Loading...
ITEM 3.8 Norin Landing ParkA 11 Y 0 Otk1 C o MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks & Recreation Parks & Recreation Director Demant March 11, 2019 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.8 STRATEGIC VISION MEETS: :I THE CITY OF OTSEGO: ,I Is a strong organization that is committed to leading the community through innovative communication. Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Sunram Construction, Inc. Pay Request #4 in the amount of $12,616.00 for the construction of Norin Landing Park. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FI CAT[ ON: Construction of Norin Landing Park began in August 2018 and is slated for completion in the spring of 2019. Sunram (the Contractor) has submitted their fourth pay request in the amount of $13,280.00. In accordance with Minnesota State Statue 337.10, the City is withholding the maximum 5% retainage of work completed, which accounts for $664.00. After factoring the 5% retainage, the pay request is for $12,616.00. Included with the Contractors's 4th pay request, is 610 cubic yards of site material that has been moved to the large berm located in the south end of the park. Originally, this material was going to be hauled away. However, after conferring with the contractor, neighbors, and the City Engineer, relocating the material on- site and creating a larger berm was more cost effective and aesthetically appealing. The estimated cost savings by relocating the material on-site rather than hauling it away is $12,960.00. SUPPORTING DOCUMENTS ATTACHED: 0 Sunram Construction, Inc. - Pay Request #4 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THEM I NUTES: Motion for approval of Sunram Construction, Inc. Pay Request #4 in the amount of $12,616.00 for the construction of Norin Landing Park. FUNDING: BUDGETED: Fund #208 — Community Facilities Yes Norin Landing City of Otsego (2nd & 4th Monday) Line Item Mobilization Clearing Grubbing Remove Concrete Pipe Remove Bituminous Pavement Sawing Bituminous Pavement Common Excavation Topsoil Borrow - Infiltration Basin Salvaged Topsoil from Stockpile Haul Excess Material Aggregate Base Class 5 Mill Bituminous Surface 1.5" Bituminous Material for Tack Coat Type SP 9.5 Wearing Course Mixture Type SP 12.5 Non Wearing Course Mixture Retaining Wall 4" Concrete Walk Concrete Curb & Gutter Design. B612 Truncated Domes Traffic Control Silt Fence Type Machine Sliced Flotation Silt Curtain Type Moving Water Storm Drain Inlet Protection Stabilized Construction Exit Erosion Control Blanket Category 0 Pavement Message (Thru Arrow & Handicap) Paint 4" Solid Line White Paint 15" RC Pipe Apron 18" RC Pipe Apron 15" HDPE Pipe Sewer 15" RC Pipe Sewer Design 3006 CL V 18" HDPE Pipe Sewer 18" RCP Pipe Sewer Design 3006 CL V Connect to Existing Storm Structure Construct Drainage Structure Design 2' x 3' Construct Drainage Structure Design 48" - 4020 Construct Drainage Structure Design PCS Random Rip -Rap Special Articulated Interlocking Block Open Cell Type 3 Concrete Plank Boat Ramp F&I MnDOT Class 2 Aggregate Trail F&I 6" x 12" Concrete Edger F&I Brick Pavers F&I Limestone Block Seating F&I 6'x 34' Boarding Dock w/Abutment F&I Conrete Fishing Platform