ITEM 3.5C Kadler Street improvement0tSc eF o MINNESOTA C DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner September 10, 2018 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.5C STRATEGIC VISION MEETS: THE CITY OF OTSEGO; for work completed on the Kadler Avenue and 73rd Street Improvement Project. Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. All roads have been graded to subgrade. Boulevards are at or near finish grade. Only the ponds remain to Is a social community with diverse housing, service options, and employment opportunities. the street base onsite and leave loaded with the excess material off site. Approximately Y2 of the sanitary Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Pay Estimate #2 in the amount of $215,060.57 to LaTour Construction, Inc. for work completed on the Kadler Avenue and 73rd Street Improvement Project. ARE YOU SEEKING APPROVAL OF A CONTRACT? ISA PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: All roads have been graded to subgrade. Boulevards are at or near finish grade. Only the ponds remain to be graded and that will occur later during the project when they can "double haul" i.e, haul aggregate for the street base onsite and leave loaded with the excess material off site. Approximately Y2 of the sanitary sewer has been installed. Water and Sanitary sewer are anticipated to be complete by September 7th Pay Estimate #2 is for $215,060.57. Pay Estimate #2 includes Change Order #1. This change order was necessary due to the wetland and storm pond along the west side of Kadler Avenue, just north of 70th Street was too wet to install silt fence as planned. The water elevations required Sediment Control Logs/Bio-Rolls to be placed for approximately 340 feet in two layers. Two layers is required by the NPDES Permit to provide additional protection for the wetland. The float curtain was necessary due to the water elevation in the storm pond. This float curtain will also provide protection while reconstructing the storm pond outlet structure as well as multiple inlet pipes. Change Order #1 is in the amount of $5,615.75. This does not reflect that approximately 1,085' of silt fence is eliminated @ $1.60/LF thus saving $1,736.00. SUPPORTING DOCUMENTS ATTACHED; • Pay Estimate #2 • Change Order #1 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #2 in the amount of $215,060.57 to LaTour Construction, Inc. for work completed on the Kadler Avenue Improvement Project. BUDGET INFORMATION FUNDING: BUDGETED: Fund #438 — Kadler Avenue Improvements No — The project will be financed by a grant from Minnesota DEED and the issuance of debt. The debt is to be repaid from a combination of special assessments and property taxes. PAY ESTIMATE #2 CITY OF OTSEGO KadierAvenue Improvements, Project 17-04 RiA Crh.A'd. "d" - C}-fr 1 -fl.. nraval madl ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 Mobilization 1 LS $78,000,00 $ 78,000.00 0.50 $ 39,000.00 2 Clearing and Grubbing 1 LS $3,100.00 $ 3,100.00 1 $ 3,100.00 3 Remove Bituminous Pavement 280 SY $3.00 $ 840.00 $ 4 Sawing Bit Pavement Full Depth) 150 LF $3.00 $ 450.00 S 5 1 Remove Sewer Pipe (Storm) 119 LF $7.00 $ 833.00 $ - 6 Remove Manhole 1 EACH $400.00 $ 400.00 7 lRemaye Fence 300 LF $2.00 $ 600.00 300 $ 600.00 8 Common Excavation P 46,961 CY $3.60 $ 169,059.60 30,524 $ 109,886.40 9 Su rade Excavation E 4,925 CY $1.051s 5,171.25 4,974 $ 5,222.70 10 Salvage Are ale E 1,291 CY $4.25 § 5486.75 1,291 $ 5486.75 11 Salvaged Topsoil From Stock ilo L 11,956 CY $2.10 $ 26107.60 5 978 $ 12,553.80 12 Haul and Dispose of Excess Material (L 