ITEM 3.6A Kadler Ave Drainage improvementsRequest for otSCITY OF �'O City Council Action t4l 2 DE A►I TM1E 1T INFORMATION ORIGINATING DEPARTMENT: REUESTo : MEETING DATE. Public Works City Engineer Wagner r August 26, 2013 PRESENTER(s): REVIEWED BY: ITEM Consent Agenda City Administrator Johnson 3.6A AGENDA ITEM DETAIL RECOMMENDATION: OMMENDATION: City Staff Recomm nds payment in the amount of $44,x..09.70 for the i ad le r Avenue Drainage Improvements for work completed by Dave Perkins Contracting, Inc. ARE YOU SEEKING APPROVAL of A CONTRACT? T? 1S A PUBLIC H EARI NG RE FIRED? No No BAC KGROUNDfJUSTIFICATIoN: Dave Perkins Contracting, Inc. has completed the project. We are retaining or a little over $2000 to ensure turf establishment. SUPPORTING DOCUMENTS: N A17A HED ONE Pay Estimate i o.1 POSSIBLE MOTION W, 1 11 11111 Please word motion as you would file it to appear In the minutes. Motion to approve payment to Dave Perkins Contracting, Inc. In the amount of $44.,109.70 for the Ka ler Avenue Drainage Improv ments. BUDGET INFORMATION FUNDING: BUDGETED: N YES o Storm water — Out of District(77%) 222 Story water Utility Fund — In -District (23%) u NO ACTION TAKEN a APPROVED AS REQUESTED n DENIED o TABLED o OTHER (List barn COMMENTS: PAY ESTIMATE 1 OWNER CITY FOTSEGO Kadl r Avenge Draina a Improvements August 20, 2013 Honorable Mayor & CityCouncil CRY of Otsego 8899 Nashua Avenue NE Otsego, MN 56330 f adlerAvenue Drainage Improments Contractor! Dave Perkins Contracting, Inc. Contract Amount: $47,121.00 Award ate: June 111 2013 ompietlon Date: August 2 , 2013 Dear Honorable Mayor and Council Members: The follovgng work has been completed on the above -referenced project by Dave Perkins Contracting, Inc. taI&I Q.i-kar4ra#n " A I I . cz#nrm Qaviar ITEM ESTIMATED CONTRACT UNIT USED T ITEM DE8CRIPTION Q A TiTY UNIT FI VI DATE EXTENSION I MOBILIZATION I LS 3,ODO.00 I 3,000.N REMOVE 18' PLASTIC PIPE CULVERT 10 LF �0,0� 100.00 10 IO .OD 3 REMOVE 18'RC PIPE 137 LF $%00 1,370.00 187 1,370.00 4 REMOVE 243 CMP CULVERT 40 LF $10,00 r 100.00 10 100.00 REMOVE BITUMINOUS CURB 20 LF $5.00 146.00 22 410,50 REMOVE D AINTILE 4 LF $10.00 40.00 a 80.00 REMOVE BITUMINOUS PAVEMENT 118 S`� 13,00 354,00 113 35 .04 # EMOVE Ian RC PIPS APRON 1 EA $160.00 160.00 1 160.00 REMOVE 24" METAL APRON I EA $150.00 IK00 1 150.00 10 REMOVE MANHOLE OR CATCH BASIN 4 E $760.00 750.00 1 760.00 'I3SAWING BITUMINOUS PAVEMENT {FULL DEP 80 LF $6.00 $ 440.00 08 440.00 SALVAGE CASTING 1 60.00 61.00 'I 260.00 13 COMMON BORROW (CV) (P) 120 CY $23.00 $ 3,360,00 120 $ 3,360,00 J4 SALVAGE TOPSOIL (Eli) 404 C.y $10.00 1,040-00 104 S I p040.00 16 AGGREGATE BABE CLASS 6 19 TOIL 20.00 632.00 Is 532.00 16 MILL BITUMINOUS S S RFA E 1.6m 12 $50.00 000.00 0 17 TYPE L114 WEARING COURSE MIXTURE (B) 10 TOM $250.00 $ 2,60.0010 $ 2,500-00 18 BITUM I NOUS MATERIAL FOR TACT{ COAT 3 GAS. $10.01 30.Q0 3 30.b 10 CONCRETE SURGEE BASIN 1 EA $1,800.Go 1,800.00 1 1,8 00.00 20 1 180 CONCRETE APRON I EA 750.00 3 750.00 1 750.00 2i 124" CONCRETE APRON W TRASH GUARD 1 EA $2,400.1DO $ 2,400.00 1 00.00 2 118-1 PC PIPE SEWER DESIGN 3006 OL IN 3 0 LF X40.00 10 000.00 390 35,000.00 23 124" RC PiPH SEWER DESIGN 3006 CL lit 52 LF $45,00 $ 2,140.00 5 520,00 24 ICONST DRAINAGE STRUCTURE CES 46-4020 2 EA $20400.00 $ .4 ,800.00 2 4,800.00 25 INSTALL NEW CASTING1 EA $760,00 750,00 3 750.00 26 INSTALL SALVAG ED CASTIN 'I EA $350.00 360.00 1 50.DO 27 RANDOM RIPRAP CLASS 11 4 Gy 360.0 69c,a0 4 800,00 2,9 ICON STRU T BITUMIN OUS CURB 29 LF $10.001 2913.00 11 110.00 29 TRAFFIC CONTROL 1 L $120.00 4 OD.00 3 3 200.00 0 SILT FENCE, TYPE I ACHINE SLICEO 35 L1* $3.00 108,00 36 105,00 31 SEED MIT RE 270 22 LBS $26.00 650.00 22 860.00 32 MULCH 1-i I iATEI II L TYPE 1 1 TON 300.00 $ 300.00 1 300.00 33 FERTILIZER R TYKE ' 76 LBB 5a00 370.00 751- 375,00 Total Bits Schedule "A" $479121.00 48 628,00 AMun1 1PaM T E 14361Pay EskiatesWM30pe PE -1 Bid Schedule "R' TOTAL* Total Work Completed to [date LESS % RETAINAGE: WE RECOMMEND PAYMENT F: FLAY ESTIMATE #1 CITY OF OTSEGO #ad[er Avenue Drainage improvements 7J21.00 APPROVALS: CONTRACTOR: DAV PERKINS CONTRACTING, INC. Certlfl on yC a tor: rtify that all items and amounts are correct for the work completed to date. Signed: - f Title: Date ENGINEER: HAKANSON ANDERSON Cortifleation by Engineer: Wo recemend payment for pori and qu ntitles as shown, Signed: Title. SER: CITY OF OTSEGO Date Signed:. Title; Date AK1un1cTpaM T E I4 6Tay Esti atesW4 6pe PE -2 NE 411111ilm.... 41,.00 4%626.00 % .0 _ _.-.. /0 J 4 _._ 526,00__ 2,326.30 $ 441199.70. 411111ilm....