ITEM 3.1TPC
The Planning Company
PLANNING REPORT
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
TO: Otsego Planning Commission
FROM: D. Daniel Licht, AICP
ITEM 3.1
RE: Otsego — Hansen Heights; Revised Preliminary Plat/PUD-CUP
REPORT DATE: 10 July 2019
ACTION DATE: 10 August 2019
TPC FILE: 101.02
BACKGROUND
VHF Investments, LLC received preliminary plat approval from the City Council on 22 April 2019
for a proposed development of 117 single family lots on 87.09 acres located east of Odean
Avenue between 75th Street and 70th Street (CSAH 38). The developer has an agreement to
incorporate an additional 5.00 acres located at 7330 Odean Avenue owned by Daniel and Susan
Oelke into the development that will provide an increase of 6 lots from the approved
preliminary plat for a total of 123 lots. The proposed incorporation of the additional parcel as
part of the development requires consideration of applications for a Zoning Map amendment,
PUD -CUP, revised preliminary plat, as well as vacation of existing drainage and utility
easements and public right-of-way. A public hearing to consider the applications has been
noticed for the Planning Commission meeting to be held on 15 July 2019.
Exhibits:
• Site Location Map
• Hansen Heights development plans dated 06/06/19 (36 sheets)
• Landscape Plan dated 03/26/19 (7 sheets)
ANALYSIS
Subdivision Design. The revised preliminary plat incorporates the 5.00 acre parcel with
changes to the central portion of the development. The number of lots within the revised
preliminary plat is increased by 6 from 117 lots to 123 lots (including 2 existing dwellings that
will remain). The alignment of Odell Avenue is changed to provide for a three-way intersection
at 73rd Street that will serve to reduce speeds for north -south traffic. The intersection of 73rd
Street with Ohland Avenue has also been revised to introduce a longer curved section and
improved alignment of the streets at the intersection. Lastly, 74th Street between Odean
Avenue and Odell Avenue has been shifted slightly south to allow for deeper lots on both sides
of the street. The changes to the street layout improve the overall quality of the subdivision
design.
Zoning. The property to be included within the revised Hansen Heights preliminary plat is
zoned A-1, Agriculture Rural Service District consistent with the polices of the 2012
Comprehensive Plan guiding that rural land uses be maintained as interim until a property is
rezoned to allow for development planned by the Future Land Use Plan. The proposed
development requires consideration of a Zoning Map amendment rezoning the subject site to
R-4, Residential Urban Single Family District, which allows single family dwellings as a permitted
use. A PUD -CUP is also being processed with the preliminary plat to allow for a modification of
certain lot requirements. Consideration of the Zoning Map amendment and PUD -CUP is to be
based upon (but not limited to) the following criteria established by the Zoning Ordinance:
1. The proposed action's consistency with the specific policies and provisions of the Otsego
Comprehensive Plan.
Comment: The 2012 Otsego Comprehensive Plan includes the subject site within the East
Sewer District and guides the area for low density residential uses at 3.0 dwelling units
per acre or less. The gross density of the proposed 123 single family lots is 1.33 dwelling
units per acre and net density is 2.33 dwelling units per acre. The proposed subdivision
of single family lots served by sanitary sewer and water utilities is consistent with the
2012 Comprehensive Plan.
2. The proposed use's compatibility with present and future land uses of the area.
Comment: The property to be incorporated as part of the preliminary plat is
surrounded by the approved preliminary plat on three sides. The overall preliminary
plat of Hanson Heights is surrounded by the following existing and/or planned land uses
shown in the table below.
Direction
Land Use Plan
Zoning Map
Existing Land Use
North
LD Residential
R-4 District
Single family homes (Crimson Ponds West)
R-5 District
Single family villa homes (Crimson Ponds West)
East
LD Residential
R-5 District
Lefebvre Creek Greenway (Boulder Creek)
A-1 District
Rural single family homes
South
LD Residential
R-3 District
Single family homes (LIN -BAR Estates)
West
LD Residential
A-1 District
Rural single family homes
Undeveloped
R-3 District
Rural single family lots (LIN -BAR Estates)
1A
The proposed single family lots within the revised Hansen Heights preliminary plat are
consistent with the existing single family lots within Crimson Ponds West, Boulder Creek,
and Ashwood. The revised preliminary plat provides for transitional lots with greater width
and area as required by the Zoning Ordinance as a transition to the R-3 District lots within
LIN -BAR Estates. The proposed development will be compatible with the existing and
planned land uses in the area.
3. The proposed use's conformity with all performance standards contained within the
Zoning Ordinance and other provisions of the City Code,
Comment: The proposed preliminary plat will comply with all applicable development
regulations except as specifically modified by the PUD -CUP.
4. Traffic generation of the proposed use in relation to capabilities of streets serving the
property.
Comment: The subject site is accessed via 75th Street and Odean Avenue. Intra -
neighborhood street connections to LIN -BAR Estates also provide access to 70th Street
(CSAH 38). The 2012 Transportation Plan designates 75th Street and Odean Avenue as
residential collector streets, whereas 70th Street (CSAH 38) is designated as a minor
arterial roadway serving regional transportation needs. These roadways have adequate
capacity to accommodate the traffic that will be generated by the homes within the
preliminary plat.
5. The proposed use can be accommodated by existing public services and facilities and will
not overburden the City's service capacity.
Comment: The subject site is located within the East Sewer District where the City
anticipates provision of services in support of urban development as guided by the Future
Land Use Plan; the proposed preliminary plat can be accommodated by existing City
services.
Access. The preliminary plat is accessed from Odean Avenue and 751h Street, which are
designated by the 2012 Comprehensive Plan as residential collector streets. Section 10-8-5.B.4
of the Subdivision Ordinance requires that access collector streets be spaced at least 500 feet
apart. The access to Odean Avenue is 735 feet south of 75th Street. The access to 751h Street is
aligned with Odell Avenue to the north within Crimson Ponds West 500 feet east of Odean
Avenue. The location of the accesses to 75th Street and Odean Avenue comply with the
requirements of the Subdivision Ordinance.
The proposed preliminary plat is also accessed by extension of streets from temporary dead -
ends within LIN -BAR Estates at Odell Avenue and 7111 Street. These connections to existing
local streets provide for access to Odean Avenue and 70th Street (CSAH 38). Wright County has
begun reconstruction of 70th Street (CSAH 38) between Odean Avenue and Quaday Avenue.
3
The existing intersection at Ogren Avenue and 70th Street (CSAH 38) will be improved with a
right turn lane for west bound traffic as part of the Wright County project. Based on Wright
County spacing guidelines, the access to 70th Street (CSAH 38) at Ogren Avenue will likely be
restricted to right-in/right-out only at such time in the future as traffic volumes on CSAH 38
dictate expansion to a 4 lane divided roadway.
The preliminary plat also provides for street extension through the 2 rural parcels to the east of
the subject site to the north of 701h Street (CSAH 38). These street connections will provide for
future access to 70th Street (CSAH 38) at the intersection within Boulder Creek. This
intersection is planned to be a full access intersection with Packard Avenue south of 70th Street
(CSAH 38) to be realigned to this location at such time as the land south of the roadway
develops.
The multiple access points available to the proposed preliminary plat to adjacent collector and
arterial streets will allow for disbursement of traffic generated within the neighborhood,
provide connections between neighborhoods, and insure emergency vehicle access.
Lot 5, Block 1 (Phase 3) is the remainder of the 5.00 acre parcel incorporated within the revised
preliminary plat that includes the existing single family dwelling. The existing single family
dwelling is to remain and will maintain the existing driveway accessing to Odean Avenue. The
revised preliminary plat indicates the potential to subdivide Lot 5, Block 1 (Phase 3) into 4 single
family lots. The two potential west lots do not have access to an interior local street and would
require access to Odean Avenue. Approval of the revised preliminary plat will include a
condition that future subdivision of Lot 5, Block 1 (Phase 3) shall be allowed to maintain 1
driveway to Odean Avenue to access not more than 2 lots. All other lots (specifically the two
easterly lots) would be required to access Odell Avenue.
The preliminary plat also provides for future street connections to the exception parcel at the
northwest corner of the plat to allow for future resubdivision. The preliminary plat does not
extend a public right-of-way through Block 1 to the 2 lots at the southwest corner of the
development. These lots are each approximately 1 acre in area. The dimensions of these lots
limit the ability to extend a City street with a cul-de-sac turnaround for access that would allow
for potential resubdivision. Also, neither parcel could be further subdivided without assembling
both lots and removing the existing principal and accessory buildings.
Right -of -Way. The preliminary plat provides for dedication of right-of-way for the south half of
75th Street and east half of Odean Avenue abutting the subject site for 80 feet of right-of-way
for these existing streets. Local streets interior to the preliminary plat are provided with a 60
foot right-of-way. The proposed rights-of-way for City streets is consistent with the
requirements of Section 10-8-5.B.1 of the Subdivision Ordinance.
The preliminary plat provides 75 feet of right-of-way for the north half of 70th Street (CSAH 38),
which is subject to review and approval of Wright County.
4
Right-of-way was dedicated with the plat of Hidden Haven to the east of PID 118-180-000010,
which is a parcel within the preliminary plat. The existing right-of-way is to be vacated as part
of the current application as it serves no public purpose based on the proposed subdivision
design.
Streets. The proposed lots are to be accessed by local public streets. The proposed local
streets are to be 28 feet wide with concrete curb and gutter within a 60 foot wide right-of-way.
A 5 foot concrete sidewalk is provided on 1 side of all streets. Street names will be established
at the time of final plat approval in accordance with Section 10-8-10.13.13 of the Subdivision
Ordinance and the Wright County grid system. All street designs and construction plans are
subject to review and approval by the City Engineer.
Lot Requirements. The R-4 District establishes the minimum lot requirements shown in the
table below. The lots abutting existing 1 acre lots zoned R-3 District within LIN -BAR Estates are
subject to the lot requirements of the R -4A District in accordance with Section 11-66-8 of the
Zoning Ordinance.
The R-4 District lots all exceed the minimum lot area, width and depth requirements of the
Zoning Ordinance. The proposed R-4 District lots north of 72"d Lane and east of Ohland Avenue
and the R -4A District lots abutting LIN -BAR Estates meet the minimum area width, and depth
requirements, but not the minimum depth requirement. These lots are proposed to be a
minimum of 135 feet deep, which is to be accommodated through approval of a PUD -CUP. The
subdivision design for these lots are consistent with the intent of the transitional lot
requirements to minimize the number of urban lots abutting the existing 1 acre lots to the
south.
Landscaping. Section 11-19-2.13.1 of the Zoning Ordinance requires single family lots to be
provided at least 2 trees per lot or a total of 232 trees for the proposed preliminary plat (not
including the lot platted with the existing house). The developer has submitted a landscape
plan that illustrates trees along the street boulevards with a note that 1 tree will be installed by
the builder for each lot. The City allows trees to be planted in the boulevard in R-5 or R-6
Districts where the 25 foot front yard setback limits area in the front yard for a shade tree. The
35 foot setback within the R-4 District is sufficient for a tree to be located within the front yard
Lot
Lot
Lot
Setbacks
Area
Width
Depth
Front
Side
Rear
75th St.
Wetland
Odean Ave.
70th St.
Lots except
Interior
12,000sf.
75ft.
100ft.
35ft.
10ft.
20ft.
65ft.
40ft.
Corner
100ft.
in row
below
L1, 131(3)
Interior
18,000sf.
100ft.
150ft.
L1-10, B5(3)
Corner
130ft.
L1-4, B4(4)
L3-6, 65(4)
The R-4 District lots all exceed the minimum lot area, width and depth requirements of the
Zoning Ordinance. The proposed R-4 District lots north of 72"d Lane and east of Ohland Avenue
and the R -4A District lots abutting LIN -BAR Estates meet the minimum area width, and depth
requirements, but not the minimum depth requirement. These lots are proposed to be a
minimum of 135 feet deep, which is to be accommodated through approval of a PUD -CUP. The
subdivision design for these lots are consistent with the intent of the transitional lot
requirements to minimize the number of urban lots abutting the existing 1 acre lots to the
south.
Landscaping. Section 11-19-2.13.1 of the Zoning Ordinance requires single family lots to be
provided at least 2 trees per lot or a total of 232 trees for the proposed preliminary plat (not
including the lot platted with the existing house). The developer has submitted a landscape
plan that illustrates trees along the street boulevards with a note that 1 tree will be installed by
the builder for each lot. The City allows trees to be planted in the boulevard in R-5 or R-6
Districts where the 25 foot front yard setback limits area in the front yard for a shade tree. The
35 foot setback within the R-4 District is sufficient for a tree to be located within the front yard
outside of the public right-of-way. The landscape plan is to be revised to indicate that the
builder will install 2 trees per lot at the time of construction within the yard of each lot.
A landscape buffer yard is required to be provided within the yards abutting 75th Street, Odean
Avenue, and 70th Street (CSAH 38) in accordance with Section 11-19-3.B of the Zoning
Ordinance. The landscape plan provides for installation of the required buffer yard with a mix of
evergreen and deciduous trees.
The types of proposed trees are appropriate and the sizes of trees to be planted in accordance
with the landscape plan complies with Section 11-19-2.13.3 of the Zoning Ordinance.
Park and Trail Dedication. The Future Parks and Trails System Plan included in the 2012
Comprehensive Plan does not identify acquisition of park land from the subject site. The City
has developed the Lefebvre Creek Greenway from 75th Street east through the Boulder Creek
development to Palmgren Avenue. The developer will dedicate Outlot A (Phase 1) to the City
that includes Lefebvre Creek and wetlands below the ridgeline along the east portion of the
development. Deeding this parcel will not be credited for park and trail dedication purposes
and these requirements for the preliminary plat are to be satisfied by payment of a cash fee in
lieu of land calculated on a per lot basis at the time of final plat approval. The City will utilize
Park Dedication funds to construct a trail from Ohland Avenue through Outlot A (Phase 1) to
the Lefebvre Creek Greenway providing park access to the proposed development, as well as
LIN -BAR Estates.
Grading Plan. The developer has submitted grading and drainage plans for the proposed
preliminary plat. There are wetlands Outlot A (Phase 1) which will be preserved by dedication
of the outlot to the City. Outlot A (Phase 1) and the Outlot A (Phase 2) are to be deeded to the
City in accordance with Section 10-8-12.D of the Subdivision Ordinance. All grading, drainage,
erosion control issues, and any wetland impacts are subject to review and approval by the City
Engineer.
Utility Plan. The developer has submitted utility plans for extension of sanitary sewer and
water utilities to serve the proposed lots. The developer will be required to pay the Sewer and
Water Availability Charges in effect at the time of final plat approval. All utility plans are
subject to review and approval of the City Engineer.
Easements. Drainage and utility easements are shown to be dedicated at the perimeter of all
lots and over stormwater facilities as required by Section 10-8-12.A of the Subdivision
Ordinance. Existing drainage and utility easements dedicated with the Hidden Haven plat no
longer serve a public purpose and will be vacated. All drainage and utility easements are
subject to review and approval of the City Engineer.
Environmental Review. Minnesota Rules 4410.4300, Subd. 36.A requires that an
Environmental Assessment Worksheet (EAW) be prepared for any land use conversion involving
80 acres or more. Although the gross area of the subject site is 92.40 acres, only 69.3 acres will
be converted to urban use by development of the preliminary plat. An EAW is not required for
the proposed preliminary plat.
Phasing Plan. The developer has submitted a proposed plan for phasing development of the
subject site summarized in the table below and the attached plan set. Each phase will require
approval of a final plat with the timing of each phase determined by market conditions. The
City guarantees access to sewer and water capacity only for developments that have received
final plat approval and executed development agreements to pay for these utilities.
Phase
# of Lots
1
27
2
33
3
38
4
25
RECOMMENDATION
The revised preliminary plat for Hansen Heights is consistent with the policies of the
Comprehensive Plan and requirements of the Zoning Ordinance and Subdivision Ordinance.
Our office recommends approval of the applications subject to the conditions outlined below.
POSSIBLE ACTIONS
Decision 1— Zoning Map Amendment
A. Motion to recommend approval of a Zoning Map amendment rezoning the subject site
from A-1 District to R-4 District based on a finding that the request is consistent with the
criteria outlined in Section 11-3-2.1' of the Zoning Ordinance.
B. Motion to deny the application based on a finding that the request is not consistent
with the criteria outlined in Section 11-3-2.F of the Zoning Ordinance.
C. Motion to table.
Decision 2 — Vacation/PUD-CUP/Preliminary Plat
A. Motion to recommend City Council approval of a vacation of existing drainage and
utility easements and a revised preliminary plat/PUD-CUP for Hansen Heights, subject to
the following conditions:
1. Approval of the preliminary plat shall not guarantee access to sanitary sewer
service. The City shall only allocate sanitary sewer capacity to approved final plats
with signed development contracts to assure the City of timely development.
7
2. Lots within the preliminary plat shall be subject to the following requirements:
Future subdivision of Lot 5, Block 1 (Phase 3) shall be allowed to maintain 1
driveway meeting the requirements of Section 11-21-7 of the Zoning Ordinance
to Odean Avenue to access not more than 2 lots.
4. All street right-of-way, design, and construction plans shall be subject to review
and approval of the City Engineer.
The landscape plan shall be revised to indicate that the builder will install 2 trees
per lot (outside of the public right-of-way) at the time of construction.
6. Outlot A (Phase 1) and Outlot A (Phase 2) shall to be deeded to the City in
accordance with Section 10-8-12.D of the Subdivision Ordinance.
Park dedication requirements shall be satisfied as a cash fee in lieu of land paid
at the time of final plat approval in accordance with the fee schedule then in
effect.
8. All grading, drainage, and erosion control issues shall be subject to review and
approval of the City Engineer
9. All utility issues shall be subject to review and approval of the City Engineer.
10. All easements are subject to review and approval of the City Engineer.
11. The preliminary plat is subject to review and approval of Wright County Highway
related to right-of-way and access to CSAH 38.
B. Motion to recommend the application be denied based on finding that the request is
inconsistent with the Comprehensive Plan and does not comply with the requirements
of the Zoning Ordinance, Subdivision Ordinance, and/or Engineering Manual.
Lot
Lot
Lot
Setbacks
Area
Width
Depth
Front
Side
Rear
75th St.
Wetland
Odean Ave.
70th St.
Lots except
Interior
12,000sf.
75ft.
100ft.
35ft.
10ft.
20ft.
65ft.
40ft.
Corner
100ft.
in row
below
L1, 61(3)
Interior
18,000sf.
100ft.
135ft.
1-1-10, 65(3)
Corner
130ft.
1-1-4, 134(4)
1-3-6, 135(4)
Future subdivision of Lot 5, Block 1 (Phase 3) shall be allowed to maintain 1
driveway meeting the requirements of Section 11-21-7 of the Zoning Ordinance
to Odean Avenue to access not more than 2 lots.
4. All street right-of-way, design, and construction plans shall be subject to review
and approval of the City Engineer.
The landscape plan shall be revised to indicate that the builder will install 2 trees
per lot (outside of the public right-of-way) at the time of construction.
6. Outlot A (Phase 1) and Outlot A (Phase 2) shall to be deeded to the City in
accordance with Section 10-8-12.D of the Subdivision Ordinance.
Park dedication requirements shall be satisfied as a cash fee in lieu of land paid
at the time of final plat approval in accordance with the fee schedule then in
effect.
8. All grading, drainage, and erosion control issues shall be subject to review and
approval of the City Engineer
9. All utility issues shall be subject to review and approval of the City Engineer.
10. All easements are subject to review and approval of the City Engineer.
11. The preliminary plat is subject to review and approval of Wright County Highway
related to right-of-way and access to CSAH 38.
B. Motion to recommend the application be denied based on finding that the request is
inconsistent with the Comprehensive Plan and does not comply with the requirements
of the Zoning Ordinance, Subdivision Ordinance, and/or Engineering Manual.
C. Motion to table.
Adam Flaherty, City Administrator/Finance Director
Tami Loff, City Clerk
Andy MacArthur, City Attorney
Ron Wagner, City Engineer
Henry Hansen, VHF Investments, LLC
Scott Dahlke, Civil Engineering Site Design
Oj
J=
° %�!� I L_ J 111 L!/��,_. ,,r,�Er:.r� ua,
Lit Li
05.OQ284204 '
`IA
74TH ST NE µ
,,I, 18_0000010 w
w 7r2�'D ST NE 73RD�S�T NE 'w
7r1,S�T S]T NE LU -
70TH€ST NEof
Vlv 38 ; 7
- ;
Oelke Parcel - -'-
s7AHi[C.�RiN Approved �--
Preliminary Plat
w
W
p 118500333101 W 118500343100
OQ 62ND ST NE - p
-� III,
�,' �
118500333300 Q
_ µ_ 60THfSiUNE.
1,519k-- I -
-ii�, r�,} 114800042100 -
KIiT50H ROSEAU
HAKE OF
VAR. HA LL
KOOCHICHIIIO
PENH x4iox RELiRP III
RE —E COON
AKF
POLK � rtnacA sr. Loins
IIOR V.AH OV EH �
GIAY OECHER �
Y AITNIN
CROW CARLTOII
WU,G
UIIEH TAIL
4 TODD S\l OR1H} UG:A MOO RIROX s[f
_� ,Itf POPE RTEAHN9 f�
R4VSEY
Cl4> u
MINNESOTA
HANSEN HEIGHTS
RESIDENTIAL DEVELOPMENT PROJECT
OTSEGO, MN
WRIGHT COUNTY
5\lt
S
��, I��U ��� 1 Iii•IJ' y�i
1 I
1�
PROJECT LOCATION
♦ r
OTSEGO, MN
INDEX OF CIVIL SITE DRAWINGS:
CLIENT.
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238.1610
V
LOCATION PLAN
W
C1.0
aZiT
�a
N
tL
3b�v
-E$
a
v' ' u
„oY�3
nje o
GRADING AND DRAINAGE PLANS
O
C
O
m
U
i^ a
W W
0Lu
Q
m
f
W
C5.1-05.2
o
o
C6STORM
a
2Z
C7.1
-C7.3
DETAILS
Project Location
e
LOCATION PLAN
��•a
C1.0
aZiT
DoE
N
C1.1
3b�v
-E$
p Z�Imm
v' ' u
„oY�3
nje o
GRADING AND DRAINAGE PLANS
��
W o0i
ro1o
yoR
m
U
i^ a
V)
ro
C5.1-05.2
,Z,ya
u P r Is
$ E
o
C6STORM
WATER POLLUTION PREY. PLAN
C7.1
-C7.3
DETAILS
Project Location
G
m
� II
� U
a�
CL
CL
w
a
� p
�
0
rn
o
V)
0
(o
0
Lo
N
Orz
m
m
W
2
=
O
Y
O
c�
U
FILE NO.
00715
COPROJECT
LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1
-C1.7
PRELIMINARY PLAT
C2.1
-C2.7
GRADING AND DRAINAGE PLANS
SANITARY AIJD WATER UTILITY PLANS
co3.1-C3.7
/`/
C4.1
-C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6STORM
WATER POLLUTION PREY. PLAN
C7.1
-C7.3
DETAILS
Project Location
/Ii7E1rT/_'Tm
- - -- _�„� IC�glll�il111�f11f� 7tltll�7pllldl
1 " I
I Lr`�-r!'Fh ES1A iC5 I r �
1 I I
I i I I I II 11 I I I ,
7217d Strut
I
1 I I
I I I 11 ' II I
7/5
I- •�E5 . I I I I
I 0P� I I I
` 7/5t Street
�---
I
I I I I
- - COUND'ROAD--5b- (7Qth Street -
co Street
II I I I I
I
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55448
HENRY HANSEN
(783) 238.1810
INDEX OF CIVIL SITE DRAWINGS:
CO
C1.0
C1.1 -C1.7
C2.1 -C2.7
C3.1 -C3.7
C4.1 -C4.7
C5.1-05.2
C6
C7.1 -C7.3
PROJECT LOCATION PLAN
OVERALL LAYOUT AND PHASING PLAN
PRELIMINARY PLAT
GRADING AND DRAINAGE PLANS
SANITARY AND WATER UTILITY PLANS
STORM SEWER UTILITY PLANS
STREET PROFILE PLANS
STORM WATER POLLUTION PREY. PLAN
DETAILS
FILE NO. 00715
C1.0
Overall Layout and
Phasing Plan
0 - 150 300 450
~
`
GRAPHIC SCALE IN FEET
cof/��
PROJECT LOCATION
f'
Z
Q
PART OF SE} OF SECTION 28, TOWNSHIP
=
LU
m
.
.0
� Z
Q
121, RANGE 23,
z
W a
O
O -r
a
AND PART OF SWJ OF SECTION 27,
= O
C
}
O
TOWNSHIP 121, RANGE 23,
Q
=
\\ 1
WRIGHT COUNTY, MINNESOTA.
7 I
Z 5
'1
LU
C
Q
JUj
GROSS AREA
Z a
O
>
'
92.40 ACRES
Q Z
0
O
PROPOSED LOTS
LIJ
r
I
EXISTING HOME LOTS = 2
NEW HOME LOTS = 121
TOTAL PROPOSED LOTS = 123 LOTS
e
PHASE 1 = 27 LOTS
Yoh
e:° §
n
V
I
PHASE 2= 33 LOTS*
g
y $•�
N
y bN
PHASE 3 = 38 LOTS*
" °
L
`
PHASE 4 = 25 LOTS
-s-6
d -cb
i $
•
/
*EXISTING HOME LOT: L1, B6, 2ND ADDN
*EXISTING HOME LOT: L5, B1, 3RD ADDN
E F
W 1
I �m
u
�%
aea�5
�IWR.
�n
m3
o
I�
v
-----I
It
4
m
m
n
INDEX OF CIVIL SITE DRAWINGS:
CO
C1.0
C1.1 -C1.7
C2.1 -C2.7
C3.1 -C3.7
C4.1 -C4.7
C5.1-05.2
C6
C7.1 -C7.3
PROJECT LOCATION PLAN
OVERALL LAYOUT AND PHASING PLAN
PRELIMINARY PLAT
GRADING AND DRAINAGE PLANS
SANITARY AND WATER UTILITY PLANS
STORM SEWER UTILITY PLANS
STREET PROFILE PLANS
STORM WATER POLLUTION PREY. PLAN
DETAILS
FILE NO. 00715
C1.0
Overall Layout and
Phasing Plan
I
EXISTING P.I.D. # PROPOSED LOTS N c
LEGEND PAGE LAYOUT:
WETLAND DELINEATIONCLIENT:118-500-284-401 EXISTING HOME LOTS = 2 RrAR -E
118-180-000-010 NEW HOME LOTS = 121 INFORMATION PROVIDED BY: VHF INVESTMENTS
118-500-284-204 TOTAL PROPOSED LOTS = 123 LOTS AG WETLAND SERVICES, INC. Existing Tree Line
118-500-284-200 - C1. 1 C1.2
118-500-273-200 PHASE t = 27 LOTS P.O. BOX 82 SETMCKLLC
118-500-264-201 PHASE 2 = 33 LOTS* KIMBALL, MN 55353 SETBAGIS --- - - Existing Wetland Boundary
PHASE 3 = 38 LOTS' FRONT YARD 35 FT
EXISTING ZONING E SIDE R/W 35 FT ExistingR Line C1,3 C1,4 1450543rd AVENUE N.
PHASE 4 = 25 LOTS a SIDE INTERNAL 10 FT PLYMOUTH, MN 55446
A-1 AND A-2 10 REAR YARD 20 FT
AGRICULTURAL *EXISTING HOME LOT: L1, B6, 2ND ADON n ARTERIAL R/W 65 FT Existing Easement HENRY HANSEN
PROPOSED ZONING 'EXISTING HOME LOT: L5, B1, 3RD ADDN Existing Boundary Line C1.5 C1.6 (763)238.1610
RESIDENTIAL SINGLE FAMILY PROJECT DENSITY FRONT LORINE
RR=4 R-4 -- Proposed Street R/W
1st L1, Bt4th L1-1-2, B1 GROSS DENSITY: 1.33 LOTS/AC
1st L7 -L15, B2 4th Lt -L8, B3 (TOTAL LOTS / GROSS AREA) LOT DETAIL Proposed Lot Line 0 50 100 150 H
1st L7 -Lit, 83 41h L5, B4 (123 / 92.40) a
2nd Lt -L5, B1 R -4A z h1 ----------- Proposed Setback C 1 • /
2nd Lt -L5, B2 NET DENSITY: 2.33 LOTS/AC 60' 3 GRAPHIC SCALE !N FEET �
(TOTAL LOTS / NET AREA } --- -- ------- ------ -- Proposed D&U Easement
2nd L7 -Ll 1, B3 3rd L1 -L10, 86 (NEI AREA = GROSS AREA LESS R/W AND ODTLOTS) _
2nd L7 -L5, B4 4th Ll L6 B4 (123 / 52.79) 16' 28 B B 16'
2nd Li -L6, B5 4th L1 -L6, B5 IJ -•---`•-•-•`-----'---'-- proposed Curb and Gutter li 7-
2nd L1-L5 B6 MINIMUM LOT REQUIREMENTS o SURVEY DATA PROJECT LOCATION = N m ¢
3rd L2-L5, Bt o• a Proposed 5' Wide Sidewalk Z J
R-4 LOT MINIMUMS: (1{
3rd L1 -L8, B2 4' g' 7' SURVEY INFORMATION PROVIDED BY: PART OF SE} OF SECTION 28, TOWNSHIP 121, �_+ W q IL
LOT AREA 12,000 SF
3rd L1 -L11, B3 I 708 I ROHLIN LAND SERVICES RANGE 23, AND 0 0
3rd L1-L3, 84 LOT WIDTH -INTERIOR 75 FEET SLOPE i/3" PER FT. 2% MIN. Drainage and utility easements is are shown thus: 706 1st AVENUE NE W d }
LOT WIDTH -CORNER 100 FEET SLOPE
PART OF SWj OF SECTION 27, TOWNSHIP 721,
3rd L1,B5 LOT DEPTH 100 FEET BUFFALO, MN 55373 WRIGHT COUNTY, MINNESOTA. O Q
GROSS AREA
MAX BUILDING COVERAGE 30% SEE PLATE 704 -5 DATED: FEBRUARY 12, 2019 W ?
92.40 ACRES R -4A LOT MINIMUMS: 4" THICK, 5' WIDE CONCRETE CURB & 5 W LU co
LOT AREA 18,000 SF CONCRETE SIDEWALK ON A dT 8 BITUMINOUS MAT GUTTER PLACED ON o o BENCHMARKS (PROVIDED BY OTSEGO CITY W
PUBLIC STREET 60' R/W LOT WIDTH -INTERIOR 100 FEET APPROVED SUBGRADErsss APPROVED SUBGRADE ENGINEER, HAKANSON ANDERSON, INC. LEGAL DESCRIPTION fA o m
LOT WIDTH -CORNER 130 FEET (EITHER SIDE) -""------- NGVD 29 DATUM): Z -t a
LENGTH = 8,820 FT LOT DEPTH 750 FEET • C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH SEE SURVEY. Q
AREA = 12.82 AC (INCLUDES 75TH ST., MAX BUILDING COVERAGE 307. Being 10.00 feet In width, unless otherwise TNH, EAST SIDE OF ODELL LANE, IST Q N
ODEAN AVE., AND 70TH ST.) D APPROVED SUBGRADE 30' WIDTH indicated, and adjoining lot !Ines, and 70.00 HYDRANT N OF 75TH ST., ELEV=928.00 = Z
• ADJUSTMENT TO 135 FEET DEPTH Leet in width, unless otherwise indicated, RR SPIKE IN PP, NW QUADRANT OF OGREN W
OPEN SPACE REQUESTED DUE TO EXISTING PARCEL TYPICAL s71rEEr SEC770N and adjoining right-of-way //nes as shown 0
26.79 ACRES (OUTLOTS A AND B) LIMITED DIMENSION WIDTH N0 an the plat. AVENUE AND CO RD 38, ELEV=948.06 W
i -� -------- --- 1/�c.--1` ---- --� -'---- -II --� ---- - -J. - - - - - rte...'
--- -- s1\ f �cn Yp�
f�
_ R t -h\ Strt ee- . �o
. �[[, 1Q.1J N
1 ' NB9• N IbN
sr. \s_ - --- '- RZ�$
75_-�a:NofPp� c"°' Ltl CZ9 °rahlo
�-�
927.50 _�� / --��- •-� _ _ _$� L>,� In
'Fi[
M - - _
�,� �! - `t_ - I,�_ --:--.{..-�1 � i�---Fig-f:�-Y=T`♦-•.�1_-7s(=,•; .. _ i- � f - 1 - - � � � '[wao`"� _ _ °'0.'o
40rD �1 _ >' Ne919'i]E �� _ - _. _ - ._
` _4OO] 90.00 -- - 80.00 - -90.00 - 90.049D.00� 90.00_ 18.1] L -N!0. tti - -
z__- V> ♦ i e•0A0 _.._- - - - - '-___- ._ - -.is- - -l. _- - - -__ - zo
__ _1 I_-- - ---- -i-- _ - o a a. 2 -3
y l `
m
�_
I V '
R� ' t 1 5. Re w_oE i _____ _ _ ______----- ------------
----------- ________ I -_ -__-_ __
_-- $
, / I .� 1 r___________., __ ____ 1__ I i I 1 I I I - I I - _ _ I I I _ - - - _
- I _--- i. s- _- 104 e P.,
I, I L1. B7 ��11 1) `I I I' --I �, u '
1st - pl' I In II I& I I .I II 1 \. i6 i L6, 82 IB 'i L7, B2 in i L8,'82 i0 ji i8 ii L10, 82 i o
1 \- 27,091 SF I IAF I L1, B2 1 • g l L2, 62 I I L3, B2 I I I L4, B2 1 7: 1 L5, B2 NI $ , I m L9, 82 I S I I I L11, 62 (� o
I I "Is I Ye -k: f.. 1• 1 Ic I 1st 16 ' 1st 1' 1 let 'r ist D 1st 1st I.. 1st
' I Ili , : fill ; ,
is , -. _ ,est I 1st I T � 1 1 _ 1 i �' -i .-_ 15,125 SF 1 1 1 15,133 SF i t i 15,140 SF i ; 1 11 1st 1 I 11 15,247 SF i ' I
I I , I 16,397 SF ; $ ' I 15 Ill I 1 15,702 SF ' I I 15,110 SF I I 15,117 SF _ { 15,148. SF , 18,637 SF
i
- ------ i1r2g2I�
7 - - --- 111111
.._ _ I '
o I I L_________1 �________ 931.3A._________CJl I 1 J - `_ _ ;, I I - BZSi3• i 1 I - 5 `?es7af
�I I f I I1 II II 1 - _-_--
.o II.IEB- C--- L --------- i L _ ____ ______ _ ________ '
/'.
93 9 I - --------------- ss 1
922.30 s 43'T I (�I I I 931-- __� L__ _______� 1 � n� 38! 929.38' 928.38 927.37 926 I L I� wxaox nustr -•4.5 ` 923.45`r SF
VU _ - _ __ I - �'_ I
i,fis' I ' 932.21 , 1 aoNaRE I .5 6
1-2156. R-,5.00 ma
I M+E NIM CM" S Ro E' ------- - --- - -__--__
l , . j usrs rrosr u BIER -------
---I__ -) -'-) L ,C
- -- J '- -- - - - L - ' -- - -----� t- -- -- }--
a6Ra
.1198
N89'2]'o0'E (. kj\
1 i 2 X89' 29 WE a� LU I
,,
p O
�m 738 hland Ave.01
tNO' 2Y
MW
/ X89 2S W'..��� MOO 86.02 �, \
91]I 90.00 90.00 00.00 90.00 .�_\ - _- ___ __-_-____ _- __.___ __ _Y_-
f'
[t
! L=29.12 R=15A0 -- I i ; _- '----_--- -rpt__ i - ' _- ,moi
1 I 929.55 926.161 j 928.10 926.70 _ 1 Rq\\ ` 92 CQS
6 931.88 932.55 931.56 930.56 928.55 928.36 j '
I- - 8. -2&1 r___-__�.---1 r____------^ -- h
// ' r---------�I r-----------1 Ir -----------1 r-----------11 Ir -----------1 Ir------- 1 r -T-- I 1 1 1
(/ NIS
i i i i ��il i \ •1 ,, i ': i a
1 1 I 1 I L4, B3 1 I L5, B3 1' 7 ,
Lt, B3 I , L2, 83 , , L3, 63 1 , I I i L6. B3 i , i 17, -83 L6, 83 { L9, B3 i� , L10, 83
Lll, 83 1 it 1 r /' I 9
1 1 II I let I;- I 1st I !1 1st 1 1 1st I I 1st I' 1 1st _ 1st 1st lsl T 1 , t 1 t
$19 1 1st I, H, 14,850 SF IS '- --14,850 SF I 1 14,850 SF 14,850 SF 18 ' 14,850 SF 18 I 14,850 SF 8 14,850 SF 18 i 14,850 SF i' i, 14,850 SF g 8 19,085 SF �' ) �1 1/ o O •E
• _ d 116.474 SF I $ I I I g I. 1 I �, 1 I I m g 8
'�18Iia 1
/
' �'�. i /' - -5 1 I I I I , 1 I I I 1 1 -I - 9� 9. 9� 9� 9� 9t 9� Nl et 9� 9. 9• 0� 9� OEt OEt 9e M 1 I P 1 1
II II it i i !� 9g9�J1`IR s O o O
If 1 e91 N ti
T MATCH LINE Sheets Ci.i / C1.4 [�
1 I I I I t 1, I I I 1
-- ------------
-- ------------- - caxcREr
--_J L__________-Jj !L -____J L -_ _ J L_____l ____J L____ _ __J L_______ -___I L__ _ _J, e 1_•� ( N m
Y 1 1 L -- -1 �_ _ L _-_ h I I { -' - - - L.- - - 1 - - - - --� -- - - I - so n v M p
f 7 -'--- - --- - t - J I m
917.68 918.70 918.32 Moo Moo 918.00'.1 X89. 2s 00'E O •+ 1 1 4 141
90.24 NB9' 2]' Wi
ooi ii W W 80.00 . 917.12 90.00 90.40 00.00 00.00 '10.00 ,1141 P Z
90.00 Mae P 00.00 8a.o0
- -_ 0------
------------
90.09918
^ ---- 918.10 ___ _ 917.82 __91.8.00 -_-- I 1 h O V
,g 90.00 940491 _ _ _ ___
--- r 0 e ___-- ----------- -----------
__-__- - _r- _-- __ -- ___
. 9. 9400
____ _-_ (r_ _ 1g------------ .. _ _ _--------- (( I 1 r
, - - - - - �}r- -9.- - it 1 r 1 r 1 r- - --1 CR O U
96 91 9 }
MATCH LINE Sheets C1.1C1.3
1. _ ___ 1 I I I I 1 I I
- --- / 1.3
u _ FILE NO. 00715
C I I I I I 1
_j_ j �� _; INDEX OF CIVIL SITE DRAWINGS:
930.80 - - 6 22 WE I I I t -1 1 : 1 1-,- - --I; - _ -
.. 0.00 9,.00 Y Iotas B - - , 7 -r�- ± 1 - I I _ T- .. - I -T- - T 1 ' T
I CO PROJECT LOCATION PLAN
--- - ---p, -- o 1 L , B3 Lg g3 L7, B3 L8, B3 1 L9, 83 i L1o, C1.0 OVERALL LAYOUT AND PHASING PLAN
-- -- _ , (r -� r--- -----1 ' & 7 s.o R waE = 8 I $ Lh, B3 . I - I - 1 $ - I 2, Cl. 1 -C1.7 PRELIMINARY PLAT
II';I 11 .I I Ifi $1 10. , L3, 133- ,o 'I 2nd 2nd _-- I;- II -2n[l. -1,' I 2nd I 11 2nd I; I 2nd li I
' _ 1 _ 60.0 1 Lt, B3 5' I 2nd I - I i 14,861 SF �.{ � '14850 SF '-T 1� I I 14,850 SF I 1 14,850 SF I 1 - 14,850.SF 1 1 16,3E C2.1 -C2.7 GRADING AND DRAINAGE PLANS
L5, et - i 0.w 2nd 5,oe>9 SF I I I C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
1 , _ 1 , I I L2, B3 1 i
1 2nd r 15,564 SF I I{ I I, L - L' I _ ..
1 1 -- i H -1 1- 1- I `, I C/
2nd _- G �_ { I - 1 I J I I 1 C4.1 -C4.7 STORM SEWER UTILITY PLANS •
111 ; i e 1 12072 SF -I 1 a �. 18.269 SF g �_' 19.052 SF L --- ------J ; L--= - __ ==J t-= ---_ �. i ----- J-. - L--- ---� 1 9i4.87----- C5.1-05.2 STREET PROFILE PLANS
Bl I i - t 2nd li I I
L3, -81 :, L4, 9 SF $ , I" I. sao IS { 1 - ------ - 1
12 01 I _ 926 47 926.65 927.10 927.22 I COSY.»FrE
• A �, I18 els la I I. 7 swEw C6 STORM WATER POLLUTION PREY. PLAN
A .I `
L_____ ... 1 ._ 928.52 927+0 , SO R NDE
2nd • Ib -I i 1 b -
13657 SF _J { 92966 _ C7.1 -C7.3 DETAILS
1 ----- ; I 930.62 ' i I _ - - i -- `---- ----- L Preliminary Plat
If
EXISTING P.I.D. #S
PROPOSED LOTS
1
GRAPHIC SCALE jN FEEr
�
$ c
F
2nd L1-L5, 81 R -4A
NET DENSITY: 2.33 LOTS/AC
WETLAND DELINEATION
g
u 'q
60'
In b
118-500-284-401
EXIST114G HOME LOTS = 2
2 O
W „
J
a
RUR UnUN
Zi
2nd 1_1-1_11, B3 3rd L1 -L10, 66
118-180-000-010
NEW HOME LOTS = 121
INFORMATIO14 PROVIDED BY:
28 B - B
16'
2nd L1-L5, B4 4th L1 -L6, B4
A
118-500-284-204
TOTAL PROPOSED LOTS = 123 LOTS
AG WETLAND SERVICES, INC.
3 a�a
2nd Ll -L6, B5 4th Li -L6, B5
2Z
Lu°
a
118-500-284-200
o (1111
P.O. BOX 82
2nd Lt -LS B6
MINIMUM LOT REQUIREMENTS
aa
118-500-273-200
PHASE 1 = 27 LOTS
KIMBALL, MN 55353
R-4 LOT MINIMUMS:
sEre.LcxSETBAC
118-500-284-201
PHASE 2 = 33 LOTS•
LOT AREA 12,000 SF
S' 7'
FRONT YARD
35 FT
EXISTING ZONING
PHASE 3 = 38 LOTS'
1 SLOPE 1/3" PER FT
SIDE R/W
35 FT
AGR AND
PHASE 4 = 25 LOTS
to
SIDE INTERNAL
10 FT
RAL
AGRICULTURAL
'EXISTING HOME LOT: Lt, B6, 2ND ADDN
GROSS AREA
REAR YARD
ARTERIAL R/W
20 FT
65 FT
PROPOSED ZONING
'EXISTING HOME LOT: L5, B1, 3RD ADDU
92.40 ACRES
R -4A LOT MINIMUMS:
Al" THICK, 5' WIDE
RESIDENTIAL SINGLE FAMILY
PROJECT DENSITY
LOT AREA 18,000 SF
FROM LOTUNE
CONCRETE SIDEWALK ON
A & B BITUMINOUS MAT
GUTTER PLACED ON
PUBLIC STREET 60' R/W
LOT WIDTH -INTERIOR 100 FEET
APPROVED SUBGRADE ""
APPROVED SUBGRADE
1st Li, B1 4th L1-L2, B1
GROSS DENSITY: 1.33 LOTS/AC
(EITHER SIDE)
C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH
AREA = 12.82 AC (INCLUDES 75TH ST.,
1st L1 -L15 82 4th L1-L3 B3
(TOTAL LOTS / GROSS AREA)
LOT DETAIL
ODEAN AVE., AND 70TH ST.)
1st Lt -L11, 83 4th L5, 84
(123 / 82.40)
1
GRAPHIC SCALE jN FEEr
�
$ c
F
2nd L1-L5, 81 R -4A
NET DENSITY: 2.33 LOTS/AC
Z
g
u 'q
60'
In b
2nd Ll -L5, 82
(TOTAL LOTS / NET AREA)
2 O
W „
J
a
PART OF SE{ OF SECTION 28, TOWNSHIP 121,
Zi
2nd 1_1-1_11, B3 3rd L1 -L10, 66
(NET
279) ROSS AREA LESS R/W AND OUTLOTS)
RPART ANGE
WRIGHT COUNTY, MINNESOTA.
16'
28 B - B
16'
2nd L1-L5, B4 4th L1 -L6, B4
A
SEE SURVEY.
3 a�a
2nd Ll -L6, B5 4th Li -L6, B5
2Z
Lu°
a
°§�
o (1111
W
2nd Lt -LS B6
MINIMUM LOT REQUIREMENTS
aa
M
3rd L2-L5, Bt
R-4 LOT MINIMUMS:
3rd L1 -L8, 82
LOT AREA 12,000 SF
S' 7'
3rd L1 -L1, B3
3rd L1-L3, B43 4'
LOT WIDTH -INTERIOR 75 FEET
1 SLOPE 1/3" PER FT
2% MIN.
3rd L1,B5
LOT WIDTH -CORNER 100 FEET
,. SLOPE
LOT DEPTH 100 FEET
GROSS AREA
MAX BUILDING COVERAGE 30%
92.40 ACRES
R -4A LOT MINIMUMS:
Al" THICK, 5' WIDE
SEE PLATE 704
CONCRETE CURB &
LOT AREA 18,000 SF
CONCRETE SIDEWALK ON
A & B BITUMINOUS MAT
GUTTER PLACED ON
PUBLIC STREET 60' R/W
LOT WIDTH -INTERIOR 100 FEET
APPROVED SUBGRADE ""
APPROVED SUBGRADE
LENGTH = 8,820 FT
LOT WIDTH -CORNER 130 FEET
LOT DEPTH 150 FEET i
(EITHER SIDE)
C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH
AREA = 12.82 AC (INCLUDES 75TH ST.,
MAX 13UI DING COVERAGE 30%
ODEAN AVE., AND 70TH ST.)
D APPROVED SUBGRADE 30' WIDTH
' ADJUSTMENT TO 135 FEET DEPTH
OPEN SPACE
REQUESTED DUE TO EXISTING PARCEL
TYPICAL STREt7 secnov
26.79 ACRES (OUTLOTS A AND B)
LIMITED DIMENSION WIDTH
� scuc
LEGEND
Existing Tree Line
---- Existing Wetland Boundary
- - - - Existing R/W Una
Existing Easement
Existing Boundary Una
-- Proposed Street R/W
Proposed Lot Una
----------------- Proposed Setback
---- - ------ -- ----- --- Proposed D&U Easement
Proposed Curb and Gutter
Proposed 5' Wide Sidewalk
Drainage and utYity easements are shown thus:
5
5
Being 10.00 feet in width, unless otherwise
Indicated, and adjo/n/ng lot lines, and 10.00
feet In width, unless otherwise indicated,
and adjoining right-of-way lines as shown
on the plod.
�U T�1'1 T
I'lllh ,�
,I I
Y).
-
_
2a ail
{ j
1 \• \ \ \ \ , • ,eao
0 11-
r1
i Z 1 C72 1\ `, 11 11 1 1 , ' ` . • . ��q'4r q+t, , 1 1 \ � 1
-� m 1a8s�81�a
923.45 N
OUTLOT A
3rd
, \II + 1,093.940 SF
01� 922.e2r I 11 It II 1 .\�\ •<.` \1\I \ 25.11 AC
\ :+FN.
` \\\ P`PfB
\i T \ \
IN,
II ' 1, 1 1 i ; r , � � '. 1 , 1 , 1 1 I I � `•-- y--7 '\ \ �! h+ l+ \\ , `,
T
i \
1 1S- EDA'
1 13, t so.a I 1 11 \, , `+ 1 1 d \ , I ✓ "\ \,\ 1 , tl
11 I R/M
oot��� t 1� a II � � I I I I I S I• I� , I I �/ �I 1 I `+ .
i I
--1 I �} � i� � 1$ i '�" �� m � I I , 1 � � � 1 �,--�.-s --'�- 1 11 �. � r•L
t -1
I 1 1 } = s�
r 1 ZL p3."
g3 III , { R a 4 \ I--
6
aRMWm
9--
--} -} i I"i. } / U; r �r•.< i illi, \ \' , �\ �;.
1 I r! r % , \ \
1 ', it %C1, cl.' �ll.2WV 49M
V , V, )��'h 'oA
l
MATCH LINE Sheets C1.2 / C1.4
1 \` STORM WATER %.
+ BASIN
I \
1
'1I N
PAGE LAYOUT:
C1.1 C1.2
C1.3 I C1.4
C1.5 I C1.6
C1.7
SURVEY DATA
SURVEY INFORMATION PROVIDED BY
MEYER ROHLIN LAND SERVICES
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC.
NGVD 29 DATUM):
TNH, EAST SIDE OF ODELL LANE, 1ST
HYDRANT N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
11
H
U
1
GRAPHIC SCALE jN FEEr
�
$ c
F
N
N
Ito a
g
u 'q
111
In b
PROJECT LOCATION
2 O
W „
J
a
PART OF SE{ OF SECTION 28, TOWNSHIP 121,
RANGE 23, AND
F WJ OF SECTION 27, TOWNSHIP 121,
W d C
= IL t
6-0
I mIn on'
ep u
RPART ANGE
WRIGHT COUNTY, MINNESOTA.
obs a- %,-I
Q
LEGAL DESCRIPTION
W w 13
7 J
` Q
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
0 50 100 150Uj
H
U
GRAPHIC SCALE jN FEEr
�
$ c
F
N
N
Ito a
g
u 'q
R_I>,
In b
PROJECT LOCATION
2 O
W „
J
a
PART OF SE{ OF SECTION 28, TOWNSHIP 121,
RANGE 23, AND
F WJ OF SECTION 27, TOWNSHIP 121,
W d C
= IL t
6-0
I mIn on'
ep u
RPART ANGE
WRIGHT COUNTY, MINNESOTA.
obs a- %,-I
Q
LEGAL DESCRIPTION
W w 13
7 J
` Q
a
SEE SURVEY.
3 a�a
O
2Z
Lu°
°§�
o (1111
0)
LU
M
,,' as•a l n." n
b
o L
�
$ c
F
N
N
g
u 'q
R_I>,
In b
-124
W V
on 0,E
�eN 1 a
-E
j
2 4
w �V
6-0
I mIn on'
ep u
obs a- %,-I
5�8Y
3 a�a
O
°§�
o (1111
1 onsrwe
I arrol -
1 ~
1
I �
} A
1 09
11 111 ` o
/
11`
V)i tai)
cc
O O U
INDEX OF CIVIL SITE DRAWINGS: FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7 PRELIMINARY PLAT
C2.1 -C2.7 GRADING AND DRAINAGE PLANS
C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7 STORM SEWER UTILITY PLANS C1.2
C5.1-05.2 STREET PROFILE PLANS
C6STORM WATER POLLUTION PREV. PLAN
C7.1 -C7.3 DETAILS
Preliminary Plat
EXISTING P.I.D. #S PROPOSED LOTS WETLAND DELINEATION
118-500-284-401 EXISTING HOME LOTS = 2 a L..... PAGE LAYOUT:
LEGEND
118-180-000-010 NEW HOME LOTS = 121 INFORMATION PROVIDED BY:
118-500-284-204 TOTAL PROPOSED LOTS = 123 LOTS AG WETLAND SERVICES, INC. _r- Existing Tree Line FW1
C12
118-500-284-200 P.O. BOX 82
118-500-273-200 PHASE 1 = 27 LOTS KIMBALL, MN 55353 sEllucREI@AGK -'---- Existing Wetland Boundary
118-500-284-201 PHASE 2 = 33 LOTS- FRONT YARD 35 FT
EXISTING ZONING PHASE 3 = 38 LOTS* SIDE R/W 35 FT - - - Existing R/W line C1.3 C1.4
PHASE 4 = 25 LOTSPs SIDE INTERNAL 10 FT
A-1 AND A-2 -10'REAR YARD 20 FT Existing Easement
AGRICULTURAL -EXISTING HOME LOT: Li, 86, 2ND AEON jg ARTERIAL R/W 65 FT
PROPOSED ZONING •EXISTING HOME LOT: L5, Bt, 3RD ADDNC1.5 C1.6
Existing Boundary Una
RESIDENTIAL S114GLE FAMILY PROJECT DENSITY FRONT LOWNE --
Rst4O 50 100 150
L7, B1 4th L1-L2, B1 GROSS DENSITY: 1.33 LOTS/AC Proposed Street R/W
1st Lt -L15, B2 4th L1 -L8, B3 (TOTAL LOTS / GROSS AREA) LOT DETAIL Proposed Lot Una
1st LI -L11, 83 4th L5, B4 (123 / 92.40) w w C1.7
61 RR 4A -"" ------ Proposed Setback GRAPHIC SCALE IN FEET
2nd L1-L5,
2nd Li -L5, B2 NET DENSITY: 2.33 LOTS/AC 60'
2nd L1 -L11, B3 3rd LI -L10, 86 (TOTAL LOTS /NET AREA) Proposed OEEU Easement
2nd L1-L5, 64 4th L7 -L6, B4 (NET AREA = cRoss AREA LESS R/w AND outtots) 16' 28 B - B 16'
(123 / 52.79) W •--- ----------- Proposed Curb and Gutter SURVEY DATA PROJECT LOCATION
2nd Ll -L6, BS 4th L7 -L6, B5 a i a
2nd L1-L5 B6 MINIMUM LOT REQUIREMENTS a a
3rd L2-L5, 87 a a Proposed 5' Wide Sidewalk
R-4 LOT MINIMUMS: SURVEY INFORMATION PROVIDED BY: PART OF SE1 OF SECTION 28, TOWNSHIP 121,
3rd Lt -L8, B2 LOT AREA 12,000 SF 4 5' 7 MEYER ROHLIN LAND SERVICES RANGE 23, AND
3rd L1 -L11. B3 LOT WIDTH -INTERIOR 75 FEET SLOPE 1/3" pER FT. 2% MIN. Drainage and utility easements are shown thus: 708 1st AVENUE NE PART OF SWC OF SECTION 27, TOWNSHIP 121,
3rd L1-L3, 84 LOT WIDTH -CORNER 100 FEET - - .> SLOPE BUFFALO, MN 55313 RANGE 23,
3rd L1,65 LOT DEPTH 100 FEET 5 WRIGHT COUNTY, MINNESOTA.
GROSS. AREA MAX BUILDING COVERAGE 30% SEE PLATE 704 DATED: FEBRUARY 12, 2019
92.40 ACRES R -4A LOT MINIMUMS: 4" THICK, 5' WIDE CONCRETE CURB & 5 BENCHMARKS (PROVIDED BY OTSEGO CITY
LOT AREA18,000 SF CONCRETE SIDEWALK ON A ::5: -A -V -EL
INOUS MAT GUTTER PLACED ON o o_
PUBLIC STREET 60' RAW LOT WIDTH -INTERIOR 100 FEET EITHER SIDE) APPROVED SUBGRADE..•• APPROVED SUBGRADE ENGINEER, HAKANSON ANDERSON, INC. LEGAL DESCRIPTION
LOT WIDTH -CORNER 130 FEET (-"�-----^- ` --� -- NGVD 29 DATUM): L C CLABASE (MODIFIED) 29' WIDTH SEE SURVEY.
LENGTH = 8,820 FT LOT DEPTH 150 FEET'
AREA = 12.82 AC (INCLUDES 75TH ST., MAX BUILDING COVERAGE 30% Being 10.00 feet in width, unless otherwise TNH, EAST SIDE OF ODELL LANE, 1ST
ODEAN AVE., AND 70TH ST.) D APPROVED SUBGRADE 30' WIDTH indicated, and odj lnfng lot lines, and 10.00 HYDRANT N OF 75TH ST., ELEV=928.00
• ADJUSTMENT TO 135 FEET DEPTHfeet in width, unless otherwise indicated, OF
OPEN SPACE REQUESTED DUE TO EXISTING PARCEL TYPICAL STREET SECHON and adjoining right-of-woy lines as shown GREN
RR SPIKE IN PP, NW QUADRANT AVENUE AND CO RD 38, ELEV=9OF OO
LIMITED DIMENSION WIDTH
I '''o sr on the plat.
26.79 ACRES OUTLOTS AAND B) I 1
,
MATCH LINE Sheets C7.1 / C1.3 ; LL __ ____ I
J L__ -___-
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
F-
W
3
O
�a
U' w
a
ILI d
,°,
C
2
W
�
Z
Lu
��
�
W
ZQ
O
a
2Z
Uj
LU
7t 3 ____J __-____-__ +
\\ - - SII. ' ' /%J _ 1 ; lrf tt/'1if 1� lj� e� r• i - I I L__-__
_ ___ _ g .___- _' 9 2
______�___- 9 -___- 70 Sao 'C
,r r fg
y
1 I - . 11 [ t �� _ 90.00 917.12 9o.ao BOOD 90.00 18. 9aoo - 9o.ao
R02a 'pQ 90.00 917._82 _ e-3918.00
_______ _ �� -- r so DB918.60 9118 ____918.1017 __ -__ _______ _____ [ Log° N iN bN
1 NBB• 13' 00'E o e - 66 90.00 1
i.. - - -
1 to0a0 9000 919.9.6 90
_ 1 r -
i. i h i I li i i Y.9J2.0 i 0.1V 3mu�i�o
i 1 I I I :1 1 � ; ; ; l;
I 1 I --- °LN to
I - - rlt /�. lo- r- i Ij i i I I 1_ I i W mm° ti'n •i
, - _ 1 i i� t -1-I. --1_ r.___ .-t_I it LI I -. �-- --r- i--� 1 - `T
t �I A
91700G •)'_�- 930.80 _. .. NB9'2Y 10'E -- 1 �i_ - I - 1-- -. -T.- i - I; II T ,r ! T- .1� I �I- oLeC 4L1�Ip�� 3
!' I �• I I - I j l I 1 ` -I g- I
:1411) - 9000 _- i'-_ ` _ 9,.00 Y - I B I O ^ c c 3
i• a a, m L5 B3 6 g 1 I L7. B3 1 I LB. B3( I Q I
o \ L 3 I 1 m E r
- -----� --- ---- -'�- - �- ----- - - - --- I so Er xtoE R 1 - - -L4, B3 1 " i - i 1 ' 1 1 - I
------- ( -- r----` - ' r r, ---- t T--- T E { $ IS 1 i 8 L3. B3 _ I - 8 - - -2nd ! I 2nd. 1 I 2nd I I 2nd a
I
i i I I I -{ 1 . 1 I ; t 1 1 \ fie I ; m I 2nd 1 - 1 I: -I 14,850 SF I I 14,85 F I 1 E
;-1 1 t 90.0 ! I . N, B3 i i L2, B3 1 � i 2nd I ` i 15,069 SF � ; i :.:,-.- 74,861. SF _ 1_ 1 14,850 SF I I I I t I I
a,
- 1' I 2nd t - -nM .1 2nd t= 1 - L I'---15.564-Sf 1 - _ Ii II _ 1 t _ 1-._>-.oln_ 0- L .y
2 k{
L4,-81 -- i - I J - 16A52SF- -r- - _7 - -1 IL -- - I ( I - - j!� -- S ----
/' _ _� I I ` T i -12.072 -SF- -� w_ -._� 18;26TSF!t } i I 1 1 I i i i 1 1 i 1 et , I_ b 5 0
-.-I - ----I- - 1 __ _ 2nd _ - _'-++ _._ I f ______ __ 4 o
gg -L-- m R T _ 92 .47 i 926.65 8 927.10 r' 1
,< 1 - I, L3, B1-. 1 I 12,079 SF j R S I I el- 2ao�-1 I _1-
k 1 � I , I" 7, I R g I i mIR BTB RI$ / X928.52 -- V e°
e I g (I 2nd I �, I t I j 1- J- 929.66_ .. _. I j- _ I ¢ o
L1, B7 i$ i i BI 1 i$ 1 13,657 SF I I 1= 930.70" ' 1 930.62
I� I ' 1 .47. R-1SOD -�-gp,IL-�
! 1 1 _ * T -
23 69 SF I ` 1 I 1 1 I 1 __ I .- _ ___ _---. 0'E �- N69'.23' WE ` Y
•1 14.585 SF f I I , ; L.1335. R.ISW f _. -f- --- - 1 Nes• m• , 0
co 1 ( I i J 931.36 , 1 '- -_ , __ wuHox a W .� -
_ ,._..-__ __ 7
- { 4L01 L-ND0.� 1910W �-�B-a�
t5 a
/ t I -^Trp R-710.00
1 I I j I I-
LN9a0X alrslob I �) ',� Ne9. 1Y lo -E
�-____-_-- J 930 .-. _ -• __
I jL''^e
mNf lnrw _ __--_ ..
r "•
- - -_ �N89' 13' 00'E� NBB' 2J' OD'E ` -
TIFF RIM CITY MV
/ USPSFast�� In
1LL91ER.
'--------------------- - - -1 - _ _ �Y - - -
/ 1 IR+9 Pobr
a`IOap / ,1.07 �76D]�Rdr00„i�•`••e '-•"`•= 1 •�••- _i�'E-mI0L0 LNBD2 MBIOOD 3561 'Ill
1 D4.7B n.s__»
- - I '', N69' 21' 10-E ••••.<- .• ! L=9L93• Mia' � -90.36\ , J-L�IJ2 -_ ___ --__ _ { I, ` 41J.69 R 16.00 _-__- � Z
4j N E L a9.4B. R-Xi10W /
.«- - e t '- 67.00 _ -- - L 2,66. R ,--------- ------ ---- ---- --
11..88 �
5tre L r 926.12! iO L LL 11
v7y,-} p.61000 - _-.L-2x00. R 16 O .w 929.78 ' 1928.65 r 1 , I ----_ - - - - e ; , =
- ...�• -
_ 74th _" __ ----- - --- - -
rc - te.a7 r __ __ !j L5 4
( 1 ` I � 93093
-,, r,' � r I I \a I I I �- �_ 1 u. B5
III t r -Lag•?\ - - -. -
NfiB• 1Y ,D C s I 12. Q
_�--�- -__---------1 1 i 1 1 I I 1 I is 2nd I- e. I 1 13,451 SF 1 rd q a
1a:a o-7sR3. R-73oaD_._ r-_-- t - _ / 1 1 �� 1 1 \' L 2nd4 i I ,1' I $ 8 2
... __ - -- 4 ) 1 I t..� 9: I I E I,� i I I 14.543 SF 72,21 0.L _ I '_ 'g
1 - ------ -- !- I I I I I $i L B4 1' 7 SF ti
m�- ---- - I L3, 64 I $ T
r'I L1, B4 2!' la. 2n c 1. 1 1 L.
930.42 Q I� I 12,92 IT;I / 1 I` ! - -__L -
1 I�"@ �; I I:, ml I-�I 12,4335E 1 .I 1' 1 1 '�1 {--
I L5, 62 j- 1 1� I 1 I = a 1 , 2nd I � " 1 -�•
e I ---I r II i 7 82 1" 8 i 2nd i I C =1- ( I 13,010 SF i I i 12.232 SF i „; \ .I I •�I !1'C NB9' 23 OOE 1 I I LO o p
V r_________� ! 929.20 I I I I § ,� 1116,255 SF II -��= _,ABB __-__ --------
---------
, _
i I 1 In `u �y
,4 2nd � ., / 1
500' I! I I I. L4, I //
1 111 IB M1 1 1 znd -
:. 1 1 -1.- , I 1 = 1 • I __
I R "�- I I � y 13,428 SF I. . I I � 9 1 L_ _ I �_----------
8 1 - L3, B2 1 ` I
i ' J� J 1
Y I Lt,_B2 I c . 1 L2, 82 $ , I 1 ! 1 -- - _I - - I -I -i, .` ' / i i 916.6 N J' 00'E ��
I- I , 1-L= Ind- tt - I i r - _ 90.00- --r• , loaoo--r a e° ? 8 u1 K c
a 2nd 1- -2n"I 9110 - - =�-9aooe1s.3z _ -- . i B3 i o
Im 15 504 SF i ! - -12.009 SF 12,058 -SF- - -' _- - -' ___- -- - -- - ------ -- - - -- 5 SF - -
„ I 1 NOB 2Y "_J---------------------
__-__ _ F. r E 1 60.0 j Owe 12,015 i o
_ i 10'E 2 1
_
EwD J
9 1.37L7e 919.60 919.27 -nest 920.83 x09• Itr`
_ - _
O 929.60 Yt3150 100.18 o / 9100 a 90.00•. '. - 100.00 __- _ 1 `I / 1 t i - I o -------------
---------
0______
__-NB9_2-1 ICE 92810 9------ ' 932.20 - '. 929.00 NB9' 1Y 10 E II I; I J a o, /�� ...J 116.30 LB 3rd 2 I/ ; > IV f
__-'---'-- ---- - ww t }} y
--- - \;.14\ a $le 1 --. 20.405 8F I I I 1 /� LV 31 ),
«� 1 m
7/' -- 111 ^ \ bla \ EpEIOg111 htL It _ 1 _�� 1 I g O 03 LL7 W
�:.. ���_---��_! 1 G 1,e1r - i I R i L2,
3rd B3 --
3rd
-
wi 1 71 0\ 1 i/. ,/ ';$ --12z 101w12,015 SF f• .� �O o o cZi
otx _--__--.--------_---_-' _-_-_-_-_ - - 1
In -_ 1._-_-- 1 �� �� ���I��tylli7i�����L�•ir �iG X00{ h 1,I S-
T L53rd. B1 8 I i MATCH LINE Sheets C1.3 / C1.6 L7' g? g ; FILE NO. 00715
8,350 SF I$ ' 3rd' 1- INDEX OF CIVIL SITE DRAWINGS:
'1 - ti' 1 B 529 SF (^
CO PROJECT LOCATION PLAN
S .r e
C I � - C1.0 OVERALL LAYOUTD PHASING PLAN
7 1 4Zsk� -Ifi12T NB9'SeiBE C1.1 -C1.7 PRELIMINARY PLATN
{__. ----------.....__ --------- ........ ..... ... ...- .___ _____- _ __-___-_ - _ - SB9 10'W -__ _ 1• 9 - _ - - -� ' I _ - _N.1 -=.. - - - ..� t"1. _
-------7 26.32 , C2.1 C2.7 GRADING AND DRAINAGE PLANS
307.00 __-� '4-- C -.i _ 'cOc: ' h��.� - -
69 u,DE-r-i1fT3-- _ __ _______ (. C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS C1.3
g o� vB�>I q" i ' j - i ( i --- - i I " ; C4.1 -C4.7 STORM SEWER UTILITY PLANS
- 1 (1 -'-'---- ----:-- - -- ` ` ``7 P i f i i ! i i 1 C5.1-05.2 STREET PROFILE PLANS
0.0- L4, et\ '\ \ ��� C6 STORM WATER POLLUTION PREY. PLAN
g F 3rd \ \.� '4p•. L I e 1 I I,. 1 ! C7.1 -C7.3 DETAILS
s ! 'I 78,398 SF `\ �` \ �,. 4, B2 I - .�'1 L5, B2 1 e I L6, B2 1 I $IS I Preliminary Plat
EXISTING P.I.D. 4S PROPOSED LOTS
WETLAND DELINEATION N CLIENT.
11
EXISTING HOME LOTS = 2 LE LEGEND PAGE LAYOUT:
118-180-000-010 NEW HOME LOTS = 121 INFORMATION PROVIDED BY: VHF INVESTMENTS
118-500-264-204 TOTAL PROPOSED LOTS = 123 LOTS 9
AWETLAND SERVICES, INC. Existin Tree Line LLC
11fi-soo-2a4-too P.O..BOX az SETBACK -' �- - g C1.1 C1.2
118-500-273-200 PHASE 1 = 27 LOTS
118-500-284-201 PHASE 2 = 33 LOTS" KIMBALL, MN 55353 FRONT 1S - - -- 35 FT Existing Wetiond Boundary
EXISTING ZONING PHASE 3 = 38 LOTS" F DE R/W D 35 FT - - - - 14505 43rd AVENUE N.
/ Existing R/W Line C 1.3 C1.4
PHASE 4 = 25 LOTS 10• SIDE INTERNAL 10 FT PLYMOUTH, !AN 58486
A-1 AND A-2 REAR YARD 20 FT
AGRICULTURAL *EXISTING HOME LOT: Lt, B6, 2ND ADDN A ARTERIAL R/W 65 FT - Existing Easement
PROPOSED ZONING *EXISTING HOME LOT: L5, B1, 3RD ADDN / HENRY HANSEN
Existing Boundary Line C1.5 C1.6 (763)238-1610
RESIDENTIAL SINGLE FAMILY PROJECT DENSITY rnoln LOTUNE
R-4 -4-4 -- Proposed Street R/W
1st L7, B1 4th L7 -L2, B7 GROSS DENSITY: 1.33 LOTS/AC
1st Lt -L15, B2 4th L1 -L8, B3 (TOTAL LOTS / GROSS AREA) LOT DETAIL - Proposed Lot Line 0 50 100 150 F -
1st Lt -L11, 83 4th L5, B4 (123 / 92.40)
2nd L7 -L5, 81 R -4A W �' -"-- ----- Proposed Setback C 1.7 W
NET DENSITY: 2.33 LOTS/AC - 60' z P GRAPHIC SCALE IN FEET 7
2nd L7 -L5, B2 .J
(TOTAL LOTS /NET AREA)
2nd L1 -L11, 83 3rd L1 -L10, 86 "-'---------- --"----'- Proposed D&U Easement ''n^
2nd Lt -L5, B4 4th L1 -L6, B4 (NET AREA =GROSS AREA LESS R/W AND oun.ors) 16' 28 B - B 16' co
(123 / 82.79) rc ----------I- FZ
2nd Lt -L6, B5 41h L1 -L6, BS a f a "--"-"""" Proposed Curb and Gutter
2nd Lt -L5 B6 MINIMUM LOT REQUIREMENTS it o SURVEY DATA PROJECT LOCATION = m Q
3rd L2-L5, B7 a ii Proposed 5' Wide Sidewalk Z O J
R-4 LOT MINIMUMS: SURVEY INFORMATION PROVIDED BY: PART OF S OF SECTION 28, TOWNSHIP 121, M
(7 LU a
3rd L1 -L8, 82 LOT AREA 12,000 SF 4 5' 7 SURVEY
MEYER RINFOROHLIN LAND SERVICES RANGE F SEI D W d C }
3rd L1 -L11, B3 I SLOPE 1/3" PER Drains a and unlit easements ore shown thus: PART OF . A OF SECTION 27, TOWNSHIP 121,
LOT WIDTH -INTERIOR 75 FEET 2% MIN. 9 Y _
3rd LI -1.3, 84 LOT WIDTH -CORNER 100 FEET �' SLOPE BUFFALO,
1st AVENUE NE
3rd L1,65 LOT DEPTH 100 FEET BUFFALO, MN 55313 RANGE 23. It
WR GHT COUNTY, MINNESOTA. _j Q
MAX BUILDING COVERAGE 30% 5 W Z
GROSS AREA SEE PLATE 704 DATED: FEBRUARY 12, 2019 W W q
92.40 ACRES R -4A LOT MINIMUMS: 4" THICK, 5' WIDE CONCRETE CURB & 5
LOT AREA 18,000 SF CONCRETE SIDEWALK ON Alk B BITUMINOUS MAT GUTTER PLACED ON o o BENCHMARKS (PROVIDED BY OTSEGO CITY W
PUBLIC STREET 60' R/W LOT WIDTH -INTERIOR 100 FEET APPROVED SUBGRADE**** APPROVED SUBGRADE L_ ENGINEER, HAKANSON ANDERSON, INC. LEGAL DESCRIPTION to a It
LOT WIDTH -CORNER 130 FEET (EITHER SIDE) - ----- NGVD 29 DATUM): Z J Q d
LENGTH = 8,820 FT LOT DEPTH 150 FEET " C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH SEE SURVEY. Q
AREA = 12.82 AC (INCLUDES 75TH ST., MAX BUILDING COVERAGE 30% Being 10.00 feet in width, unless otherwise TNH, EAST SIDE OF ODELL LANE, 1ST Q H
OCEAN AVE., AND 70TH ST.) D APPROVED SUBGRADE 30' WIDTH indicated, and adjoining lot lines, and 10.00 HYDRANT N OF 75TH ST., ELEV=928.00 = Z
* ADJUSTMENT TO 135 FEET DEPTH feet in width, unless otherwise Indicated, W
OPEN SPACE REOUESTED DUE TO EXISTING PARCEL TYPICAL sTrrEE7 SEC77ON and adjoining right-of-way lines as shown RR SPIKE IN PP, NW QUADRANT OF OGREN 9
26.79 ACRES (OUTLOTS A AND B) `LIMITED DIMENSION WIDTH on the plat. AVENUE AND CO RD 38, ELEV=948.06 V)
Uj
`- I•____ r `_-__ I� I II ,( ry , 1 i �q�-1 r 11 I I \ I 1 / = $ 1 ✓ • / I 1 I
i I I -- MATCH LIN^ Sheets Ci.i C1.4�s,.r�! 1 N/N a-"� .T \
I I 1} 8 Boa 1
/
,-- __ -7777-- I ,1 I I \ MATCH LINE Sheets C1.2 / C1.4 `_ ,. , 't • ` , I rf
t ------- ._ - -- J _ _
9p0a 91(1.32 90.08 fa00 918.00,.1) Ne9• u 00'E_ o o $ .I II ! - / T - _ _ _ T
91.7.82 e000 _918.00 saoo 918.48 918.80 1 -�� ----� L --- -- nx .�. -'l 4� �( I II -�-� / Ill I 1 1---
--------------
y J V AI 1
1 it t I ; Idl l------
----44
-- - r- - ----- ' r ( Lr l , 7. la II I N ,N / - -\ \ \ \ 1 \ 8 In INo
1
G
I N
1 \
-sBsux3w •, I ,.\\\\ , t 1 \. '\ Y� ~I��f✓1 Ei
•I I�:_t_t+. , I�.4(_ Ili- t, --F--/"' ._�--;-,�_\
83 ( I a ti ��; // ,ly_ 1 7 �� It \•vv I' . p pp
,- 5TORM WATER
I i I A S i L70, B3 1 n l 2nd , I II v - w iO li vv` v ` •` II II �•1 . Q `c V ti w a r o
Obd
n BA51N
L8. 83 , I L9, 83 . I 2nd i I S( 17,229 SF ( ( v v 1 II I A ,` t / V t 1 ♦ 1 �'• 'v A I I\ o s , m ii o a
2nd I I - -2nd I* I - t 7 1 , 1 I ���� 1 1\
t ti `a
I I -t_ 16,367 SF
/ �
' 14,850 SF I - 14,850 SF. ( I.1. i - .i 1 1 1 II ,�`� t / r sr /� '\ \ 1, \ \ :� - 1 \ \ 1 u U
t } 1-
i gg
I` ,I I I' I - { _-- . r1' �, CJ If1.' / /i \\ \ \ \ I I `CB
l -- T- t >nlg i / r I I \ \ \ \ \ \ \ \ o $: '\ \ i` '5 u J Tnq a N i
;L 4 - i 1 F �\ I II 1 /e�w�tol E �
_ - 9{,9.33
L.___ __ 924.87---------------L=x3]9. a=1B00 - _ ) 1 \ fl <LL;1L'L! / j l \ \ \^ \ \ '. \ \ £ o
92.70 927.22 mNu+E'r[ 1 t _ j 1 \ \ \ L o m
soE- I . ...... - m __
1 so rr rroE
�I------
_ _----------------
37'
.. , I ", s�g.0 \
i .
73).15 L.)x.0_M�3x9➢B. N01 _�,,..�:l�pubEi
= uulsox wtslErc g n1 eLv ✓.-- g.. 1 1 i 1 ! \ . � , \ � \ \ ` � \ ` _ \ \\ I
mE ILim°aun°'ir A'110vu �� ,yam / 1�4�1 1 ✓.Til ,.-... _ _ ... - •^ , \ � \. I�/ �` all I \ \, \' \
1 \ I
Z I
NB9' y' OD'E
77_77 i- - '\\ `t1 \ �� r j sB";,•�i, s
-L - I 1
N j j ( -- -- � (- -----j r-- i----- 1 __ _------ \\�
I I r-- a. r--__- _ - r� 7777-, I•,, •Ir �\ 1 r ♦ \ 'o -L{ 881.43'1
8 ___- __
jl
N ,- i j 7 - - I I I i i i Io i B5 \ t \ � ♦ ♦ 4� \: \ r b "♦♦ �C. jI , 1 eouxxw xore � � .,
11 J -WWL II c `1 ,z f \ ;\ p aBa 1B9 \ \' ^ ♦ $• I 1 `
U
18 I- 12, B5 I g 8 i L3.' B5 18 n I L4, B5 t n ? II ;430 SF \ \ ` �♦ /.'. ', \ •\ Y. '6, 1
(a tt 2nd -- j >$ 11 j 2nd - -i y 1 13, i �'''\ \ ' .. Y' '< ♦♦ \ ' * IjjI a
12,216 -SE _ - I 12,150 -SF 13.661 SF \ IF t I' \\ 4° a ♦WNCFETE `jJ k. \ I ♦\ \,� I I I I i - - -
I T I _ 6 j 1 - 1 ,, I ' \, i9 el 1 \ scEvrux _ _ . _ 1 ♦ \ 1
n i - t •• t \� �S �o�r878.0fi
I! '
� I I I I i i-� ... I, of \ � _ I I -
A - j-••'rl - - _-- I f i L__ _ J ( - - '{,I i'o 0♦50 ♦♦♦♦ ♦\ \\,• r \..h -
I
7777_ -, L 7,777 _ ._ _ ___ - : ♦ S �•'.e \ \ -•
-89.84 BOAO-' IIS. q8' p1'E 1 a F I I d
� \ \
916.63 Nae• xs oo•E 915.95 Nes• u' -E e>� a S ♦\ -,t4 \,, O ♦' S,r, \ a 3 I II II - - N ,�
I
LP"
- Il \\ ♦ / 914.48 ' ` ��. \\ -' _ `
_ Je'A \\ ♦♦ `♦e ` �
\\ ♦ . / /!j `' ♦'� '�\ ErmEirmrL 882.41 I I I vl N N
1
�/ v Lays eosr wsrrl:n .. � i
, � I
b
I OUTLOT A;.,F - - _ ' c &3 / %' •)' , �• 'Ib•\'Vy\ N >
3rd ,L.
t g 75,479 SF - _ ) 'r ei� / ,°r4 >t, \ m
1.73 AC \\ \\ \. \\\ \ 2
1.I T p� ,{ ',7�/�'1-TFp914.80 `` `00 ♦ : ' `,, , <•� c' Ca? I R ♦ \ \ '\ 3 Cn
j j I Sl01\fVf WA/LI\ - �•b.J ,,ro ..'�� / / .ly. `�Oe ``\\) / 1e V'♦. �?S�a�uI ��a y1c � /, i a � 'I \ \ ' C
n - r�t�t�-- - - -t��/< ?S � ������ 14.T��lB■��7C��r� Jr,�� i 1. \ 1
•IAs,MATCH L .\,. 1 I J \ , FILE NO. 00715
MATCH LINE Sheets C1.4 / C1.5 INE Sheets C1.4 / C1.6
J 89014 INDEX OF CIVIL SITE DRAWINGS:
CO PROJECT LOCATION PLAN
-tt -��--^ �- `♦ / / \ '� ! 2 _ C1.0 OVERALL LAYOUT AND PHASING PLAN
NBB' x3' 00'E NB9' x]' WE j , ,� 4� J?�, t<, / .
I _ \ - i�'•, I'Y p^\''', --� ��- - �-: -- - C1.1 -C1.7 PRELIMINARY PLAT
91
`1 ( - -t .a ;' fig, cb 9F �. �� j \\ \r� y. o9ais, C2.1 -C2.7 GRADING AND DRAINAGE PLANS
\ r____--- r----__ ^J Ig N C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
-- _
___ ' e
\ j ( III \\ \ O s, snEw /,/ �: / gg\ C4.1 -C4.7 STORM SEWER UTILITY PLANS
I vl B 1,'�' 914.20 / (n✓ V �♦♦ 'b \ ` C5.1-05.2 STREET PROFILE PLANS
3Td , \$\ C6 STORM WATER
I i L5, 83 , j.S L6, B3 '� „ o i L 3rd 3 II $ 9144.70 12142 S ,t �`��, : Vis% /�a., j ,�� , \` \ 910 ( - \\ C7.1 -C7.3 DETAILS POLLUTION PREY. PLAN
Preliminary Plat
EXISTING P.I.D. # PROPOSED LOTS WETLAND DELINEATION LEGEND PAGE LAYOUT:
118-500-284-401 EXISTING HOME LOTS 2 RML x
118-180-000-010 NEW HOME LOTS = 121 INFORMATION PROVIDED BY:
118-500-284-204 TOTAL PROPOSED LOTS = 123 LOTS AG WETLAND SERVICES, INC. Existing Tree Line
118-500-284-200 --' ' `- - C 1.1 C1.2
118-500-273-200 PHASE 1 = 27 LOTS P.O. BOX 82 SE79AOR
118-500-284-201 PHASE 2 = 33 LOTS- KIMBALL, MN 55353 FRONT 1Y - - --- Existing Wetlond Boundary
FRONT YARD 35 FT
EXISTING ZONING PHASE 3 = 38 LOTS- SIDE R/W 35 FT - Existing R/W Lina C1.3 C1.4
A-1 AND A-2 PHASE 4 = 25 LOTS -7a SIDE INTERNAL 10 FT
REAR YARD 20 FT
AGRICULTURAL *EXISTING HOME LOT: L1, 86, 2ND ADDN ARTERIAL R/W 65 FT
Existing Easement
PROPOSED ZONING *EXISTING HOME LOT: L5, B1, 3RD ADDN Existing Boundary Una
C1.5 C1.6
RESIDENTIAL SINGLE FAMILY PROJECT DENSITY FRONT LOTUNE
1st Lt, Bt 4th Lt -L2, B1 GROSS DENSITY: 1.33 LOTS/AC -- Proposed Street R/W
Tat 0-05, B2 4th Lt -L8, B3 (TOTAL LOTS / GROSS AREA) LOT DETAIL Proposed Lot Line 0 50 100 150
tat L1 -L11, 83 4th L5, 84 (123 / 92.40)
2nd L1-L5, 81 R -4A NET DENSITY: 2.33 LOTS/AG 60' Z __-------------- Proposed Setback H. GRAPHIC SCALE IN FEET
2nd L1-L5, BZ (TOTAL LOTS / NET AREA) zi ""
2nd Lt -L11, 63 3rd L1 -L10, B6 __________---'--'--- Proposed D&U Easement
2nd Lt -L5, B4 4th Lt -L6, 84 (123 AREA =GROSS AREA LESS R/W AND OUTLOTS) 16' _ 28 B - B 16'
2nd L -L6, BS 4th L1 -L6, 85 (/ 6279) n. 4 --------- -------
Proposed Curb and Gutter SURVEY DATA PROJECT LOCATION
2nd LI -L5 e6 MINIINI MUM LOT REQUIREMENTS 0
8
3rd L2-L5. °• a Proposed 5' Wide Sidewalk
3rd L1 -L8, 82 R-4 LOT MINIMUMS: 4' 5' 7' SURVEY INFORMATION PROVIDED BY: PART OF SEJ OF SECTION 28, TOWNSHIP 121,
LOT AREA 12,000 SF SLOPE Drains a and utilit easements ore shown thus: MEYER ROHLIN LAND SERVICES RANGE 23, AND
3rd L1 -L11, B3 / PER FT. 708 tat AVENUE NE PART OF SWJ OF SECTION 27, TOWNSHIP 121,
3rd L1 -L3, B4 LOT WIDTH -INTERIOR 75 FEET 1 3" p 2% MIN. 9 Y
LOT WIDTH -CORNER 100 FEET SLOPERANGE 23,
3rd L1,B5 LOT DEPTH 100 FEET 5 BUFFALO, MN 55313 WRIGHT COUNTY, MINNESOTA.
MAX BUILDING COVERAGE 30% DATED: FEBRUARY 12, 2019
GROSS AREA SEE PLATE 704
92.40 ACRES R -4A LOT MINIMUMS: 4" THICK, 5' WIDE CONCRETE CURB & 5
LOT AREA 18,000 SF CONCRETE SIDEWALK ON A & B BITUMINOUS MAT GUTTER PLACED ONo o BENCHMARKS (PROVIDED BY OTSEGO CITY
PUBLIC STREET 60' R/W LOT WIDTH -INTERIOR 100 FEET APPROVED SUBGRADE 9.:w APPROVED SUBGRADE 1 --- - ______ j__ ENGINEER, HAKANSON ANDERSON, INC. LEGAL DESCRIPTION
LENGTH = 8,820 FT LOT WIDTH -CORNER 130 FEET + (EITHER SIDE) C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH NGVD 29 DATUM): SEE SURVEY.
LOT DEPTH 150 FEET
AREA = 12.82 AC (INCLUDES 75TH ST., MAX BUILDING COVERAGE 30%Being 10.00 feet in width, unless otherwise TNH, EAST SIDE OF ODELL LANE, 1ST
ODEAN AVE., AND 70TH ST.) D APPROVED SUBGRADE 30' WIDTH Indicated, and adjoining lot lines, and 10.00 HYDRANT N OF 75TH ST., ELEV=928.00
+ ADJUSTMENT TO 135 FEET DEPTH I1PICAL STREt7 SECTION feet in width, unless ofberwis indicated, RR SPIKE IN PP, NW QUADRANT OF OGREN
OPEN SPACE REQUESTED DUE TO EXISTING PARCEL and adjoining right-of-way lines as shown
26.79 ACRES (OUTLOTS A AND B) LIMITED DIMENSION WIDTH h° scuE on the plat. AVENUE AND CO RD 38, ELEV=948.06
`, __ 20,405 SF i 1 i I 't - - >> 72
v �Tf pl j $I I i es'E _ -rte' a t I i 1 j f OUTLOT A !< ' 1 9g3a
'\ ( 1 �• 1 Im j I - x7s1Y _ 1 ` I I 3rd
`� ` \r' - f 1 l-_-- -- " MATCH LINE Sheets C1.3 / C1.5
1 % Rf�i �'✓X .. \ ISI " I - _ _ -�'� 'I II� I L2,\B3
/, 3rd-- I g " MATCH LINE -Sheets C1.4 C1.6
015 SF
,-
\
STORM WATER
__-_�_ -
-------------- ~ I i is w`•' -. 1\ � H \ , _ I --' ---1-`_ _� - -- A � �.
'•� L5 Bi j Ig \ \ G \ _ 'j - 9 131ao o 1 BASIN
3rd to 18''. L7. B2: , ,$ . _. v_r W.3en ,
78,350 SF I¢ 1 •'i 1�&i, �. \t If+n �sy ns `S , �; 11 3rd
' w M' rte' 18,529 SF
1 ,�' 1 \ • i •^7 se``` ---- --- - ---I " I %1 L3, B3
1 I
1� 11 ` \ \ r�-''1 +r +'2�- -181--J-� _
- ' , - 16127 "'Ne9'38'•1 \ I
-____- _ 0•w.___ -_ _____ __- _._. '� \ , .. `� 4,ts_ - 3 12 01! SF I Ne9' 23' 00'E
,r
..... ... ....._------------------926 32 r' _ NB9 ,
- -r ses• zY I `_ : "`` j �� . __� , j 1 1. I --(T. ' _ _ I B lol.00._:.� ezza-_T-eo.er__-_. 0'S
1 . \ I
1z_ _� j 1 _ Z3 I I \ I r I _ _ _ ___----------- ` __________ ! -----------
7
______ __- 1 'Stag
P ----- ---- Y- r t t--- -- ------ ( Ci i o
w , r •• � , j I I ° ,•/ \�'•
-Ilao- ' '
I I 1
^ L4. 61 \\ '',� S.�•. '•,�+ �,�•,• � ST , i ; 1 1 `. I I I .1.1. 'I I .. I i I� 1 , i t g3 est a.zo
' ` � � i 1 •, I I 13100__- _-___ , I
�.I I I rC` ` __ ---- - l I I - IL8' d ,'� �1
3rd i '• \. \ 4 1', I I ` I I I 31
@ Cq 9 °' o i L5. 82 i in_ - L6, 82 i pp i b '^I I L7. 63 1 i tA2 Sf 1 . ,\,
18,39 SF \ A i Et . 1 I I L5, 83 L6; 83 81, y
929.02 ig
6,90 d ? i if -b 3rd 13 3rd j !j j s 1 �� rl i L 3rd 3 . I 8 I 3rd n I 3rd. i'S. i 3rd SF i $ 914.70 �i, ■
-. _... -- seg•• 22o1ow e'/e° '•. SF , 7 i bb I I I E e/e !!!. �I2 i 13.453 SF i 13,635 SF , , 13,635 ASF I $ I \12,732
�- '-------'-'r !d 9 SF j' :. i 16,787 SF I t 1;
l j 14,38 , I 1 mvna7E III I, I i t�
l
- __ ____
\\
__ - -----------
L-20.V,
___-_____� 1
____-_923 so.o J 1 }IL r
I j
R-15�
L3 B7 L 20 n, caRnElE f R/w - -
��t'2> SO R wLE J - _ --.00 I I L-2144, R-fS00
3rd % : $ / : �., 2 �2 - _ ( _� L _____ L 2169. R 1 ______-__-
I 26.549 SF r - i" 1 '• TOW.18L2'- -i-
\ 21.24 Ne9' 23' De'E_ Y•E { 1� 1� =0.00 10100 6220 L�Yei R�70a9
n.
r / - r •" Ne9' 23' 00•E 110.62 101.29 NB9'23' OD'E
n in I J F/` 2' ``•w ._ .-......... - .. .. _ . I� - 1. -m,. -Y.... mraceu iourroxAr,»
-se9•_-__ _ _ ___-__ r' `._--.. b bm 1 1YS' xlnr arc Axa ar
( 1
- ------------
I �' `. �m om 3rd Street - ���'�•- �W
L2 61.
3rd' i / l � R-1 �`�?ao - .. a .. � \ e n oo•c��
r` x99. 2S o0 -E. �_ -x]350 ���- -- ���� ����� ���� ��� ���� �- -- - -� L-mr/A R-{!1100_
17.474 SF i .`; Y� 'l1 / / i i.as.a a-z9aoo Ssas _ .w �----------
.J2
- --_ _- -iso - ---'- - 13zw - -- a7z. _ 1 2
111/ \
` J
-10.0- 'l �'/ p �] f 'car fr - - --- -- ( .---------- ----- (• u1Rmz"0,tool: --- ---- (-------- (' "i
' ,• it r s.o rr RwE E �Lounax avo j - ___-"1'', F-
fI
---------- f ! �I / t / - /ii.. u"sEsrs Rosr u�Asriz --- ----------- ----- - g5
--J--' -- -- - ------ I -----------
1 � F
zle.er ( t% r - i r 11
_ -�.. r______ i I r___________________ /.____________ 1 1 I � I 1. 1 � L9'
r _ se9• ar orw -' - ---' "- ;\ r/ r • e i r 1, 1' 1 j \ d
lyOsr'y /3'�; Ig I i Ii.., _ I, , Ir •',
i 1 t_ uA2eoz uus7m; 0 SF i/ i L2; 65 11. 8 I I I 1 _ I I 85 .
v c°rs1Ru Laulrav .vm I A'. r L3. B5 • I 1 -L4:-65 I I L5. B5 g I % L6, 85 i I $ 1 - L7. BS I g b I L8, \ ` \
I t k'1 _ i tS - �nrE lxm an.wo r , 1. 3rd - , I - _ 1 8 I I I 3rd / 3rd Is, ' I 3rd
w L1, Bt _�_ . i1 ! O i I jusrs Fosr uA9IeR // r 18.009 SF I $ ' -' 3rd ,.� , 3rd - 8 , 3rd I 1 a i 17, 18 SF T- ° \
o m 20,926 SF _I 18,022 SF ` •I ? i 18,022 SF , 18,022 -SF j I I \ 18;022 SF o 1 7 ; -
N 1t I I 18.022 SF
Ne I ,1 r ii i` -----
-------- -- F1 -
j< L - - l ----- -- -----T------------
V'j 1'
/._ `•\
- --1 6
_1-
` ----- ---
iL L ---- 'iIS]So
- --- - --- --
a
coAA M
......... . .. .. -_
--_._
__
-..
= ti
0 w
---------------
y ____- ------
91.21 --: 199.7{
F-
Q
a
, ]].50
11 6.35
Ne9' 21' oa'E
,-' -.
111. ' 1x99.23' 00•E 937.61
932.35 '. ` , :�.,.. 925.40
922.24 .... 921.96
WW
V)
a
W
ZQ
o
a.
a 1=
o
= W
EO
LU
cc
J
O
Q
E1;'�,��
�
m
/ 1 r
u
INDEX OF CIVIL SITE DRAWINGS:
a
1 I
CO PROJECT LOCATION PLAN
holp
C1.0 OVERALL LAYOUT AND PHASING PLAN
2II�
rn
C1.1-C1.7 PRELIMINARY PLAT
p�
C2.1 -C2.7 GRADING AND DRAINAGE PLANS
0
4
I
C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
co
N
C4.1 -C4.7 STORM SEWER UTILITY PLANS
�
m
o
I
C5.1-05.2 STREET PROFILE PLANS
g
2
�
(
C6 STORM WATER POLLUTION PREY. PLAN
Y
I
O
C7.1 -C7.3 DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
N
V
�
0
coAA M
o y �
= ti
0 w
�
°e
F-
Q
a
UJ It
2,glmm�2''-
Q
On°
a�a��
WW
V)
a
W
ZQ
o
a.
a 1=
o
= W
EO
LU
cc
c �
b
C b
c�
•q
I 2
o y �
W V
>. 0 E
i 3ma I o
�EoE
4
2,glmm�2''-
V�Iwdco3
On°
a�a��
m °03
� E,, '
V)
o
J
Q
�
m
u
rZ 7�
a
w
holp
2II�
rn
0
co
N
�
m
o
m
2
g
2
�
Y
O
O
U
FILE N0.
00715
C1.S
minary Plat
EXIS
11B-5 0-2 PI -401#S PRONG H MELOTS
LO S = 2 WETLAND DELINEATION R-
116-160-000-010 NEW HOME LOTS = 121 LEGEND PAGE LAYOUT:
118-500-284-204 TOTAL PROPOSED LOTS = 123 LOTS INFORMATION PROVIDED BY: ✓�
118-500-284-200 AG WETLAND SERVICES, INC. � �. _ � _. Existing Tree Line
P.O. BOX 82 C1'2
118-500-273-200 PHASE 1 = 27 LOTS KIMBALL, MN 55353 s�e6cz $II9AGK --'-- Existing Wetland Boundary
118-500-284-201 PHASE 2 = 33 LOTS" FRONT YARD 35 FT
EXISTING ZONING PHASE 3 = 38 LOTS- SIDE R/W 35 FT — - - — Existing R/W Line C1.3 C1.4
A-1 AND A-2 PHASE 4 = 25 LOTS i0. - SIDE INTERNAL 10 FT
REAR YARD 20 FT Existing Easement
AGRICULTURAL *EXISTING HOME LOT: L1, B6, 2ND ADDN ARTERIAL R/W 65 FT
PROPOSED ZONING 'EXISTING HOME LOT: L5, B1, 3RD ADDN Existing Boundary Line C1.5 C1.6
RESIDENTIAL SINGLE FAMILY PROJECT DENSITYrRour LnTUNe
1st L7, BI 4th4 LI -L2, BI GROSS DENSITY: 1.33 LOTS/AC -- Proposed Street R/W
1st L7 -L15, B2 4th Lt -L8, B3 (TOTAL LOTS / GROSS AREA) LOT DETAIL Proposed Lot Line D 50 100 750
1st L1 -L11, B3 4th L5, B4 (123 / 92.40) C1.7
----------------- Proposed Setback GRAPHIC SCALE IN FEET
2nd L1-L5, B1 R -4A NET DENSITY: 2.33 LOTS/AC � 60' ?
2nd L1-L5, B2 (TOTAL LOTS / NET AREA) J ---
2nd L1 -L11, B3 3rd L1 -L10, B6 (NET AREA = GROSS AREA LESS R/W AND OUTLOTS) 16' 28 B. - B 16' - Proposed D&U Easement
2nd L1-L5, B4 4th LI -L6, 84 (123 / 52.79) w ---•---•-----'-•-•-•--••- Proposed Curb and Gutter
2nd Ll -L6, 65 4th LI -L6, B5 Q. ti a SURVEY DATA PROJECT LOCATION
2nd L1-L5 66 MINIMUM LOT REQUIREMENTS0
3rd L2-L5, B7 0. a Proposed 5' Wide Sidewalk
R-4 LOT MINIMUMS: SURVEY INFORMATION PROVIDED BY: PART OF SE OF SECTION 28, TOWNSHIP 121,
3rd L7 -L8, 82 4' S' T
LOT AREA 12,000 SF MEYER ROHLIN LAND SERVICES RANGE 23, AND
3rd L1 -L11, 83 LOT WIDTH -INTERIOR 75 FEET I SLOPE 1/3" PER F7. 2% MIN. Drainage and utility easements ore shown Thus: 708 1st AVENUE NE PART OF SWJ OF SECTION 27, TOWNSHIP 121,
3rd L1 -L3, B4 LOT WIDTH -CORNER 100 FEET a.-.. .> SLOPE BUFFALO, MN 55313 RANGE 23,
3rd L1,B5 LOT DEPTH 100 FEET L 5 WRIGHT COUNTY. MINNESOTA.
GROSS AREA MAX BUILDING COVERAGE 307 PLATE 704 (� DATED: FEBRUARY 12, 2019
SEE
92.40 ACRES R -4A LOT MINIMUMS: 4" THICK,5' WIDE CONCRETE CURB & 5
LOT AREA 18,000 SF CONCRETE SIDEWALK ON -q & B BITUMINOUS MAT GUTTER PLACED ON ol o BENCHMARKS (PROVIDED BY OTSEGO CITY
PUBLIC STREET 60' R/W LOT WIDTH -INTERIOR 100 FEET APPROVED SUBGRADE... APPROVED SUBGRADE -1_--_ ENGINEER, HAKANSON ANDERSON, INC. LEGAL DESCRIPTION
EITHER SIDE
LOT WIDTH -CORNER 130 FEET ( )
LENGTH =13,820 FT C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH NGVD 29 DATUM): SEE SURVEY.
LOT DEPTH 150 FEET ' TNH, EAST SIDE OF ODELL LANE, 1ST
AREA = 12.82 AC (INCLUDES 75TH ST., MAX BUILDING COVERAGE 30%Being 10.00 feet in width, unless otherwise
ODEAN AVE., AND 70TH ST.) D APPROVED SUBGRADE 30' WIDTH Indicoted, and adjoining lot lines, and 10.00 HYDRANT N OF 75TH ST., ELEV=928.00
' ADJUSTMENT TO 135 FEET DEPTH feet In width, unless otherwise indtceted,
OPEN SPACE REQUESTED DUE TO EXISTING PARCEL TYPIC4L STREET SECMU and adjoining right -o( -way lines as shown RR SPIKE IN PP, NW QUADRANT OF OGREN
no st0 on the plat. AVENUE AND CO RD 36 ELEV 948.06
26.79 ACRES (OUTLOTS A AND B) LIMITED DIMENSION WIDTH
sF /' 2 MATCH LINE Sheets C1.4 / C1.6 r' y` R 89'55'52"
,
@ •\ \ a.. \ f7•GS'S2'2"
E
a4 \\ 9)4.eO
" • F // ' // I `+'a\ �] ♦ \` 1 I / \. \ \\� � \` .( 932.0 - - „ 1 (^<5.:', iti;t:
'`" • �'• \ JJ 890.14
/+$ Irl SO •`\ \.•'��:/ l� \ - `\�\\\\
NN' 2Y 001c \.
i
..4 s,'�? y - - _- -4ai ✓ - .
\ \ v
\ %
\ .
_ - _-_�,. -'"� vdi - c
\
—.- -- - _ --- -- -- �'-- — J
CO
-
i
':
`
T00
I'
_
91 4.20
i5.0 IT woe- /_X ,\ •/;I `\
\ •.y I�\I 1
\
�...
( i~
1 1-
�L.�.
�
✓3/V,bb
1 0l
1 -"
_. \
\\ \ ♦ te,4� ,
.' •. \ 1
i 1
.
\',,. 1
914.701 1 \'\ ��
/ i/
17718
'
rl
916.10'. j
-
j
-
nJL� \ +i"
J (I ;,J r� � � '� o' S
T 1 \
41o,
�_
tC
— _______
: ` //
Q
_ --_ ,
1
• � i ' \ \ Neq•`0\�
bl
n
088.1217Qµ
0 R woe
•—
0�^1
TTI
,•'is6!1
_ `\ \ �\ \ O1 �•, 11i
I I I
\1
__—_ -_ 1
_
,\Y\0.��!,� /
j 611'
Y' `
.
-
\\ `. � -- I
`o
"oa'o'9u, .\\\\ ` \ 1 � I '• �
K
`\ +� -
--
i
s >"'I"0s]�usr w _ N'`�'• -
:
_\\a
j
p
_ \
r,00se•RN N i-.- t
\, '.\ ry�p05 \
^\I ,V�, \k ` \ T
897.77 `\
■
'\ ,+\•,,
\\\ \1 Li (T�
\v
1�
6'
CO
135
\ 1
\ 1
i
\ 913.77 ( V-
`
T00
I'
\,\
C3.1 -C3.7
.11 20108
•\`'4 '�\ - '
•,I:- '�
I `•r \. \\ -tP AN 1
&IT.
'1�
( i~
1 1-
�L.�.
8 ,.7c
i IS k .\ \ \\I
SY(1 1 -
SF
1 0l
1 -"
_. \
\\ \ ♦ te,4� ,
.' •. \ 1
i 1
.
