer Subtotal Construction Other School CrGssing Land Acquisition Subtotal Other Costs Overhead and Contingency Engineering Estimate to completion Legal Estimate to completion Planning Appraisal Subtotal Overhead & Contingency Total Project Cost LaBeaux Project Summary March 11, 2013 May 13, 2013 2013 Feasibility CIP Estimate June 4, 2013 July 22, 2013 Bid Update 197j000,00 118,235.00 127,342.47 127,342.47 69.57% 36,620.00 55,706.35 55,706.35 30.43% 197,000.00 154,855.00 183,048.82 183F048.82 78.75 2,500.00 6,930.00 30,971.00 36,609.76 9g430.00 4.06% 27,607.00 7,700.00 21421.50 725.00 1,1500.00 - 30,971.00 36,609.76 39,953.50 17.19% 197,000.00 185,826.00 219,658.58 232*432-32- 17.99% Over Budget Funding Sources Special Assessments 76,000.00 4,433.75 x 16 70,940.00 38-181 4,371.68 x 16 69j946.88 31-941 69j946.88 30-09yo City Share 121,000.00 114,886.00 61.825/o 149,71130 68.16% 1621485.44 69.91% 0 ts e go'. Cre a k 36jW0i0 0- . 58;579162.67 67,8659.20 29. Street Fund -to be.dete'rnned 91,132.08 .41949%' -'. 94,620.2 -4 40.71% Updated July 30, 2013 Administration 8/2/2013 11:47 AM