Loading...
ITEM 3.6 East WWTF Digester Piping Improvemento1012'� Ot�c e4F o MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier June 11, 2018 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.6 STRATEGIC VISION MEETS: -I THE CITY OF OTSEGO: improvements. Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. The 2018 Utility budget and capital improvement plan includes $50,000 to complete piping modifications Is a social community with diverse housing, service options, and employment opportunities. identified in the 2018 Wastewater Master Plan as "East Solids — Interim Digester Improvements". Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff is recommending approval of the quote from Magney Construction for the East WWTF Digester Piping improvements. ARE YOU SEEKING APPROVAL OFA CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The 2018 Utility budget and capital improvement plan includes $50,000 to complete piping modifications to support independent air distribution and operational control of the aerobic digesters. The project is identified in the 2018 Wastewater Master Plan as "East Solids — Interim Digester Improvements". Engineering documents including drawings and specifications were completed by Scott Schafer from AE2S to support quote requests. Six contractors were requested quotes to complete the work; three responded with proposals ranging from $47,600.00 to $62,552.00. Staff is recommending approval of the Magney Construction proposal of $47,600.00 to complete the project prior to December effluent dissolved oxygen minimum requirements. SUPPORTING DOCUMENTS ATTACHED: Quotes • Magney Construction • Gridor Construction, Inc. • Land Pride Construction, LLC POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve the quote from Magney Construction for the East Wastewater Treatment Facility Digester Piping Improvement Project in the amount of $47,600.00. BUDGET INFORMATION FUNDING: BUDGETED: 602 — Sanitary Sewer Fund Yes May 30, 2018 Kurt Neidermeier Utility Manager— City of Otsego. 13400 9011 Street NE Otsego, MN 55330 Re: Otsego East WWTF Digester Blower Piping Improvements Dear Mr. Neidermeier: We propose to do the work, as described below, for Forty-seven thousand six hundred dollars ($47,600.00). Our quotation is based on the email, and its attachments, from Kurt Neidermeier to Mark Magney on Wednesday, May 16, 2018 at 11:02am. The material specifications were prepared by Scott Schaefer of AE2S and are dated May 15, 2018. It consists of ten pages. The plans consist of six pages and were prepared by Scott Schaefer of AE2S and are dated May 15, 2018. The drawings are P1 (Process Symbols and Abbreviations), P2 (Demolition Plan), P3 (Demolition Section), P4 (Improvement Plan), P5 (Improvement Section), and P6 (Improvement Section). The work consists of removing pipe insulation, piping, fittings, and valves. New pipe, pipe fittings, valves, and insulative coating will be installed per plans and specs. Materials that will be removed and reused include one 4 -inch flanged butterfly valve, one 8 -inch x 6 -inch flanged DI tee, and 2 -1/2 -inch piping and valves. Notes The following items are not included in the above proposal: electrical, HVAC, plumbing, engineering, bid bond, payment and performance bonds, and permits or fees. Water, electricity and owner's rest room facilities are to be available for our use. Work to be done during normal business hours, 7 am to 5 pm, Monday through Friday. Thank you for the opportunity to provide this quotation and do not hesitate to contact us to discuss the proposal further. Sincerely, :Bill Hays Project Manager Cc: Mark Magney Gary Disch GRIDOR CONSTR., INC. 3990 27th Ave SE (763) 559-3734 Buffalo, MN 55313 (Fax) 559-3736 Improving America's Water Quality since 1970 May 30, 2018 City of Otsego, MN 13400 9011, Street NE Otsego, MN 55330 Attn: Kurt Neidermeier, Utility Manager RE: Otsego East WWTF Piping Project Mr. Neidermeier Gridor Contr., Inc. has reviewed your plans and specifications for the Otsego East Wastewater Treatment Facility Digester Blower Piping Improvements dated 5-15-18 and Gridor can do this work for the following price. $58,400.00 -Fifty-Eight Thousand Four Hundred This price is valid for 60 days and we assume this work will be done with in 120 days per the contract. Price includes material, labor, taxes and equipment for a complete project based on your specifications. Payment terms are net 30 upon completion of work with no retainage Please let me know if this is acceptable and if you would like us to proceed. Thanks for the opportunity to bid this project. Sincerely Steve Lee Project Manager Gridor Constr., htc. Land Pride Construction, LLC 50480 368th Street Paynesville, MN 56362 320.894.2579 landprideconstruction@gmail.com Quote Estimate# Date 1864 5/30/2018 Name / Address City of Otsego Project East Wastewater Treatment Description Qty U/M Rate Total Remove and replace piping at East Wastewater Treatment facility at 5850 Randolph Ave, Otsego, MN. This quote is per plans sent. I LS 62,552.00 62,552.00 Signature Signature Troy Soine Customer Total $62,552.00