Loading...
ITEM 8.1 Audio/Visual system in Council Chambers0tSTe 7 F o MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Administration City Clerk Loff May 14, 2018 PRESENTER(s) REVIEWED BY: ITEM #:' Administration City Administrator/Finance Director Flaherty Parks & Recreation Director Demant 8.1 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: X Is a strong organization that is committed to leading the community through innovative communication. No Has proactively expanded infrastructure to responsibly provide core services. BACKGROUND/J USTI FICATION: Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. considered obsolete, therefore staff is recommending replacement. The system is used on a regular basis Is a social community with diverse housing, service options, and employment opportunities. function and appearance. The City had budgeted $25,000 in the capital improvement plan for 2018 not Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Approve quote from Tierney Brothers for replacement of the Audio Visual system in the Council Chambers. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FICATION: The Audio Visual (AV) system in the Council Chambers has exceeded its expected useful life and is considered obsolete, therefore staff is recommending replacement. The system is used on a regular basis by the City Council and the Advisory Commissions and it's important to have a reliable working system for function and appearance. The City had budgeted $25,000 in the capital improvement plan for 2018 not knowing the estimated amount. City staff met with the City of Albertville to review their AV system updates that were completed by Tierney Brothers (state contract) which is the same company that has quoted for our system updates. After that City staff worked with Tierney Sales Representative and System Engineer to come up with a scope of service that will meet our needs. There are a few different options as outlined in the quote. City staff recommends the quote options as follows: Price Quote B- Two 80" displays on carts $13,407.60 Quote D- Base quote and replacing existing mics with wireless mics $71,541.86 Total $84,949.46 Along with the AV system updates, there are some necessary modifications to the dais structure. The work will include modifications to account for: network cables, power cables, electrical outlets, and for some appearance updates. City staff has worked with Kinghorn Construction who has provided estimate in the amount of $11,523.60. Kinghorn has stated that this should be pretty close to what the finished project would cost; it may need to be adjusted once the technology piece (monitors & microphones) is finalized. The project and preliminary quotes were reviewed by the Administrative Subcommittee and received positive feedback with a recommendation for full City Council consideration and approval. SUPPORTING DOCUMENTS ATTACHED: • Quote - Tierney Brothers, Inc. • Quote — Kinghorn Construction POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Recommendation: Approve quote package B & D from Tierney Brothers for replacement of the Audio Visual system in the Council Chambers in the amount of $84.949.46 and approve quote from Kinghorn Construction for dais modifications in the amount of $11,523.60. Alternative: Approve quote package (A & B) or (A & C) or (C & D) from Tierney Brothers for replacement of the Audio Visual system in the Council Chambers and approve quote from Kinghorn Construction for dais modifications in the amount of $11,523.60. BUDGET INFORMATION FUNDING: 1 BUDGETED: 414-Capitial Improvement Revolving CIP Project #IT -2018-02 $25,000 ■ Tuesday, April 24, 2018 Ross Demant City of Otsego Proposal for Audio -Visual Service RE: Adding Monitors to Dais Opportunity Number: 17321 R2 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 www.tierneybrothers.com 612.331.5500®800.933.73370 Fax - 612.331.3424 Scope of Integration Services Summary of Work to be completed by Tierney Brothers, Inc. at 8899 Nashua Avenue NE Otsego, MN 55330, (Please initial if address is correct or provide correct address, I Quote A - Video Conferencing Cart System Display System TBI will provide and assemble (1) AVFI Portable height adjustable lectern. TBI will provide and install (11) 24" Commercial grade Dell monitors at the dais to provide local viewing of shared content to the board members. TBI will also provide (1) 24" dell monitor to be used by meeting operator as a control panel and to be used as their desktop monitor. These 8 displays will be placed on the dais positioned at an angle that allows the board members to see over the monitors easily as well as see the content easily. TBI will be providing (2) additional wall plate connections where (2) portable monitors can be connected for the audience to also see the shared content. System Inputs Audio and video content will be distributed throughout the space using Crestron's NVX Platform. The available sources will be as follows: • TBI will provide (1) new Blu-ray player at either the Dais OR inside the rack • TBI will provide (3) laptop connections at the Dais via HDMI cables • TBI will provide (2) HDMI connections at the Lectern for guest sharing • TBI will provide Wireless content sharing via (1) WePresent WiCS-2100 • TBI can connect (1) owner furnished cable/satellite box at the rack if desired • TBI will provide (1) new Epson DC -21 document camera at the lectern • TBI will allow (1) network streaming camera's video feed to be input into the system Only one video source will be able to be displayed at a time. Video can be viewed on all displays simultaneously, Audio System TBI will provide and install new high fidelity commercial speakers throughout the audience locations (both rooms) as well as over the dais to allow for high quality audio reproduction and intelligibility. The room will be configured as a divisible space. Dividing the space will happen automatically when the curtain wall is pulled into place. TBI will be installing a new proximity sensor near the meeting point of the two curtain walls. TBI will also be configuring the speakers over the dais in a "Mix -minus" configuration where the microphones (owner furnished) will not be reproduced through the speaker that is directed at that location. This is done for improved intelligibility. The dais speakers are compact surface mount speakers will be directed toward the listening areas of the dais and supplemented by a single subwoofer. The overhead dais speakers will be powered by a QSC CX108V (owner furnished), while the (14) new Sonance ceiling speakers in the audience area will be powered by a new Crown DCi2 1 600N. TBI will provide a wireless microphone system for guest presenters. There will be (1) wireless desktop microphone at the lectern, (1) wireless bodypack to be used to roam the space, and (1) wireless handheld microphone to pass around the space as necessary. Control System TBI will control the entire system via (1) Crestron CP3N processor. Control of the system will be from 2 locations at the dais, The primary control will be from the Dell touch monitor furthest to the left, while the secondary control will be from a wireless touch panel that can be moved anywhere on the dais. The dell touch monitor will double as the monitor for the meeting operator. Each touchscreen will be capable of the same controls, which include: • Turn system on • Start/Stop Recording (utilizing Owner furnished Denon Recorder located in the rack) • Mute/unmute microphones • Select source of presentation video • Control program volume (content) • Control microphone volume • Control Blu-ray player functions (Play/Pause/FFwd/Stop/etc.) • Trigger Security camera feed to show on Dais monitors (manual control) • Auto trigger security feed to show (triggered by motion sensing on the camera or network NVR, if compatible) Network Equipment TBI will provide a network switch to connect/power necessary A/V equipment in the space. Client is responsible for providing a new "control VLAN" on the network for TBI to connect all AV equipment to, Client will have the option to open up the network firewall from the WePresent device to the guest network for the wireless presentation system if desired. TBI will assist in determining proper configuration. Equipment Rack TBI will supply and install a new Middle Atlantic rack as well as all necessary accessories to properly mount all required equipment. We will be utilizing a new rack to minimize system down time and improve efficiency on-site (cost of rack will be offset by labor efficiency). TBI will relocate the existing rack into a nearby space and client is responsible for the final removal/repurposing of any unused existing equipment. QUOTE B - Add (2) 80" portable monitors TBI will provide, install, and test (2) complete video cart systems. Each system can be used either independently or as part of the above solution. When operating in stand-alone mode the display will need to be powered on and off manually, however video will automatically switch between the (2) HDMI connections provided on the cart. When utilized as part of the above system, the main system controller will be able to turn on, route video as if it were a permanently installed fixture within the system. Each of the (2) systems will include: • (1) 80" Sharp commercial LCD display • (1) Chief height adjustable cart (manual operation) (1) Crestron NVX transceiver for audio/video/control • (1) Power distribution unit • (2) HDMI connections for laptop or media devices Quote C - Add (1) Projection System TBI will provide and install (1) Epson Pro L -Series laser projector with necessary mounting hardware. TBI will provide and install (1) Da -Lite 137" diagonal motorized screen to replace the existing 4:3 format screen. TBI will provide (1) wall plate near the projector location to allow either a VGA or HDMI video source to be used to provide video to the room. Control of this space will be via the portable Crestron controller located at the Dais. This projector could be utilized during meetings if desired, but is intended for use when the room is being used for movie viewing (Audio will play over the speakers in the ceiling). Quote D - Replace Owner furnished microphones TBI will upgrade the existing dais microphones by providing (11) additional wireless microphones, the associated wireless receivers, and all necessary charging stations to maintain the system - the wireless microphones will be Shure MXW8 bases with 15" gooseneck microphones for flexible placement of microphones and the ability to easily add additional microphones at the dais if # of staff members changes (current configuration would allow up to 2 additional microphones before requiring any added microphone receivers). *** Project Notes*** TBI is not responsible for the necessary modifications to the dais (refinish the black upper surround to rid the dais of unnecessary cutouts and blemishes) Client is responsible for ensuring the rack location and dais both have dedicated 20A circuits (on the same phase of power) Client is responsible to provide the portable carts and displays (at time of install) to be rolled into the room for the audience viewing for TBI to install necessary accessories and properly test the system • TBI not responsible for additional labor/goods required to replace any existing products found to be defective during installation (owner furnished microphones and monitors) • Client will be responsible for relocation/disposal/recycle of all unused products after TBI removes them from the working system. We appreciate the opportunity to present this proposal. If you have any questions, please do not hesitate to contact us at your convenience at 612-331-5500. Our fax number is 612-331- 3424. Proposal Prepared By: Sales Representative - Missy Johnson Systems Engineer - Paul Erickson Please initial to acknowledge and authorize the Scope of Integration Services presented here. T'1'E,R'N',E"Y Quote Serving the States of: CO I IL I IN I IA I KY I MI I MN MOINDINEOHI SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St, Paul, MN 55108 Page 1 of 4 (612) 331-5500 1(800) 933-7337 1 Fax (612) 331-3424 www.tierneybrotners.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 121234 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 _ Initial If correct or revise accordingly _ Initial if correct or revise accordingly Expires`-• Contract memo 7/23/2018 350 Missy Johnson MNS-CPV 21594 A - Adding Monitors to Dais (SC) ---------- 01 - Video Equipment ---------- 1 XT1143 H.265, True 4K, dual video decode, enterprise HTML5 player with 477,43 477.43 expanded 1/0 package, PoE+ and Live TV 1 Integration Item Crestron DM-DA4-4K-C 1,552,50 1,552.50 1:4 4K HDMI to DM 8G+ & HDBaseT Splitter 3 DM-NVX-350 DigitalMediaTM 41<60 4AA HDR Network AV Encoder/Decoder 1,035.00 3,105,00 1 DM-DGE-200-C Digital Graphics Engine 200 w/PinPointTM UX & 4K DM 8G+O Input 1,840.00 1,840.00 2 DM -RMC -4K -100-C Wall Plate 41K DigitalMedia 8G+" Receiver & Room Controller 100, 402.50 805.00 -1 G -B -T Black Textured 1 DM -TX -4K -202-C 4K DigitalMedia 8G+" Transmitter 202 862.50 862.50 1 HD-MD4X2-4K-E 4x2 4K HDMI" Switcher 517.50 517.50 2 BD -J6300 Samsung BD -J6300 1 Disc(s) 3D Blu-ray Disc Player 107.30 214,60 ---------- 03 - Audio Equipment ---------- 1 Integration Item DU 21600N 1,479.72 1,479.72 Crown Two -channel, 600W @ 40 Power Amplifier with BLU link, 70V/100V 1 MX415/C 15" Shock -Mounted Gooseneck, Cardioid, includes surface mount 239.40 239.40 preamplifier 1 MXW1/O Bodypack Transmitter with Integrated Omnidirectional Microphone 438,90 438.90 and 4 -Pin Mini Connector (TA4M) (Includes one SB901 Battery) 1 MXW2/SM58=-Z10 Handheld Transmitter with SM58" Microphone (Includes one SB902 450.30 450.30 Battery) 1 MXW8=-Z10 Desktop Base Transceiver 433.20 433.20 1 Integration Item Shure MXWANI4 917.70 917.70 4 -Channel Network Interface 1 MXWAPT4=Z10 4 -Channel Access Point Transceiver -Z10 Frequency (10 MHz) 1920 1,967.81 1,967.81 — 1930 MHz *would need to order additional components separately* Quote�' Ilhi N: Page 2 of 4 121234 4/24/2018 1 MXWNCS4 4 -CH NETWORKED CHARGING STATION 1,028.85 1,028.85 The following 3 items must be ordered together in place of the former MXWS4 kit: MXWANI4 MXWAPT4 MXWNCS4 1 WL -183 Pro Omni Lavalier Mic 80.94 80.94 1 Integration Item William Sound CHG 3512 405.31 405.31 1700107 Drop-in Charger 4 Integration Item William Sound NKL 001 39.45 157.80 Neckloop 18" for earphone 1 Integration Item William Sound PPA 457 NET PRO 1,301.03 1,301.03 Personal PA Pro FM assistive listening system with one PPAT46NET transmitter and 4 PPA R37 receiver 4 Integration Item William Sound PPA R37 95.14 380.56 Personal Pa FM Receiver ---------- 06 - Control Equipment ---------- 1 CEN-GWEXER infiNET EX" & ER Wireless Gateway 258.75 258.75 1 GLS -PART -CN Cresnet- Partition Sensor 402.50 402.50 1 TST-902 8.7" Wireless Touch Screen \ 2,185.00 2,185.00 1 Integration Item Logitech MX800 169.99 169.99 Combo Wireless Keyboard/Mouse ---------- 08 - Equipment Rack/Accessories---------- 1 Integration Item CUB4 189.21 189.21 Table top cable well w/ 2 AC outlet and 2 USB 1 Integration Item VFI LEXYZ34 1,141.21 1,141.21 Electric Lift Lectern Roll -about multimedia lectern with silent lift mechanism. Surface to support monitors, laptops and room control systems. Inside adjustable shelf. One locking door. 4" heavy duty casters (2 lock). Thermowrap body. 1 IRUR1 Rack Header -Image Series1 Rack -Logo 16.22 16.22 1 CBS-ERK-25 CBS-ERK-25 Skirted Wheel Base w/Casters for 25" ERK Racks 132.87 132.87 1 Integration Item Middle Atlantic D4LK 162.55 162.55 Anodized drawer with lock, 4 space 1 Integration Item ERK-4425 584.06 584.06 Middle Atlantic 44SP/25D STANDALONE RACK 1 ERK-RR44 Rackrail, 10-32, 44 RU, ERK Series 62.26 62.26 5 HBL1 1 Space (1 3/4") 1/8" Flat Aluminum Blank Panel, Black Brushed 13.34 66.70 Finish 2 Integration Item Middle Atlantic HP 15.98 31.96 Quote #TtERN, Y E4 Page 3of4 row •�;I °''i.� 121234 4/24/2018 *This quotation is for product and services included on the Minnesota State Contract only. * Additional components not available on Contract may be needed for the system to function as designed. * Installation and non contract items provided on separate quotation. The services on this page must be purchased in conjunction with the Integration services on the Contract Release portion of this proposal. * Cabling is a combination of pre -terminated product and bulk cable requiring termination with a specific compression tool. * Manufacturer's warranties only apply to product purchased on State Contract portion of this proposal. * Tierney Brothers, Inc. will assist in any vendor communications to obtain replacements or return product as specified in the Contract. Standard rack screw, truss -head, 100 piece in a poly bag 1 LBP -1A 'T' SHAPED LACING BAR, 10 PC, PACK 25.61 25.61 1 Integration Item Middle Atlantic PDT2020C-RN 165.30 165.30 PDT series corded power strip, 20 amp, 9' cord terminated, 20 outlet 1 Integration Item Middle Atlantic U2V 4 161.45 161.45 Utility rack shelf, 2 space, 14.75" deep, vented, 4 piece 2 NAPDH11 Rack Mount Power Distribution 11 Outlet 78.20 156.40 1 Cables, Custom Package of Cables, Connectors and Hardware 3,699.83 3,699.83 Connectors and Hardware 1 Services: Design - Services: Design - State Contract (Non Construction) Engineering 3,378.00 3,378.00 State Contract and Project Management Services 52.78 Hours at $64.00/Hour 1 Services - State Contract (Non Construction) Installation Services (Non -Union, 6,304.00 6,304.00 Integration for MN Non Prevailing Wage; Normal Business Hours). Union and/or State Contract Prevailing Wage rate requirement will result in a change order to the client. 90.06 Hours at $70.00/Hour 1 Programming and Programming and Configuration Completed in the Field or In House 7,335.00 7,335.00 Configuration 63.78 Hours at $115.00/Hour Includes 90 -day Programming Warranty; allowing for modifications to be made to the initial functionality within this time frame at no charge. Appointment times determined by Tierney Brothers, Changes requested after this time will be billable at standard hourly rates. 1 EDGE-1YRPM-Ser Tierney Brothers, Inc. Premium Warranty Plan - Coverage for one 990.00 990.00 vice -TBI year with preventative maintenance. If tax has not been included on this proposal, pricing does not include Minnesota General Sales Tax under Minnesota Statues Chapter 297A Section 70 "Exemptions for Governments and Nonprofit Groups." Please inform us if this project will be used for taxable purposes. If tax has been included on this proposal, we do not have a tax exempt form on file for your account. Please provide a completed Form ST3, Certificate of Exemption if applicable. *This quotation is for product and services included on the Minnesota State Contract only. * Additional components not available on Contract may be needed for the system to function as designed. * Installation and non contract items provided on separate quotation. The services on this page must be purchased in conjunction with the Integration services on the Contract Release portion of this proposal. * Cabling is a combination of pre -terminated product and bulk cable requiring termination with a specific compression tool. * Manufacturer's warranties only apply to product purchased on State Contract portion of this proposal. * Tierney Brothers, Inc. will assist in any vendor communications to obtain replacements or return product as specified in the Contract. Page 4 of 4 121234 4/24/2018 Subtotal 46,274.92 Shipping Cost (UPS Ground) 0.00 Total $46,274.92 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal In full. Please inspect product upon delivery. All claims for defective merchandise or errors in shipping must be made within five days after receipt of goods, Clients using their own carriers will be responsible for filing their own freight claims if product is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables', such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 25%. The information contained within this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tlerney Brothers, Inc. This document is subject to the terms and conditions found here: www.tierneybrothers.com/SOTC Quote Serving the States of: CO I IL I IN I IA I KY MIIMNIMOINDINEIOH� SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 Page 1 of 2 (612) 331-5500 1(800) 933-7337 1 Fax (612) 331-3424 www.tierneybrothers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 121236 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 — Initial if correct or revise accordingly _ Initial if correct or revise accordingly Expires'-• contract Memo 7/23/2018 350 Missy Johnson Transaction Not Eligible ---------- Adding Monitors to Dais (NC)---------- Non-Contract Services - This sale is consistent with the "Contract Release Construction Language Modification" associated with the MN State Contract. 1 WICS-2100 wePresent WiCS-2100 1,047.50 1,047.50 12 Integration Item Dell P2418HT 371.00 4,452.00 24 inch 8,000,000:1 Ems VGA/HDMI/DisplayPortTouchscreen LED LCD Monitor (Black) 1 Integration Item Sonance PS-S83WT WHITE 300.00 300.00 8" Professional series surface mount woofer, 8 Ohm 14 Integration Item Sonance PS-C83RT WHITE 425.00 5,950.00 8" Professional Series 70V1100V/8 Ohm selectable in -Ceiling speaker 4 Integration Item Sonance PS-S43T BLACK 212.50 850.00 4" Professional series surface -mount speaker, 8 Ohm/70V 1 AMS -2624P 26 Port Switch With 24 Ports PoE 773.75 773.75 1 Services - Non Contract Installation Services - Construction Services by a 1,280.00 1,280.00 Integration for MN Contract Vendor (Non -Union, Non Prevailing Wage; Normal Business State Contract Hours). Union and/or Prevailing Wage rate requirement will result in a change order to the client. 16 Hours at $80.00/Hour T - Quote . R N'"Q� Page 2 of 2 121236 4/24/2018 Subtotal 14,653.25 Shipping Cost (UPS Ground) 360.00 Total $15,013.25 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal in full. Please inspect product upon delery. vAll claims for defective merchandise or errors in shipping must be made within five days after receipt of goods. Clients using their own carriers will be responsible for filing their own freight claims if product is damaged in transit, Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables', such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 25%. The information contained within this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc. This document is subject to the terms and conditions found here; www.tierneybrothers.com/SOTC t Y T [E R N' Quote Serving the States of: CO I IL I IN I [A I KY I MI I MN I MO I ND I NE I OH I SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 Page I of 2 (612) 331-5500 I (800) 933-7337 1 Fax (612) 331-3424 www,tierneybrot ers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 121248 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 _, Initial if correct or revise accordingly ^ Initial If correct or revise accordingly Expires Sales `-• Contract memo 7/23/2018 350 Missy Johnson MNS-CPV 21594 B - Adding Display Carts (SC) 2 XPAIUB X -Large Fusion Manual Height Adjustable Cart 1,202.19 2,404.38 2 Integration Item ACP -BK -15 3.77 7.54 Universal AC Power Extension, 16/3 Black 15ft. 2 CAT6-25PROBLK-E Pro AV/IT CAT6 Ethercon Heavy Duty Patch Cable - Black 25ft 27.77 55.54 E 6 MHD-MHD-3PROB MicroFlex Pro AV/IT Series High Speed HDMI Cable with ProGrip Jet 13.05 78.30 LK Black aft 2 DM-NVX-350 DigitalMediaTm 4K60 4AA HDR Network AV Encoder/Decoder 1,035.00 2,070.00 10 22-2C-PSH-BLK Black Audio and control 22 AWG 1 pair shielded plenum 0.12 1.20 2 PN-LE801 Sharp PN-LE801 - 80" Class LED TV - digital signage - 1080p (Full 3,192.32 6,384.64 HD) - full array 1 Markup Custom Miscellaneous Parts 40.00 40.00 1 Services: Design - Services: Design - State Contract (Non Construction) Engineering 434.00 434.00 State Contract and Project Management Services 6.78 Hours at $64.00/Hour 1 Services - State Contract (Non Construction) Installation Services (Non -Union, 1,124.00 1,124.00 Integration for MN Non Prevailing Wage; Normal Business Hours). Union and/or State Contract Prevailing Wage rate requirement will result in a change order to the client. 16.06 Hours at $70.00/Hour 1 Programming and Programming and Configuration Completed in the Field or In House 550.00 550.00 Configuration 4.78 Hours at $115.00/Hour Includes 90 -day Programming Warranty; allowing for modifications to be made to the initial functionality within this time frame at no charge. Appointment times determined by Tierney Brothers. Changes requested after this time will be billable at standard hourly rates. If tax has not been included on this proposal, pricing does not include Minnesota General Sales Tax under Minnesota Statues Chapter 297A Section 70 "Exemptions for Governments and Nonprofit Groups." Please inform us if this project will be used for taxable purposes. If tax has been included on this proposal, we do not have a tax exempt form on file for your account. Please provide a completed Form ST3, Certificate of Exemption if applicable. *This quotation is for product and services included on the T HE-, I I I I R. !'N Quote Page 2 of 2 Minnesota State Contract only. * Additional components not available on Contract may be needed for the system to function as designed. * Installation and non contract items provided on separate quotation. The services on this page must be purchased in conjunction with the Integration services on the Contract Release portion of this proposal. * Cabling is a combination of pre -terminated product and bulk cable requiring termination with a specific compression tool. * Manufacturer's warranties only apply to product purchased on State Contract portion of this proposal. * Tierney Brothers, Inc, will assist in any vendor communications to obtain replacements or return product as specified in the Contract. 121248 4/24/2018 Total $13,149.60 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal in full. Please Ins act product upon delivery. All claims for defective merchandise or errors in shipping must be made within five days after receipt of goods, Clients using their own carriers will be responsible for filing their own freight claims if product is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables", such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 25%. The information contained within this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc, This document is subject to the terms and conditions found here: www.tierneybrothers.com/SOTC L Serving the States of: CO I IL I IN I IA I KY I MI I MN I MO I ND I NE I OH � SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 (612) 331-5500(800) 933-7337 Fax (612) 331-3424 www.tierneybrot ers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 — Initial if correct or revise accordingly Expires- -• Contract Memo 7/23/2018 350 Missy Johnson Transaction Not Eligible B - Adding Display Carts (NC) 121251 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 Initial if correct or revise accordingly Non -Contract Services - This sale is consistent with the "Contract Release Construction Language Modification" associated with the MN State Contract. 2 Integration Item Panamax PLUGLOCK-PFP 49.00 98.00 Circuit -Breaker Protected Locking Outlet Strip 1 Services - Non Contract Installation Services - Construction Services by a 160.00 160.00 Integration for MN Contract Vendor (Non -Union, Non Prevailing Wage; Normal Business State Contract Hours). Union and/or Prevailing Wage rate requirement will result in a change order to the client. 2 Hours at $80.00/Hour Total $258.00 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal in full. Please inspect product upon delivery. All claims for defective merchandise or errors in shipping must be made within five days after receipt of goods. Clients using their own carriers will be responsible for filing their own freight claims if product is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables', such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 26%. The Information contained within this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc. This document is subject to the terms and conditions found here: www.tierneybrothers.com/SOTC Quote Serving the States of: CO ILIINIIAIKYIMIIMNIMOINDINEIOH� SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 Page 1 of 2 (612) 331-5500 I (800) 933-7337 Fax (612) 331-3424 www.tierneybrot ers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 121263 4/24/2018 ShipTo City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 _ Initial if correct or revise accordingly _ Initial if correct or revise accordingly Expires-• Contract Memo 7/23/2018 350 Missy Johnson MNS-CPV 21594 C - Adding Projection System (SC) 1 CMA640W SHIELD RING, WHITE 1 CMS -003W 3" Fixed Pipe White 1 Integration Item Chief CMS492CP2 1 VCMUW Heavy Duty Universal Projector Mount 1 RJ45-STP-L6 WHITE 1 DM-NVX-350 DigitalMediaTm 4K60 4:4:4 HDR Network AV Encoder/Decoder 1 Pro L1200 Pro L1200 Laser Projector, 7000 lumens, WUXGA 1 HD -MD -300 -C -E -W HD Scaling Auto-Switcher & Extender 300, White 1 24-4P-PL6-EN-BLK Plenum CAT6 1000ft reel 1 RJ45-STP-L6 Category 6 shielded 8P8C RJ45 Plug with 360 degree shielding 6,208.40 Package 1 Markup Custom Miscellaneous Parts 1 Services: Design - Services: Design - State Contract (Non Construction) Engineering State Contract and Project Management Services 6.78 Hours at $64.00/Hour 1 Services - State Contract (Non Construction) Installation Services (Non -Union, Integration for MN Non Prevailing Wage; Normal Business Hours). Union and/or State Contract Prevailing Wage rate requirement will result in a change order to the client. 15.06 Hours at $70.00/Hour 1 Programming and Programming and Configuration Completed in the Field or In House Configuration 5.78 Hours at $115.00/Hour Includes 90 -day Programming Warranty; allowing for modifications to be made to the initial functionality within this time frame at no charge. Appointment times determined by Tierney Brothers. Changes requested after this time will be billable at standard hourly rates. If tax has not been included on this proposal, pricing does not include Minnesota General Sales Tax under Minnesota Statues Chapter 297A Section 70 "Exemptions for Governments and Nonprofit Groups:' Please inform us if this project will be used for taxable purposes. If tax has been included on this proposal, we do not have a tax exempt form on file for your account. Please provide a completed Form ST3, Certificate of Exemption if applicable. 9.50 9.50 7.48 7.48 523.09 523.09 301.53 301.53 1,035.00 1,035.00 6,208.40 6,208.40 862.50 862.50 0.30 0.30 80.04 80.04 100.00 100.00 434.00 434.00 1,054.00 1,054.00 665.00 665.00 ie• Page 2 of 2 *This quotation is for product and services included on the Minnesota State Contract only. * Additional components not available on Contract may be needed for the system to function as designed. * Installation and non contract items provided on separate quotation. The services on this page must be purchased in conjunction with the Integration services on the Contract Release portion of this proposal. * Cabling is a combination of pre -terminated product and bulk cable requiring termination with a specific compression tool. * Manufacturer's warranties only apply to product purchased on State Contract portion of this proposal. * Tierney Brothers, Inc, will assist in any vendor communications to obtain replacements or return product as specified in the Contract. 