Loading...
ITEM 3.4E Norin Landing Park4-0 ots71.r o MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks & Recreation Parks & Recreation Director Demant November 26, 2018 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.4E STRATEGIC VISION MEETS: ITHE CITY OF-OTSEGO: the construction of Norin Landing Park. Is a strong organization that is committed to leading the community through innovative communication. IS A PUBLIC HEARING REQUIRED?r Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Construction of Norin Landing Park started in August 2018 and is currently stopped due to weather Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings.7A AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Sunram Construction, Inc. Pay Request #2 in the amount of $162,317.57 for the construction of Norin Landing Park. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED?r No No BACKGROUND/JUSTIFICATION: Construction of Norin Landing Park started in August 2018 and is currently stopped due to weather conditions and will begin again in the spring of 2019. Items which have been completed include the trail, curb and gutter, and the base course of the parking lot. Installation of the landscaping, parking lot wear course, and items connected with the shelter will be completed in the spring of 2019. Sunram Company has submitted their second pay request in the amount of $162,317.57. In accordance with Minnesota State Statue 337.10, the City is withholding the maximum 5% retainage of work completed, which accounts for $15,046.96 of the completed total of $300,939.10. SUPPORTING DOCUMENTS ATTACHED: 0 Sunram Construction, Inc. - Pay Request #2 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Staff recommends approval of Sunram Construction, Inc. Pay Request #2 in the amount of $162,317.57 for the construction of Norin Landing Park. BUDGET INFORMATION FUNDING: BUDGETED: Fund #208 — Community Facilities Yes Norin Landing City of Otsego (2nd & 4th Monday) Line Item Mobilization Clearing Grubbing Remove Concrete Pipe Remove Bituminous Pavement Sawing Bituminous Pavement Common Excavation Topsoil Borrow - Infiltration Basin Salvaged Topsoil from Stockpile Haul Excess Material Aggregate Base Class 5 Mill Bituminous Surface 1.5" Bituminous Material for Tack Coat Type SP 9.5 Wearing Course Mixture Type SP 12.5 Non Wearing Course Mixture Retaining Wall 4" Concrete Walk Concrete Curb & Gutter Design 8612 Truncated Domes Traffic Control Silt Fence Type Machine Sliced Flotation Silt Curtain Type Moving Water Storm Drain Inlet Protection Stabilized Construction Exit Erosion Control Blanket Category 0 Pavement Message (Thru Arrow & Handicap) Paint 4" Solid Line White Paint 15" RC Pipe Apron 18" RC Pipe Apron 15" HDPE Pipe Sewer 15" RC Pipe Sewer Design 3006 CL V 18" HDPE Pipe Sewer 18" RCP Pipe Sewer Design 3006 CL V Connect to Existing Storm Structure Construct Drainage Structure Design 2'x 3' Construct Drainage Structure Design 48" - 4020 Construct Drainage Structure Design OCS Random Rip -Rap Special Articulated Interlocking Block Open Cell Type 3 Concrete Plank Boat Ramp F&I MnDOT Class 2 Aggregate Trail F&I 6" x 12" Concrete Edger F&I Brick Pavers F&I Limestone Block Seating F&I 6'x 34' Boarding Dock w/Abutment F&I Conrete Fishing Platform F&I 2'x Tx 2' Glacial Boulder F&I Trash Receptacle F&1 Picnic Table F&I Game Table F&I Grill F&I Type A Seed Mix F&12.5" Deciduous Tree F&I 8' Coniferous Tree F&I 2" NMC Alternate Bid Items F&I Bituminous Trails - MnDot Class 2 Aggregate Trails F&I Wood Overlook Deck F&I 6' High Vinyl Coated Chain Link Fence F&I 4" Concrete Pavement under Pavilion Additional on site material moved to berm 8/23 Additional Clearing Pay App 1$130,078.49 Pay App 2 $170,860.61 5% Retainage = $15,046.96 1st Payment $123,574.57 2nd Payment $162,317.57 Pay App 2 10/4/2018 11/20/2018 Quantity Quantity Quantity Quantity Pay 1 Pay 2 Pay 3 Pay 4 0.5 Total Unit Bid Qty Unit Price Bid LS 1 $49,000.67 $ 49,000.67 AC 0.53 $8,200.00 $ 4,346.00 AC 1 $5,455.00 $ 5,455.00 LF 24 $21.00 $ 504.00 SY 427 $2.70 $ 1,152.90 LF 31 $3.00 $ 93.00 LS 1 $39,000.00 $ 39,000.00 CY 61 $44.00 $ 2,684.00 CY 512 $14.15 $ 7,244.80 CY 1612 $20.00 $ 32,240.00 TN 1232 $20.55 $ 25,317.60 SY 12 $27.00 $ 324.00 GAL 135 $3.00 $ 405.00 TN 485.7 $72.25 $ 35,091.83 TN 303 $72.25 $ 21,891.75 LS 1 $12,600.00 $ 12,600.00 SF 266 $10.50 $ 2,793.00 LF 1443 $13.60 $ 19,624.80 SF 52 $63.00 $ 3,276.00 LS 1 $1,500.00 $ 1,500.00 LF 992 $2.65 $ 2,628.80 LF 163 $19.00 $ 3,097.00 EA 5 $150.00 $ 750.00 EA 1 $1,200.00 $ 1,200.00 SY 526 $1.65 $ 867.90 EA 6 $27.00 $ 162.00 LF 502 $0.35 $ 175.70 EA 5 $920.00 $ 4,600.00 EA 1 $1,070.00 $ 1,070.00 LF 275 $34.75 $ 9,556.25 LF 293 $45.00 $ 13,185.00 LF 64 $41.00 $ 2,624.00 LF 37 $51.00 $ 1,887.00 EA 1 $815.00 $ 815.00 EA 1 $2,135.00 $ 2,135.00 EA 4 $2,735.00 $ 10,940.00 EA 2 $3,750.00 $ 7,500.00 CY 155 $95.00 $ 14,725.00 SY 8 $175.00 $ 1,400.00 LS 1 $15,500.00 $ 15,500.00 SY 352 $16.25 $ 5,720.00 LF 92 $27.00 $ 2,484.00 SF 292 $14.25 $ 4,161.00 EA 13 $725.00 $ 9,425.00 EA 1 $15,200.00 $ 15,200.00 EA 1 $1,250.00 $ 1,250.00 EA 3 $250.00 $ 750.00 EA 2 $1,025.00 $ 2,050.00 EA 4 $2,080.00 $ 8,320.00 EA 4 $1,955.00 $ 7,820.00 EA 2 $760.00 $ 1,520.00 AC 0.3 $1,310.00 $ 393.00 EA 28 $565.00 $ 15,820.00 EA 17 $520.00 $ 8,840.00 LF 600 $7.50 $ 4,500.00 10/4/2018 11/20/2018 Quantity Quantity Quantity Quantity Pay 1 Pay 2 Pay 3 Pay 4 0.5 0.25 0.53 $0.00 1 $7,007.00 Schmidt CY 1500 $8.00 1800 0 24 LS 1 $2,425.00 1 427 $526,663.00 31 0.75 0.25 512 31.37 1595.63 1 278 1443 56 0.25 0.25 650 165 125 S 1 275 293 64 37 1 1 4 2 30 61 75 Total Complete $36,750.50 $4,346.00 Tree Top $5,455.00 Tree Top $504.00 Penn $1,152.90 $93.00 $39,000.00 $0.00 $7,244.80 $0.00 $33,434.85 9/10 Barton $0.00 $0.00 $0.00 $0.00 $12,600.00 $2,919.00 Schmidt $19,624.80 Schmidt $3,528.00 Schmidt $750.00 $1,722.50 Groundscape $3,135.00 Groundscape $450.00 $1,200.00 $0.00 $0.00 $0.00 $4,600.00 Penn $1,070.00 Penn $9,556.25 Penn $13,185.00 Penn $2,624.00 Penn $1,887.00 Penn $815.00 Penn $2,135.00 Penn $10,940.00 Penn $7,500.00 Penn $14,725.00 $0.00 $15,500.00 $0.00 $1,647.00 Schmidt $0.00 $0.00 $15,200.00 $1,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $562.50 SY 352 $35.00 $ 12,320.00 $0.00 LS 1 $32,000.00 $ 32,000.00 $0.00 LF 792 $35.00 $ 27,720.00 $0.00 SF 637 $11.00 $ 7,007.00 637 $7,007.00 Schmidt CY 1500 $8.00 1800 0 $14,400.00 LS 1 $2,425.00 1 $2,425.00 Tree Top $526,663.00 $300,939.10