Loading...
ITEM 4.1 Mississippi Shores/Antelope Park0tsTe Foo MINNESOTA C7 DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner March 12, 2018 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 4.1 AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends approval of Resolution 2018-26 Accepting Plans and Specifications for the 2018 Street Renewal Project (Improvement of Streets within Mississippi Shores and a portion of Antelope Park) and Authorize Advertisement for Bids ARE YOU SEEKING APPROVAL OF A CONTRACT? [IS A PUBLIC HEARING REQUIRED? No Yes —Was Held February 12, 2018 BACKGROUND/J USTI FICATION: The Capital Improvement Plan has the streets within Mississippi Shores scheduled for 2018. Mississippi Shores streets were constructed between 1973 and 1980 with 2" of asphalt over 4" of class 5. In 1996, a 1.5" overlay was placed. Currently, the streets have a Pavement Condition Index (PCI) of 39 out of 100. The streets have been in preventative maintenance mode since 2004 and have been receiving asphalt patching as necessary. The City Council ordered Hakanson Anderson to prepare plans and specifications for the improvement on February 26th, 2018. The total project costs are currently estimated at $1,461,470. The feasibility report estimated the project cost at $1,541,760 and the CIP estimated project cost was $1,555,733. The project costs are to be paid Y2 from the City's Street Funds and the other Y2from assessments to benefitting properties. SUPPORTING DOCUMENTS ATTACHED: • Engineer's Cost Estimate • Plans and Specifications • Resolution 2018-26 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to Approve Resolution 2018-26 accepting the plans and specifications for the 2018 Street Renewal Project and Authorize Advertisement for Bids. BUDGET INFORMATION FUNDING: FBUDGETED: Fund #201— Pavement Management I Yes City of Otsego 2018 Street Renewal Project MISSISSIPPI SHORES ENGINEER'S COST ESTIMATE Rid Schwdula "A" - STRFFTS Item No. Spec, Ref Description Estimated Quantity Unit Unit Price Total Estimated Extension 1 2021.501 MOBILIZATION 1 LS $58,925.00 $ 58,925.00 2 2104.501 REMOVE METAL CULVERT 1514 LF $5.50 $ 8,327.00 3 2104.505 REMOVE BITUMINOUS PAVEMENT DRIVEWAYS 333 SY $5.00 $ 1,665.00 4 2104.513 SAWING BIT PAVEMENT FULL DEPTH 4186 LF $2.50 $ 10 465.00 5 1 2112.501 SUBGRADE PREPARATION 54 RDST $150.00 $ 8,100.00 6 2211.501 CL 5 AGGREGATE DRIVEWAYS 74 TON $20.00 $ 1,480.00 7 2211.506 SALVAGE AGGREGATE RECLAIM TO STOCKPILE 9297 CY $4.00 $ 37 188.00 8 2215.501 FULL DEPTH RECLAMATION P 79868 SY $1.00 $ 79 868.00 9 2232.501 MILL BITUMINOUS SURFACE 1.5" 196 SY $5.00 $ 980.00 10 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 4330 GAL $3.00 $ 12 990.00 11 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) 7306 TON $60.00 $ 438 360.00 12 2360.502 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,C) 9741 TON $55.00 $ 535 755.00 13 2540.602 RELOCATE MAIL BOX SUPPORT 25 EA $150.00 $ 3,750.00 14 2563.601 TRAFFIC CONTROL 1 LS $3,000.00 $ 3,000.00 15 2573.530 CULVERT INLET PROTECTION 26 EA $200.00 $ 520000 16 2574.525 PULVERIZED TOPSOIL BORROW LV 556 CY $40.00 $ 22 240.00 17 2575.555 TURF ESTABLISHMENT (Hydro Seed 3.8 ACRE $2,000.00 $ 7,600.00 18 2582.502 4" DOUBLE SOLID LINE YELLOW - PAINT 6481 LF $0.10 $ 648.10 19 2582.502 24" STOP LINE WHITE - PAINT 221 LF $4.00 $ 884.00 Total - Bid Schedule "A" Rid Schedule "R" - STORM SEWER �l,Z3b,b4"I."IU Item No. Spec. Ref Description Estimated Quantity Unit Unit Price Total Estimated Extension 20 2501.511 12" RC PIPE CULVERT CL V 49 LF $25.00 $ 1,225.00 21 2501.511 15" RC PIPE CULVERT CL V 198 LF $33.00 $ 6,534.00 22 2501.511 18" RC PIPE CULVERT CL V 272 LF $37.00 $ 10 064.00 23 2501.511 21" RC PIPE CULVERT CL III 82 LF $43.50 $ 3,567.00 24 1 2501.511 24" RC PIPE CULVERT CL III 593 LF $46.00 $ 27 278.00 25 2501.515 12" RC PIPE APRON 2 EA $500.00 $ 1,000.00 26 2501.515 15" RC PIPE APRON 8 EA $600.00 $ 4,800.00 27 2501.515 18" RC PIPE APRON 14 EA $750.00 $ 10,500.00 28 2501.515 21" RC PIPE APRON 4 EA $775.00 $ 3,100.00 29 2501.515 24" RC PIPE APRON 1 24 EA $800.00 $ 19,200.00 30 2501.602 ITRASH GUARD FOR 24" PIPE APRON 1 24 EA $200.00 $ 4,80000 Total - Bid Schedule "B" .-.YL,uoo.uu Bid Schedule "A" - STREETS $1,236,541 Bid Schedule "B" - STORM SEWER $92,068 10% Administration, Legal, & Engineering $132,861 TOTAL ESTIMATED PROJECT COST $1,461,470 S:\MunicipaMOTSEGO\392\20/8\MISSISSIPPI SHORES\B-PROJECT DEVELOPMEM\3-DESIGMOT392-2018 EngEst Page 1 of 2 RESOLUTION NO. 2018-26 RESOLUTION ACCEPTING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE IMPROVEMENT OF STREETS WITHIN MISSISSIPPI SHORES ADDITIONS AND A PORTION OF ANTELOPE PARK SUBDIVISION WHEREAS, pursuant to a request from the council, Hakanson Anderson has prepared plans and specifications for the improvements of streets within Mississippi Shores subdivisions and a portion of Antelope Park subdivision, and has presented such plans and specifications to the council for approval; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: 1. Such plans and specifications, dated March 12, 2018, a copy of which is attached hereto and made a part hereof, are hereby approved 2. The City Clerk shall prepare and cause to be inserted online in Quest CDN and within the City of Otsego's website, an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be viewable for (3) three week(s), shall specify the work to be done, shall state that bids will be opened and considered by the council at City Hall located at, 13400 90th Street NE, Otsego, MN 55330. No bids will be considered unless sealed and filed with the clerk and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the clerk for 5.0 percent of the amount of each bid Adopted by the council this 12th day of March, 2018. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk