Loading...
ITEM 3.8A Soccer Fields Well Room ModificationsRequest for 0tSCITY 240 F 90 City Council Action DEPARTMENT INFORMATION _:.-:::.:.:_____..:.w.wn::ry�u..,_.:..:_:.n::n.-.:.:.:....:.:.:..n.:.:..-....::.:-........:.:...:-.:_....._.n...:.. - --—.-.ry_-:._.:_N......w ._..-..........-........-._....._......-...-....--..-..-......_..-.n--...-..._.n..n,.-.-w..-..-. _.-.-_..w._..-..n...w_.....ry-.wryNw- ry._..-..-.. -_....__...-...._..................-....... o I I ATIN- T: E uE To : MEETING DATE: Parks and Recreation City Engineer Wagnr September 23, 2013 P E ENTEf ( : REVIEWED BY: ITEM Consent Agenda City Administrator Johnson 3.8A AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends approval of payment in the amount of $69,,525.28 for the Otsego Soccer Fields Well Bova Modifications and irrigation System to Great Northern Landscapes, Inc. ARE YOU SEEKING APPROVAL OFA CONTRACT? IS A PUBLIC HEARING REQUIRE D7 NO I NO The Irrigation system installed will provide the Otsego Soccer Fields with approximately I" of grater per week over the entire athletic turf area. The irrigation system was designed by Central Turf & Irrigations Supply. The system design required a booster pump to be installed next to the irrigation pond, pipe to be placed throughout the athletic fields, and between the fields and the booster pump (supplied by City but installed by Great Northern Landscaping, Inc) and Various irrigation control and electrical modifications and sensors to the public works well room to use the existing well as a water supply. Also included in this contract (via Change order No. is the installation of a concrete pad for the Please electrical transformer (installed by Wright -Hennepin) that is required to power the booster pump located next to the irrigation pond as well as some additional electrical work required to make the connection between the booster pump and the new transformer. The irrigation system has been completed and is currently operating manually. The system has yet to function on automatic; therefore we are not recommending 100 payment at this time. Our cost estimate from the Soccer Field Comprehensive Project Cost memo slated March 1 , 2013 was $102,500.00 for the irrigation system, boaster station, and VFD and Control items. We anticipate the entire project will remain within budget. f..9I: 193U9919111 811121 &1 Pair Estimate No. 0 ATTACHED n NONE POSSIBLE MOTION ................................n.._.............nN...n..._i.v...n......n.:........v...v............:.......vv..._.:.x.v....:......................_._... ..... .............n.........._.............,_.._.._..._:....:.......:...:..._............ .,..n_ ......... .:........_..._..._........._. _ _............._..._.....................x.. n.......... .... ....... ... .......... Please word moron a you would li�C t t' appear in the minutes. Motion to approve ayment to Great Northern Landscapes, Inc. in the amount of $69,525.28 for the Otsego Soccer Melds — VII Room Modifications and irrigation System for the Otsego Soccer Fields— ell Room Modifications and irrigation System. BUDGET INFORMATION FUNDING: BUDGETED: X YES 208 Community Facilities Funds TR ° No ACTION TAKEN u APPROVED ED AB REQUESTED ❑ DENIED ❑ TABLED o OTHER List rang COMMENTS: : PAY ESTIMATE #1 CITY OF OTSEGO Otsego Soccer Fields -Well Room Modification and Irrigation System September 18, 2013 Honorable Mayor & City Council City of Otsego 13409 90th Street NE Otsego, Mid 66330 RE: Otsego Soccer Fields - Well Room Modifications and Irrigation System Contractor: Great Northern Landscapes, Inc. Contract Amount: $79,985 Award Date: July 8, 2913 Completion Dato: August 9, 2013 Dear Honorable Mayor and CounolI Members: The following work Inas been completed on the above -referenced project by Great Northern Landscapes, Inc. 1310 SchadulG "A" ITER] NO. ITEM DESCRIPTION ESTIMATED {QUANTITY UNIT CONTRACT UNIT PENCE CONTRACTAMOUNT USED T DATE USED T DATE EXTENSION I well Room Modificaklons 1 LS $ 650.00 2,660.00 1 $ 2850.00 tester Pump Installation 1 LS $2,660,00 $ 2,650.00 1 1 2,650,00 3 Somer Held ]M ation System 1 LS $60,005.00 68 005.00 0.9 1 61,204.50 4 -Built Flans LS $0.001$ - T 1 $ Total B1d Schedule "A" 73,606.00 66 704.60 hannA Order No.1 ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRIDE CONTRACTAMOUNT USED T DATE EXTENSION I Lura Sure -- AdditlonaI E I ed ftal work 1 LS SP630.00 $ 5,530.00 1 5,680,00 Install minimum 60"x8Wx ° Concrete Aad 1 LS 650.00 660.00 1 650.00 3 I=umish and Install Casting for Wet well 1 LS 300.06 300.00 1 300-00] Total Doan a Order No.1 Bld Schedule 'W' Change Order No. I TOTAL Tota[ Wo Completed to Daae LESS % RETAINAGE: WE RECOMMEND PAYMENT OF: C:\U ers%fentl ppDataXLovalWi osoftX ndms\Temporar Internet File l ontent. utlook1S4 F JJM ot7 0 PE IRRIGATION.As PE R I 6,460.00 73x606.90 6,480.00 6,480.00 66,7'04.60 61480.00 73184.50 73,184.60 3,659.23 69,626.28 PAY ESTIMATE IMATE 1 CITY OF OTSEGO Otsego Soccer Fields -Well Room Modification tion anti Irrigation System APPROVALS: CONTRACTOR: GREAT NORTHERN LANDSCAPING, INC. Certification by Contractor: I certify that all Items and amounts are correct for the work completed to date. Signed:. -- _...... Title: ENGINEER: HAKANSON ANDERSON Date e€tiflo tion by Engineer: We recommend payment forwork and quantities as shown. Signed: Title: Date SIE; CITY OF OTSEGO Signed: Title: Date AU ser )bre tBAppDaWLocal W i orosoft\W nd oviffe M po ra ry Internet F i I e sIC onlent. 0 utlookl 4 Q FX JJ 81 ot720 PE IRRIGAT1ONAs PE