DEPARTMENT INFORMATION
Request for
City Council Action
ORIGINATING DEPARTMENT
REQUESTOR:
MEETING DATE:
Public Works
City Engineer Wagner
January 8, 2018
PRESENTER(s)
REVIEWED BY:
ITEM #:
City Engineer Wagner
City Administrator/ Finance Director Flaherty
6.1
AGENDA ITEM DETAILS
RECOMMENDATION:
Staff recommends approval of quote from E. H. Renner & Sons, Inc in the amount of $27,849.25 for
supplying and installing a new motor and pump in Well #7.
ARE YOU SEEKING APPROVAL OF A CONTRACT?
IS A PUBLIC HEARING REQUIRED?
Yes
No
BACKGROUND/J USTI FICATION:
Staff has obtained two quotes for a new pump and motor to be installed in Well #7 capable of supplying
1100 gpm to Water Tower #2 (west side). The two quotes are as follows
EH Renner Thein Well
Alternate 1 (Franklin/Gould) $27,849.25 $28,585.00
Alternate 2 (contractor submittal) $25,409.25 $25,135.00
Although the quotes for the Alternate #2 proposals were a bit less expensive, Kurt and I reviewed the
pump curves for those pump and motor combos and determined they were steeper and thus less desirable
than the Franklin/Gould combo. The City has several Franklin motors in wells already and they have shown
to be quite reliable. The pump curve is more flat allowing for more flexibility if needed (i.e. more gpm or
more total dynamic head is encountered).
Therefore, we recommend the E.H. Renner & Sons, Inc. quote of $27,849.25 for the 100 hp Franklin motor
and Gould pump combo.
Attached is the preliminary project cost breakdown of the overall 2017 West Side Water Project. With this
quote we are expecting the project to come in considerably below the CIP budget. The only portion of the
project remaining is the interior modifications to Pumphouse #4.
SUPPORTING DOCUMENTS ATTACHED:
• Quote — Thein Well
• Quote — E.H. Renner & Sons, Inc.
• Preliminary Project Cost (12/18/17)
POSSIBLE MOTION
PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES:
Motion to recommend approval of quote from E. H. Renner & Sons, Inc. in the amount of $27,849.25 for
supplying and installing a new motor and pump in Well V.
BUDGET INFORMATION
FUNDING: BUDGETED:
Fund #601— Water Utility Yes
QUOTE PROPOSAL
CITY OF OTSEGO
WELL NO. 07 REHAB
Quoter agrees to perform all the work described to the Contract Documents for the following unit prices and/or lump sums, which include sales tax
and other applicable taxes and fees.
R.en n„nfe
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNITPRICE
EXTENSION
1
I Labor to instal re aired Pump and motor
1
LUMP SUM
000
?�� 000 , UO
2
NI le 8" x 12" TBE With B" cou lin
PU
(Q�
*EACH
.r
+ J 5
GD
3
8" Dro Pi a with R&D couplings Sch 40 - In stock'rf required)105
LF
s
4
Submersiblle Cable 00/3 rd acketed
Ward
115
LF
/
3
/.
UU
5
Mlsc. Splice Kit 2" Tae Pie Doe
1
LUMP SUM
•s
23-0,00
8
Pine PVC 1" Sch 120 Surali n
240
LF
2
y80• 00
Total Boise Quote
Rid An---#. 4
ITEM
ESTIMATED
ITEM
NO. ITEM DESCRIPTION
QUANTITY . UNIT
UNIT PRICE
NO, ITEM DESCRIPTION
EXTENSION
Geuld's 1100 282 fdh SSB" dlcha e%heck to line
1 EACH
� G,
0o
/
PU
(Q�
E2Franldln 100 HP 460 VOIU80/3 Motor e" dia_ _
1 EACH
i_ 3 J _ t7_
C C 00
r E7C7
Total Alternate No.1
Bid Alternate 2
ITEM
ESTIMATED
NO, ITEM DESCRIPTION
QUANTITY UNIT
UNIT PRICE
EXTENSION
1 Suggested Alt Pum 8" discharge, 1100+tdh
0-262
1 EACH
J �%o
-5-0
2 Suggested Alt Motor 100 HP 460V/60/3 Phase Motor 8" dia
1 EACH
C C 00
�0
Total Alternate No.1
TOTAL QUOTE SUMMARY
Bass Quote
Base Quote +Altnernate Bid No. I
Base Quote + Alternate Bid No.2
v '- 6 (IAIIGlV,�,S ( I �OJ' 0c)
8:\MunicipallAOTSEGO\533\SPECIFICATION\OT533 Quote Proposal
1PLI3EI LL
r..
QUOTE PROPOSAL
CITY OF OTSEGO
WELL NO. 07 REHAB
Quoter agrees to perform all the work described In the Contract Documents for the following unit prices and/or lump sums, which Include sales tax
and other applicable taxes and fees.
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
EXTENSION
1
Labor to install re aired pump and motor
1
LUMP SUM
$2100.00
$2100.00
2
Nipple 8" x 12" TBE With 8" coupling
1
EACH
$320.00
$320.00
3
V'Drov Pipe with R&D couplings Sch 40 - In stock if required)
105
LF
$39.30
$4,128.50
4
Submersibile Cable 00/3 Ward iacketed
115
LF
$14.65
$1,707.75
5
Misc. Splice Kit 2" Tae Pipe Doe
1 ILUMPSUM
$300.00
$300.00
6
Pipe PVC 1" Sch 120 Suraii n
240 1
LF
$2.00
$480.00
Total Base Quote
$9,034.25
31d Alternate 1
ITEM ESTIMATED
NO, ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION
1 Gould's 1100 qpm 262 tdh SS 8" dlchar a/check In rine 1 EACH $5,900.00 $5,900.00
2 Franklin 100 HP 460 VoIV6013 Motor 8" We 1 EACH V2,915.00 $12,915.00
Total Alternate No.1 $18,815.00
31d Alternate 2
ITEM ESTIMATED
NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION
1 Su4qested Alt Pum 8" discharge, 1100 gpm CM 262 tdh 1 EACH $5,400.00 $5,400.00
2 Suagested Alt Motor 100 HP 46OW6013 Phase Motor 8" dia 1 EACH $10,975.00 $10,975.00
Total Alternate No.1
TOTAL QUOTE SUMMARY
Base Quote
Base Quote + Altnernate Bid No, 1
Base Quote + Alternate Bid No.2
$16,376.00
$9.034.25
$27,849.25
$25,409.25
Quote Form
00410-4
Project Cost -12/18/17
Well #7 Rehab
Test Pumping $6,660
Hakanson Eng to date $11,080
Hakanson Eng est to complete $5;000
Electrical Eng $11,400
New Well Pump and Motor w/ install $00,000.
Pumphouse Modifications
Exterior Modifications $12,000
Interior Modifications $50,000
Kadler Ave. Watermain Extension
Construction - Latour
$1,008,566.48
Hakanson Eng and Inspection
$77,845.08
Testing
$2,542
Kadler Ave Street Repair - Omann
$49,390.59
Asbuilt Drawings and GIS updates
$21000
Estimated Total
$1,266,484
CIP Budget - 601 -Water Utility
$1,525,000
Amount Estimated under budget
$258,516