ITEM 3.5C Kadler Street improvement0tSc eF o
MINNESOTA C
DEPARTMENT INFORMATION
Request for
City Council Action
ORIGINATING DEPARTMENT
REQUESTOR:
MEETING DATE:
Public Works
City Engineer Wagner
September 10, 2018
PRESENTER(s)
REVIEWED BY:
ITEM #:
Consent
City Administrator/Finance Director
Flaherty
3.5C
STRATEGIC VISION
MEETS:
THE CITY OF OTSEGO;
for work completed on the Kadler Avenue and 73rd Street Improvement Project.
Is a strong organization that is committed to leading the community through innovative
communication.
X
Has proactively expanded infrastructure to responsibly provide core services.
No
Is committed to delivery of quality emergency service responsive to community needs and
expectations in a cost-effective manner.
All roads have been graded to subgrade. Boulevards are at or near finish grade. Only the ponds remain to
Is a social community with diverse housing, service options, and employment opportunities.
the street base onsite and leave loaded with the excess material off site. Approximately Y2 of the sanitary
Is a distinctive, connected community known for its beauty and natural surroundings.
AGENDA ITEM DETAILS
RECOMMENDATION:
Staff recommends approval of Pay Estimate #2 in the amount of $215,060.57 to LaTour Construction, Inc.
for work completed on the Kadler Avenue and 73rd Street Improvement Project.
ARE YOU SEEKING APPROVAL OF A CONTRACT?
ISA PUBLIC HEARING REQUIRED?
No
No
BACKGROUND/JUSTIFICATION:
All roads have been graded to subgrade. Boulevards are at or near finish grade. Only the ponds remain to
be graded and that will occur later during the project when they can "double haul" i.e, haul aggregate for
the street base onsite and leave loaded with the excess material off site. Approximately Y2 of the sanitary
sewer has been installed. Water and Sanitary sewer are anticipated to be complete by September 7th
Pay Estimate #2 is for $215,060.57.
Pay Estimate #2 includes Change Order #1. This change order was necessary due to the wetland and storm
pond along the west side of Kadler Avenue, just north of 70th Street was too wet to install silt fence as
planned. The water elevations required Sediment Control Logs/Bio-Rolls to be placed for approximately
340 feet in two layers. Two layers is required by the NPDES Permit to provide additional protection for the
wetland. The float curtain was necessary due to the water elevation in the storm pond. This float curtain
will also provide protection while reconstructing the storm pond outlet structure as well as multiple inlet
pipes. Change Order #1 is in the amount of $5,615.75. This does not reflect that approximately 1,085' of
silt fence is eliminated @ $1.60/LF thus saving $1,736.00.
SUPPORTING DOCUMENTS ATTACHED;
• Pay Estimate #2
• Change Order #1
POSSIBLE MOTION
PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES:
Motion to approve Pay Estimate #2 in the amount of $215,060.57 to LaTour Construction, Inc. for work
completed on the Kadler Avenue Improvement Project.
BUDGET INFORMATION
FUNDING:
BUDGETED:
Fund #438 — Kadler Avenue Improvements
No — The project will be financed by a grant from
Minnesota DEED and the issuance of debt. The
debt is to be repaid from a combination of special
assessments and property taxes.
PAY ESTIMATE #2
CITY OF OTSEGO
KadierAvenue Improvements,
Project 17-04
RiA Crh.A'd. "d" - C}-fr 1 -fl.. nraval madl
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
USED TO
DATE
EXTENSION
1
Mobilization
1
LS
$78,000,00 $
78,000.00
0.50
$ 39,000.00
2
Clearing and Grubbing
1
LS
$3,100.00 $
3,100.00
1
$ 3,100.00
3
Remove Bituminous Pavement
280
SY
$3.00 $
840.00
$
4
Sawing Bit Pavement Full Depth)
150
LF
$3.00 $
450.00
S
5
1 Remove Sewer Pipe (Storm)
119
LF
$7.00 $
833.00
$ -
6
Remove Manhole
1
EACH
$400.00 $
400.00
7
lRemaye Fence
300
LF
$2.00 $
600.00
300