121263 4/24/2018 Total $11,280.84 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal in full. Please Inspect product upon delivery All claims for defective merchandise or errors in shipping must be made within five days after receipt of goods. Clients using their own carriers will be responsible for filing their own freight claims if product is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables", such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 26%. The Information contained within this proposal Is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc. This document is subject to the terms and conditions found here: www.tierneybrottiers.com/SOTC Serving the States of: GO I IL I IN I IA I KY I MI I MN I MO I ND I NE I OH � SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 (612) 331-5500 )(800) 933-7337 1 Fax (612) 331-3424 www.tierneybrothers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 — Initial if correct or revise accordingly ,Expires-• contract• 7/23/2018 350 Missy Johnson Transaction Not Eligible C - Adding Projection System (NC) 121265 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 _, Initial if correct or revise accordingly Non -Contract Services - This sale is consistent with the "Contract Release Construction Language Modification" associated with the MN State Contract. 1 Services - Non Contract Installation Services - Construction Services by a 1,414.00 1,414.00 Integration for MN Contract Vendor (Non -Union, Non Prevailing Wage; Normal Business State Contract Hours). Union and/or Prevailing Wage rate requirement will result in a change order to the client. 3 Hours at $80.00/Hour and a subcontracted rate of $1,174.00 Total $1,414.00 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal In full. Please inspect pro uct upon ellvery All claims for defective merchandise or errors in shipping must be made within five days after receipt of goods. Clients using their own carriers will be responsible for filing their own freight claims if product is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables", such as projector lamps, may not be returned, Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 25%. The information contained within this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc. This document is subject to the terms and conditions found here: v,ww.tierneybrothers.com/SOTC #,T'1'E,,R'N',E,Y Quote Serving the States of: COIILIINIIAIKYIMIIMNIMOINDINEIOH� SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 Page 1 of 4 (612) 331-5500 I (800) 933-7337 1 Fax (612) 331-3424 www.tierneybrot ers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 Initial if correct or revise accordingly 7/23/2018 350 Missy Johnson MNS-CPV 21594 D - Upgrade to MXW on Dais (SC) 121308 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 — Initial if correct or revise accordingly *would need to order additional components separately* 1 MXWAPT8-Z10 8 -Channel Access Point Transceiver -Z10 Frequency (10 MHz) 1920 2,567.38 2,567.38 ---------- 01 -Video Equipment ---------- 1 XT1143 H.265, True 4K, dual video decode, enterprise HTML5 player with 477.43 477.43 expanded 1/0 package, PoE+ and Live TV 1 Integration Item Crestron DM-DA4-4K-C 1,552.50 1,552.50 1:4 4K HDMI to DM 8G+ & HD13aseT Splitter 3 DM-NVX-350 DigitalMediaTm 4K60 4:4:4 HDR Network AV Encoder/Decoder 1,035.00 3,105.00 1 DM-DGE-200-C Digital Graphics Engine 200 w/PinPointTM UX & 4K DM 8G+@ Input 1,840.00 1,840.00 2 DM -RMC -4K -100-C Wall Plate 4K DigitalMedia 8G+'" Receiver & Room Controller 100, 402.50 805.00 -1 G -B -T Black Textured 1 DM -TX -4K -202-C 4K DigitalMedia 8G+" Transmitter 202 862.50 862.50 1 HD-MD4X2-4K-E 42 4K HDMF Switcher 517.50 517.50 2 BD -J6300 Samsung BD -J6300 1 Disc(s) 3D Biu -ray Disc Player 107.30 214.60 ---------- 03 - Audio Equipment ---------- 1 Integration Item DCi 21600N 1,479.72 1,479.72 Crown Two -channel, 600W @ 40 Power Amplifier with BLU link, 70V/100V 11 MX415/C 15" Shock -Mounted Gooseneck, Cardioid, includes surface mount 239.40 2,633.40 preamplifier 1 MXW1/O Bodypack Transmitter with Integrated Omnidirectional Microphone 438.90 438.90 and 4 -Pin Mini Connector (TA4M) (Includes one SB901 Battery) 1 MXW2/SM58=-Z10 Handheld Transmitter with SM58" Microphone (Includes one SB902 450.30 450.30 Battery) 11 MXW8=-Z10 Desktop Base Transceiver 433.20 4,765.20 1 MXWANI8-Z10 8 -Channel Network Interface -Z10 Frequency (10 MHz) 1920 fl 1930 940.65 940.65 MHz *would need to order additional components separately* 1 MXWAPT8-Z10 8 -Channel Access Point Transceiver -Z10 Frequency (10 MHz) 1920 2,567.38 2,567.38 Page 2 of 4 E) 1930 MHz 121308 4/24/2018 *would need to order additional components separately* 3 MXWNCS8 8 -CH NETWORKED CHARGING STATION 1,338.32 4,014.96 1 Integration Item William Sound CHG 3512 405.31 405.31 1700107 Drop-in Charger 4 Integration Item William Sound NKL 001 39.45 157.80 Neckloop 18" for earphone 1 Integration Item William Sound PPA 457 NET PRO 1,301.03 1,301.03 Personal PA Pro FM assistive listening system with one PPA T45NET transmitter and 4 PPA R37 receiver 4 Integration Item William Sound PPA R37 95.14 380.56 Personal Pa FM Receiver ---------- 06 - Control Equipment ---------- 1 CEN-GWEXER infiNET EX" & ER Wireless Gateway 258.75 258,75 1 GLS -PART -CN Cresnef' Partition Sensor 402.50 402.50 1 TST 902 8.7" Wireless Touch Screen 2,185.00 2,185.00 1 Integration Item Logitech MX800 169.99 169.99 Combo Wireless Keyboard/Mouse ---------- 08 - Equipment Rack/Accessories---------- 1 Integration Item CUB4 189.21 189.21 Table top cable well w/ 2 AC outlet and 2 USB 1 Integration Item VFI LEXYZ34 1,141.21 1,141.21 Electric Lift Lectern Roll -about multimedia lectern with silent lift mechanism. Surface to support monitors, laptops and room control systems, Inside adjustable shelf. One locking door. 4" heavy duty casters (2 lock). Thermowrap body. 1 IRUR1 Rack Header -Image Series1 Rack -Logo 16,22 16.22 1 CBS-ERK-25 CBS-ERK-25 Skirted Wheel Base w/Casters for 25" ERK Racks 132.87 132.87 1 Integration Item Middle Atlantic D4LK 162.55 162.55 Anodized drawer with lock, 4 space 1 Integration Item ERK-4425 584.06 584.06 Middle Atlantic 44SP/25D STANDALONE RACK 1 ERK-RR44 Rackrail, 10-32, 44 RU, ERK Series 62.26 62.26 5 HBL1 1 Space (1 3/4") 1/8" Flat Aluminum Blank Panel, Black Brushed 13.34 66.70 Finish 2 Integration Item Middle Atlantic HP 15.98 31.96 Standard rack screw, truss -head, 100 piece in a poly bag 1 LBP -1A "L" SHAPED LACING BAR, 10 PC. PACK 25.61 25.61 1 Integration Item Middle Atlantic PDT -2020C -RN 165.30 165.30 T I NE Y E R, Quote Page 3 of 4 121308 4/24/2018 *This quotation is for product and services included on the Minnesota State Contract only. * Additional components not available on Contract may be needed for the system to function as designed. * Installation and non contract items provided on separate quotation. The services on this page must be purchased in conjunction with the Integration services on the Contract Release portion of this proposal. * Cabling is a combination of pre -terminated product and bulk cable requiring termination with a specific compression tool. * Manufacturer's warranties only apply to product purchased on State Contract portion of this proposal. * Tierney Brothers, Inc. will assist in any vendor communications to obtain replacements or return product as specified in the Contract. PDT series corded power strip, 20 amp, 9' cord terminated, 20 outlet 1 Integration Item Middle Atlantic U2V-4 161.45 161.45 Utility rack shelf, 2 space, 14.75" deep, vented, 4 piece 2 NAPDH11 Rack Mount Power Distribution 11 Outlet 78.20 156.40 1 Cables, Custom Package of Cables, Connectors and Hardware 3,699.83 3,699.83 Connectors and Hardware 1 Services: Design - Services: Design - State Contract (Non Construction) Engineering 3,378.00 3,378.00 State Contract and Project Management Services 52.78 Hours at $64.00/Hour 1 Services - State Contract (Non Construction) Installation Services (Non -Union, 6,304.00 6,304.00 Integration for MN Non Prevailing Wage; Normal Business Hours). Union and/or State Contract Prevailing Wage rate requirement will result in a change order to the client. 90.06 Hours at $70.00/Hour 1 Programming and Programming and Configuration Completed in the Field or In House 7,335.00 7,335.00 Configuration 63.78 Hours at $115.00/Hour Includes 90 -day Programming Warranty; allowing for modifications to be made to the initial functionality within this time frame at no charge. Appointment times determined by Tierney Brothers. Changes requested after this time will be billable at standard hourly rates. 1 EDGE-1YRPM-Ser Tierney Brothers, Inc. Premium Warranty Plan - Coverage for one 990.00 990.00 vice -TBI year with preventative maintenance. If tax has not been included on this proposal, pricing does not include Minnesota General Sales Tax under Minnesota Statues Chapter 297A Section 70 "Exemptions for Governments and Nonprofit Groups:' Please inform us if this project will be used for taxable purposes. If tax has been included on this proposal, we do not have a tax exempt form on file for your account. Please provide a completed Form ST3, Certificate of Exemption if applicable. *This quotation is for product and services included on the Minnesota State Contract only. * Additional components not available on Contract may be needed for the system to function as designed. * Installation and non contract items provided on separate quotation. The services on this page must be purchased in conjunction with the Integration services on the Contract Release portion of this proposal. * Cabling is a combination of pre -terminated product and bulk cable requiring termination with a specific compression tool. * Manufacturer's warranties only apply to product purchased on State Contract portion of this proposal. * Tierney Brothers, Inc. will assist in any vendor communications to obtain replacements or return product as specified in the Contract. Page 4 of 4 121308 4/24/2018 Subtotal 56,528.61 Shipping Cost (UPS Ground) 0.00 Total $56,528.61 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal in full. Please Ins act product upon del very. All claims for defective merchandise or errors In shipping must be made within five days after receipt of goods. Clients using their own carriers will be responsible for filing their own freight claims if product Is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables', such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 25%. The information conta ned within this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc. This document is subject to the terms and conditions found here: www.tierneybrothers.com/SOTC T11E., R''NE.-Y Quote Serving the States of: COIILIINIIAIKYIMIIMNIMOINDINEIOH� SD I WI Remit To: 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 Page 1 of 2 (612) 331-5500 ( (800) 933-7337 Fax (612) 331-3424 www.tierneybrot ers.com Bill To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 121309 4/24/2018 Ship To City of Otsego 8899 Nashua Avenue NE Otsego MN 55330 _, Initial if correct or revise accordingly _- Initial if correct or revise accordingly Expires- -• Contract -Memo 7/23/2018 350 Missy Johnson Transaction Not Eligible D - Upgrade to MXW on Dais (NC) Non -Contract Services - This sale is consistent with the "Contract Release Construction Language Modification" associated with the MN State Contract. 1 WiCS-2100 wePresent WiCS-21 00 1,047,50 1,047.50 12 Integration Item Dell P2418HT 371.00 4,452.00 24 inch 8,000,000:1 6ms VGA/HDMI/DisplayPortTouchscreen LED LCD Monitor (Black) 1 Integration Item Sonance PS-S83WT WHITE 300.00 300.00 8" Professional series surface mount woofer, 8 Ohm 14 Integration Item Sonance PS-C83RT WHITE 425.00 5,950.00 8" Professional Series 70V/100V/8 Ohm selectable in -Ceiling speaker 4 Integration Item Sonance PS-S43T BLACK 212.50 850.00 4" Professional series surface -mount speaker, 8 Ohm/70V 1 AMS -2624P 26 Port Switch With 24 Ports PoE 773.75 773.75 1 Services - Non Contract Installation Services - Construction Services by a 1,280.00 1,280.00 Integration for MN Contract Vendor (Non -Union, Non Prevailing Wage; Normal Business State Contract Hours). Union and/or Prevailing Wage rate requirement will result in a change order to the client. 16 Hours at $80.00/Hour 'EY Quote �T I'c 0, N Page 2 of 2 121309 4/24/2018 Subtotal 14,653,25 Shipping Cost (UPS Ground) 360.00 Total $15,013.25 To accept this quotation, complete the proposal summary page at the end of this document. Please review the terms, conditions and client responsibilities of this proposal In full, P easenspect product uppon e ivery All claims for defective merchandise or errors in shipping must be made within five days after receipt of goods. Clients using their own carriers will be responslble for filing their own freight claims if product is damaged in transit. Returns require an authorization number and must be made within 30 days. Custom orders and "Consumables", such as projector lamps, may not be returned. Returns are subject to restocking fees with the exception of out of box failures and replacements under warranty. Restocking fees varying depending on the product line, expect a minimum charge of 25%. The information contained wit in this proposal is supplied to you on a confidential basis and is not for disclosure to any organization without written consent of Tierney Brothers, Inc. This document is subject to the terms and conditions found here: www.tierneybrothers.com/SOTC e City of Otsego Adding Monitors to Dais 17321 R2 Proposal Summary A - Addinq Monitors to Dais State Contract Total: $ 46,274.92 Non Contract Total: $ 15,013.25 Proposal Total: $ 61,288.17 B - Adding Display Carts State Contract Total: $ 13,149.60 Non Contract Total: $ 258,00 Proposal Total: $ 13,407.60 C - Adding Protection System State Contract Total: $ 11,280.84 Non Contract Total: $ 1,414.00 Proposal Total., $ 12,694.84 D - Upgrade to MXW on Dais State Contract Total: $ 56,528.61 Non Contract Total: $ 15,013.25 Proposal Total: $ 71,541.86 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 www.tierneybrothers.com Please Initial to Accept or Decline Please Acknowledge All Proposals Accept Decline The undersigned authorizes Tierney Brothers to proceed in accordance with the proposal including options elected and agrees as a representative of the client to be responsible for payment. By signing below, the client has read and understands the scope of services and agrees to the client responsibilities and conditions. Client's Name: Authorized Signature: *Client's Email Address: *Client's Email Address: *Please note, one or more items on your quote may include software. Our vendors require two unique email addresses with different domain names to be submitted with software orders. These email addresses will receive the electronic key codes required to download and install your new software, Please include these two email addresses with your purchase order at the time your order is placed. Responsibilities and Conditions 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 www.ilerneybrothers.com 612.331,55004 800.933.7337+ Fox - 612.331.3424 Client Responsibilities Tierney Brof hers Responsibilities (Upon_ Authorization) Contract a licensed electrician to provide high voltage power Proceed with ordering the specified equipment and preparing a connections. The system design will determine if optimum schedule for completion of the proposed services. placement of outlets is best achieved before or after the installation of the AV equipment. The assigned Project Manager will Conduct pre -installation site visit (if necessary) involving the main site communicate the specific to you during the project planning. contact, site facilities representatives and a Tierney Brothers' project Tierney Brothers recommends that each projector, TV, plasma, LCD, manager or a qualified alternate. etc, have a dedicated quad electrical outlet. Provide Tierney Brothers with any existing system design specifications, diagrams, room drawings or other materials that would facilitate completion of the proposed Scope of Integration Services. All necessary ceiling tile work involved in the Installation, unless an alternative has been indicated in the Scope of Integration Services in this proposal. Prepare, replace, repair or modify any structural or cosmetic changes that Tierney Brothers has made or needs to make. This includes, but is not limited to, ceiling grids, floor tiles, walls and pre- existing equipment. This does not include repair for accidental damage caused by Tierney Brothers. Confirm area is ready for installation when scheduled. This includes but is not limited to the room being vacated, physical conditions confirmed and owner fumished equipment (OFE) available. If the area is not prepared for installation when scheduled or the client has not notified Tierney Brothers five business days in advance of any schedule change or installation cancellation, there will be a $350.00 charge. Rescheduling of the installation will be set for a later date as determined by Tierney Brothers. TBI will not be responsible for the condition and functionality of any existing OFE during the installation process. This includes de -install and reinstall of OFE. Should existing equipment fail or not work properly with our system design, the customer will have the option of sourcing a TBI approved replacement part or TBI will offer a billable replacement alternative. If OFF malfunction causes delays in the installation timefrome, additional billable labor charges may apply. Clients purchasing SMART product are responsible for loading all SMART software on the applicable computers and connection of these computers to the SMARTboard prior to any scheduled training sessions, Complete Customer Configuration Worksheets as requested by Tierney Brothers within five business days. This information is required to properly integrate the new equipment with your existing IT infrastructure. TBI requires access to customer's computer and network at the time of installation to be able to complete installation and testing of the designed system. Return visits to test equipment and functionality may result in additional charges. TBI's initial estimates assume all work may be completed using standard ladders. If a lift 1s required, additional charges will be incurred and presented as part of a change request. For U of M Installations only: University of Minnesota customers are responsible for contacting their Facilities Management Department to coordinate conduit installation for all AN wire and cable installations. Review scope, terms and conditions of the installation with the client at the pre -installation site visit. This will include, but is not limited to electrical, construction and cosmetic responsibilities. Basic system training, separate from Professional Development, is included in this proposal. This training will be scheduled and completed by a Tierney Brothers' representative at the end of the project installation. If Professional Development is part of this proposal, sessions must be scheduled within six months of install completion. Clients purchasing SMARTboards: After the installation of the SMARTboard is complete, the SMARTboard USB connection will be tested using the Tierney Brothers installer's laptop. After system functionality is confirmed, the USB connection will be hooked into the client's computer if it is present in the space. For safety reasons, Tierney Brothers will not modify/cut the trays on existing white boards or chalk boards. A solution for mounting over the existing board will be proposed. Any modifications to the existing board would need to be made by the customer priorto the arrival for Tierney Brothers' installation personnel. Scheduling Installations are typically scheduled six to eight weeks from receipt of the customer's purchase order. Custom ordered product may increase the time needed to complete the proposed services. Standard service and support is limited to Monday through Friday, 8:00 AM to 5:00 PM central standard time, excluding national holidays. Expanded service hours may be available for an additional charge if determined necessary. This schedule assumes no delays or obstacles will be encountered in gaining access for the installation. Site Conditions Tierney Brothers cannot enter into work in or otherwise disturb any areas containing asbestos, Tierney Brothers recommends that each Projector, TV, Plasma, LCD, etc. have a duplex receptacle fed off of a dedicated 20 amp circuit available for use. Systems containing multiple racks of amplifiers or other equipment may require additional circuits. Please initial to acknowledge and authorize the Responsibilities and Conditions presented here. L 1771 Energy Park Drive, Suite 100 St, Paul, MN 55108 www.tierneybrothers.com 612.331.5500®800.933.7337®Fax - 612.331.3424 Proposal Terms Accounting Terms For Installations scheduled to take 30 days or less from the first day on site to the last, Tierney Brothers will invoice the total project in full upon substantial completion. Tierney Brothers reserves the right to bill progressively for installations which are scheduled to take more than 30 days on site. The balance is due Net 30 days from the installation completion date, with 21Y. interest added to unpaid balance. Sales Taxes All applicable sales tax amounts will be charged on the sale of goods or services according to each governing law and remitted to the proper taxing authority, If your organization is tax exempt, please complete an exemption certificate and return to Tierney Brothers. Proposal Changes If additional products or services are requested prior to receipt of your signed purchase order or quote proposal, Tierney Brothers will provide an updated quote proposal, including a revised scope. If additional products or services are requested after receipt of your signed purchase order or quote proposal, Tierney Brothers will provide a change request quote with the requested equipment and scope to detail the requested changes for your approval. Upon receipt of your signed purchase order or quote proposal, Tierney Brothers will proceed with the authorized services and invoice in accordance with the purchase order or quote proposal. Verbal agreements will not be processed until confirmation, in writing, has been received. There may be a 20% to 30% restocking fee plus freight charges for those items ordered which have to be returned to the manufacturer due to customer request or by change of order. Custom order products and certain product lines not typically carried by Tierney Brothers may not be returned. Other Terms Installation Warranty See specific warranty coverage program outlined in this proposal. Repair or replacement service for TBI installed consumer grade monitors/displays are subject to manufacturer warranty and service, TBI does offer de-install/re-install assistance for vendor warranty repair or replacement at an additional charge. Programming Warranty The programming warranty is 90 days, starting at the commission of the system. Changes or fixes to the system after this time will be billable at our standard service call rates." Labor Classifications and Assumptions Unless mutually agreed upon in writing prior to executing this agreement, it Is the understanding of both parties that Union and/or Prevailing Wage regulations, specifically those contained in 40 U.S.C. 276a-5, or MN Stat § 177.41-177.44, do not apply to the work to be performed under this contract. Unless travel charges are specified, this proposal assumes Tierney Brothers, Inc, has local certified, licensed and insured technicians available to complete the integration services. In the event, the job site is located in a geographical area where this does not apply or a specific installation time is requested for which this personnel is not available, additional charges may apply. All hours for installation are assumed to be between 8am and 5pm (normal business hours) unless specified in this proposal. Request for work outside of normal business hours will be subject to the following increased hourly labor rates: - Second Shift (3:00pm to 10:00pm) will be billed at one and a half times our standard labor rate. - Weekend or Holiday hours will be billed at two times our standard