F&I 2'x 3'x 2' Glacial Boulder F&I Trash Receptacle F&I Picnic Table F&I Game Table F&I Grill F&I Type A Seed Mix F&I 2.5" Deciduous Tree F&I 8' Coniferous Tree F&I 2" NMC Alternate Bid Items F&I Bituminous Trails - MnDot Class 2 Aggregate Trails F&I Wood Overlook Deck F&I 6' High Vinyl Coated Chain Link Fence F&I 4" Concrete Pavement under Pavilion Additional on site material moved to berm 8/23 Additional Clearing 11/27 Hay Bales & Labor Pay App 1$130,078.49 Pay App 2 $170,860.61 Pay App 3 $126,047.32 Pay App 4 $13,280.00 5% Retainage = $22,013.32 1st Payment $123,574.57 2nd Payment $162,317.57 3rd Payment $119,744.96 4th Payment $12,616.00 Pay App 4 10/4/2018 11/20/2018 12/26/2018 2/5/2019 Quantity Quantity Quantity Quantity Tata I Unit Bid Qty Unit Price Bid LS 1 $49,000.67 $ 49,000.67 AC 0.53 $8,200.00 $ 4,346.00 AC 1 $5,455.00 $ 5,455.00 LF 24 $21.00 $ 504.00 SY 427 $2.70 $ 1,152.90 LF 31 $3.00 $ 93.00 LS 1 $39,000.00 $ 39,000.00 CY 61 $44.00 $ 2,684.00 CY 512 $14.15 $ 7,244.80 CY 1612 $20.00 $ 32,240.00 TN 1232 $20.55 $ 25,317.60 SY 12 $27.00 $ 324.00 GAL 135 $3.00 $ 405.00 TN 485.7 $72.25 $ 35,091.83 TN 303 $72.25 $ 21,891.75 LS 1 $12,600.00 $ 12,600.00 SF 266 $10.50 $ 2,793.00 LF 1443 $13.60 $ 19,624.80 SF 52 $63.00 $ 3,276.00 LS 1 $1,500.00 $ 1,500.00 LF 992 $2.65 $ 2,628.80 LF 163 $19.00 $ 3,097.00 EA 5 $150.00 $ 750.00 EA 1 $1,200.00 $ 1,200.00 SY 526 $1.65 $ 867.90 EA 6 $27.00 $ 162.00 LF 502 $0.35 $ 175.70 EA 5 $920.00 $ 4,600.00 EA 1 $1,070.00 $ 1,070.00 LF 275 $34.75 $ 9,556.25 LF 293 $45.00 $ 13,185,00 LF 64 $41.00 $ 2,624.00 LF 37 $51.00 $ 1,887.00 EA 1 $815.00 $ 815.00 EA 1 $2,135.00 $ 2,135.00 EA 4 $2,735.00 $ 10,940.00 EA 2 $3,750.00 $ 7,500.00 CY 155 $95.00 $ 14,725.00 SY 8 $175.00 $ 1,400.00 LS 1 $15,500.00 $ 15,500.00 SY 352 $16.25 $ 5,720.00 LF 92 $27.00 $ 2,484.00 SF 292 $14.25 $ 4,161.00 EA 13 $725.00 $ 9,425.00 EA 1 $15,200.00 $ 15,200.00 EA 1 $1,250.00 $ 1,250.00 EA 3 $250.00 $ 750.00 EA 2 $1,025.00 $ 2,050.00 EA 4 $2,080.00 $ 8,320.00 EA 4 $1,955.00 $ 7,820.00 EA 2 $760.00 $ 1,520.00 AC 0.3 $1,310.00 $ 393.00 EA 28 $565.00 $ 15,820.00 EA 17 $520.00 $ 8,840.00 LF 600 $7.50 $ 4,500,00 10/4/2018 11/20/2018 12/26/2018 2/5/2019 Quantity Quantity Quantity Quantity Pay 1 Pay 2 Pay 3 Pay 4 0.5 0.25 0.10 0.53 CY 1500 1 LS 1 $2,425.00 24 $8.00 427 $526,663.00 31 0.75 0.25 512 31.37 1595.63 117 284 SY 352 $35.00 $ 12,320.00 LS 1 $32,000.00 $ 32,000.00 LF 792 $35.00 $ 27,720.00 SF 637 $11.00 $ 7,007.00 CY 1500 $8.00 LS 1 $2,425.00 $8.00 $526,663.00 0.25 650 165 125 1 278 1443 56 0.25 5 1 275 293 64 37 1 1 4 2 30 0.25 61 100 9 2 4 4 4 -4 2 75 Total Complete $41,650.57 $4,346.00 $5,455.00 $504.00 $1,152.90 $93.00 $39,000.00 $0.00 $7,244.80 $0.00 $33,434.85 $0.00 $0.00 $8,453.25 $20,519.00 $12,600.00 $2,919.00 $19,624,80 $3,528.00 $1,126.00 $1,722.50 $3,135.00 $450.00 $1,200.00 $0.00 $0.00 $0.00 $4,600.00 $1,070.00 $9,556.25 $13,185.00 $2,624.00 $1,887.00 $815.00 $2,135.00 $10,940.00 $7,500.00 $14,725.00 $0.00 $15,500.00 $0.00 $1,647.00 $1,425.00 $6,525.00 $15,200,00 $1,250.00 $0.00 $2,050.00 $16,640.00 $0.00 $1,520.00 $0.00 $ 0.00 $0.00 $562.50 352 $12,320.00 1 $32,000.00 577 215 $27,720.00 637 $7,007.00 1800 0 610 $19,280.00 1 $2,425.00 $0.00 $440,266.42