\',,. 1
O\AIJ
'm -i a7,_ _
t 1
17718
'
rl
916.10'. j
-
j
I
\
�_
un:
tC
— _______
912591
Q
_ --_ ,
1
bl
n
1
r�
I
\
L�TS56, R�1600 rr
I I I
——._— - ,alas—R
__—_ -_ 1
_
---
Nee se WE
908.82 -- -
•I(:-a51)'TS•00'E__---N59']3�y,i
-
K
D,OD, -
ry1 -5'F -J
I E l • E .'-
`�i�, I
ill
i
I,
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, !AN 55446
HENRY HANSEN
(763)230-1610
I I
\' R9 23 001 r
t
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
T00
I I
I
C3.1 -C3.7
._
�" ASN—m
B
'--i•
C5.1-05.2
on
11
G¢ I
Nam on
— —�— — — — — C7.1 -C7.3
DETAILS
I
' 1/L _
MATCH
LINE Sheets C1.6 / C1.7
I 1
e
N I mll7
I 1
L---- ------ ----- ,asoo'-= - "_'
---- ------ SOV 2r 60•w__
916.10'. j
Co
j
I
�1
Lu
un:
tC
_
__ -__ -____
Q
_ --_ ,
II
U
I I i�
I I
L�TS56, R�1600 rr
I I I
1
tr c
- — - uo.o0
S
a
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, !AN 55446
HENRY HANSEN
(763)230-1610
I I
I
I i i
INDEX OF CIVIL SITE DRAWINGS:
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREY. PLAN
— —�— — — — — C7.1 -C7.3
DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, !AN 55446
HENRY HANSEN
(763)230-1610
e b
C Is
m
W
Z
z
wm
m
I" ON
>, u`nio0
CO 1L
W�y'3mull0
� �W
I m au
C7 UJ
°
F
tL
LU ix
C
m aO3
is
20
rn U
Z
a e� V)
IL W
00
as
W
ZQ
o
a
IZ
LUO
�1
Lu
tC
e b
C Is
m
ee
:Oi I a
N
aga
Z
z
wm
m
I" ON
>, u`nio0
8bu
W�y'3mull0
� �W
I m au
c
$• C�Qlmoun]S
wL"1pO
«m-�-
un3
•�ICE�
oa �
O.ja o�
.yo
N'rlwd�ea
m aO3
is
rn U
I'
a e� V)
p
b
O
p�
qp e
J
Q
II
U
tr c
S
a
K
O)NI�
a,
2 II
O e�
O
2w�
N
m
no
o
Co
p
U
FILE NO. 00715
C1.6
Preliminary Plat
EXISTING P.I.D. #S
PROPOSED LOTS
WETLAND DELINEATION
118-500-284-401
EXISTING HOME LOTS = 2
oo' _
118-180-000-010
NEW HOME LOTS = 121
INFORMATION PROVIDED BY:
118-500-284-204
TOTAL PROPOSED LOTS = 123 LOTS
AG WETLAND SERVICES, INC.
118-500-284-200
9516'.
r ..__
P.O. BOX
118-500-273-200
PHASE 1 = 27 LOTS
N
KIMBALL, MN 55353
118-500-284-201
PHASE 2 = 33 LOTS"
1
EXISTING ZONING
PHASE 3 = 38 LOTS -
\
A-1 AND A-2
PHASE 4 = 25 LOTS
L4, B5
4t
AGRICULTURAL
-EXISTING HOME LOT: L1, 86, 2ND ADDN
mI 20,776 SF
I
PROPOSED ZONING
-EXISTING HOME LOT: L5, Bt, 3RD ADDN
SEE SURVEY,
RESIDENTIAL SINGLE FAMILY
PROJECT DENSITY
\___
1
I ! 1 � 1a
-_, - - -- �i - - -- -- ----- -
-
B
I a
I
1st Lt, B1 4thth L1 -L2, 81
1st
GROSS DENSITY: 1.33 LOTS/AC
/
164.31
1st L1 -L15, B2 4th Ll -L8, 83
(TOTAL LOTS / GROSS AREA)
1st Lt -L71, B3 4th L5, B4
(123 / 92.40)
2nd 0-1-5, B1 R -4A
NET DENSITY: 2.33 LOTS/AC
2nd 1-1-1.5, 82
(TOTAL LOTS / NET AREA)
F
2nd 0-1-1 1, 63 3rd Ll -L10, B6 (NET AREA = GROSS AREA LESS R/W AND OUTLOTS)
16'
2nd L1-L5, B4 4th Lt -L6, B4
(123 / 62.79)
2nd LI -L6, B5 4th L1 -L6, B5
U
0.
2nd L7 -L5 86
MINIMUM LOT REQUIREMENTS
a
3rd 1-2-1-5, B7
R-4 LOT MINIMUMS:
3rd 1-1-1-8, B2
LOT AREA 12,000 SF
4' 5' 7'
3rd L1 -L1 I. 63
LOT WIDTH -INTERIOR 75 FEET
i
3rd Lt -L3, B4
LOT WIDTH -CORNER 100 FEET
,
3rd L1,B5
LOT DEPTH 100 FEET
w
MAX BUILDING COVERAGE 30%
GROSS AREA
holy
92.40 ACRES
R -4A LOT MINIMUMS:
4" THICK, 5' WIDE
LOT AREA 18,000 SF
CONCRETE SIDEWALK ON
PUBLIC STREET 60' R/W
LOT WIDTH -INTERIOR 100 FEET
APPROVED SUBGRADE----
LENGTH = 8,820 FT
LOT WIDTH -CORNER 130 FEET
(EITHER SIDE)
AREA = 12.82 AC (INCLUDES 75TH
LOT DEPTH 150 FEET '
ST_ MAX BUILDING COVERAGE 30%
ODEAN AVE., AND 70TH ST.)
*ADJUSTMENT TO 135 FEET DEPTH
OPEN SPACE
REQUESTED DUE TO EXISTING PARCEL
26.79 ACRES (OUTLOTS A AND B)
LIMITED DIMENSION WIDTH
I
i I
I
I I
I I I
m
I
3 v
I
O
2 III SOD' J2' IOT
U
I 1DJ.43
120.00 '. 80.W 100.00
BQW 9RW 1.
1
it
$ I C3, 82 I I S 1
JL4, 821 81 "' IS I L7 83'�
I F L2, 83 I " L3, B3' 1 1
s' s
4th I iC11ri
4th I ji 'l11k !�? 4th"
iSSi 4th i !i 4th' i8
• SF I i; st
16,151 SF I
! 1�; =I^ 113,452 SF
!6.1 12,150 SF i' 12,150 SF !' i
S
n 114,004
II\I$
I
I = I 1 I
__- -1��-J I III__
r I - -
I __-J
-4-- --II' I 1 \ ' 009 ^ I,1 L ---I -
I I I --j' ' II I I
ISL_____ __J L_____-�____J L
1 WNfWY Lao'- AIA I L�215B, R=1100
I MM80X OWSTM •` ' 6/e ' ----,
Z I i 042 I1(\/i/ _
M L__ I uses MT -m
1fPE RaN CITY AND= R�ISW -' �'
-
CMICRE2E I
, i
I -&.- _J L _ __L._._-_
E - �-
_
_- R�SJOOO - HI]] _7
eo
- BS --=11]1
±
T---
__
d A
28 8 - B 16'
4
FT.
'SEE PLATE 704
CONCRETE CURB &
A& B BITUMINOUS MAT GUTTER PLACED ON
APPROVED SUBGRADE
C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH
D APPROVED SUBGRADE 30' WIDTH
TIPIGIL STREET SECnON
xn scar
0
n
&\��\l
RM LORI IE
1
SETBACK
oo' _
SETBACj(
FRONT YARD 35 FT
90.00
11
'\ saw •\
\ \
SIDE R/W 35 FT
l 4.W -�-
----------
to'
SIDE INTERNAL 10 FT
REAR YARD 20 FT
9516'.
r ..__
, , -- ____
ARTERIAL R/W 65 FT
rsart LOTUNE
W
I>e , t
LOT DETAIL
28 8 - B 16'
4
FT.
'SEE PLATE 704
CONCRETE CURB &
A& B BITUMINOUS MAT GUTTER PLACED ON
APPROVED SUBGRADE
C CLASS 5 GRAVEL BASE (MODIFIED) 29' WIDTH
D APPROVED SUBGRADE 30' WIDTH
TIPIGIL STREET SECnON
xn scar
S00' 3Y 10-E
i 11
i
N I
&\��\l
m U an ve
�PART
PROVIDED BY.
oo' _
'W''
90.00
11
'\ saw •\
\ \
500'32 CE
-
l 4.W -�-
----------
__------.,�- --- 9W ]2 -0E
154.W \ --
L�,. B3 l i
9516'.
r ..__
, , -- ____
- -\ - \ = --- l 2558 i
i 4th is
12,150 SF
W
I>e , t
i� ___
1
r--
\
I i• 1
I 1
o
1II L3, B5
4th
L4, B5
4t
L L85
14th 41 '\
' 20,828 SF \
I1I�I IiI
NGVD 29 DATUTA):
mI 20,776 SF
I
20,790 SF
,I
790 SIF
20,
1 1
SEE SURVEY,
-----------
; l , _' - --- --- -
\___
1
I ! 1 � 1a
-_, - - -- �i - - -- -- ----- -
-
-D rt-
I a
I
RR SPIKE IN PP, NW QUADRANT OF OGREN
164.31
-151.00
54.5]
S00' 3Y 10-E
i 11
i
LEGEND
.�.. , Existing Tree Line
---- Existing Welland Boundary
Existing R/W Line
- - - - Existing Easement
Existing Boundary Line
-- Proposed Street R/W
Proposed Lot Line
------------ Proposed Setback
---- ------ -- ...... __ Proposed D&U Easement
----------------- -- Proposed Curb and Cutter
Proposed 5' Wide Sidewalk
Drainage and utility eosements are shown thus:
5
5
0 0
Being 10.00 feet in width, unless otherwise
indicated, and adjoining lot lines, and 10.00
feet in width, unless otherwise indicated,
and adjoining right-of-woy lines as shown
on the plat.
I I
BOW
L7, B3 I I L 4th 3
-- 4th I S I 12,731 SF 1
12,150 SF 15 r
is
COY
11vE n1TN cnr.wD _
usrs vosr uAst2R - _ __--
j _ _L- N00' 12' 111*7
1 V 11].]8
--
6/6 '
\ 1 i ovz 1 - - ------
RJe I i
�!•o Oro9 I I
s L7 B4
4th
gl (1 ` biz j 17,888 SF
`L I
` 1
['_i i 1 - -----------
S00'
-- --
. !_,
&\��\l
C1.0
�PART
PROVIDED BY.
oo' _
'W''
90.00
11
'\ saw •\
\ \
R
"�
I
( \
L�,. B3 l i
I L5, B3 I
1 '�6 133
4th i S'
12150 SF
i 4th is
12,150 SF
1 , 4th
' i 12,150 SF
W
I>e , t
DATED: FEBRUARY 12, 2019
1
�I
- -- -A
-- --
LEGEND
.�.. , Existing Tree Line
---- Existing Welland Boundary
Existing R/W Line
- - - - Existing Easement
Existing Boundary Line
-- Proposed Street R/W
Proposed Lot Line
------------ Proposed Setback
---- ------ -- ...... __ Proposed D&U Easement
----------------- -- Proposed Curb and Cutter
Proposed 5' Wide Sidewalk
Drainage and utility eosements are shown thus:
5
5
0 0
Being 10.00 feet in width, unless otherwise
indicated, and adjoining lot lines, and 10.00
feet in width, unless otherwise indicated,
and adjoining right-of-woy lines as shown
on the plat.
I I
BOW
L7, B3 I I L 4th 3
-- 4th I S I 12,731 SF 1
12,150 SF 15 r
is
COY
11vE n1TN cnr.wD _
usrs vosr uAst2R - _ __--
j _ _L- N00' 12' 111*7
1 V 11].]8
--
6/6 '
\ 1 i ovz 1 - - ------
RJe I i
�!•o Oro9 I I
s L7 B4
4th
gl (1 ` biz j 17,888 SF
`L I
` 1
['_i i 1 - -----------
S00'
-- --
--� SOa JY IDE_
9.65
---------------
L2,
------ -L2, B4
i 4th
18,022 SF/
I
I I '
I '
\� 13JSD
`fi7.
E
PAGE LAYOUT. CLIENT:
VHF INVESTMENTS,
C1.1 C1.2 LLC
C1.3 C1.4 14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
131,5 C1,6 (763)238-1610
0 50 100 150
131.7
GRAPHIC SCALE IN FEET
it
. !_,
&\��\l
C1.0
�PART
PROVIDED BY.
oo' _
\N-
MEYER ROHLIN LAND SERVICES
RANGE 23, AND
R
"�
708 1st AVENUE NE
t% I
I i II
I I
I
I
--� SOa JY IDE_
9.65
---------------
L2,
------ -L2, B4
i 4th
18,022 SF/
I
I I '
I '
\� 13JSD
`fi7.
E
PAGE LAYOUT. CLIENT:
VHF INVESTMENTS,
C1.1 C1.2 LLC
C1.3 C1.4 14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
131,5 C1,6 (763)238-1610
0 50 100 150
131.7
GRAPHIC SCALE IN FEET
it
SURVEY DATA
PROJECT LOCATION
C1.0
�PART
PROVIDED BY.
OF SEJ OF SECTION HIP 121,
22
MEYER ROHLIN LAND SERVICES
RANGE 23, AND
R
"�
708 1st AVENUE NE
PART OF SWJ OF SECTION 27, TOWNSHIP 121,
BS
BUFFALO, MN 55313
RANGE 23,
4"b h
I I
WRIGHT COUNTY, MINNESOTA.
W
I>e , t
DATED: FEBRUARY 12, 2019
-L
�I
BENCHMARKS CITY
BYOON,
LEGAL DESCRIPTION
I i• 1
I 1
ENGINEER ' HAKAN30N ANDERSPRVIDED
ZINC.
('1
I
NGVD 29 DATUTA):
IW
I
SEE SURVEY,
I
TNH, EAST SIDE OF ODELL LANE, 1ST
\ _
CO)
LUM
HYDRANT N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
1
-
t x
F
�1
II
U
a
6 W `-' 16280.7 _
,- _---
i
20211 --
''I
I
I
I
!
I
I
I
I
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
22
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
R
"�
.\ ! L5, 4th4 1
•,
I
BS
C5.1-05.2
STREET PROFILE PLANS
4"b h
I I
20.633 SF i
W
I>e , t
I
(I'.
-L
�I
1 Dvz I
I a
I i• 1
I 1
, �• i'
'
('1
I
Ei
IW
I
T
I
\1Q -•. 1
20211 --
''I
I
I
I
!
I
I
I
I
INDEX OF CIVIL SITE DRAWINGS:
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
22
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
\'
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
BS
C5.1-05.2
STREET PROFILE PLANS
4"b h
I I
M I
'a�..
r
a3
�I
f Ij
.1�Ill
I a
.•I
S RAE,
('1
IyL
�41
Ei
IW
t r
;•\\l\S\- � -f=65:0-�
\1Q -•. 1
\ _
CO)
LUM
1
F
INDEX OF CIVIL SITE DRAWINGS:
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
\'
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREY. PLAN
C7.1 -C7.3
DETAILS
N
V
3
O
m
I
rr^^
vJ
EL
A
N
�zlo
N q
h VIN
U' UJ
a.
W It
e°,
C
I_D
CO
WF
Q
¢CCS(
,,hlwa
a3
WW
W0
v
0W
to
I a
ZQ
o
(L
a ►_
Ei
IW
9
CO)
LUM
time
m
I
A
N
�zlo
N q
h VIN
�'a
DoE
I_D
CO
WF
a.
w0� u
¢CCS(
,,hlwa
a3
O O
U
I a
Ei
E
II
U
a
a
w
holy
c
In
to
N
m
}}
m
3 v
U
O
D q
U
FILE NO. 00715
C1.
Preliminary Plat
I
GEMMING NOTES:
GENERAL GRADING NOTES:
SURVEY DATA
1. SPECIFICATIONS APPLICABLE FOR. THIS PROJECT: CURRENT
9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
STANDARD SPECIFICATIONS FOR OTSEGO, MN, AND THE LATEST
TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN A
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING:
SURVEY INFORMATION PROVIDED BY:
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS
A. WITHIN THE UPPER 3' OF STREETS, THE GRADING
MEYER ROHLIN LAND SERVICES
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS.
CONTRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN
708 1st AVENUE NE
2, OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON
1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
BUFFALO, IAN 55313
THIS PROJECT.
THE STANDARD PROCTOR TEST -ASTM: D-698 WITH
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48
COMPACTION MEETING 100% STANDARD PROCTOR DENSITY
DATED: FEBRUARY 12, 2019
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.)
AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%.
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND
BELOW THE UPPER 3', COMPACTION SHALL MEET 95%
BENCHMARKS PROVIDED BY OTSEGO CIN
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY
STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE
ENGINEER, HAKANSON ANDERSON, INC.
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY
OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL
NGVD 29 DATUM):
NOTIFY THE ENGINEER OF ANY CONFLICTS.
BE 0.1'.
5. EROSION CONTROL SHALL BE CONSTRUCTED, AS APPLICABLE, AS
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE
TNH, EAST SIDE OF ODELL LANE, IST
SEQUENCED BELOW:
SHALL BE 0.25'.
HYDRANT N OF 75TH ST., ELEV=928.00
A. SILT FENCE.
10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED
B. ROCK CONSTRUCTION ENTRANCE.
ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED IN THE
RR SPIKE IN PP, NW QUADRANT OF OGREN
C. DEMOLITION
FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR
AVENUE AND CO RD 38, ELEV=948.06
D. COMMON EXCAVATION (GRADING).
SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND
GRAPHIC SCALE IN FEET
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE
PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION.
PROJECT LOCATION
PLAN).
11. THE GRADING. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE ON
5. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT
THE SITE AT ALL TIMES.
PART OF SE� OF SECTION 28, TOWNSHIP 121,
DIMENSIONS.
12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND
RANGE 23, AND
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE
TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT
THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED, ESPECIALLY
PART OF SWj OF SECTION 27, TOWNSHIP 121,
GRADING CONTRACTOR.
AT THE END OF EACH DAY'S WORK.
RANGE 23,
8. EROSION CONTROL MAINTENANCE SHALL BE PERFORMED BY THE
13. ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION.
WRIGHT COUNTY, MINNESOTA.
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT
14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED
GARAGEG_-.�
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY
GRADE UNLESS OTHERWISE NOTED.
_�_- .�.�._, Existing Tree Llne
ALL NECESSARY RESTORATION OF DISTURBED AREA. THIS WORK
15. ALL EROSION CONTROL BEST MANAGEMENT PRACTICES SHALL BE
LEGAL DESCRIPTION
SHALL BE INCIDENTAL TO THE GRADING CONTRACT.
PER CIN STANDARDS.
J
SEE SURVEY.
+1 =ADJUST 1 BLOCK UP --- - W LL
Driveway Grade O
�1
•,r; d* 1'!, ts. �.nn °F., �"! T' - ---__ -- - - - -- - p- y ` --- -- .c 8J`'1'41 I- oo I .�8 n C5 I w
75th Street 1 I _ �s;� 1., _._._._._.,o.. ,u�-777-,_ ��g< N 2M'
_._._._._._._._. _._ _._. _._._._-_:L:_._._._._r_. 0.77.1 _._.'_/.�._ 2L�, a �'Z >` u10E
.r.. ,
927.50 ' ti `VN rYU
pg
2f -E
___ ___ __ - _. ___ -__.__ ,T__ -._ __-_ _ _ - - - ,i - - `O y y V y I W IL u O 3
I � n �
YII i _ .•i:tr - I ! _ 906
l 1920--."Lp
926.41 Na+ ..924
1_ ,
I I I
I
922
4 -
�0 . 1 4 0
� I NW3WmK
I I m a � °''- sax 628.8 827.7 927.7 626.9 I 822,9 I 821.9 " 820,9 816.9 I 917.8 1 919.8 " _
LF923,0 I T` �' - LF824.7 I I LF824.7 I I I LF629,8 ' •-'LFB22.6 ' { LFB21.B LFB20.9 { LF818.8 - - I I I LF817.8 I I - , LF918.8 I JJJ ¢
I I { FBLO i I FBLO' 1 1 FBLO I FBCO FBWO - FSWO I ' FB.WO I FBWO -FBWO FBWO F8W0 j - / r " /
- -- - - 891.9 I 832.7 892.7 891.8 969.9 ` °928.8_ 828.9 927.9 828.9 628.9 824.8 i [p29p pj
L ._._._._._. .de I :B7. G ziz G i G 1"az 931.39 G G ua: I G „e7. G ��sz I G Baez I I G sez j I G ;:iez Ij Ii G :iBz 9?Ab
y
1 ` 930.367 929.38 a 928.38 927.37 926.52 925,36 924.SQ 923.'5..; C, a 1 y
R1000'
922 30 931.32
'... f ;. l I i -_ { -! ._ -__ I �._._ ____-_ __ _ \ �25.fi7 I 924.66 �6 6 !;� •1 L / W
928 76 '
/ ' 130-62930.69 829.68 928.68 927.68 _ 926 67 -- _ (n I k
i
, r : _ • ' 92 � 931.54
i
/' , i klp o l+Do yo 2+DD 5+ob 4+do 5+ _ s+oo +oo T �_ s+''oo §+o'D - rd+uo . // [G
c.Al, v,'�: I .--�4 9-- ,�-.-'� �•-1.--.--• }- •.--•---�---..�- g21i�-�. .-F•- 2k 922.12 J ,' a W ._
1 l I / �. 11-�^ g30 t 929 reed ' p',
927.85 ' 938.84, 925.84 92484 ` 923.83 v -t-- 923.21 \ \ (_.) S
929.50 929:86 � � _ _ 828.85 � _ � � � _ I � � a
/ I 931.18 931.80 930.86 � -X
w.. - L.
/ / '•
4!" -'4^""I "[ - 'I /%� 7` j. is�,�i1•pY}}I 9zaj.s7 L -1.-& 3!5}f I >i;ef i 8 ------
%"��t 31.88 932.55 ' 931.5 930.56I 928.55 9�\• \ : 1{{ +-9�27.97 i yUQ
•` xB
L].BJ !].B1 I '-4.03 LS,BJtB,BJ L].BS LB,03 LB.83 L,0.B3 L,I,BJ ,'�11 M1 O
/... �;n( i (•,1 ' ? I d ,.L G ., G G ,•1 { I G ., I G , 1 G ,., G ,., G ,rt G ,,, I G ,., G ,.1 az1s7 * �9 ;21.25 I Q
a 892.1 I X32.7 892.7 831.7 890.7 829.7 .829.7 928.7 I I 828.8 828.8
Fl,
I x 1 F�LQ FBWO FBWO FBWO FBWO F8W0 FB O FBWO FBWO FBWO FBLO
Hf 11 v7 0
927.43 1 LF924.1 ' LF624.7 LF824.7 LF929.3 LF922.8 LF921.7 LF820.7 LF820.7 I I LF620.6 LF920.6 I LF818.8 I
i i. .,.. 1 I `1 680 ,n c
I y ` 929.1 824.7 . _924.7 I I 829.7 I 922.7 821.7 820.7 820.7 920.6 ,920.6 821.8
1 i 1
771
c� O O
k X17 I _ _ _ ' I I `! i •R'y - t ` _ _ ..__91 (n (f) V1
N m >
I
�� I __. _ _ - L_ N __ _.__._J .-___ ____-J __1 �__-'.1{_ __ _-__-_____- _ �. _ __ " - ___ - _ _ .917741 i •� 1 M m O
N - y ; > 977.68 Bx 918.70 a ae 918.32 z.ox �+ 918.00 _ - i O 2 O
R1000' �'1. 930.26 a) 917.72 Y
__ _�_8_l�l.l0_Iw_ -__ _ ___---------
___- 918 91.7.82 _ __918,00 _ _ 48-- 18.80 1 ___... 8��1 z °------
r I - -__- { (� - - - i - l _- -`9� 1, 9 ��!• �,I�i - �_�_.�
I I I MATCH LINE Sheets C2.1 / C2.3 ` - - Ij - - { I I MATCH LINE Sheets C2.1 9,1
II 1 I
1 j I I I
i _ _ ._ I FILE NO. 00715
93 fi IN CIVIL SITE DRAW
930.80 ' o� ti's- _ 06 A_.. , ,SII+; I 't.{.�. - - - COD F PROJECT LOCATION PLAN
- e z6x a a -z x} 0 2 r I { I ! j 822.7 I C1.0 E OVERALL LAYOUT AND PHASING PLAN
- -- ��7 11 ;
--- I� I i ,
e7 1 I
N,� rti � I
� 9 I ' ' 622.0 824.4 822.4 922.6 �Bf
gy8 i 821.9 LF920,8 1� LF616.7 I''• - I LF918.4 I LF818.4 { I LF919.5 LF C1.1 -C1.7 PRELIMINARY PLAT
1033.3 I {, x24.2 i 923.1 I LF62LB FBWQ FB Lo ! ! FBLO FBLO FBLO FBLO Fl C2.1 -C2.7 GRADING AND DRAINAGE PLANS C2.1
'1
LFF2.a� �I Fewo ;'e29.e 920.6 _{ 92� G 027.4_ _ i e2z4, - _ _ 927.5 e C3.1 -C3.7 SANITARY AND WATER UTILITY PIANS
9sss - , I Fewo G µ,BJ G L➢B3B3 -.G XB3' ' C4.1 -C4.7 STORM SEWER UTILITY PLANS ` • 1
I ! I 932.2 I- - 931.1 I G 13,8].. 1 ¢ne I me I . _ 2w - _._ zna - ana - 1 924.87 G
832.6 1_
LF624.6 I'I C5.1-05.2 STREET PROFILE PLANS
LF929.6 I I 1 8825 - I L491 I II { ,I C' z;el G Via' I 929.66`- - ma 926.52 ! - 927.4 i i 926.41_ I I 926.65 6 927.10 - N 927.22 1 - -
{ h +", C6 ST WATER POLLUTION PREV. PLA Gradin and
MLWO 93o.ez 1 I I - - I -- �- - - - - -- - Y 1- - C7.1 -C7.3 DETAILS W �e
„+ N
Drains Plan
PAGE LAYOUT:
CLIENT`
VHF INVESTMENTS,
C2.1
C2.2
LLC
14505 43rd AVENUE N.
PLYMOUTH, NIN 55446
n
HENRY HANSEN
(763) 238-1610
0 50 100 1.50
F-
V
3
Z
GRAPHIC SCALE IN FEET
Q
LEGEND
� a
w
TYPICAL HOUSE PAD
9;, Existing Spot Elevation=
Z «13
CDIInn
Q
O
V
=
P03 - - - Existing Contour
m
LU
Q
GARAGEG_-.�
_�_- .�.�._, Existing Tree Llne
IL
t]
828.7
SUGGESTED GARAGE FLOOR ELEVATION
J
F8W0
SUGGESTED BUILDING TYPE
LOWEST
- - -- Existing Wetland Boundary
W
Z i
O
LF821.7
821.7
FLOOR ELEVATION
LOWEST OPENING ELEVATION
" " Existing Storm Sewer
WLU m
ro
Q
_ nu, o.crur.rr
-•-•-•-•- Propsed Storm Sewer
9 . A
0
+1 =ADJUST 1 BLOCK UP --- - W LL
Driveway Grade O
�1
•,r; d* 1'!, ts. �.nn °F., �"! T' - ---__ -- - - - -- - p- y ` --- -- .c 8J`'1'41 I- oo I .�8 n C5 I w
75th Street 1 I _ �s;� 1., _._._._._.,o.. ,u�-777-,_ ��g< N 2M'
_._._._._._._._. _._ _._. _._._._-_:L:_._._._._r_. 0.77.1 _._.'_/.�._ 2L�, a �'Z >` u10E
.r.. ,
927.50 ' ti `VN rYU
pg
2f -E
___ ___ __ - _. ___ -__.__ ,T__ -._ __-_ _ _ - - - ,i - - `O y y V y I W IL u O 3
I � n �
YII i _ .•i:tr - I ! _ 906
l 1920--."Lp
926.41 Na+ ..924
1_ ,
I I I
I
922
4 -
�0 . 1 4 0
� I NW3WmK
I I m a � °''- sax 628.8 827.7 927.7 626.9 I 822,9 I 821.9 " 820,9 816.9 I 917.8 1 919.8 " _
LF923,0 I T` �' - LF824.7 I I LF824.7 I I I LF629,8 ' •-'LFB22.6 ' { LFB21.B LFB20.9 { LF818.8 - - I I I LF817.8 I I - , LF918.8 I JJJ ¢
I I { FBLO i I FBLO' 1 1 FBLO I FBCO FBWO - FSWO I ' FB.WO I FBWO -FBWO FBWO F8W0 j - / r " /
- -- - - 891.9 I 832.7 892.7 891.8 969.9 ` °928.8_ 828.9 927.9 828.9 628.9 824.8 i [p29p pj
L ._._._._._. .de I :B7. G ziz G i G 1"az 931.39 G G ua: I G „e7. G ��sz I G Baez I I G sez j I G ;:iez Ij Ii G :iBz 9?Ab
y
1 ` 930.367 929.38 a 928.38 927.37 926.52 925,36 924.SQ 923.'5..; C, a 1 y
R1000'
922 30 931.32
'... f ;. l I i -_ { -! ._ -__ I �._._ ____-_ __ _ \ �25.fi7 I 924.66 �6 6 !;� •1 L / W
928 76 '
/ ' 130-62930.69 829.68 928.68 927.68 _ 926 67 -- _ (n I k
i
, r : _ • ' 92 � 931.54
i
/' , i klp o l+Do yo 2+DD 5+ob 4+do 5+ _ s+oo +oo T �_ s+''oo §+o'D - rd+uo . // [G
c.Al, v,'�: I .--�4 9-- ,�-.-'� �•-1.--.--• }- •.--•---�---..�- g21i�-�. .-F•- 2k 922.12 J ,' a W ._
1 l I / �. 11-�^ g30 t 929 reed ' p',
927.85 ' 938.84, 925.84 92484 ` 923.83 v -t-- 923.21 \ \ (_.) S
929.50 929:86 � � _ _ 828.85 � _ � � � _ I � � a
/ I 931.18 931.80 930.86 � -X
w.. - L.
/ / '•
4!" -'4^""I "[ - 'I /%� 7` j. is�,�i1•pY}}I 9zaj.s7 L -1.-& 3!5}f I >i;ef i 8 ------
%"��t 31.88 932.55 ' 931.5 930.56I 928.55 9�\• \ : 1{{ +-9�27.97 i yUQ
•` xB
L].BJ !].B1 I '-4.03 LS,BJtB,BJ L].BS LB,03 LB.83 L,0.B3 L,I,BJ ,'�11 M1 O
/... �;n( i (•,1 ' ? I d ,.L G ., G G ,•1 { I G ., I G , 1 G ,., G ,., G ,rt G ,,, I G ,., G ,.1 az1s7 * �9 ;21.25 I Q
a 892.1 I X32.7 892.7 831.7 890.7 829.7 .829.7 928.7 I I 828.8 828.8
Fl,
I x 1 F�LQ FBWO FBWO FBWO FBWO F8W0 FB O FBWO FBWO FBWO FBLO
Hf 11 v7 0
927.43 1 LF924.1 ' LF624.7 LF824.7 LF929.3 LF922.8 LF921.7 LF820.7 LF820.7 I I LF620.6 LF920.6 I LF818.8 I
i i. .,.. 1 I `1 680 ,n c
I y ` 929.1 824.7 . _924.7 I I 829.7 I 922.7 821.7 820.7 820.7 920.6 ,920.6 821.8
1 i 1
771
c� O O
k X17 I _ _ _ ' I I `! i •R'y - t ` _ _ ..__91 (n (f) V1
N m >
I
�� I __. _ _ - L_ N __ _.__._J .-___ ____-J __1 �__-'.1{_ __ _-__-_____- _ �. _ __ " - ___ - _ _ .917741 i •� 1 M m O
N - y ; > 977.68 Bx 918.70 a ae 918.32 z.ox �+ 918.00 _ - i O 2 O
R1000' �'1. 930.26 a) 917.72 Y
__ _�_8_l�l.l0_Iw_ -__ _ ___---------
___- 918 91.7.82 _ __918,00 _ _ 48-- 18.80 1 ___... 8��1 z °------
r I - -__- { (� - - - i - l _- -`9� 1, 9 ��!• �,I�i - �_�_.�
I I I MATCH LINE Sheets C2.1 / C2.3 ` - - Ij - - { I I MATCH LINE Sheets C2.1 9,1
II 1 I
1 j I I I
i _ _ ._ I FILE NO. 00715
93 fi IN CIVIL SITE DRAW
930.80 ' o� ti's- _ 06 A_.. , ,SII+; I 't.{.�. - - - COD F PROJECT LOCATION PLAN
- e z6x a a -z x} 0 2 r I { I ! j 822.7 I C1.0 E OVERALL LAYOUT AND PHASING PLAN
- -- ��7 11 ;
--- I� I i ,
e7 1 I
N,� rti � I
� 9 I ' ' 622.0 824.4 822.4 922.6 �Bf
gy8 i 821.9 LF920,8 1� LF616.7 I''• - I LF918.4 I LF818.4 { I LF919.5 LF C1.1 -C1.7 PRELIMINARY PLAT
1033.3 I {, x24.2 i 923.1 I LF62LB FBWQ FB Lo ! ! FBLO FBLO FBLO FBLO Fl C2.1 -C2.7 GRADING AND DRAINAGE PLANS C2.1
'1
LFF2.a� �I Fewo ;'e29.e 920.6 _{ 92� G 027.4_ _ i e2z4, - _ _ 927.5 e C3.1 -C3.7 SANITARY AND WATER UTILITY PIANS
9sss - , I Fewo G µ,BJ G L➢B3B3 -.G XB3' ' C4.1 -C4.7 STORM SEWER UTILITY PLANS ` • 1
I ! I 932.2 I- - 931.1 I G 13,8].. 1 ¢ne I me I . _ 2w - _._ zna - ana - 1 924.87 G
832.6 1_
LF624.6 I'I C5.1-05.2 STREET PROFILE PLANS
LF929.6 I I 1 8825 - I L491 I II { ,I C' z;el G Via' I 929.66`- - ma 926.52 ! - 927.4 i i 926.41_ I I 926.65 6 927.10 - N 927.22 1 - -
{ h +", C6 ST WATER POLLUTION PREV. PLA Gradin and
MLWO 93o.ez 1 I I - - I -- �- - - - - -- - Y 1- - C7.1 -C7.3 DETAILS W �e
„+ N
Drains Plan
GENERAL GRADING NOTES:
1. SPECIFICATIO14S APPLICABLE FOR THIS PROJECT: CURRENT
STANDARD SPECIFICATIONS FOR OTSEGO, IAN, AND THE LATEST
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS.
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON
THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.)
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY
NOTIFY THE ENGINEER OF ANY CONFLICTS.
5. EROSION CONTROL SHALL BE CONSTRUCTED, AS APPLICABLE, AS
SEQUENCED BELOW:
A. SILT FENCE.
B. ROCK CONSTRUCTION ENTRANCE.
C. DEMOLITION
D. COMMON EXCAVATION (GRADING).
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE
PLAN).
6. FI14AL PLAT SHALL GOVERN FOR EASEMENTS AND LOT
DIMENSIONS.
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE
GRADING CONTRACTOR.
B. EROSION CONTROL MAINTENANCE SHALL BE PERFORMED BY THE
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY
ALL NECESSARY RESTORATION OF DISTURBED AREA. THIS WORK
SHALL BE INCIDENTAL TO THE GRADING CONTRACT.
I
_y 0990 I I _ _
�.
GENERAL GRADING NOTES:
9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN A
TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING:
A. WITHIN THE UPPER 3' OF STREETS, THE GRADING
CONTRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN
1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
THE STANDARD PROCTOR TEST -ASTM: D-698 WITH
COMPACTION MEETING 100% STANDARD PROCTOR DENSITY
AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%.
BELOW THE UPPER 3', COMPACTION SHALL MEET 95%
STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE
OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL
BE 0.1'.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE
SHALL BE 0.25'.
10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED
ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED 114 THE
FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND
PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION.
11. THE GRADING CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE ON
THE SITE AT ALL TIMES.
12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND
TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT
THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED, ESPECIALLY
AT THE END OF EACH DAY'S WORK.
13. ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION.
14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED
GRADE UNLESS OTHERWISE NOTED.
15. ALL EROSION CONTROL BEST MANAGEMENT PRACTICES SHALL BE
PER CITY STANDARDS.
jP00
Z�,ca?oa ^o
to •A, 0
913.45 C N
22_75 j
922.82
22, 922.12
921.97' -
921 25 � i i 0
r
;i
1 I
"-91915'
,I I g78
l �
C)209
/ e
_--- m
ea
�I1
6' 1 - - -
N m O u
111 1 9TI i 1
rll _ - '
1 I -
I' +
1
_ -
111.6 I a
9 i 1 A11 1 I I�
f �
� I
913.78+ I
4111"AT/*d7e1410
SURVEY INFORMATION PROVIDED BY
MEYER ROHLIN LAND SERVICES
708 1st AVENUE NE
BUFFALO, IAN 55313
DATED: FEBRUARY 12, 2019
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER. HAKANSON ANDERSON, INC.
NGVD 29 DATUM):
TNH, EAST SIDE OF ODELL LANE, 1ST
HYDRANT N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
PROJECT LOCATION
PART OF SEJ OF SECTION 28, TOWNSHIP 121,
RANGE 23, AND
PART OF SWj OF SECTION 27, TOWNSHIP 121,
RANGE 23,
WRIGHT COUNTY, MINNESOTA.
LEGAL DESCRIPTION
SEE SURVEY
PAGE LAYOUT:
C2.1 C2.2
C2.3 C2.4
C2.5 C2.6
C2.7
TYPICAL HOUSE PAD
PROJECT LOCATION PLAN
GARAGEG
N
Z
a
WM
It.
929.7
SUGGESTED GARAGE FLOOR ELEVATION
= I-
C7 LU
FBWO
SUGGESTED BUILDING TYPE
LF821.7
LOWEST FLOOR ELEVATION
927.7
LOWEST OPENING ELEVATION
�
FB = FULL BASEMENT
'W'A W
FBLO = FULL BASEMENT LOOKOUT
a
FBWO = FULL BASEMENT WALKOUT
lw°d� oi3
MLWO = MULTI-LEVEL WALKOUT
`Q
TQ
y 111
+1 = ADJUST 1 BLOCK UP
i nl,r I� I r_Lll �I
--------------
X
x I I.
,Q
i
el0_
/ 1
I
I1
1
I _
BASIN DATA:\
BOTTOM=876.0
OUTLET=877.5
100YR HWL=879.9
\\\
WET
STORM WATER
BASIN
MATCH LINE Sheets C2.2 / C2.4
BASIN DATA:
BOTTOM=876.0
OUTLET=879.0
10OYR HWL=879.9
-DRAINAGE SPILLWAY
ELV=879.0
ARTICULATED CONCRETE
BLOCK OR CABLE
CONCRETE
sm
0 50 100 150
GRAPHIC SCALE IN FEET
LEGEND
Existing Spot Elevation
Existing Contour
Existing Tree line
Existing Wetland Boundary
Existing Storm Sewer
- •- •- •- •- Propsed Storm Sewer
e2sw Proposed Spot Elevation
zm Proposed Contour
Driveway Grade
...........................................
L-
TO- ;,' JG" (11
nrL- n n
s ; u
h x r.Ts 61 .G 737 2
INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763) 238-1610
b
Com
PROJECT LOCATION PLAN
Ll!
2
N
Z
a
WM
It.
a
= I-
C7 LU
a
ro
O
z
LU IL
o
a
¢
W
�
�
'W'A W
to
a
Z
lw°d� oi3
Q
`Q
TQ
y 111
U
I•
Q
Q
o
0)
LU
fa�b$V)
o
M
b
Com
PROJECT LOCATION PLAN
x
N
2
N bN
a" -W
L�ys`i
DN �Y
�G
G
`WIQ�fM6,
V q
Imm Ort j
/ C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
oaa 5 �3
V ij
lw°d� oi3
$ode
j C7.1 -C7.3
U
a
o
fa�b$V)
o
m
V V
►r'.
II
O
W
�
� c
LL11
s
5
a
Z
J.vA
W
�pH
0
m
o
17
p
In
o
1n
N
O
m
m
W
m
W
2
3
O
�
h
Y
W
U
O
O
FILE NO. 00715
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
C2.2
/ C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREV. PLAN
Grading and
j C7.1 -C7.3
DETAILS
Drainage Plan
GENERAL GRADING NOTES: GENERAL GRADING NOTES: SURVEY DATA PAGE LAYOUT: CLIENT:
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT 9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
STANDARD SPECIFICATIONS FOR OTSEGO, MN, AND THE LATEST TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN A VHF INVESTMENTS,
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING: SURVEY INFORMATION PROVIDED BY:
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS A. WITHIN THE UPPER 3' OF STREETS, THE GRADING MEYER ROHLIN LAND SERVICES C2.1 C2.2 LLC
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS. CONTRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN 708 Tat AVENUE NE
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY BUFFALO, MN 55313
THIS PROJECT. THE STANDARD PROCTOR TEST -ASTM: D-698 WITH C2..3 C2.4 14505 43rd AVENUE N.
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48 COMPACTION MEETING 100% STANDARD PROCTOR DENSITY DATED: FEBRUARY 12, 2019 PLYMOUTH, MN 55446
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.) AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%. BENCHMARKS PROVIDED BY OTSEGO CIN HENRY HANSEN
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND BELOW THE UPPER 3', COMPACTION SHALL MEET 95%
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE ENGINEER, HAKANSON ANDERSON, INC. C2.5 C2.6 (763) 238-1610
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL NGVD 29 DATUM):
NOTIFY THE ENGINEER OF ANY CONFLICTS. BE 0.1'.
5. EROSION CONTROL SHALL BE CONSTRUCTED. AS APPLICABLE, AS B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE TNH, EAST SIDE OF ODELL LANE, 1ST 0 50 100 150 t -
SEQUENCED BELOW: HYDRANT N OF 75TH ST., ELEV=928.00
SHALL BE 0.25'. V
A. .SILT FENCE. 10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED C2. % LU
B. ROCK CONSTRUCTION ENTRANCE. ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED IN THE RR SPIKE IN PP, NW QUADRANT OF OGREN GRAPHIC SCALE IN FEET -3 Z
C. DEMOLITION FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR AVENUE AND CO RD 38, ELEV=948.06 ��Q J
//��
D. COMMON EXCAVATION (GRADING). SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND v) Cc IL
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION. PROJECT LOCATION LEGEND = IL q WO
PLAN). 11. THE GRADING CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE ON
6. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT THE SITE AT ALL TOAES. a� :a,a c Existing Spot Elevation
DIMENSIONS. 12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND PART OF SEI OF SECTION 28, TOWNSHIP 121, TYPICAL HOUSE PAD LU O Q
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT RANGE 23, AND ._.. ---- W q Z
- vrrs Existing Contour
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED, ESPECIALLY PART OF SQ OF SECTION 27, TOWNSHIP 121, W d Q
GRADING CONTRACTOR. AT THE END Of EACH DAY'S WORK. RANGE 23, Existing Tree Una O [ Q
8. EROSION CONTROL IAAINTENANCE SHALL BE PERFORMED BY THE 13. ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION. WRIGHT COUNTY, MINNESOTA. GARAGE G _ .J o
828.7 SUGGESTED GARAGE FLOOR ELEVATION
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT 14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED - - - - Existing Wetland Boundary W
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY GRADE UNLESS OTHERWISE NOTED. FB WO SUGGESTED BUILDING TYPE Z O Z
ALL NECESSARY RESTORATION OF DISTURBED AREA. THIS WORK 15. ALL EROSION CONTROL BEST MANAGEMENT PRACTICES SHALL BE LF821.7 LOWEST FLOOR ELEVATION .. ,. Existing Storm Sewer W W to Q
SHALL BE INCIDENTAL TO THE GRADING CONTRACT. PER CITY STANDARDS. LEGAL DESCRIPTION 821.7 LOWEST OPENING ELEVATIONQ 0
SEE SURVEY. -•-•-•-•- Propsed Storrs Sewer -
1 it \ ',.I / p/, �� 1<.:f� •.�..f �/' I/ %'' 4311 � /
RI000'
vl
41
1 � 1
1-] iG1'�7
`6•,
.�.� �._.� _. �. _._t.•,y.. _. _. � � � _. wry.. 'q'>'4�_ 0�� .
o�� • o,`I' 9 los -- z.zs:
1
999.3" -
1. I LF925.3�
FB
828.8 FB 939.3- I I
I 19'�°� 2 I I' 'I> „I LF923.6 1932.6 i I
1 i9 8 e39'. , LF9z2.7 1 MLWO ! G s3o.7o-tea I r
MLW' 991.8 I
1
` MLIW
LF929.6 1 ,G 932
990.7 930.75
I 991.9 aw 931.36 [ - --
usI s41 �.e, G i s3o m
G see, eti sea i I 930.55 _
g I I t93O - -r-
-
`-
♦928.39
-
I ♦ '
929 07 - 82811 h
-1
1 � ( - '. ::s+`r•� gkOD ���� � � 931.
0+00 +b0 3+00 9?. _:4=yr _ - ------
- _ --799'
_ 30.27
I �..._..__I -� '�` .........._. -' � -- - __ - 928.
45
FB = FULL BASEMEN Q
FBLO = FULL BASEMENT LOOKOUT • ass.w Proposed Spot Elevation Q Z p
FBWO = FULL BASEMENT WALKOUT Q
MLWO = MULTI-LEVEL WALKOUT sm Proposed Contour = Q
+1 = ADJUST 1 BLOCK UP LU Q
Driveway Grade
N
7111 I, 1III , LU
II I
oll ( MATCH LINE Sheets C2.1 / C2.3
-_
0
a $ a
� 917I.6n y, 918.70..
tet_
8.32
bi 917.82 918z.0o0
919.96 9 18.60 918.90 918 .-__
? aa
,
II• I o z y�°
f �.e
I Iii I i1 j J' �( I 1 jl SII it a a � ;o!I
.820.8
B I , I I I-,. , L ♦ o
9 •I II - -- - - 821.1. - LF020.8
F - --LF919.7 I L,F818,0 I. LF818.4 I LFB1B.4 I ° U I ^ a
1, 924.2- 823.1 -O B WO I FBWO- FBLO FBLO FBLO FBLO i E J mo
O 928.8 927.7 _ 827.0 _ _ _ , 827.4 - - 827.. v1 '• �a Ie
FBWO-. -- _' FBWO 829.9 I u.es ... G s.e3... ibb3 �i uea .G. �, G et e 5 0
I, I 1831.1 :4 I. G as 1 "�b°„
C
I I I G u,aa I zna 8---927.40 I 926.47 _� _ _ 1 926.65 f_ I 927.10 N I E° qK
444444 � 1
I" I I G ' use I zea 929.66 - -928 52 � l 0� J � ( � � ° i
I' I
.' 04 52 •t (�
I 926.70 _ -- �
92762 -� �- - 926.40 a -
928 96 _
50.i2
- -:: a _ ,. .-f ... r - • - 9ry8 01 - --CSr-emoi- N -_4-++ 2+00 3+6
-10+-00 {'�1--'
+UO 92# 0)
a+
uZ+
I F� 928 ..•ti. � 929• - - -- 1 2 I r
......�-
V I i - 928.66 N� 1 li
1..192938_ - 928.51 -� ------------
0.aii �f 93D.99 I I,6,ez 92
� • s3i G
1910 929.2o -- q;2 , 1 i BSL9 ( I Le9
2
66
I u,ez t u.ez I I, MLWO I
G I l �99L6 I I LF929.6 I l I I
I, 1 I 892.6 932. I5 L MLWO 828.8 I 1 92s �'
1 I I MLWO I ( MLWO I-LF923.4- I _ \, j! !-1_ •es.
- ZF924A ( LF024.0 I 928.5
> t } - .e.928.6 i •. -- 926029.6_
i 1 - - - - Po --------`
9224 E4 I
, ._-___�� _____ 1 92BO _.__ ..• `, � .60:
92980
--------=
926.9 8 . a _--___- •-f •�-
' 1 , szsi 4 1\ 'ate
-- ------ --------
/
..�930928��;,
- _._.934-
_._.__.__._._._:_._._._._.L._._. 9--_ -:--�
I
9
1 - --
317.00
--zo99'
N
- 925.88
929.08 -_ - __ •. 01'h, --__ __ _ _-- l
9 .64
6
tJ.l
-
- m
21
�_9 (� -•
I.I 930.93 I _ Ian 1
1 u.e44/ I{ G1* G 828.0 , B2B.9 I I I 7�tx ! 92
FB Q I 1
1\ G 991.2 G i 1 i FBWO , I g2 o i! LFezos I 9 SII I I 'N m o x a LB1
9sfz I � •�;
FBWO 1 F�WO LF82t9 I 921.0 929.9
I 929.2 0 92L9/928,9 I 1i 921 85_ - 1., - - ,-'. Ci
I ( / I ,' \ I I• \ it' 0
_____ I -s. 116.63 �91• mm Q,:- 920.89 - '>:. 1 --919.27- _ _920 83 _- /A'^O �U _
9 6-1 __ _ J 914.20 V) (n (f)
•u
.b _! 916.30 U � � U $ '1 I �i , - -820.06 1I
c co m
I 04 A-- p- zsx 1 • 1 W
918.68 II 0 m W
j 3 U
924.2 z.§x O N N I I O O
a n
1 MATCH LINE Sheets C2.3 / C2.5 (_ INDEX OF CIVIL SITE DRAWINGS: FILE N0. 00715
1 \ a yo m
, -�%' - �,:' I g♦` CO PROJECT LOCATION PLAN
I RzSo' ep s° oo C1.0 OVERALL LAYOUT AND PHASING PLAN
------------
- C1.1 -C1.7 PRELIMINARY PLAT
1 •�__ -_ - _.-918.53
�.; � � _ -_ , • 1 r : - - ' " _ I C2.1 -C2.7 GRADING AND DRAINAGE PLANS
"cd,
9256z o ;1 __ _ C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
a c s,�iyos y� j I C4.1 -C4.7 STORM SEWER UTILITY PLANS �•
�\�;'., a•G2s0 I1 C5.1-05.2 STREET PROFILE PLANS
♦� �., \ I I I m� C6 STORM WATER POLLUTION PREY. PLAN Grading and
�. 820.5 I II 920.5 920.6 1 rn C7.1
-C7.3 DETAILS Drainage Pian
GENERAL GRADING NOTES:
GENERAL GRADING NOTES:
SURVEY DATA
t. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT
9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
._-- 1
t
STANDARD SPECIFICATIONS FOR OTSEGO, MN, AND THE LATEST
TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN A
SUGGESTED GARAGE FLOOR ELEVATION
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING:
SURVEY INFORMATION PROVIDED BY:
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS
A. WITHIN THE UPPER 3' OF STREETS, THE GRADING
MEYER ROHLIN LAND SERVICES
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS.
CONTRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN
708 1st AVENUE NE
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON
1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
BUFFALO, MN 55313
THIS PROJECT.
THE STANDARD PROCTOR TEST -ASTM: D-698 WITH
1P i,
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48
COMPACTION MEETING 100% STANDARD PROCTOR DENSITY
DATED: FEBRUARY 12, 2019
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.)
AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%.
BENCHMARKS (PROVIDED BY OTSEGO CITY
OTS,
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY
BELOW THE UPPER 3', COMPACTION SHALL MEET 95%
STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE
ENGINEER, HAKANSVI ANDERSON, INC.
ENGINEER,
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY
OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL
NGVD 29 DATUM):
NOTIFY THE ENGINEER OF ANY CONFLICTS.
BE 0.1'.
5. EROSION CONTROL SHALL BE CONSTRUCTED, AS APPLICABLE, AS
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE
E OF ODEL L LANE, 1ST
TNH, EAST SIDEDEL
SEQUENCED BELOW:
SHALL BE 0.25'.
