Loading...
ITEM 3.7 Nornin Landing Park Construction4) F 066 / 0 MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks & Recreation Parks & Recreation Director Demant January 28, 2019 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.7 STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Sunram Construction, Inc. Pay Request #3 in the amount of $119,744.96 for the construction of Norin Landing Park. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Construction of Norin Landing Park began in August 2018 and is slated for completion in the spring of 2019. The majority of the construction of the park is complete with the final lift of asphalt in the parking lot, landscaping, and installation of picnic tables and other minor equipment left to complete. Sunram Construction, Inc. has submitted their third pay request in the amount of $126,047.32. In accordance with Minnesota State Statue 337.10, the City is withholding the maximum 5% retainage of work completed, which accounts for $6,302.36. After factoring in the 5% retainage, Sunram Construction Inc. request is $119,744.96. SUPPORTING DOCUMENTS ATTACHED: • Sunram Construction, Inc. - Pay Request #3 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion for approval of Sunram Construction, Inc. Pay Request #3 in the amount of $119,744.96 for the construction of Norin Landing Park. BUDGET INFORMATION FUNDING:BUDGETED: Fund #208—Community Facilities Yes Norin Landing City of Otsego (2nd & 4th Monday) Line Item Mobilization Clearing Grubbing Remove Concrete Pipe Remove Bituminous Pavement Sawing Bituminous Pavement Common Excavation Topsoil Borrow - Infiltration Basin Salvaged Topsoil from Stockpile Haul Excess Material Aggregate Base Class 5 Mill Bituminous Surface 1.5" Bituminous Material forTack Coat Type SP 9.5 Wearing Course Mixture Type SP 12.5 Non Wearing Course Mixture Retaining Wall 4" Concrete Walk Concrete Curb & Gutter Design B612 Truncated Domes Traffic Control Slit Fence Type Machine Sliced Flotation Slit Curtain Type Moving Water Storm Drain Inlet Protection Stabilized Construction Exit Erosion Control Blanket Category 0 Pavement Message (Thru Arrow & Handicap) Paint 4" Solid Line White Paint 15" RC Pipe Apron 18" RC Pipe Apron 15" HDPE Pipe Sewer 15" RC Pipe Sewer Design 3006 CL V 18" HDPE Pipe Sewer 18" RCP Pipe Sewer Design 3006 CL V Connect to Existing Storm Structure Construct Drainage Structure Design 2'x 3' Construct Drainage Structure Design 48" -4020 Construct Drainage Structure Design. OCS Random Rip -Rap Special Articulated Interlocking Block Open Cell Type 3 Concrete Plank Boat Ramp F&I MnDOT Class.2 Aggregate Trail F&I 6" x 12" Concrete Edger F&I Brick Pavers F&I Limestone Block Seating F&I 6'x 34' Boarding Dock w/Abutment F&I Conrete Fishing Platform F&I 2'x 3'X 2' Glaclal Boulder F&I Trash Receptacle F&I Picnic Table F&I Game Table F&I Grill F&I Type A Seed Mix F&I 2.5" Deciduous Tree F&18' Coniferous Tree F&I 2" NMC Alternate Bid Items F&I Bituminous Trails- MnDot Class 2 Aggregate Trails F&I Wood Overlook Deck F&I 6' High Vinyl Coated Chain Link Fence F&14" Concrete Pavement under Pavilion Additional on site material moved to berm 8/23 Additional Clearing 11/27 Hay Bales & Labor Pay App 1$130,078.49 Pay App 2 $170,860.61 Pay App 3 $126,047.32 5% Retainage = $21,349.32 1st Payment $123,574.57 2nd Payment $162,317.57 3rd Payment $119,744.96 Pay App 3 10/4/2018 11/20/2018 1/24/2019 Total Quantity Quantity Quantity Quantity Total Unit Bid Qty Unit Price Bid Pay Pay Pay Pay Complete LS 1 $49,000.67 $ 49,000.67 0.5 0.25 0.10 $41,650.57 AC 0.53 $8,200.00 $ 4,346,00 0.53 $4,346.00 AC 1 $5,455.00 $ 5,455.00 1 $5,455.00 LF 24 $21.00 $ 504.00 24 $504.00 SY 427 $2.70 $ 1,152.90 427 $1,152.90 LF 31 $3.00 $ 93.00 31 $93.00 LS 1 $39,000.00 $ 39,000.00 0.75 0.25 $39,000.00 CY 61 $44.00 $ 2,684.00 $0.00 CY 512 $14.15 $ 7,244.80 512 $7,244.80 CY 1612 $20.00 $ 32,240.00 $0.00 TN 1232 $20.55 $ 25,317.60 31.37 1595.63 $33,434.85 SY 12 $27.00 $ 324.00 $0.00 GAL 135 $3.00 $ 405.00 $0.00 TN 485.7 $72.25 $ 35,091.83 117 $8,453.25 TN 303 $72.25 $ 21,891.75 284 $20,519.00 LS 1 $12,600.00 $ 12,600.00 1 $12,600.00 SF 266 $10.50 $ 2,793.00 278 $2,919.00 LF 1443 $13.60 $ 19,624.80 1443 $19,624.80 SF 52 $63.00 $ 3,276.00 56 $3,528.00 LS 1 $1,500.00 $ 1,500.00 0.25 0.25 $750.00 LF 992 $2.65 $ 2,628.80 650 $1,722.50 LF 163 $19.00 $ 3,097.00 165 $3,135.00 EA 5 $150.00 $ 750.00 3 $450.00 EA 1 $1,200.00 $ 1,200.00 1 $1,200.00 SY 526 $1.65 $ 867.90 $0.00 EA 6 $27.00 $ 162.00 $0.00 LF 502 $0.35 $ 175.70 $0.00 EA 5 $920.00 $ 4,600.00 5 $4,600.00 EA 1 $1,070,00 $ 1,070.00 1 $1,070.00 LF 275 $34.75 $ 9,556.25 275 $9,556.25 LF 293 $45.00 $ 13,185.00 293 $13,185.00 LF 64 $41.00 $ 2,624.00 64 $2,624.00 LF 37 $51.00 $ 1,887.00 37 $1,887.00 EA 1 $815.00 $ 815.00 1 $815.00 EA 1 $2,135.00 $ 2,135.00 1 $2,135.00' EA 4 $2,735.00 $ 10,940.00 4 $10,940.00 EA 2 $3,750.00 $ 7,500.00 2 $7,500.00 CY 155 $95.00 $ 14,725.00 125 30 $14,725.00 SY 8 $175.00 $ 1,400.00 $0.00 LS 1 $15,500.00 $ 15,500.00 1 $15,500.00 SY 352 $16.25 $ 5,720.00 $0.00 LF 92 $27.00 $ 2,484.00 61 $1,647,00 SF 292 $14.25 $ 4,161.00 100 $1,425.00 EA 13 $725.00 $ 9,425.00 9 $6,525.00 EA 1 $15,200.00 $ 15,200.00 1 $15,200.00 EA 1 $1,250.00 $ 1,250.00 1 $1,250.00 EA 3 $250.00 $ 750.00 $0.00 EA 2 $1,025.00 $ 2,050.00 2 $2,050.00 EA 4 $2,080.00 $ 8,320.00 4 $8,320.00. EA 4 $1,955.00 $ 7,820.00 4 $7,820.00 EA 2 $760.00 $ 1,520.00 2 $1,520.00 AC 0.3 $1,310.00 $ 393.00 $0.00 EA 28 $565.00 $ 15,820.00 $0.00 EA 17 $520.00 $ 8,840.00 $0.00 LF 600 $7.50 $ 4,500.00 75 $562.50 SY 352 $35.00 $ 12,320.00 352 $12,320.00 LS 1 $32,000.00 $ 32,000.00 1 $32,000.00 LF 792. $35.00 $ 27,720.00 577 $20,195.00 $F 637 $11.00 $ 7,007.00 637 $7,007.00 CY 1500 $8.00 1800 0 $14,400.00 LS. 1 $2,425.00 1 $2,425.00 $526,663.00 $426,986.42