ITEM 6.1 Well #7do OF Otsego MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner January 8, 2018 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/ Finance Director Flaherty 6.1 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of quote from E. H. Renner & Sons, Inc in the amount of $27,849.25 for supplying and installing a new motor and pump in Well #7. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/J USTI FICATION: Staff has obtained two quotes for a new pump and motor to be installed in Well #7 capable of supplying 1100 gpm to Water Tower #2 (west side). The two quotes are as follows EH Renner Thein Well Alternate 1 (Franklin/Gould) $27,849.25 $28,585.00 Alternate 2 (contractor submittal) $25,409.25 $25,135.00 Although the quotes for the Alternate #2 proposals were a bit less expensive, Kurt and I reviewed the pump curves for those pump and motor combos and determined they were steeper and thus less desirable than the Franklin/Gould combo. The City has several Franklin motors in wells already and they have shown to be quite reliable. The pump curve is more flat allowing for more flexibility if needed (i.e. more gpm or more total dynamic head is encountered). Therefore, we recommend the E.H. Renner & Sons, Inc. quote of $27,849.25 for the 100 hp Franklin motor and Gould pump combo. Attached is the preliminary project cost breakdown of the overall 2017 West Side Water Project. With this quote we are expecting the project to come in considerably below the CIP budget. The only portion of the project remaining is the interior modifications to Pumphouse #4. SUPPORTING DOCUMENTS ATTACHED: • Quote — Thein Well • Quote — E.H. Renner & Sons, Inc. • Preliminary Project Cost (12/18/17) POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to recommend approval of quote from E. H. Renner & Sons, Inc. in the amount of $27,849.25 for supplying and installing a new motor and pump in Well V. BUDGET INFORMATION FUNDING: BUDGETED: Fund #601— Water Utility Yes QUOTE PROPOSAL CITY OF OTSEGO WELL NO. 07 REHAB Quoter agrees to perform all the work described to the Contract Documents for the following unit prices and/or lump sums, which include sales tax and other applicable taxes and fees. R.en n„nfe ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNITPRICE EXTENSION 1 I Labor to instal re aired Pump and motor 1 LUMP SUM 000 ?�� 000 , UO 2 NI le 8" x 12" TBE With B" cou lin PU (Q� *EACH .r + J 5 GD 3 8" Dro Pi a with R&D couplings Sch 40 - In stock'rf required)105 LF s 4 Submersiblle Cable 00/3 rd acketed Ward 115 LF / 3 /. UU 5 Mlsc. Splice Kit 2" Tae Pie Doe 1 LUMP SUM •s 23-0,00 8 Pine PVC 1" Sch 120 Surali n 240 LF 2 y80• 00 Total Boise Quote Rid An---#. 4 ITEM ESTIMATED ITEM NO. ITEM DESCRIPTION QUANTITY . UNIT UNIT PRICE NO, ITEM DESCRIPTION EXTENSION Geuld's 1100 282 fdh SSB" dlcha e%heck to line 1 EACH � G, 0o / PU (Q� E2Franldln 100 HP 460 VOIU80/3 Motor e" dia_ _ 1 EACH i_ 3 J _ t7_ C C 00 r E7C7 Total Alternate No.1 Bid Alternate 2 ITEM ESTIMATED NO, ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION 1 Suggested Alt Pum 8" discharge, 1100+tdh 0-262 1 EACH J �%o -5-0 2 Suggested Alt Motor 100 HP 460V/60/3 Phase Motor 8" dia 1 EACH C C 00 �0 Total Alternate No.1 TOTAL QUOTE SUMMARY Bass Quote Base Quote +Altnernate Bid No. I Base Quote + Alternate Bid No.2 v '- 6 (IAIIGlV,�,S ( I �OJ' 0c) 8:\MunicipallAOTSEGO\533\SPECIFICATION\OT533 Quote Proposal 1PLI3EI LL r.. QUOTE PROPOSAL CITY OF OTSEGO WELL NO. 07 REHAB Quoter agrees to perform all the work described In the Contract Documents for the following unit prices and/or lump sums, which Include sales tax and other applicable taxes and fees. ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE EXTENSION 1 Labor to install re aired pump and motor 1 LUMP SUM $2100.00 $2100.00 2 Nipple 8" x 12" TBE With 8" coupling 1 EACH $320.00 $320.00 3 V'Drov Pipe with R&D couplings Sch 40 - In stock if required) 105 LF $39.30 $4,128.50 4 Submersibile Cable 00/3 Ward iacketed 115 LF $14.65 $1,707.75 5 Misc. Splice Kit 2" Tae Pipe Doe 1 ILUMPSUM $300.00 $300.00 6 Pipe PVC 1" Sch 120 Suraii n 240 1 LF $2.00 $480.00 Total Base Quote $9,034.25 31d Alternate 1 ITEM ESTIMATED NO, ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION 1 Gould's 1100 qpm 262 tdh SS 8" dlchar a/check In rine 1 EACH $5,900.00 $5,900.00 2 Franklin 100 HP 460 VoIV6013 Motor 8" We 1 EACH V2,915.00 $12,915.00 Total Alternate No.1 $18,815.00 31d Alternate 2 ITEM ESTIMATED NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION 1 Su4qested Alt Pum 8" discharge, 1100 gpm CM 262 tdh 1 EACH $5,400.00 $5,400.00 2 Suagested Alt Motor 100 HP 46OW6013 Phase Motor 8" dia 1 EACH $10,975.00 $10,975.00 Total Alternate No.1 TOTAL QUOTE SUMMARY Base Quote Base Quote + Altnernate Bid No, 1 Base Quote + Alternate Bid No.2 $16,376.00 $9.034.25 $27,849.25 $25,409.25 Quote Form 00410-4 Project Cost -12/18/17 Well #7 Rehab Test Pumping $6,660 Hakanson Eng to date $11,080 Hakanson Eng est to complete $5;000 Electrical Eng $11,400 New Well Pump and Motor w/ install $00,000. Pumphouse Modifications Exterior Modifications $12,000 Interior Modifications $50,000 Kadler Ave. Watermain Extension Construction - Latour $1,008,566.48 Hakanson Eng and Inspection $77,845.08 Testing $2,542 Kadler Ave Street Repair - Omann $49,390.59 Asbuilt Drawings and GIS updates $21000 Estimated Total $1,266,484 CIP Budget - 601 -Water Utility $1,525,000 Amount Estimated under budget $258,516 rd�s