HYDRANT N 75TH ELEV=928.00
A. SILT FENCE.
B. ROCK CONSTRUCTION ENTRANCE.
10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED
ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED IN THE
RR SPIKE IN PP, NW QUADRANT OF OGREN
C. DEMOLITION
FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR
AVENUE AND CO RD 38, ELEV=948.06
D. COMMON EXCAVATION (GRADING).
SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE
PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION,
PROJECT LOCATION
PLAN).
11. THE GRADING CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE ON
6. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT
THE SITE AT ALL TIMES.
PART OF SES OF SECTION 28, TOWNSHIP 121,
DIMENSIONS.
12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND
RANGE 23, AND
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT
TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT
PART OF OF SECTION 27, TOWNSHIP 121,
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE
GRADING CONTRACTOR.
THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED. ESPECIALLY
AT THE END OF EACH DAY'S WORK.
RANGE 23,
8. EROSION CONTROL MAINTENANCE SHALL BE PERFORMED BY THE
13, ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION.
WRIGHT COUNTY, MINNESOTA.
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT
14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY
GRADE UNLESS OTHERWISE NOTED.
ALL NECESSARY RESTORATION OF DISTURBED AREA. THIS WORK
15. ALL EROSION CONTROL BEST MANAGEMENT PRACTICES SHALL BE
LEGAL DESCRIPTION
SHALL BE INCIDENTAL TO THE GRADING CONTRACT.
PER CITY STANDARDS.
�
SEE SURVEY.
_o- I I I I- -p. MATCH LINE Sheets C2.1 / C2.4
Ago
1
- _- III. II
922.4 I II r 922 5
LF919.4 F
.I - LF91B 5FBL'- FB€o927.. 927 ¢UBJ tea'GG-and 9.
7.10 _ t }
�936_�a r
92652 --�
PROJECT LOCATION PLAN
924.1
�
I4+00
926
._-- 1
t
-----------� i
Z 926.20
SUGGESTED GARAGE FLOOR ELEVATION
---- m - -
-
SUGGESTED BUILDING TYPE
LF,.,.7
926.90
„LJ,BS
1
I ,` it 916A
N La9'+
y w ei.B-G G
N .FBWO I I 1
927.1
FBWO
L919.0
'917.5'1'
FBWO = FULL BASEMENT WALKOUT
0
1P i,
ZQ
+1 = ADJUST 1 BLOCK UP
gA
916f3--875.95
16 3 __-914
__-91 4
in
o
i1
,III
/ I
I>
978.8
FOLO
LF ) 919.8 -
LO - �
G toA3 1 I
aw _ 91 G.3A -
PAGE LAYOUT:
C2. 1 C2.2
C2.3 C2.4
I C2.5 I C2.6
C2.7
TYPICAL HOUSE PAD
9112-
914.06 913.78 911.60 913.14
PROJECT LOCATION PLAN
GARAGE
G
._-- 1
t
-----------� i
828.7
SUGGESTED GARAGE FLOOR ELEVATION
tZ
W
FBWO
SUGGESTED BUILDING TYPE
LF,.,.7
LOWEST FLOOR ELEVATION
821.7
LOWEST OPENING ELEVATION
I ,` it 916A
FB = FULL BASEMENT
Z�
FBLO = FULL BASEMENT LOOKOUT
'917.5'1'
FBWO = FULL BASEMENT WALKOUT
0
MLWO = MULTI-LEVEL WALKOUT
ZQ
+1 = ADJUST 1 BLOCK UP
// /� c�r-1✓nv
I r ! I'
s7e , 9,645 �� 1 MATCH LINE Sheets C2.2 / C2.4
'41 �r-�����yd%� r_
g 1
-, `
m 6
o m -----
----
` 1 ss q it _
BASIN DATA:
- ,- - -
r1,1 BOTTOM=876.0
'^ OUTLET=879.0
100YR HWL=879.9
1.' 711117117 1 I I I \ l \ , , _ -- _.
1.74'
USI -911-
I
L1 er' f \,i• i \ \ \ \ \ '
r 918.73 --_ - _ � - 913.77✓✓
/L 911.
�Oi 1 1 � 1,K �l//U1Jl � �1�115\\ \ 1 \ \ \•`.
� ��� ' 1 � _ , _ ' Yet.<.; �• 1�,1 \', \ \ \ � \ \ 1 \\
�, a •,S1 . 161.1 \ \ \ \ \
rot
919.33 1 ' 1yp5
i5- - and
G 2
0
1)23.9 1 , l a FBLO �
FBWO 1 d1 i.F911.7 si
� LF9169 916.7 !
F
11
�a
DRY
_- -1 BASIN DATA: STORM WATER \`
BOTTOM=906.0
ouTLET=906.0 DA5/1V
ll 10OYR HWL=911.6
�-
--
91
1MATCH LINE Sheets C2.4 / C2.5
DRAINAGE SPILLWAY
ELV=879.0
ARTICULATED CONCRETE
BLOCK OR GIBLE
CONCRETE
0 50 100 150
GRAPHIC SCALE IN FEET
LEGEND
x a Existing Spot Elevation
Existing Contour
_.. .�.. Existing Tree Una
- - - - Existing Wetland Boundary
•• • Existing Storm Sewer
- •- •- •- Propsed Storm Sewer
93530 Proposed Spot Elevation
9p9 Proposed Contour
1`ez Driveway Grade
i
�P\ \ I ll �I•,k 1..yrPO Y fA81,43
Nri'P
\ J \
878.06
\J� Y1v
912.49
m
Nk-
\,.� � •-><- 91614 ��db''.Pa. > I j � i I �
\`• 91� \ A�e�O J
88241
c
/
m4OjJ l
>1913.69
•914.60
913.69 ,l �\ 913.5\�\ .�i�/tp'o 'o i
/ y, %MATCH LINE Sheets C2.4 / C2.6
890.14
m�mmOmo •1\
/ \
913.64
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763) 238-1610
U
9112-
914.06 913.78 911.60 913.14
PROJECT LOCATION PLAN
0
914
._-- 1
t
-----------� i
J
a
tZ
W
- -
- - -
Wo
ado
0
e
1 III
it
I ,` it 916A
aO
Z�
O
'917.5'1'
I 915.3 t it If9U73
fe
0
1
ZQ
LFeozs 914.70
DRAINAGE SPILLWAY
ELV=879.0
ARTICULATED CONCRETE
BLOCK OR GIBLE
CONCRETE
0 50 100 150
GRAPHIC SCALE IN FEET
LEGEND
x a Existing Spot Elevation
Existing Contour
_.. .�.. Existing Tree Una
- - - - Existing Wetland Boundary
•• • Existing Storm Sewer
- •- •- •- Propsed Storm Sewer
93530 Proposed Spot Elevation
9p9 Proposed Contour
1`ez Driveway Grade
i
�P\ \ I ll �I•,k 1..yrPO Y fA81,43
Nri'P
\ J \
878.06
\J� Y1v
912.49
m
Nk-
\,.� � •-><- 91614 ��db''.Pa. > I j � i I �
\`• 91� \ A�e�O J
88241
c
/
m4OjJ l
>1913.69
•914.60
913.69 ,l �\ 913.5\�\ .�i�/tp'o 'o i
/ y, %MATCH LINE Sheets C2.4 / C2.6
890.14
m�mmOmo •1\
/ \
913.64
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763) 238-1610
U
CO
PROJECT LOCATION PLAN
0
Z
Q
(A tL
a
tZ
W
a
v
2
Wo
ado
0
e
Q
Z 0
aO
Z�
O
cj
z
0)o
0
Q
ZQ
�
Z
QP
in
o
C6
= LU
O
O
Q
0
DETAILS
t
LU
Q
Y �
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
N
C1.1 -C1.7
V bN
i�iff rJ
8c o
d
z
w �
��
N
�3b Ddu
I o'a Elan
� �-
C3.1 -C3.7
I
uc��
F
6V E:
VhI�O.
h0 u�•V
poi
20
o
U
I^
E O
�
in
o
C6
i
O
O
C7.1 -C7.3
DETAILS
t
wv
k
�
m
�
W
ti v
a c
ti
a
�
yy
w
V)
a
m
�u
0
rn
C10
0
1n
N
cpo
m
Z
2
Y
O
O
O
U
FILE NO. 00715
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
ING LANS
C3.1 -C3.7
SANIITTARY AND WATEROUTILITY PLANS
C2
C4.1 -C4.7
STORM SEWER UTILITY PLANS
•
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREY. PLAN
Grading and
C7.1 -C7.3
DETAILS
Drainage Plan
M
GEMMING NOTES:
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT
STANDARD SPECIFICATIONS FOR OTSEGO, MN, AND THE LATEST
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS.
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON
THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.)
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY
NOTIFY THE ENGINEER OF ANY CONFLICTS.
5. EROSION CONTROL SHALL BE CONSTRUCTED, AS APPLICABLE, AS
SEQUENCED BELOW:
A. SILT FENCE.
B. ROCK CONSTRUCTION ENTRANCE.
C. DEMOLITION
D. COMMON EXCAVATION (GRADING).
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE
PLAN).
6. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT
DIMENSIONS.
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE
GRADING CONTRACTOR.
B. EROSION CONTROL MAINTENANCE SHALL BE PERFORMED BY THE
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY
ALL NECESSARY RESTORATION OF DISTURBED AREA. THIS WORK
SHALL BE INCIDENTAL TO THE GRADING CONTRACT.
GENERAL GRADING NOTES:
9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN A
TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING:
A. WITHIN THE UPPER 3' OF STREETS, THE GRADING
C014TRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN
1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
THE STANDARD PROCTOR TEST -ASTM: D-698 WITH
COMPACTION MEETING 100% STANDARD PROCTOR DENSITY
AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%.
BELOW THE UPPER 3', COMPACTION SHALL MEET 95%
STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE
OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL
BE 0.1'.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE
SHALL BE 0.25'.
10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED
ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED IN THE
FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND
PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION.
11. THE GRADING CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE ON
THE SITE AT ALL TIMES.
12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND
TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT
THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED, ESPECIALLY
AT THE END OF EACH DAY'S WORK.
13. ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION.
14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED
GRADE UNLESS OTHERWISE NOTED.
15. ALL EROSION CONTROL BEST MANAGEMENT PRACTICES SHALL BE
PER CITY STANDARDS.
\9'9p5 `9� ' /
y'LI /�
I1�!L J 6.1-x f �Ntt 9 30 /
0 I i t 3q
9 - 938
939.58 i _ 939.27 _ - 937.61
[ %
I
ZZ
v I,'
I
SURVEY DATA
SURVEY INFORMATION PROVIDED BY:
MEYER ROHLIN LAND SERVICES
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC.
NGVD 29 DATUM):
TNH, EAST SIDE OF ODELL LANE, 1ST
HYDRANT N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
PROJECT LOCATION
PART OF SES OF SECTION 28, TOWNSHIP 121,
RANGE 23, AND
PART OF SW} OF SECTION 27, TOWNSHIP 121,
RANGE 23,
WRIGHT COUNTY, MINNESOTA.
LEGAL DESCRIPTION
SEE SURVEY.
PAGE LAYOUT:
C2.1 C2.2
C2.3 I C2.4
C2,5 I C2.6
0 50 100 /50
C2.7
GRAPHIC SCALE IN FEET
LEGEND
TYPICAL HOUSE PAD Existing Spot Elevation
Existing Contour
GARAGEG - - - Existing Tree Line
g2g,7 SUGGESTED GARAGE FLOOR ELEVATION
FBWO SUGGESTED BUILDING TYPE Existing Wetland Boundary
LF921.7 LOWEST FLOOR ELEVATION „ .. Existing Storm Sewer
821.7 LOWEST OPENING ELEVATION
•-•-•-•-
F8 =FULL BASEMENT Propsed Storm Sewer
FELD = FULL BASEMENT LOOKOUT • 6]510 Proposed Spot Elevation
FBWO = FULL BASEMENT WALKOUT
MLWO = MULTI-LEVEL WALKOUT hoe Proposed Contour
+1 = ADJUST 1 BLOCK UP
Driveway Grade
UNM WA l LK
BOTfOM=906.0
/111T14T-OAR A F2 /1 4'.'1A/ % <�
INDEX OF CIVIL SITE DRAWINGS:
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6STORM
WATER POLLUTION PREY. PLAN
C7.1 -C7.3
DETAILS
W
Qo;
UU°
I I
1
�
ZQ
O
Z
I
I
I
1
I
I
II
1
i
1
1
I
,I
°
PAGE LAYOUT:
C2.1 C2.2
C2.3 I C2.4
C2,5 I C2.6
0 50 100 /50
C2.7
GRAPHIC SCALE IN FEET
LEGEND
TYPICAL HOUSE PAD Existing Spot Elevation
Existing Contour
GARAGEG - - - Existing Tree Line
g2g,7 SUGGESTED GARAGE FLOOR ELEVATION
FBWO SUGGESTED BUILDING TYPE Existing Wetland Boundary
LF921.7 LOWEST FLOOR ELEVATION „ .. Existing Storm Sewer
821.7 LOWEST OPENING ELEVATION
•-•-•-•-
F8 =FULL BASEMENT Propsed Storm Sewer
FELD = FULL BASEMENT LOOKOUT • 6]510 Proposed Spot Elevation
FBWO = FULL BASEMENT WALKOUT
MLWO = MULTI-LEVEL WALKOUT hoe Proposed Contour
+1 = ADJUST 1 BLOCK UP
Driveway Grade
UNM WA l LK
BOTfOM=906.0
/111T14T-OAR A F2 /1 4'.'1A/ % <�
INDEX OF CIVIL SITE DRAWINGS:
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6STORM
WATER POLLUTION PREY. PLAN
C7.1 -C7.3
DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
N
V
LU
Z
Q
CO a
N
(L
=z
I
o
W_a
ea
Z
0
�
Ix
°
W
Qo;
UU°
13 b
a
ZQ
O
Z
QP
B
°
= W
�
Q
Y
0
N
W
o
x
R
a
o
C �
g
N
I V) N
g
zd
O
N
I o W)
f:
n5
Cz7 ('y��I
I m o D b >
tW ho
ccs
ySl�d
,221
Qo;
a
CO
f
K�E c
0
� o
B
�
k
FILE NO. 00715
C2._5
Grading and
)rainage Plan
to
N
m
CO
o
B
B
�
Y
0
0
o
x
FILE NO. 00715
C2._5
Grading and
)rainage Plan
_T
GENERAL GRADING NOTES: GENERAL GRADING NOTES: SURVEY DATA PAGE LAYOUT:
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT 9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
STANDARD SPECIFICATIONS FOR OTSEGO, MN, AND THE LATEST TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS INA SURVEY INFORMATION PROVIDED BY:
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING: SURVEY
RINFOR LAND SERVICES C2.1 C2.2
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS A. WITHIN THE UPPER 3' OF STREETS, THE GRADING MEYERNE
NUE
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS. CONTRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN BUFFALO, 708 1st AVENUE
NE
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BYMN
THIS PROJECT. THE STANDARD PROCTOR TEST -ASTM: D-698 WITH C2.3 C2.4
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48 COMPACTION MEETING 100% STANDARD PROCTOR DENSITY DATED: FEBRUARY 12, 2019
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.) AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%.
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND BELOW THE UPPER 3', COMPACTION SHALL MEET 95% BENCHMARKS (PROVIDED BY OTSEGO CITY
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE ENGINEER, HAKANSON ANDERSON, INC. C2.5 C2.6
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL NGVD 29 DATUM):
NOTIFY THE ENGINEER OF ANY CONFLICTS. BE O.1'.
5. EROSION CONTROL SHALL BE CONSTRUCTED, AS APPLICABLE, AS B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE TNH, EAST SIDE OF ODELL LANE, 1ST
SEQUENCED BELOW: SHALL BE 0.25. HYDRANT N OF 75TH ST., ELEV=928.00 0 50 100 7517
A. SILT FENCE. 10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED C2. ]
B. ROCK CONSTRUCTION ENTRANCE. ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED IN THE RR SPIKE IN PP, NW QUADRANT OF OGREN GRAPHIC SCALE IN FEET
C. DEMOLITION FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR AVENUE AND CO RD 38, ELEV=948.06
D. COMMON EXCAVATION (GRADING). SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION.PROJECT LOCATION LEGEND
PLAN). 11. THE GRADING CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE OIJ
6. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT THE SITE AT ALL TIMES. PART OF SEJ OF SECTION 28, TOWNSHIP 121, X 93z.o Existing Spot Elevation
DIMENSIONS. 12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND RANGE 23, AND TYPICAL HOUSE PAD
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT --- --- .ons' - -- - Existing Contour
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED, ESPECIALLY PART OF SWj OF SECTION 27, TOWNSHIP 121,
GRADING CONTRACTOR. AT THE END OF EACH DAY'S WORK. RANGE 23, Existing Tree Line
8. EROSION CONTROL MAINTENANCE SHALL BE PERFORMED BY THE 13. ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION. WRIGHT COUNTY, MINNESOTA. GARAGE G J
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT 14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED BY9,7 SUGGESTED GARAGE FLOOR ELEVATION - - - --- Existing Wetland Boundary
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY GRADE UNLESS OTHERWISE NOTED. FBWO SUGGESTED BUILDING TYPE
ALL NECESSARY RESTORATION OF DISTURBED AREA. THIS WORK 15. ALL EROSION CONTROL BEST MANAGEMENT PRACTICES SHALL BE LEGAL DESCRIPTION LFB21.7 LOWEST FLOOR ELEVATION Existing Storm Sewer
SHALL BE INCIDENTAL TO THE GRADING CONTRACT. PER CITY STANDARDS. 821.7 LOWEST OPENING ELEVATION
SEE SURVEY. - •- •- •- Propsed Storm Sewer
X912.50'i / \
V a
913.68 �\
10--912
0
3.14 912
/ X
EOF \ \ \
.; I9"
914.0 N
94\20
9,4.70
'G \ �� �� �'
ci
o�
m
913. Ott a, 6
N«.0 ,/ r`.• a\4,. / �' \ \.,` Imo; -9
m�
B
VB1BA 914.45
> 913.77.
FB
b
`.918.9 , 11, 9, _ �`� '•�
600 , 1 __
____ 9`ryg1 ______ __.. __-912 z-� --------
---
\6 , p-
I
I
I
I
I
FB = FULL BASEMENT
Proposed Spot Elevation
FBLO = FULL BASEMENT LOOKOUT
B}5�0
FBWO = FULL BASEMENT WALKOUT yoe Proposed Contour
MLWO = MULTI-LEVEL WALKOUT
+1 = ADJUST 1 BLOCK UP Driveway Grade
MATCH LINE Sheets C2.4 C2.6 1 T \` a'5 '
11 890.14
91560
.913.37 .;
„.0
ll G
..342 \\'•. 1284 , '�"id .aea.ae I ,,x r/a.aX
rv,_
\\ \A
\ \
0
I
1 l
912 1.41 l \ \
912.76 � �• \ ��� � ` V ` ��,v.9 _
I
0
_------
1 1 1
0'
----------
912.59
1 _ '
I
912.69 �., �' �• I 908.82-mies _ _ { --� _-j--_
____ __-._ ____, - 1 912.69___ _-__-.____ -. 1 I -t 3, O D,'• - .-
16'rmb I'
9 Eom i' I
Q � W -
_, a_____ -
MATCH LINE Sheets C2.6 / C2.7 I I I
5E I 1OL
y Ig I I, I I I I I INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
N
LLC
N bN
14505 43rd AVENUE N.
PLYMOUTH, MN 65446
CO
C1.0
HENRY HANSEN
(753) 238.1610
'OE
3bb I 0
N
W
2
Z
v(r
CO0
IL
h Oh O
d
=z
16
UJ
°
0
Uj
0
?
Wa
T
e
�
C1.1 -C1.7
PRELIMINARY PLAT
V'
E �
''W^ W
W 0
a
ZQ
0
2
QP
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
= W
do rll
It
I
W
CI -C3.7
C4.1 -C4.7
SANITARY AND WATER UTILITY PLANS
STORM SEWER UTILITY PLANS
fr
lgtio
c
o
N
N bN
b
CO
C1.0
W (J'
WItf,
'OE
3bb I 0
919.51 s1a.a1
x 1
t? k l o
W h
h Oh O
<
60 CCX-
LAYOUT AND PHASING PLAN
!�1 r�j�IWa�43
yrs
_Oi.�
c
N
0
C1.1 -C1.7
PRELIMINARY PLAT
V'
E �
a
(
g•�
{iS5
a
I I I
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
do rll
I
\
CI -C3.7
C4.1 -C4.7
SANITARY AND WATER UTILITY PLANS
STORM SEWER UTILITY PLANS
C2.6
lgtio
C5.1-05.2
STREET PROFILE PLANS
ca
i I I I
u
t
STORM WATER POLLUTION PREY. PLAN
Grading and
I
II
943.27 - - __
I --_____-_-.L_-_-_-.-_- --_-_-_-_- -_-_-_-____
J
a
DETAILS
Drainage Plan
k
�Isi
toIn
a
2 II
O
to
CO
W
W
�
U
FILE NO.
00715
CO
C1.0
PROJECT LOCATION PLAN
OVERALL
919.51 s1a.a1
I I
LAYOUT AND PHASING PLAN
yrs
_Oi.�
C1.1 -C1.7
PRELIMINARY PLAT
(
- __
I I I
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
do rll
I
\
CI -C3.7
C4.1 -C4.7
SANITARY AND WATER UTILITY PLANS
STORM SEWER UTILITY PLANS
C2.6
lgtio
C5.1-05.2
STREET PROFILE PLANS
i I I I
C6
STORM WATER POLLUTION PREY. PLAN
Grading and
I
II
943.27 - - __
I --_____-_-.L_-_-_-.-_- --_-_-_-_- -_-_-_-____
C7.1 -C7.3
DETAILS
Drainage Plan
1
GENERAL GRADING NOTES: GENERAL GRADING NOTES: SURVEY DATA PAGE LAYOUT: CLIENT:
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT 9. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER
STANDARD SPECIFICATIONS FOR OTSEGO, MN, AND THE LATEST TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN A VHF INVESTMENTS,
MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING: SURVEY INFORMATION PROVIDED BY:
FOR HIGHWAY CONSTRUCTION AND ALL NPDES REQUIREMENTS A. WITHIN THE UPPER 3' OF STREETS, THE GRADING MEYER ROHLIN LAND SERVICES C2.1 C2.2 LLC
EXCEPT WHERE MODIFIED BY THESE CONTRACT DOCUMENTS. CONTRACTOR SHALL UTILIZE APPROVED SOILS THAT ARE WITHIN 708 1st AVENUE NE
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY BUFFALO, IAN 55313
THIS PROJECT. THE STANDARD PROCTOR TEST -ASTM: D-698 WITH C2. 3 C2,Q. 14505 43rd AVENUE N.
3. THE CONTRACTOR SHALL NOTIFY "GOPHER STATE ONE CALL" 48 COMPACTION MEETING 100% STANDARD PROCTOR DENSITY DATED: FEBRUARY 12, 2019 PLYMOUTH, MN 55446
HOURS PRIOR TO ANY EXCAVATION (1-800-252-1166.) AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%. BENCHMARKS (PROVIDED BY OTSEGO CITY HANSEN
4. THE GRADING CONTRACTOR SHALL VERIFY ALL LOCATIONS AND BELOW THE UPPER 3', COMPACTION SHALL MEET 95% ENGINEER, S (PROVIDED
ANDERSON, OTS, INC. C2. Jr' C2.6 HENRYENR 2301610
ELEVATIONS OF UNDERGROUND UTILITIES WITH UTILITY STANDARD PROCTOR DENSITY, AND BE WITHIN 3% OF THE
COMPANIES PRIOR TO ANY CONSTRUCTION, AND IMMEDIATELY OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL NGVD 29 DATUM):
NOTIFY THE ENGINEER OF ANY CONFLICTS. BE 0.1'. TNH, EAST SIDE OF ODELL LANE, 1ST
5. EROSION CONTROL SHALL BE CONSTRUCTED, AS APPLICABLE, AS B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE ., :
SEQUENCED BELOW: SHALL BE 0.25'. 0 50 100 150
HYDRANT N OF 75TH STELEV=92800
A. SILT FENCE. 10. ALL AREAS OF UNSUITABLE SOILS FOUND IN THE PAD DESCRIBED C2.7 W
B. ROCK CONSTRUCTION ENTRANCE. ABOVE THAT CANNOT BE CORRECTED SHALL BE LOCATED IN THE RR SPIKE IN PP, NW QUADRANT OF OGREN GRAPHIC SCALE IN FEET - Z
C. DEMOLITION FIELD BY THE GRADING CONTRACTOR. THE GRADING CONTRACTOR AVENUE AND CO RD 38, ELEV=948.06ff�� Q Q
D. COMMON EXCAVATION (GRADING). SHALL IMMEDIATELY NOTIFY THE ENGINEER OF THESE AREAS AND co tr 0
E. SEED AND MULCH OR SOD (SEE NOTES ON LANDSCAPE PROVIDE INFORMATION AS TO THEIR SIZE AND LOCATION. PROJECT LOCATION LEGEND t1. W
PLAN), 11. THE GRADING CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE ON
6. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT THE SITE AT ALL TIMES. PART OF SEJ OF SECTION 28, TOWNSHIP 121, TYPICAL HOUSE PAD ^ ''%n Existing Spot Elevation = Z
DIMENSIONS. 12. THE GRADING CONTRACTOR SHALL KEEP PUBLIC STREETS AND (3W 0 ?
