Loading...
08-14-13 PRITEM 4.1 TO: Parks and Recreation Commission FROM: Ross Demant, Parks and Recreation Manager DATE: August 12, 2013 RE: Prairie Park Master Plan At the June 2013 Parks and Recreation Commission meeting, the Commission began the process of revising the Prairie Park Master Plan. At that meeting, future field locations, irrigation, utilities, and park amenities were discussed. Commissioners directed City staff to revise the Prairie Park Master Plan map and get quotes for running potable water and electric out to the softball/ baseball complex. Once a master plan is in place, staff will formalize a plan that addresses the future irrigation needs of the park. This plan will take into account the current irrigation format and how to best integrate it with future irrigation needs. Staff will be presenting the quotes for the water and electric at the August Parks and Recreation Commission meeting. Exhibits: A. Draft Prairie Park Master Plan Map Conclusion The Parks and Recreation Commission will review the information outlined in this memo at their meeting on August 14, 2013. Once reviewed and revisions made, staff is requesting that the Commission recommend that the City Council formally adopt the Prairie Park Master Plan. PRAIRIE PARK CONCEPT PLAN BY THE PLANNING COMPANY REVISION: AUGUST 2013 Otsego MINNESOTA flaakanson nderson / I / NEW TRAIL / J CONNECTION / I / I APPROXIMATE FLOOD PLAIN LINES CONC SIONS/RESTROOM_ LOCATI OPTION 3 1� I 150 0 150 300 SCALE IN FEET PRAIRIE PARK CONCEPT PLAN BY THE PLANNING COMPANY REVISION: AUGUST 2013 10, IN LINE N I �------- -- — NEW TRAIL SEGMEcNTS WHNN I'LLLL canis �,I EXISTING In 20'X40' -SHELTER CULVERT DITCH OR E TO J DRAINAGE RD CREEK I NEW FENCE AROUND PUBLIC i 1 WORKS RE I � � I �11 F II e ones elmuw Mal. € `•------- Ot§ TY OF ego _ I I NEW TRAIL Y I EXISTING DRIVE A MINNESOTA � i i I I I I i I I i I I I I EXCEPTION 0 NEW FENCE BETWEEN TREE LINES PROPOSE 20'X35' W_AR_M1NG—HOUSE I �r I .. ----- 2 NEW a PICNIC TABLES I W/SHADES NEXT TO SPLASH PAD Cb SIONS/RESTROOM BLDG LOCATI N OPTION 2 --------------- I 1 I 1 PRACTICE I AREA / DD I ' I ; I I I I ' I I '• I I I akanson Anderson �— EXISTING YOUTH 10 YRS AND 7 ' < SLEDDING HILL UNDER SOC ER FI DS I� o PROPOSED YOUTH PROPOSED 20'X40 (8 YRS NDER) SOC FIELD •� I i .. ----- 2 NEW a PICNIC TABLES I W/SHADES NEXT TO SPLASH PAD Cb SIONS/RESTROOM BLDG LOCATI N OPTION 2 --------------- I 1 I 1 PRACTICE I AREA / DD I ' I ; I I I I ' I I '• I I I akanson Anderson ITEM 4_4 TO: Parks and Recreation Commission FROM: Ross Demant, Parks and Recreation Manager DATE: August 12, 2013 RE: CIP Review for School Knoll Play Structure At the July 2013 Parks and Recreation Commission meeting during the CIP review the commission reviewed the replacement for the pre -k playground equipment replacement which is set to be replaced in 2014. The commission reviewed different options for the replacement and directed staff to bring more options with costs that included removal and installation to the August meeting. Staff will be presenting these costs at the Commission August 14 Commission meeting. Exhibits: A. Pictures of Different Playground Equipment Conclusion The Parks and Recreation Commission will review the information outlined in this memo at their meeting on August 15, 2013. Once reviewed and revisions made, staff is requesting that the Commission recommend that the City Council adopt the replacement of the School Knoll playground structure as part of the 2014 Capital Improvement Plan. Page 1 of 1 http://www.gametime.com/images/uploads/products/20007-slider l .jpg 8/12/2013 Page 1 of 1 Primary Tempo Natural http://www.gametime.comlimagesluploads/productsIKidTime-Color-Options-slider jpg 8/12/2013 THIS DRAWING CANNOTCBE ALTERED IN ANY WAY. IF CHANGES ARE REQUIRED PLEASE CONTACT YOUR GAMETIME REPRESENTATIVE 1-800-235-2440. ZIP SLIDE TOAD STOOL 10, LIMBER 7- ID,7D - ENTRY D ARCHWAY COUNTING LAUNCH PANEL POINT DECORATIVE BARRIER TODDLER SEVEN 20007 LITTLE FOOT SLIDE GIZMO PANEL WITH CURVED CLICK WHEEL GIZMO ZIP SLIDE ECHO CHAMBER GIZMO CLIMBER FLAT MIRROR GIZMO EXPLORATI A� ,..---4,TUNNEL THIS DRAWING CANNOTCBE ALTERED IN ANY WAY. IF CHANGES ARE REQUIRED PLEASE CONTACT YOUR GAMETIME REPRESENTATIVE 1-800-235-2440. ZIP SLIDE TOAD STOOL 10, LIMBER 7- ID,7D - ENTRY D ARCHWAY COUNTING LAUNCH PANEL POINT DECORATIVE BARRIER TODDLER SEVEN 20007 LITTLE FOOT SLIDE � o D TOAD STOOL D CLIMBER • GOLDFISH STEP CRAWLER THIS DRAWING CANNOTCBE ALTERED IN ANY WAY. IF CHANGES ARE REQUIRED PLEASE CONTACT YOUR GAMETIME REPRESENTATIVE 1-800-235-2440. ZIP SLIDE TOAD STOOL 10, LIMBER 7- ID,7D - ENTRY D ARCHWAY COUNTING LAUNCH PANEL POINT DECORATIVE BARRIER TODDLER SEVEN 20007 LITTLE FOOT SLIDE Page 1 of 1 http://www.gametime.com/images/uploads/products/20010.jpg 8/12/2013 CURVED ZIP SLIDE GOLDFISH STEP CRAWLER STEERING . . BUBBLE WHEEL PANEL BUBBLE PANEL DECORATIV BARRIER i THIS DRAWING CANNOT BE ALTERED IN ANY WAY. IF CHANGES ARE REQUIRED PLEASE CONTACT YOUR GAMETIME REPRESENTATIVE @ 1-800-235-2440 TODDLER NINE 20010 2 D DECORATIVE 1'4 BARRIER D SHAPES PANEL LAUNCH POINT WAVE CLIMBER � 1. ;' • ,"A. - -