18,721 CY $4.65 $ 87052.65 2,2$1 $ 10467.15 13 Aggregate Base Class 3 or 4 17,633 TON $8.60 $ 151,643.80 $ 14 Aggregate Base Class 5 Mod 5,871 TON $10.40 $ $1,058.40 $ 15 Mill Bituminous Surface 1.5" 36 SY $16.30 $ 586.60 $ 16 Bituminous Material For Tack Coat 852 GAL $2.10 $ 1,789.20 $ 17 Type SP 9.5 Wearing Course Mixture (3,C) 1,916 TON $63.70 $ 122,049.20 $ 18 Type SP 12.5 Non Wear Course Mixture 3,C) 2,395 TON $55.80 $ 133,641.00 $ 19 Concrete Curb & Gutter Design 13418 5,036 LF $10.60 $ 53,381.60 $ 20 lConcrete Curb & Gutter Design B618 989 LF $11.60 $ 11,472.40 $ 21 7" Concrete 402 BY $57,00 $ 22,914.00 $ 22 4" Bituminous Curb $24 LF $9.00 $ 2,916.00 $ 23 Install Mail Box Support 1 EACH $250.00 $ 250.00 $ 24 JTraffic, Control 1 LS $1,950.00 S 1,950.00 0.5 $ 975.00 25 Sin Panels, Type G 70 SP $41.00 $ 2,870.00 $ - 26 Silt Fence, Type MS 8,412 LF $1.60 $ 13 459.20 6,486 $ 10,377,60 27 Storm Drain Inlet Protection 15 EACH $185.00 $ 2,775.00 1 $ 185.00 28 Stabilized Construction Exit 2 LS $930.00 $ 1,860.00 1 S 930.00 29 Turf Establishment 5 ACRE $685,001 $ 3,325.00 $ 30 Erosion Control Blanket - Category 3 585 SY $1.551s 906.75 $ 31 Pavement Message (Arrows) t0 EACH $61.001s 610,00 5 32 24" Solid One Yellow - Paint 252 LF $3.50 $ 882.00 S 33 4" Double Solid Line Yellow- Paint 8,928 LF $0.30 $ 2,678.40 $ 34 24" Solid Line White - Paint 71 LF $3.60 $ 248.50 $ 35 4" Solid Line White - Paint 11,800 LF $0.15 $ 1,770.00 $ Total Bid Schedule "A" $ 971,138.10 $ 198,784,40 S:IMun1ctpahAOTSEG013971PAY ESTIMATElOT397 PE,xisx PE - 1 PAY ESTIMATE #2 CITY OF OTSEGO Kadler Avenue Improvements, Project 17-04 Rid Rrhnduln "B" . Aanifniv Rawer ITEM NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 36 Connect to Existing Sanitary Sewer 1 EA $4,500.00 S 4,500.00 2 $ 9,000.00 37 Casting Assembly 6 EA $1,135.00 $ 6,810.00 24" RC Pipe Apron $ 38 Raise Sanitary Structure 3 EA $985.00 $ 2,955.00 1 $ 39 8" PVC SDR 26 Sanitary Sewer Pipe 18-22' De th 851 LF $47.00 $ 39,997.00 592 $ 27,824.00 40 Standard Manhole 0-10' de th 3 EACH $2 680.00 $ 71740.00 2 $ 5 160.00 41 JEX1ra Depth 30 VF $i50.OD $ 4,500,00 20.22 $ 3,033.00 Total Bid Schedule "B" $ 66,502.00 $ 45,017-00 Bid Schedule "C" - Storm Sewer ITEM NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 42 15" RC Pipe Apron 3 EACH $770.00 $ 2,310.00 $ - 43 18" RC Pipe Apron 3 EACH $810.00 $ 2,430.00 $ 44 24" RC Pipe Apron 3 EACH $890.00 $ 2,670.00 $ 45 24" HDPE Pipe Apron 1 EACH $610,00 $ 610.00 $ 46 30" HDPE Pi a Apron 1 IFACH LF $U00.00.$ 1,000.00 $ 47 4" Perf PVC Pie Drain 626 LF $14.00 $ 8,764.00 5 48 12" RC Pipe Sewer Design 3006 CL V (all depths) 71 LF $31.00 $ 2,201.00 S 49 15" RC Pipe Sewer Design 3006 CL V all depths) 310 LF $33.00 $ 10,230.00 $ 50 18" RC Pipe Server Design 3006 CL V (all depths) 1,015 LF $36.00 $ 36 640.00 $ 51 24" RC Pipe Sewer Design 3006 CL III (all depths) 267 LF $45.00 $ 12,015.00 $ 52 18" HDPE Pi a Sewer all depths) 854 LF $26.00 $ 22,204.00 $ 53 24" HDPE Pipe Sewer all depths) 155 LF $34.00 $ 5,270.00 $ 54 30" HDPE Pipe Sewer (all depths) 414 LF $45,00 $ 18,630.00 $ 55 Construct Draina a Structure Design 48-4020 7 EACH $2,000.00 $ 14,000.00 $ 56 Construct Drainage Structure Design 60.4020 3 EACH $3,200.00 $ 9,600.00 $ 57 Construct Drainage Structure Design 72-4020 1 EACH $4,300.00 $ 4,300.00 $ 58 Construct Drainage Structure Design 2'x3' 7 EACH $2,000.00 $ 14 000.00 $ 59 48" Outlet Control Structure 2 EACH $4,000,00 $ 8,000.00 $ 60 60" Outlet Control Structure 1 EACH $5,500,00 $ 5500.00 $ 61 Articulated Interlocking Block Open Cell, Type A 141 Sy $82.001 $ 11,662.00 $ Total Bid Schedule "C" $ 191,836.00 Bid Schedule "D" - Watermain ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT SED TO DATE EXTENSION 62 Connect to Existing - Water 1 EA $940.00 $ 940.00 63 6" Watermain Ductile Iron Cl 52 139 LF $27.00 S 3,753.00 S 64 6" Watermain Ductile Iron Cl 52, 102 LF $33.00 S 3,366.00 $ 65 10" Watermain Ductile Iron C152 663 LF $40.00 $ 26520.00 $ 66 10" Watermain Ductile Iron Cl 52 Extra Depth) 103 LF $43.00 S 4429.00 $ 67 4" Insulation 4 SY $54.00 $ 216.00 $ 68 Hydrant 1 EA $4250.00 $ 4,250.00 $ 69 6" Gate Valve And Box 1 EA $1340.00 $ i,34D.00 $ 70 10" Gale Valve And Box 1 EA $2,670.00 $ 2,670.00 $ 71 Watermain Fittings 1,108 LBS $3.90 $ 4,321.20 $ 72 Relocate and Plug Existing Hydrant 5 EA $1,450.001 $ 7,250.00 S 73 ITest Existing Hydrant 1 5 1 EA 1 $200,001$ 1,000-00 $ - Total Bid Schedule "D" $ 60,055.20 $ S:\MunicipalV\OTSEGO13971PAY ESTIMATE\OT397 PE.xisx PE -2 PAY ESTIMATE #2 CITY OF OTSEGO KadterAvenue improvements, Project 17.04 Chnnap Order#1 ITEM NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 Floatatton Slit Curialn TYPB Still Water 200 LP $15,00 $ 3,000.00 200 $ 3,000-00 2 Sediment Control.Log TXpe Wood Fiber 685 LF $2.95 $ 2.020.78 685 $ 2,020.75 3 Rwk Ditch Check 7 EA $85.00 $ 595.00 7 $ 595,00 Bid Schedule "A" Bid Schedule "B" Bid Schedule "C" Bid Schedule "D" Change Order #1 TOTAL. Total Work Completed to Date LESS 5% RETAINAGE l,i~SS PAY ESTIMATE 41 WE RECOMMEND PAYMENT OF: APPROVALS: Total Change Order#1 $ 5,616.75 $ 6,615.75 $ 971,136,10 $ 196,784.40 $ 66,502.00 $ 45,017.00 $ 191,636.00 $ $ 60,055.20 $ 5,615.75 $ 5,615.75 $ 1,295,147.06 $ 249,417.15 $ 249,417.15 $ 12,470.86 $ 21,885,72 $ 211060.67 CONTRACTOR: LATOUR CONSTRUCTION, INC. Certification by CoWaQtor. I certify thAall Items and amounts are correct for the work completed to date. ENGINEER: HAKANSON ANDERSON Certification bye gin er, We reymme ent for work and quantities as shown. Stoned: / ?, -/may 1 Title:e;�1111 Date OWNER: CITY OFOTSEGO Title: S;WunlclpaNkOTSEGO13971PAY ESTIMATEIOT397 PE.xisx PE - 3 STATE AID FOR LOCAL TRANSPORTATION Rev.July2010 CHANGE ORDER Page 1 of 1 Kadler Avenue & 73rd Street Project _ _ Minn. Proj.--- N/A_ Project Location: Along Kadler Avenue from 70l" Street to 112 mile north and 73rd Street to j 1,000' west, Otsego, MN_ Local Aged -City of Otsego _ — Local Project No. 1704 Contractor: LaTour Construction, Inc. �� Contract No. Address/City/State/Zip: 2134 County Road 8 NW, Maple Lake, MN 55358 _ _ - ..:..:.,:..:..:.!�.g ....;:.:. .:.....:....... !$tip: � In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions: Station 3+00 to 7+50, west side of Kadler Avenue -- the wetland and storm pond are too wet to install two layers of silt fence as shown in the plans. Bio -rolls shall be installed in wetland areas where silt fence cannot be placed. A floating silt curtain shall be placed in the storm pond in lieu of silt fence. All labor and materials associated with this work shall be paid as Lineal Feet of Bio -Roll or Floating Silt Curtain. Chanae Order 1 ' *or— +or— Item No. Description _ Unit_ Unit Price Quantity Amount $ i 2573.505 Floatation Silt Curtain Type Still Water LF — $15.00 J.^ —200 $3,000.00 2573-533 Sediment Control Log Type Wood Fiber LF $2.95 685 $2,020.75 2573.602 Rock Ditch Check PA $85.00 7 $595.00 Net Change for Change Order No. 1 $5,615.75 Approved by Project Engineer: Date: Date: 9/4/18 Print Name: Brent Larson Phone: 763-228-6505 Approved by Contractor: Date: 14 Print Name: JO L' o_l- Phone: 3 -- 90 j_9� Distribution: Project Engineer (Original), Contractor (copy)