Loading...
ITEM 3.5B Pay Estimate #1 Sunram ConstructionOt TyFgo MiNNB50TA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT "REQUESTOR: MEETING DATE: Parks & Recreation Parks & Recreation Director Demant October 22, 2018 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.5 (B) MEETS: THE CITY OF OTSEGO: ARE YOU SEEKING APPROVAL OF A CONTRACT? Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. BACKGROUND/JUSTIFICATION: Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. SUPPORTING DOCUMENTS ATTACHED: Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Pay Estimate #1 in the amount of $123,574.57 to Sunram Construction, Inc. for work completed on the Norin Landing Park Improvements. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Construction of Norin Landing Park started in August 2018. Currently, the boat ramp, landing dock, and fishing pier have been installed, and a majority of the site grading has been completed. Sunram Construction, Inc. has submitted their first pay request, with work completed in the amount of $130,078.49. In accordance with Minnesota State Statue §337.10, the City is withholding the maximum 5% retainage of work completed, which accounts for $6,503.92. SUPPORTING DOCUMENTS ATTACHED: • Sunram Construction, Inc. — Pay Estimate #1 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #1 in the amount of $123,574.57 to Sunram Construction, Inc. for work completed on the Norin Landing Park Improvements. BUDGET INFORMATION FUNDING: BUDGETED: Community Facilities: 208-45210-530 Yes Norin Lartding City of Otsego (2nd & 4th Monday) Pay App 1 Total Line Item Unit Bid Qty Unit Price Bid Mobilization LS 1 $49,000.67 $ 49,000.67 clearing AC 0.53 $8,200.00 $ 4,346.00 Grubbing AC 1 $5,455.00 $ 5,455.00 Remove Concrete Pipe LF 24 $21.00 $ 504.00 Remove Bituminous Pavement SY 427 $2.70 $ 1,152.90 Sawing Bituminous Pavement LF 31 $3.00 $ 93.00 Common Excavation LS 1 $39,000.00 $ 39,000.00 Topsoil Borrow - Infiltration Basin CY 61 $44.00 $ 2,684.00 Salvaged Topsoil from Stockpile CY 512 $14.15 $ 7,244.80 Haul Excess Material CY 1612 $20.00 $ 32,240.00 Aggregate Base Class 5 TN 1232 $20.55 $ 25,317.60 Mill Bituminous Surface 1.S" SY 12 $27.00 $ 324.00 Bituminous Material for Tack Coat GAL 13S $3.00 $ 405.00 Type SP 9.5 Wearing Course Mixture TN 485.7 $72.25 $ 35,091.83 Type SP 12.5 Non Wearing Course Mixture TN 303 $72.25 $ 21,891.75 Retaining Wall LS 1 $12,600.00 $ 12,600.00 4" Concrete Walk SF 266 $10.50 $ 2,793.00 Concrete Curb & Gutter Design B612 LF 1443 $13.60 $ 19,624.80 Truncated Domes SF 52 $63.00 $ 3,276.00 Traffic Control LS 1 $1,500.00 $ 1,500.00 Silt Fence Type Machine Sliced LF 992 $2.65 $ 7,628.80 Flotation Silt Curtain Type Moving Water LF 163 $19.00 $ 3,097.00 Storm Drain Inlet Protection EA 5 $150.00 $ 750.00. Stabilized Construction Exit EA 1 $1,200.00 $ 1,200.00 Erosion Control Blanket Category 0 SY 526 $1.65 $ 867.90 Pavement Message (Thru Arrow & Handicap) Paint EA 6 $27.00 $ 162.00 4" Solid Line White Paint LF 502 $0.35 $ 175.70 15" RC Pipe Apron EA 5 $920.00 $ 4,600.00 18" RC Pipe Apron EA 1 $1,070.00 $ 1,070.00 15" HDPE Pipe Sewer LF 275 $34.75 $ 9,556.25 15" RC Pipe Sewer Design 3006 CL V LF 293 $45.00 $ 13,185.00 18" HDPE Pipe Sewer LF 64 $41.00 $ 2,624.00 18" RCP Pipe Sewer Design 3006 CL V LF 37 $51.00 $ 1,887.00 Connect to Existing Storm Structure EA 1 $815.00 $ 815.00 Construct Draihage Structure Design 2' x 3' EA 1 $2,135.00 $ 2,135.00 Construct Drainage Structure Design 48" - 4020 EA 4 $2,735.00 $ 10,940.00 Construct Drainage Structure Design OCS EA 2 $3,750.00 $ 7,500.00 Random Rip -Rap Special CY 155 $95.00 $ 14,725.00 Articulated Interlocking Block Open Cell Type 3 SY 8 $175.00 $ 1,400.00 Concrete Plank Boat Ramp LS 1 $15,500.00 $ 15,500.00 F&1 MnDOT Class 2 Aggregate Trail SY 352 $16.25 $ 5,720.00 F&I 6" x 12" Concrete Edger LF 92 $27.00 $ 2,484.00 F&I Brick Pavers SF 292 $14.25 $ 4,161.00 F&I Limestone Block Seating EA 13 $725.00 $ 9,425.00 F&I 6'x 34' Boarding Dock w/Abutment EA 1 $15,200.00 $ 15,200.00 F&I Conrete Fishing Platform EA 1 $1,250.00 $ 1,250.00 F&I 2'x Tx 2' Glacial Boulder EA 3 $250.00 $ 750.00 F&I Trash Receptacle EA 2 $1,025.00 $ 2,050.00 F&I Picnic Table EA 4 $2,080.00 $ 8,320.00 F&I Game Table EA 4 $1,955.00 $ 7,820.00 F&I Grill EA 2 $760.00 $ 1,520.00 F&I Type A Seed Mix AC 0.3 $1,310.00 $ 393.00 F&I 2,5" Deciduous Tree EA 28 $565.00 $ 15,820.00 F&I 8' Coniferous Tree EA 17 $520.00 $ 8,840.00 F&I 2" NMC LF 600 $7.50 $ 4,500.00 Alternate Bid Items F&I Bituminous Trails - MnDot Class 2 Aggregate 10/4/2018 Quantity Pay 1 0.5 0.53 1 0.75 31.37 0.25 650 165 125 Quantity Quantity Quantity Pay 2 Pay 3 Pay 4 Trails SY 352 $35.00 $ 12,320.00 F&I Wood Overlook Deck LS 1 $32,000.00 $ 32,000.00 F&I 6' High Vinyl Coated Chain Link Fence LF 792 $35.00 $ 27,720.00 F&I 4" Concrete Pavement under Pavilion SF 637 $11.00 $ 7,007.00 Additional on site material moved to berm CY 1500 $8.00 1800 8/23 Additional Clearing LS 1 $2,425.00 1 $52 6,663.00 Pay App 1$130,078.49 5% Retalnage = $6,503.92 1st Payment $123,574.57 Total Complete $24,500.34 $4,346,00 Tree Top $5,455.00 Tree Top $0.00 $0.00 $0.00 $29,250.00 $0.00 $0.00 $0.00 $644.65 9/10 Barton $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $375.00 $1,722.50 Groundscape $3,135.00 Groundscape $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $11,875.00 Martin 176.66 tons $0.00 $15,500.00 $0.00 $0.00 $0.00 $0.00 $15,200.00 $1,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14,400.00 $2,425.00 Tree Top $130,078.49 Confidential 10/4/2018 Page 1