Loading...
ITEM 3.12 Norin Landing Park066 Y F o MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks & Recreation Parks & Recreation Director Demant June 10, 2019 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.12 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: ARE YOU SEEKING APPROVAL OF A CONTRACT? Is a strong organization that is committed to leading the community through innovative communication. No Has proactively expanded infrastructure to responsibly provide core services. BACKGROUND/JUSTIFICATION: Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. SUPPORTING DOCUMENTS ATTACHED: Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Sunram Construction, Inc. Pay Request #5 in the amount of $38,229.05 for the construction of Norin Landing Park. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Construction of Norin Landing Park began in August 2018 and is slated for completion this summer. Sunram Construction, Inc. has submitted their fifth pay request in the amount of $40,241.10. In accordance with Minnesota State Statue 337.10, the City is withholding the maximum 5% retainage of work completed, which on this pay request accounts for $2,012.05, for a total retainage withholding of $24,025.37. After factoring the 5% retainage, Sunram Construction Inc. request is for $38,229.05. SUPPORTING DOCUMENTS ATTACHED: • Sunram Construction, Inc. - Pay Request #5 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve the Sunram Construction, Inc. Pay Request #5 in the amount of $38,229.05 for the construction of Norin Landing Park. BUDGET INFORMATION FUNDING: BUDGETED: Fund #208 — Community Facilities Yes Norin Landing City of Otsego (2nd & 4th Monday) Line Item Mobilization Clearing Grubbing Remove Concrete Pipe Remove Bituminous Pavement Sawing Bituminous Pavement Common Excavation Topsoil Borrow- Infiltration Basin Salvaged Topsoil from Stockpile Haul Excess Material Aggregate Base Class 5 Mill Bituminous Surface 1.5" Bituminous Material for Tack Coat Type SP 9.5 Wearing Course Mixture Type SP 12.5 Non Wearing Course Mixture Retaining Wall 4" Concrete Walk Concrete Curb & Gutter Design 6612 Truncated Domes Traffic Control Silt Fence Type Machine Sliced Flotation Silt Curtain Type Moving Water Storm Drain Inlet Protection Stabilized Construction Exit Erosion Control Blanket Category 0 Pavement Message (Thru Arrow & Handicap) Paint 4" Solid Line White Paint 15" RC Pipe Apron 18" RC Pipe Apron 15" HDPE Pipe Sewer 15" RC Pipe Sewer Design 3006 CL V 18" HDPE Pipe Sewer 18" RCP Pipe Sewer Design 3006 CL V Connect to Existing Storm Structure Construct Drainage Structure Design 2'x 3' Construct Drainage Structure Design 48" - 4020 Construct Drainage Structure Design OCS Random Rip -Rap Special Articulated Interlocking Block Open Cell Type 3 Concrete Plank Boat Ramp F&I MnDOT Class 2 Aggregate Trail F&I 6" x 12" Concrete Edger F&I Brick Pavers F&I Limestone Block Seating F&I 6'x 34' Boarding Dock w/Abutment F&I Conrete Fishing Platform F&I 2' x 3' x 2' Glacial Boulder F&I Trash Receptacle F&I Picnic Table F&I Game Table F&I Grill F&I