labor rate. Requests for installations outside our normal business hours are subject to approval by the Director of Post Sales Integration. NOTICE CONFIDENTIAL INFORMATION -The information in this proposal is proprietary and strictly confidential. It is intended solely for the use of the named parties. If the reader of this proposal is not the intended recipient or the employee or agent responsible to deliver it to the intended recipient, any dissemination, distribution, copying or other use of the information contained in this document is strictly prohibited. If this has been received in error, please notify the responsible party immediately and then delete this proposal from all data storage devices and destroy all hard copies. Video recording of a Tierney Brothers SMART Certified Trainer or Professional Development session, and copying or distribution of any printed material supplied by Tierney Brothers Inc., is protected content under copyright licensing and can be used only with express permission from Tierney Brothers, Inc. Any video or digital content created during a training session can be used only within the organization paying for such services and cannot be shared online or distributed in any manner, This quotation is valid for a period of 90 days. Please initial to acknowledge and authorize the Proposal Terms presented here, i 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 www.fierneybroihers.com 612.331.5500® 800.933.73370 Fox - 612.331.3424 Tierney Brothers Premium Warranty Program Designed for., City of Otsego Terms and Conditions Tierney Brothers, Inc, warrants the installation you have purchased from Tierney Brothers, Inc. from defects in materials and workmanship, under normal use, during the One Year Premium Warranty period. Normal use is defined as operating the system within its designed specifications. Included in the One Year Premium Warranty the customer will receive: • Unlimited Phone Support • On-site service • Discounts on Lamps and Accessories • Preventative Maintenance Check Preventative Maintenance Check will be completed toward the end of the one year warranty period. The warranty period commences on the date of customer signoff, at the completion of the install by Tierney Brothers, Inc. During the warranty period, Tierney Brothers, Inc. will first work to resolve any problems by troubleshooting over the phone. if Tierney Brothers, Inc. Support Specialists determine that the issue cannot be resolved over the phone, a Technician will be dispatched to your location(s) within 24 hours (if necessary) of the original call (Monday through Friday 8:00am - 5:00pm, excluding national holidays). Customers outside of a 150 mile radius of Tierney Brothers, Inc. are subject to mileage and trip charges. If service is required after the One Year Premium Warranty period has expired, the customer will be billed at Tierney Brothers, Inc. current labor rates. If the customer has purchased a Tierney Brothers, Inc. Extended Maintenance Agreement, that will commence at the end of the One Year Premium Warranty. If you would like additional information regarding Tierney Brothers, Inc. Extended Maintenance Agreements, please contact your Tierney Brothers, Inc. Sales Representative at 612-331-5500. Obtaining Warranty Service To obtain warranty service, please use your custom support portal (support.tierneybrothers.com) and contact us via chat, phone, or email: hftos://sur)r)ort,flemeybrothers.com/ Click here for a short video explaining how to log in to your support portal your first time: hftp://content.lwplatform,com/players/TDGSX2 ] s-kaM9q 1 Ga.html If you have any questions, please email support@tierneybrothers.com or call us at 800-933-7337. You can also call our advanced support line, 855- 612-7762. Obtaining Your Preventative Maintenance Check Tierney Brothers, Inc. will send out an email 60 days prior to one year warranty expiration requesting the customer go to to www.tierne,/brothers.com to schedule their preventative maintenance check, Customers can also call into our our Support Specialist at 612-331-5500 or by email at techservice@tierneybrothers.com to schedule a Preventative Maintenance Check. Customer may call to schedule Preventative Maintenance Check prior to the 60 day period if they require it done at an earlier date. Preventative Maintenance Checks are done Monday through Friday 8:00am - 5:00pm. Customer is responsible for providing access for up to 2 hours per room for Preventative Maintenance Check. If Customer doesn't schedule their preventative maintenance check before one year warranty has expired, the Preventative Maintenance Check will be void. limitations of coverage The following items are excluded from coverage under the warranty: a. Equipment that has been removed or reinstalled in a different location b. Damage or other equipment failure due to causes beyond our control including, but not limited to, operator negligence, the failure to maintain the equipment according to the owner's manual instructions, abuse, vandalism, theft, fire, flood, wind, freezing, power failure, Inadequate power supply, acts of war or acts of God. c. Any utilization of equipment that Is inconsistent with either the design of the equipment or the way the manufacturer intended the equipment to be used. d. Premium Warranty covers all hardware related failures. Network or software related failures are not covered under Tierney Brothers, Inc. Premium Warranty. L 1771 Energy Park Drive, Suite 100 St. Paul, MN 55108 www.ilerneybrothers.com 612.331.5500 + 800.933,7337® Fax - 612,331.3424 Tierney Brothers Premium Warranty Program Designed for: City of Otsego e. Operational or mechanical failure which is not reported prior to expiration of this contract. f. Equipment where the serial plate attached to the equipment is removed, defaced or made illegible. g. Damage resulting from unauthorized repair, software virus, improper electrical wiring and connections. h. Existing Owner Furnished equipment. i. Lift and Scaffolding rental is not included. This maintenance contract refers to: Adding Monitors to Dais 17321 R2 I have read, understand and agree to the above terms and conditions per the plan elected, Authorized Signature: Date: Ora COMPANY GENERAL CONTRACTORS 21830 Industrial Court Rogers, MN 55374 Phone (763) 428-8088 Fax (763) 428-8090 City of Otsego Attn: Tami Loff Budget Proposal for renovation of Council Chamber: DATE May 7, 2018 Quotation valid until: June 6, 2018 Prepared by: Preliminary millwork proposal to provide and install new plastic laminate countertop, plastic laminate front accent panel with a laminate reveal, matching plastic laminate chair rail, and a new plastic laminate marker/magnet board with a frame to match new chair rail. Includes delivery and installation. for one electrican at 16 hours and $400 material cost for re -installing outlets, etc. **NOTE: This is a budget proposal - pending coordination with the City and Technology Vendor. We propose to furnish labor & materials complete and in compliance with the above specifications for the sum of ELEVEN THOUSAND FIVE HUNDRED TWENTY-THREE AND $ 11,523.60 O/100------------------------------------------------------------DOLLARS Payment to be made as follows: NET 10 DAYS FROM INVOICE All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from the above specifications which involves extra costs will be made only upon receipt of an authorized, mitten change order and will be shown on subsequent invoices as amounts over and above the original estimate. It is understood that we will not be penalized for delays caused by strikes, accidents or other delays caused by acts of God. Our workers are covered under Worker's Compensation Insurance. Note: This Proposal may be withdrawn by us if not accepted within 30 days Authorized Signature ACCEPTANCE OF PROPOSAL: The above prices and conditions are satisfactory and are accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature: Signature: Date of Acceptance: