ORIGINATING DFPART E 1T: I EQUE T R: MEETING DATE:
Public Works fon Wagner, nor, City Engineer August 12th0 2013
P ESENTE (s): F EViEWED BY: ITEM :
Ron Wagner, City Engineer Lori Johnson, CityAdministrator 6.3
AGENDA ITEM DETAILS
RECOMMENDATION:
Staff recommends accepting proposal and awarding ar contract to SBP Associates, Inc. of St. Louis P ry ,
MIS in the amount of $4,750 for preparing a noise impact and mitigation study consistent with all FHWA
and II DOT policies for the 70"' Street Improvement Project.
ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED?
Yes I Na
BA # oUDMU TIFI ATION:
A noise sturdy was aIr ady conducted and a report was prepared by SBP Associates for the area where a rev
section ofof701h Street is proposed (this section only had a single receptor at 7009 McAllister Avenue), Thi:
initial noise study was conducted comments received front the MnDOT State Aid reviewer of the required
environmental documents (Project Memo) submitted by Hakanson Anderson. Haf ancon Anderson
resubmitted the Project Memo with the initial noise study to MOOT which was then passed to the FH IIA f
review. The FHWA determined that the noise impacts must be evaluated for all receptors along the entire
project length. A request for proposal to perform a noise studyforthe proposed 70th Street and CSAH 37 w
send to SBP Associates.
A proposal was received August 7th, 2013.
Only SBP Associates was sent a request for proposal as they performed the initial noise study and would
have the background of the project to complete the study in a cost effective and timely manner with
minimal changes to the cost. Therefore we recommend awarding the project to SBP Associates, Inc. in the
amount of $4,750.
SUPPORTING DOCUMENTS: x ATTACHED ❑ NONE
List: Proposal for 7 t� Street Noise Study
POSSIBLE MOTION
.............n._..._...._._...._..._._.._._......._.._......ry...._.._._...._._.... _.._�._._._..._......... w- n- - -v..
Please word motion as you would like it to appear In the minutes.
Motion for t it of Otsego t award contract for Additinal t�' Street Noise Study(COP 13-01) in
the amount of $4,7'50 to SBP Associates, Inc.
BUDGET INFORMATION
FUNDING: BUDGETED: xYES
MSAS Funds
Wright County CSAH Funds ii NO
Region 7W Federal Funds
ACTION! TAKE
❑ APPROVED AS REQUESTED ❑ DENIED u TABLED n OTHER (Last changes)
COMMENTS:
SSP AssocmTms, INC.
PO Box I 587
St. Louis Park, NL IN.55416
Yhone; 952- 120--1600
August 7, 2013
Mr. Roger Wagner, Otsego City Engineer
H l arson Anderson
3601 Thurston Avenue
Anoka, MN 55303
Dear Mr. Wagner:
Re: Proposal for 70th Street Eloise Study
Thank you for contacting SBP Associates, In .(SBP) for assistance with a noise impact and
mitigation sturdy for the proposed 70th Street project in Otsego, Minnesota. This letter presents
our proposal to conduct the required study.
A. Project Understanding
SBP has previously completed a noise impact study for aM portion of the proposed 70th Street
extension project. FHWA has reviewed the initial study and determined that additional receptor
locations should be included in the noise study. The receptor locations have been defined in the
request for proposals. This proposal is for the evaluation of noise impacts and mitigation
assessment for these additional receptor locations consistent with FHWA and MMD T policies.
The policies require determination of existing, and design year build and no -build noise levels at
the receptor location. if noise thresholds are exceeded, a noise barrier cost -reasonableness
study must be conducted.
B. Proposed Tasks
Existing Noise Levels — Modeling
Monitoring has been completed for the western portion of the project. This data will be used t
define existing noise levels far the western part of the project. For the eastern portion of the
project, SBP will use the M I NNO ISE model and current traffic volumes for 70tb Street and
Oakwood Avenue to define existing noise levels. This proposal assumes no additional monitoring
will be required.
No -Build Noise Levels — Noise Monitoring d Mod lin
Monit ring has been coinpleted for the western portion of the project. Tris data will be used to define
no -build levels for the western part of the project. For the eastern portion of the project, SBP will use
the M1 NNOISE mode I and design -year traffic vo lumes for 7 Dth Street and Oakwood Avenue to define no -
build noise levels.
Design Year Noise Level �--. Noise Modeling
SBP will use the MINNOISE transportation noise mod ll to determine design -gear noise impacts at the
receptor location. Mode Iin will be conducted consistent with FHWA and MnDOT requirements.
-Noise Mitigation Cost -Reasonableness Studer
Should the noise analysis show noise impacts at the receptor locations, SBP will conduct a noise barrier
cost reasonableness analysis consistent with M nDOT and F HWA req u irme nts.
I
SBP will prepare a report that includes the results of the noise monitoring, modeling, and noise barrier
cost -reasonableness analysis. The report format and content gill be consistent with FHWA and MnD T
requirements.
C. Proposed Costs
SBP proposes to conduct the above tasks on a fined price of $4,750. If no noise mitigation cost
reasonableness analysis is required (not likely), the tasks will be conducted for a fixed price of $8,250,
Additional tasks will be conducted at a labor rate o $120 per hour.
The proposed costs assu me a ny necessary traffic and mapping information will be provided by the City
of Otsego.
The project will be completed ted within fire weeks of receiving the required mapping and traffic
information.
Thank you forontarcting SBP for assistance with this project. Please feel free to contact me a 952-920-
1500 with any questions regarding this proposal.