Type A Seed Mix F&I 2.5" Deciduous Tree F&I 8' Coniferous Tree F&I 2" NMC Alternate Bid Items F&I Bituminous Trails- MnDot Class 2 Aggregate Trails F&I Wood Overlook Deck F&I 6' High Vinyl Coated Chain Link Fence F&I 4" Concrete Pavement under Pavilion Additional on site material moved to berm 8/23 Additional Clearing 11/27 Hay Bales & Labor Pay App 1$130,078.49 Pay App 2 $170,860.61 Pay App 3 $126,047.32 Pay App 4 $13,280.00 Pay App 5 $40,241.10 5% Retainage = $24,025.37 1st Payment $123,574.57 2nd Payment $162,317.57 3rd Payment $119,744.96 4th Payment $12,616.00 5th Payment $38,229.05 Pay App 5 10/4/2018 11/20/2018 2/5/2019 5/31/2019 Total Quantity Quantity Quantity Quantity Total Unit Bid Qty Unit Price Bid Pay 1 Pay 2 Pay 3-4 Pay 5 Complete LS 1 $49,000.67 $ 49,000.67 0.5 0.25 0.10 0.15 $49,000.67 AC 0.53 $8,200.00 $ 4,346.00 0.53 $4,346.00 AC 1 $5,455.00 $ 5,455.00 1 $5,455.00 LF 24 $21.00 $ 504.00 24 $504.00 SY 427 $2.70 $ 1,152.90 427 $1,152.90 LF 31 $3.00 $ 93.00 31 $93.00 LS 1 $39,000.00 $ 39,000.00 0.75 0.25 $39,000,00 CY 61 $44.00 $ 2,684.00 $0.00 CY 512 $14.15 $ 7,244.80 512 $7,244.80 CY 1612 $20.00 $ 32,240.00 $0.00 TN 1232 $20.55 $ 25,317.60 31.37 1595.63 $33,434.85 SY 12 $27.00 $ 324.00 $0.00 GAL 135 $3.00 $ 405.00 $0.00 TN 485.7 $72.25 $ 35,091.83 117 $8,453.25 TN 303 $72.25 $ 21,891.75 284 $20,519.00 LS 1 $12,600.00 $ 12,600.00 1 $12,600.00 SF 266 $10.50 $ 2,793.00 278 $2,919.00 LF 1443 $13.60 $ 19,624.80 1443 $19,624.80 SF 52 $63.00 $ 3,276.00 56 $3,528.00 LS 1 $1,500.00 $ 1,500.00 0.25 0.25 0.25 0.25 $1,500.00 LF 992 $2.65 $ 2,628.80 650 $1,722.50 LF 163 $19.00 $ 3,097.00 165 $3,135.00 EA 5 $150.00 $ 750.00 3 $450.00 EA 1 $1,200.00 $ 1,200.00 1 $1,200.00 SY 526 $1.65 $ 867.90 500 $825.00 EA 6 $27.00 $ 162.00 $0.00 LF 502 $0.35 $ 175.70 $0.00 EA 5 $920.00 $ 4,600.00 5 $4,600.00 EA 1 $1,070.00 $ 1,070.00 1 $1,070.00 LF 275 $34.75 $ 9,556.25 275 $9,556.25 LF 293 $45.00 $ 13,185.00 293 $13,185.00 LF 64 $41.00 $ 2,624.00 64 $2,624.00 LF 37 $51.00 $ 1,887.00 37 $1,887.00 EA 1 $815.00 $ 815.00 1 $815.00 EA 1 $2,135.00 $ 2,135.00 1 $2,135.00 EA 4 $2,735.00 $ 10,940.00 4 $10,940.00 EA 2 $3,750.00 $ 7,500.00 2 $7,500.00 CY 155 $95.00 $ 14,725.00 125 30 $14,725.00 SY 8 $175.00 $ 1,400.00 $0.00 LS 1 $15,500.00 $ 15,500.00 1 $15,500..00 SY 352 $16.25 $ 5,720.00 $0.00 LF 92 $27.00 $ 2,484.00 61 $1,647.00 SF 292 $14.25 $ 4,161.00 100 $1,425.00 EA 13 $725.00 $ 9,425.00 9 4 $9,425.00 EA 1 $15,200.00 $ 15,200.00 1 $15,200.00 EA 1 $1,250.00 $ 1,250.00 1 $1,250.00 EA 3 $250.00 $ 750.00 $0.00 EA 2 $1,025.00 $ 2,050.00 2 $2,050.00 EA 4 $2,080.00 $ 8,320.00 8 $16,640.00 EA 4 $1,955.00 $ 7,820,00 0 $0.00 EA 2 $760.00 $ 1,520.00 2 $1,520.00 AC 0.3 $1,310.00 $ 393.00 0.10 $131.00 EA 28 $565.00 $ 15,820.00 28 $15,820.00 EA 17 $520.00 $ 8,840.00 17 $8,840.00 LF 600 $7.50 $ 4,500.00 75 $562.50 SY 352 $35.00 $ 12,320.00 352 $12,320.00 LS 1 $32,000.00 $ 32,000.00 1 $32,000.00 LF 792 $35.00 $ 27,720.00 792 $27,720.00 SF 637 $11.00 $ 7,007.00 637 $7,007.00 CY 1500 $8.00 1800 610 500 $23,280.00 LS 1 $2,425.00 1 $2,425.00 $8.00 $0.00 $ 526,663.00 $480,507.52