$ 600.00
8
Common Excavation P
46,961
CY
$3.60 $
169,059.60
30,524
$ 109,886.40
9
Su rade Excavation E
4,925
CY
$1.051s
5,171.25
4,974
$ 5,222.70
10
Salvage Are ale E
1,291
CY
$4.25 §
5486.75
1,291
$ 5486.75
11
Salvaged Topsoil From Stock ilo L
11,956
CY
$2.10 $
26107.60
5 978
$ 12,553.80
12
Haul and Dispose of Excess Material (L
18,721
CY
$4.65 $
87052.65
2,2$1
$ 10467.15
13
Aggregate Base Class 3 or 4
17,633
TON
$8.60 $
151,643.80
$
14
Aggregate Base Class 5 Mod
5,871
TON
$10.40 $
$1,058.40
$
15
Mill Bituminous Surface 1.5"
36
SY
$16.30 $
586.60
$
16
Bituminous Material For Tack Coat
852
GAL
$2.10 $
1,789.20
$
17
Type SP 9.5 Wearing Course Mixture (3,C)
1,916
TON
$63.70 $
122,049.20
$
18
Type SP 12.5 Non Wear Course Mixture 3,C)
2,395
TON
$55.80 $
133,641.00
$
19
Concrete Curb & Gutter Design 13418
5,036
LF
$10.60 $
53,381.60
$
20
lConcrete Curb & Gutter Design B618
989
LF
$11.60 $
11,472.40
$
21
7" Concrete
402
BY
$57,00 $
22,914.00
$
22
4" Bituminous Curb
$24
LF
$9.00 $
2,916.00
$
23
Install Mail Box Support
1
EACH
$250.00 $
250.00
$
24
JTraffic, Control
1
LS
$1,950.00 S
1,950.00
0.5
$ 975.00
25
Sin Panels, Type G
70
SP
$41.00 $
2,870.00
$ -
26
Silt Fence, Type MS
8,412
LF
$1.60 $
13 459.20
6,486
$ 10,377,60
27
Storm Drain Inlet Protection
15
EACH
$185.00 $
2,775.00
1
$ 185.00
28
Stabilized Construction Exit
2
LS
$930.00 $
1,860.00
1
S 930.00
29
Turf Establishment
5
ACRE
$685,001 $
3,325.00
$
30
Erosion Control Blanket - Category 3
585
SY
$1.551s
906.75
$
31
Pavement Message (Arrows)
t0
EACH
$61.001s
610,00
5
32
24" Solid One Yellow - Paint
252
LF
$3.50 $
882.00
S
33
4" Double Solid Line Yellow- Paint
8,928
LF
$0.30 $
2,678.40
$
34
24" Solid Line White - Paint
71
LF
$3.60 $
248.50
$
35
4" Solid Line White - Paint
11,800
LF
$0.15 $
1,770.00
$
Total Bid Schedule "A" $ 971,138.10 $ 198,784,40
S:IMun1ctpahAOTSEG013971PAY ESTIMATElOT397 PE,xisx PE - 1
PAY ESTIMATE #2
CITY OF OTSEGO
Kadler Avenue Improvements,
Project 17-04
Rid Rrhnduln "B" . Aanifniv Rawer
ITEM
NO,
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
USED TO
DATE
EXTENSION
36
Connect to Existing Sanitary Sewer
1
EA
$4,500.00 S
4,500.00
2
$ 9,000.00
37
Casting Assembly
6
EA
$1,135.00 $
6,810.00
24" RC Pipe Apron
$
38
Raise Sanitary Structure
3
EA
$985.00 $
2,955.00
1
$
39
8" PVC SDR 26 Sanitary Sewer Pipe 18-22' De th
851
LF
$47.00 $
39,997.00
592
$ 27,824.00
40
Standard Manhole 0-10' de th
3
EACH
$2 680.00 $
71740.00
2
$ 5 160.00
41
JEX1ra Depth
30
VF
$i50.OD $
4,500,00
20.22
$ 3,033.00
Total Bid Schedule "B" $ 66,502.00 $ 45,017-00
Bid Schedule "C" - Storm Sewer
ITEM
NO,
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
USED TO
DATE EXTENSION
42
15" RC Pipe Apron
3
EACH
$770.00 $
2,310.00
$ -
43
18" RC Pipe Apron
3
EACH
$810.00 $
2,430.00
$
44
24" RC Pipe Apron
3
EACH
$890.00 $
2,670.00
$
45
24" HDPE Pipe Apron
1
EACH
$610,00 $
610.00
$
46
30" HDPE Pi a Apron
1 IFACH
LF
$U00.00.$
1,000.00
$
47
4" Perf PVC Pie Drain
626
LF
$14.00 $
8,764.00
5
48
12" RC Pipe Sewer Design 3006 CL V (all depths)
71
LF
$31.00 $
2,201.00
S
49
15" RC Pipe Sewer Design 3006 CL V all depths)
310
LF
$33.00 $
10,230.00
$
50
18" RC Pipe Server Design 3006 CL V (all depths)
1,015
LF
$36.00 $
36 640.00
$
51
24" RC Pipe Sewer Design 3006 CL III (all depths)
267
LF
$45.00 $
12,015.00
$
52
18" HDPE Pi a Sewer all depths)
854
LF
$26.00 $
22,204.00
$
53
24" HDPE Pipe Sewer all depths)
155
LF
$34.00 $
5,270.00
$
54
30" HDPE Pipe Sewer (all depths)
414
LF
$45,00 $
18,630.00
$
55
Construct Draina a Structure Design 48-4020
7
EACH
$2,000.00 $
14,000.00
$
56
Construct Drainage Structure Design 60.4020
3
EACH
$3,200.00 $
9,600.00
$
57
Construct Drainage Structure Design 72-4020
1
EACH
$4,300.00 $
4,300.00
$
58
Construct Drainage Structure Design 2'x3'
7
EACH
$2,000.00 $
14 000.00
$
59
48" Outlet Control Structure
2
EACH
$4,000,00 $
8,000.00
$
60
60" Outlet Control Structure
1
EACH
$5,500,00 $
5500.00
$
61
Articulated Interlocking Block Open Cell, Type A
141
Sy
$82.001 $
11,662.00
$
Total Bid Schedule "C" $ 191,836.00
Bid Schedule "D" - Watermain
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
SED TO
DATE EXTENSION
62
Connect to Existing - Water
1
EA
$940.00 $
940.00
63
6" Watermain Ductile Iron Cl 52
139
LF
$27.00 S
3,753.00
S
64
6" Watermain Ductile Iron Cl 52,
102
LF
$33.00 S
3,366.00
$
65
10" Watermain Ductile Iron C152
663
LF
$40.00 $
26520.00
$
66
10" Watermain Ductile Iron Cl 52 Extra Depth)
103
LF
$43.00 S
4429.00
$
67
4" Insulation
4
SY
$54.00 $
216.00
$
68
Hydrant
1
EA
$4250.00 $
4,250.00
$
69
6" Gate Valve And Box
1
EA
$1340.00 $
i,34D.00
$
70
10" Gale Valve And Box
1
EA
$2,670.00 $
2,670.00
$
71
Watermain Fittings
1,108
LBS
$3.90 $
4,321.20
$
72
Relocate and Plug Existing Hydrant
5
EA
$1,450.001 $
7,250.00
S
73
ITest Existing Hydrant
1 5 1
EA 1
$200,001$
1,000-00
$ -
Total Bid Schedule "D" $ 60,055.20 $
S:\MunicipalV\OTSEGO13971PAY ESTIMATE\OT397 PE.xisx PE -2
PAY ESTIMATE #2
CITY OF OTSEGO
KadterAvenue improvements,
Project 17.04
Chnnap Order#1
ITEM
NO, ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
USED TO
DATE
EXTENSION
1 Floatatton Slit Curialn TYPB Still Water
200
LP
$15,00 $
3,000.00
200
$ 3,000-00
2 Sediment Control.Log TXpe Wood Fiber
685
LF
$2.95 $
2.020.78
685
$ 2,020.75
3 Rwk Ditch Check
7
EA
$85.00 $
595.00
7
$ 595,00
Bid Schedule "A"
Bid Schedule "B"
Bid Schedule "C"
Bid Schedule "D"
Change Order #1
TOTAL.
Total Work Completed to Date
LESS 5% RETAINAGE
l,i~SS PAY ESTIMATE 41
WE RECOMMEND PAYMENT OF:
APPROVALS:
Total Change Order#1 $ 5,616.75 $ 6,615.75
$
971,136,10
$
196,784.40
$
66,502.00
$
45,017.00
$
191,636.00
$
$
60,055.20
$
5,615.75
$
5,615.75
$
1,295,147.06
$
249,417.15
$
249,417.15
$
12,470.86
$
21,885,72
$
211060.67
CONTRACTOR: LATOUR CONSTRUCTION, INC.
Certification by CoWaQtor. I certify thAall Items and amounts are correct for the work completed to date.
ENGINEER: HAKANSON ANDERSON
Certification bye gin er, We reymme ent for work and quantities as shown.
Stoned: / ?, -/may 1
Title:e;�1111 Date
OWNER: CITY OFOTSEGO
Title:
S;WunlclpaNkOTSEGO13971PAY ESTIMATEIOT397 PE.xisx PE - 3
STATE AID FOR LOCAL TRANSPORTATION Rev.July2010
CHANGE ORDER Page 1 of 1
Kadler Avenue & 73rd Street
Project _ _ Minn. Proj.--- N/A_
Project Location: Along Kadler Avenue from 70l" Street to 112 mile north and 73rd Street to j
1,000' west, Otsego, MN_
Local Aged -City of Otsego _ — Local Project No. 1704
Contractor: LaTour Construction, Inc. �� Contract No.
Address/City/State/Zip: 2134 County Road 8 NW, Maple Lake, MN 55358 _
_ -
..:..:.,:..:..:.!�.g ....;:.:. .:.....:....... !$tip: �
In accordance with the terms of this Contract, you are hereby authorized and instructed to
perform the work as altered by the following provisions:
Station 3+00 to 7+50, west side of Kadler Avenue -- the wetland and storm pond are too wet
to install two layers of silt fence as shown in the plans. Bio -rolls shall be installed in wetland
areas where silt fence cannot be placed. A floating silt curtain shall be placed in the storm
pond in lieu of silt fence. All labor and materials associated with this work shall be paid as
Lineal Feet of Bio -Roll or Floating Silt Curtain.
Chanae Order 1
' *or— +or—
Item No. Description _ Unit_ Unit Price Quantity Amount $
i 2573.505 Floatation Silt Curtain Type Still Water LF — $15.00 J.^ —200 $3,000.00
2573-533 Sediment Control Log Type Wood Fiber LF $2.95 685 $2,020.75
2573.602 Rock Ditch Check PA $85.00 7 $595.00
Net Change for Change Order No. 1 $5,615.75
Approved by Project Engineer: Date: Date: 9/4/18
Print Name: Brent Larson Phone: 763-228-6505
Approved by Contractor: Date: 14
Print Name: JO L' o_l- Phone: 3 -- 90 j_9