7. ANY EROSION CONTROL ITEMS NECESSARY TO PROTECT TRAVEL WAYS CLEAR OF SOIL AND DEBRIS. DAILY CLEANING AT RANGE 23, AND V
ADJACENT PROPERTIES SHALL BE CONSTRUCTED BY THE THE CONSTRUCTION ENTRANCE SHALL BE PERFORMED, ESPECIALLY PART OF SW4 OF SECTION 27, TOWNSHIP 121, Existing Contour IL m
Q
GRADING CONTRACTOR. AT THE ENO OF EACH DAY'S WORK. RANGE 23, .. ,._.. .. , W Q C ccExisting Tree Line
8. EROSION CONTROL MAINTENANCE SHALL BE PERFORMED BY THE 13. ALL SILT FENCE SHALL BE REMOVED AT PROJECT COMPLETION. WRIGHT COUNTY, MINNESOTA. GARAGE Ci cl
928.7 SUGGESTED GARAGE FLOOR ELEVATION J
GRADING CONTRACTOR, AND REMOVED AS PER THE CONTRACT 14. ALL PROPOSED ELEVATIONS ARE AT FLOW LINE AND FINISHED FBWO SUGGESTED BUILDING TYPE - Existing Wetland Boundary7 W
Z p
DOCUMENTS OR AS DIRECTED BY THE ENGINEER, FOLLOWED BY GRADE UNLESS OTHERWISE NOTED. LF92t.7 LOWEST FLOOR ELEVATION 5 O' t
ALLNECSHALLES INCIDENTAL OTION OF THE GRADING CONTRACT.DISTURBED ' THIS WORK 15. PALL ER EROSIONCITY CONTROL
BEST MANAGEMENT PRACTICES SHALL BE LEGAL DESCRIPTION 921.7 LOWEST OPENING ELEVATION " " Existing Storm Sewer W LU In 001 R
SEE SURVEY. FB = FULL BASEMENT Propsed Storm Sewer 7� J .�., Z
FBLO = FULL BASEMENT LOOKOUT .4x5.30 Z Q
Proposed Spot Elevation Q
FBWO = FULL BASEMENT WALKOUT TQ F- Q
MLWO = MULTI-LEVEL WALKOUT Soe Proposed Contour 2
+1 = ADJUST 1 BLOCK UP Uj
0 Q
Driveway Grads
0)
I I W
i
-----I o
________________________ i
d.j I I I I I I I I I I �g R >I> "naE
u
0
.9 I' e', I9 i 9 I 1 '9348 '\ 9 I --'910. �' V'Qlmm oN
U. s� ° 01 r.00 ,c i
- -.- - �° ...,.-.-.-..oO f 7-1 ISL-.-.�° .-. �o ,- - - .L 90.� _ �O �2 •�•_.°+ °-•-•-'-'� o `� g
'i -1- - . - '- - - - N 9 9Ze - - - - - 9f6 046 1�zos q46-fi ---- -- , y, � w ":
oa
,� r
e
o
942.501 of2� 844.2 o I ,E' I •t`a� o
1 o LF998.2 1 I h. " -+ °' cl f
' �+ 819.9/916.9 I I I 818.3 I i t l0 9 928.1 - I t I 1932.2 i I 996.9 I 9 8.9 I I 940.3 I I 1943.2 I I .I" 949.7 I I FB I o f I - 1 x�sc or uJ m _L $ o
LF906.9 ;I LF913.3 :} 0 I LFB29.1 f LF927.2 LF891.9 L795,9.8 I =' I LF996.9 I 1f9962 I` 1 LF896.7 I 944.2 5 x':46 I (9 a o
n MLWO MLWO III �!� MCWO j ! MLWO ! MLWOi I N,LWO MLWO 942.30 FB I F8 o pa
916.9 921.3 I1II 891.1 I 996.2 / I 998.9 941.6 943.3 849: 949 7 �' �V,B3 r q
Y = 1 uez G L 14 e: G I I I G uw G uea G ! u�� G I �sa� G I is�w . G `4u� G 7"¢t
I I au 91T6.fi7; "� 2 Et 4u 930.63 4N 935.11 1 4u 938.68 4u 940.60 4u 942 54 I i
913.391
�- m e - 923.'7
% 915.97
_.I �__ 'q S_ 1a , 929.93 ,,.
.. '` - , _-_ I \`m 93441
= _ �..n.�. -- - _ `--- - .r:., _•rte=. - _m=...�.-...... - -/ /!/ I u�i
f � -:-,-- - vim-= =`- ;••-, .�; _- - ,-- ,- '= zA+od-.
F
Q o Jul
2' N.--c.9�----.o��� -csa -•--:off ? 4"�.' `oil `i6, `T@ Y_I+ _
.�...v. - - - - __ ---.- ,EoO \� ��lvo,`�0y m �� �
�t912.89 939.13-� Q
- - L
-
L.939`49
XI I ! 1 II ,G42e4
9.51 934.9IN „
G 944.7
45a J I f . _ II �920.1
,Rx
FB 9 0
1 FBLO I_ F9 LF9. \ 1 w
"I
8L2W4.6O F8F999L20 0.29 I I II I LF89926 � o + V 1I I11 ' II 0a I fI 944 0. - 94236�I! I( � 944.7 ;944.4 944:4MLWO LF938.7
LF912.1 0�
917.1 96.6 � 0 � _ 9- 4_g 9_ - _ - �•,\1\_
II
lI1
Itp4
1
I
I � I 11 ,
- - - -- - - I I 1 - - -- 1 - -- -- - - _ - - ! o z
,
- - J�
I
nn , 0 9 ..
.- v0 I --940.31 .-.-,-.-.-'C° -.-...- -.-.-.... .-.-.-.-.-.-.-.-.-.-.-.,x..04--.- -.-.-.
- •-•- _ - .-.� -•-•- -•- -•- - -.-. .trr-•p939.99. ,- •-•-
I.�
7
I � w
o
I
h
INDEX OF CIVIL SITE DRAWINGS: FILE NO. 00715
i CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7 PRELIMINARY PLAT
s C2.1 -C2.7 GRADING AND DRAINAGE PIANS /'1 .
C3.1 -C3.7 SANITARY AND WATER UTILITY PLANSC4.1 -C4.7 STORM SEWER UTILITY L
I I C5.1-05.2 STREET PROFILE PLANSPLANS
C6 STORM WATER POLLUTION PREY. PLAN Grading and
N
C7.1 -C7.3 DETAILS Drainage Plan
GENERAL UTILITY NOTES SURVEY DATA PAGE LAYOUT: CLIENT:
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS 12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF SURVEY INFORMATION PROVIDED BY: VHF INVESTMENTS,
FOR THE CITY OF OTSEGO AND THE LATEST VERSION OF THE MINNESOTA DEPARTMENT OF ALL CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE MEYER ROHLIN LAND SERVICES C3.1 C3.2 LLC
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES FOLLOWING: 708 1st AVENUE NE
REQUIREMENTS EXCEPT WHERE HEREIN MODIFIED BY THESE DOCUMENTS. A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL BUFFALO, MN 55313
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT. UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DATED: FEBRUARY 12, 2019 C3.3 C3.4 1450543rd AVENUE N.
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR PLYMOUTH, MN 55446
EXCAVATION. DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%. BELOW THE UPPER BENCHMARKS (PROVIDED BY OTSEGO CITY
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND 3', COMPACTION SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF ENGINEER, HAKANSON ANDERSON, INC. NGVD HENRY HANSEN
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT 29 DATUM): C3.5 C3.6 (763) 2381610
THE ENGINEER OF ANY CONFLICTS. SHALL NOT BE CONSISTENTLY HIGH OR LOW.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOWB. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'. TNH, EAST SIDE OF OOELL UNE, 1ST HYDRANT
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING 13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL N OF 75TH ST., ELEV=928.00
STRUCTURES SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE 0 50 700 150
CONTRACT. TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S RR SPIKE IN PP, NW QUADRANT OF oGREN V
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN TESTING AGENCY AT THE CONTRACTOR'S EXPENSE. AVENUE AND GO RD 38, ELEV=948.06 C3.7 - W
EXISTING UTIUTIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE 14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON GRAPHIC SCALE IN FEET
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT O
THE EXISTING UTILITY. SEPARATION BETWEEN SEWER AND WATERMAIN. PROJECT LOCATION co
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED 15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE Q. W
BY THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO WITH MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR PART OF SF} OF SECTION 28, TOWNSHIP 121, 40 1 -
EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO CONSTRUCTION ADJACENT TO TRAVEL WAYS. RANGE 23, LEGEND = Q
UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. 16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING LU 40 Q
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS. STRUCTURES, CASTINGS, AND PART OF SW� OF SECTION 27, TOWNSHIP V W
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE 121, RANGE 23, ► - - Existing Sanitary Sewer
CONTRACTOR'S EXPENSE. ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS WRIGHT COUNTY, MINNESOTA. - Existing Water Main I�.I IL C Z IL
B. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES. DEPTHS ARE ESTIMATED. ►► Existing Storm Sewer = Q C Q }
9. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS 17. CITY INSPECTION IS REQUIRED FOR THE SANITARY SEVIER AND WATER SERVICE ► Proposed Sanitary Sewer J
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE CONNECTIONS.LEGAL DESCRIPTION I Proposed Water Main
18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS Proposed Gate Valve
CONTRACT, INCLUDING DISPOSAL TEST WATER INTO THE CITY'S SANITARY SEWER P -
SYSTEM. THE CONTRACTOR SHALL
NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR. SEE SURVEY. ►► W W Proposed Storm Sewer Iq Q F -
THE CITY'S WATER SUPPLY SYSTEM. 19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS. f Proposed Fire Hydrant & GV rrAA co o 4)
10. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS J Z
20. CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY
PRIOR TO STARTING WORK OR AS REQUIRED 8Y' THE LOCAL JURISDICTION OR BE SUBJECT Z Q O Q
DETAILS 308 AND 310.
TO BEING SHUT GOWN. Q � N
11. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET = Z
FOR THE SUBDIVISION OF THE LAND.Lu
0_
LLJ
63 LF
LL1
-� COI7NECT 70 _ 1I \ _ 1 - PVC SDR35
e• DIP TEE \• _ -- - _ ' I " _ _-_ �'�)L - _ 1 _ - _ _ .-�,--- .a, O 4( 8) - a
PVC Sc
03.
/5l�i'P.P.t
lil
I nrn
> a oo E
H 8V-6
c
M 4�
iM
t1..( r�_ 89b1- -_ E(S8
1
.. -[-� -- - 1 (L!) B
.T '-T s�--AE 8 WImm6M=
8 D i p -
_ 5 - - c - 8' DIP CL52 E ,o
RMNN oeQ c `3 '�. °d Y''•3
212 LF 8PNC 1 MH PI -2
5.11
_906 _ RE -895.50
77
�IE(5)=883.60 (8•
920 5 11 IN
0
-- -- - _ IE(NE)=883.5 ur)
0 (6. OE v o
O a o ° II�IIIjLL/cJ
MH PI -8
RE -926.28 / 0 WATERAWN"F
I 1 -// �$
Lz
IE(S)=814.28 (8•p� 1 + I! I I I I I 1- 1 I T --I $.° °
DEPTH=12.Ob / 1 1 it I I I I I I 918.9 I 8' WP CL52 L_ i
f °' III I 828.8 I 927.7 827.7 92813 I 922.9 921.8 I I 820.8 818.8 - 917.9 818.8 _ WATERMAIN / ° ,K °
LF91B.9
I LF829.8 I I-" LF92(7 I I LF924.7 I I LF89.9 I
LF.I. _) LF92t9 LF920.9
137 LF 8• PVC Ip FBLO I I FBLO FBWO I I _ FBWO FBWO I I FBWO I I �s,ez (i . -1 p BO
I FBLO'� I I FBLO
L _. - _ - - - - - �.- - SDR35 O % I 891.8 I I I 892.7 -. , I 1 992.7 1 9918 I I 830.9 1 =929.8. 928.9 927.9 I I uo.e2. I I G uts2 1 �Ol O M /
4.67X (8.68) 7 I f G f.f G I. _ G ude2 I. G �`� 2 G uiez I I G io�2 I_ _G i7i z I G iaez I Cz ,., `{ I ,., I ,., B g
o- ns ►► I use i2.ez _
I I I I I I � I -,. 1 1 I I _ �<D 1, •,
II I
rI
j o _ 8 WdIERMNN \ 5B LF 8• PVC /
+ I
8• DIP CL52 _
WATERMAIN -
114
_� o
/ MH P1-6 tM,' 0 _1++ 0 g0 'cr -�+ 0 -�� _® k _ \ m➢m�o �.,
,� ^ �. .-. c 3 0 4+00 •5+ 0� L, J6+00 +00 '10+ ,c
c� RE=928.48 I-9 - ► -► ►- -� 9•y0 ZaT.� = / / Ve�Ve _ s 9Z. -s m a _ _ _ _ a a _ g2 • e e _ m a a �� `% .� ' F
IE(S)-907.58 (8' IN) m e _. s = ,� � - e - - - - _ - 92 O g
IE(N)-907.58 8• IN) M1• ,��-_� -- -� c 720 LF 8• PVC ` 58 IL pyC / d
I' IE(E)=80253 (8� 350 LF 8• PVC y.0�6 O v RE -822.79 S / Z /j
` 6• PVC SDR28 O- MH P1-4 IE(SE,W)=894.48 (8. IN).-
DEPTH=20.9 SDR26 O MH Pf-5 -- - 0.40X (1.40) -- RE -925.971- -- ---I j 3.17X (10.15) IE(N)-894.47 (8. 00IIl!rr))�% 0.4 J 4) D:
0.40X (1.40) - -r - R3 (a- 88 - - T i" - - - �.�. IE(W)=904.68 (8• IN) I I I I DEP 2791
IE(W)-908.13 (8• IN) I I I I I IE(E)=804.67 ((8 011f)
IE(E)=906.08 (e• OUT) I I I OEPiH=21.34 I I f rj
+ I I I I .08 (a-23.80 JJC
O'
ns3 uvs3 eea �ea.G i e3 �.a I °f G I I G f.f I I G .f .f G ,.e G ,.f G f (�892.1 8927992.7 931.7 830.7 928.7 928.7 928.7 828.6 9285 828
i r I FBLO I FBWO I I FBWO I I FSWO I FBWO I I F8W0 I FBWO FBWO I I LF920.5 FBWO MH P1-9 I II Gi N
LF924.1 I I LF924.7 LF923.3 LF922.8 LF92f.. LF820.7 LF920,7 I• I LF820.6 RE=921.73 r 1
IE(SE)=894.77 (8' IN) 1
i �'•' I - 1 I II 829.1 I 921.7_924.7 I I 829.7 922.7 i i 92t7 820.7 920.7 920.6 820.6 IE(N1Q=894.72 (8. OIJf) l 920 .9 I - t •.-
- DEPiH-27.01 I I !I o
j 212 LF 8• PVC
SOR26 0 � I I I I I_ I I I I MH P1-10
0.40X (0.85)N' e• DIP CL52 I I I I I---_.. I I ( I ((S)=895.06
RE=920.90
' °+ o. . • I WATERMAIN 1 I I IE( -8 590 0 �� 8'p UIN))
9 I _- ._ I I I I DEPTH 25 89
m
L ---L- LI L--- ---J L- --mac--J L -' -----J, L---� ---J L -------J L------- L -------J L -------J
MH PI -7
RE -930.05 LINE �l ,I i - -- ---�11 r1I' --- ---_- �•rI'�` � , i rIte
MATCH LINE �Shreet�s C3 .1 C3.4
IE(S)-90847 (8. W) MATCH LINE Sheets C3.1 / C3.3 i i
IE(N)=908.42 (8. 0 I
Depth- 21� 1
I
O O WU
- I T 1 1 I I 1 1 I I _ INDEX OF CIVIL SITE DRAWINGS: FILE NO. 00715
-' 1 Ir II II
-- D PHASING PLAN
/ I I - C10.0 OVEORALL LAYOUTJECT OA
9zo.e I 8227 I I 922.0 I 1 922.4 1 1 922A I I 922_6- 1" I F C1.1 -C1.7 PRELIMINARY PLAT
NPLA
6 932 `_ I I I I 9219 - -LF919.7 - LF919.0 _ LF919.4 LFBiB.4 LF919.6 N
92 1 I I 9ss.3 9231 I I L BIND _ F.- I I I FBLO I I= -FBLo I j 9 C2.1 -C2.7 GRADING AND DRAINAGE PIANS
i I I 194 LF 6.7 0 / 824.2 LF821.B I' FBYY8 _ -I .I FBLO I FBLO 927.5 a C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
- _ LF926.3 SDR27 O -_ I _ - - LF92 2 LF923.1 _ _ _. FBWO 928.8 827.7 827.0 827.4 - - ` 927.4 - 1 I
I - 992.5 I I I- 1 �•. G � C4.1 -C4.7 STORM SEWER UTILITY PLANS C3 •
FB 0.40X (0.78) FBWO ) F81V0 929.9 G usz G fads mss G u.ea G ra%+ G `. G w.ea
` I 1 LF924.5 I I I I I ` I I 831.1 ue� zne I I zne I I zoa I I a.e = 1 I as I I me I I
9I (L
C5.1-05 2
STREET PROFILE PLANS
LG STORM WATER POLLUTION PREY. PLAN Sanitary and Water
c7.1 -c7.3 DETAILS Utility Plan
6i
GENERAL UTILITY NOTES
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS
FOR THE CITY OF OTSEGO AND THE LATEST VERSION OF THE MINNESOTA DEPARTMENT OF
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES
REQUIREMENTS EXCEPT WHERE HEREIN MODIFIED BY THESE DOCUMENTS.
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
EXCAVATION.
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY
THE ENGINEER OF ANY CONFLICTS.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING
STRUCTURES SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE
CONTRACT.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF
THE EXISTING UTILITY.
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED
BY T CONTRACTOR THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO
HE A 0
EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO
UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR.
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE.
B. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
9. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE
CONTRACT, INCLUDING DISPOSAL OF TEST WATER INTO THE CITY'S SANITARY SEWER
SYSTEM. THE CONTRACTOR SHALL NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON
THE CITY'S WATER SUPPLY SYSTEM.
10. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS
PRIOR TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT
TO BEING SHUT DOWN.
11. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET
FOR THE SUBDIVISION OF THE LAND.
12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF
ALL CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE
FOLLOWING:
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL
UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 111. BELOW THE UPPER
3', COMPACTION SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF
THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT
SHALL NOT BE CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON
THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT
SEPARATION BETWEEN SEWER AND WATERMAIN.
15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE
WITH MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS,
ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS
DEPTHS ARE ESTIMATED.
17. CITY INSPECTION IS REQUIRED FOR THE SANITARY SEWER AND WATER SERVICE
CONNECTIONS.
18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST
CONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
20, CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY
DETAILS 308 AND 310.
SURVEY DATA
SURVEY INFORIMTION PROVIDED BY
MEYER ROHLIN LAND SERVICES
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019
BENCHMARKS (PROVIDED BY OTSEGO CIN
ENGINEER, RAKANSON ANDERSON, INC. NGVD
29 DATUM):
TNH, EAST SIDE OF ODELL LANE, IST HYDRANT
N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
PROJECT LOCATION
PART OF SEJ OF SECTION 28, TOWNSHIP 121,
RANGE 23,
AND PART OF SW} OF SECTION 27, TOWNSHIP
121, RANGE 23,
WRIGHT COUNTY, MINNESOTA.
LEGAL DESCRIPTION
SEE SURVEY.
�� � � d �i ry•rr /
}I \ " 0,
--CONNECT
EXITO '
-. - .- ! �`� STING 8 DIP
-/
BY WET 8
83 DR35 _ Ex MHA
_- PVC SOR35 RE -885.20
O 4(2.8) EX IE(E)-1169.10 (B' OVI)
,J. •' • NEW IE(S)=877.0 (8- IN)
' 85 LF 8' OS DROP IE(SW7=870.0 (8' IN)
s._ PVC SOR35 \ OS DROP -7.)
FTT
^:\ O 3.68%. - -_ CORE DRILL NEW CONNECTIONS -`
(3.5)
UH PI -1
RE=888.50
DEPT-8�0 (8. OUT) I / \ / ice\ 1 •,
- 8 DIP CE52 , I 1
WATERMAIN
_ 212 LF 8 PVC _ _ \ \ `�• \ \\.,.
NH P1-2
- . 5AIX(1(1236)906 _� - 1 -J, RE=B95.50-
IE(N)=88360
_ IE(NE)=883.50 (B'
- - -_ B' DIP Cl52
917.8 918.8 -1,-WATERMAIN 'I /�/�. ,•� I V �•� A �• I �� v - - A
LF017.9 .,II. LF018.8 \ /
FBWO ..._FBWO
G e25. 1 119 I 92�, i
I
WRH VAL L \ /i�. 1 I '\ '• //i���\\'. \
58 LF B'
_ SDR28 O
0.4/X
_ Ty .♦♦
\ yc 'lop
5B LF 8' PVC
0.41. (0.24)
` A SNI
WfT
5TORbIiATER
_ B 51N
1 I I I =
i
I( I
I P _ -II j, j j MATCH LINE Sheets C3.2 / C3.4
� m �,o m _ � - - _\eli �►r _-\ j eao. a�a� o' 1
HYDINNfZ 4
WITH
iI F;?vD
t, r
PAGE LAYOUT:
C3.1 C3.2
C3.3 C3.4
C3.5 C3.6
�C3.7
0 50 100 150
GRAPHIC SCALE IN FEET
LEGEND
► Existing Sanitary Sewer
- -- - Existing Water Main
►► Existing Storm Sewer
No Proposed Sanitary Sewer
Proposed Water Main
Proposed Gate Valve
►► F Proposed Storm Sewer
4 Proposed Fire Hydrant & GV
RE -922 39 \
_ a -
IE(SEW)=894.48 18'
IE(N)-894.43 18' 066 \
- =
DEPTiI 2296 '
I I
ws�
r; lel
ulss \
let
G
828.6
826.9 I
I °bb 1 0
MH P1-9
II
NF8W0
LF020.6
020.5
RE=821.73 I I
IE(SE)-894.77 (8' 9L)
\
IE(NW)-894.72 (8' M/F) I
D =27.01
N
I MH P1-10
WIE((S)=895.08
RE=920.90
�8' IN1 I '
i
IE(NW)=895.01 8 OLID 1 I
25.899
\
W- �-
I
�J
-J L�I-----�-
�1
►r
- N 4,--
II
-918-1
II '
O
1
285 SDR26
I
I I
I o.4oX (t.
INDEX OF CIVIL SITE DRAWINGS:
1 IIFLFiF9
I I
022.2 I l
-
LF917.1/ 1
PRELIMINARY PLAT
I 19.8
\ yc 'lop
5B LF 8' PVC
0.41. (0.24)
` A SNI
WfT
5TORbIiATER
_ B 51N
1 I I I =
i
I( I
I P _ -II j, j j MATCH LINE Sheets C3.2 / C3.4
� m �,o m _ � - - _\eli �►r _-\ j eao. a�a� o' 1
HYDINNfZ 4
WITH
iI F;?vD
t, r
PAGE LAYOUT:
C3.1 C3.2
C3.3 C3.4
C3.5 C3.6
�C3.7
0 50 100 150
GRAPHIC SCALE IN FEET
LEGEND
► Existing Sanitary Sewer
- -- - Existing Water Main
►► Existing Storm Sewer
No Proposed Sanitary Sewer
Proposed Water Main
Proposed Gate Valve
►► F Proposed Storm Sewer
4 Proposed Fire Hydrant & GV
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, IAN 55446
HENRY HANSEN
(763)230-1610
V
D
Lu
7
n
CO
!>&y
qi�
I
r
T
-
\
I °bb 1 0
F -
z
Q
WtL
b
a
\
Z W
� 7
4 /
In Lu
ce
0
7.a
0
a
♦-
1 L)
�1
1 '
1
,
O
iS
W
ftCl-Zt;-
INDEX OF CIVIL SITE DRAWINGS:
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREY. PLAN
C7.1 -C7.3
\
DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, IAN 55446
HENRY HANSEN
(763)230-1610
V
D
Lu
7
n
CO
!>&y
qi�
�a
!fib °c
w
C7
I °bb 1 0
F -
z
Q
WtL
b
a
Za
Z W
Q
In Lu
ce
0
7.a
0
a
♦-
m
q
G4
W
O
iS
W
It
�
Ygg'6
D
LT:A '
Cy•T
n
CO
!>&y
qi�
N bN
I � NOE
!fib °c
�wsW U
q W
I °bb 1 0
oaic�3
n§b�
yI"IWR«o3
S, v1
o03
0
V
ro
0�9$
°
`o
o
m
q
V V
iS
a
�Qu
[3
U
S
a
W
�op
2
q
II
O
N
>
M
QO
O
O
U
FILE NO. 00715
C3.2
Sanitary and Water
Utility Plan
GENERAL UTILITY NOTES
PAGE LAYOUT.
1.
SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS
12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF
FOR THE CITY OF OTSEGO AND THE LATEST VERSION OF THE MINNESOTA DEPARTMENT OF
ALL CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE
VHF INVESTMENTS,
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES
FOLLOWING:
^�� /7
REQUIREMENTS EXCEPT WHERE HEREIN MODIFIED BY THESE DOCUMENTS.
A. WITHIN THE UPPER N OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL
2.
OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS
3.
THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
EXCAVATION.
DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%. BELOW THE UPPER
4.
THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND
3'. COMPACTION SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF
Utility Plan
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY
THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE O.1', BUT
THE ENGINEER OF ANY CONFLICTS.
SHALL NOT BE CONSISTENTLY HIGH OR LOW.
5.
THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING
13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
STRUCTURES SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
6.
CONTRACT.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER ANY CONFLICTS BETWEEN
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE
E
14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON
C3.7
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF
THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT
THE EXISTING UTILITY.
SEPARATION BETWEEN SEWER AND WATERMAIN.
7.
EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED
15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE
BY THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO
WITH MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR
EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS,
CONTRACTOR'S EXPENSE.
ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS
8.
FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
DEPTHS ARE ESTIMATED.
9.
THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS
17. CITY INSPECTION IS REQUIRED FOR THE SANITARY SEWER AND WATER SERVICE
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE
CONNECTIONS.
a
CONTRACT, INCLUDING DISPOSAL OF TEST WATER INTO THE CITYS SANITARY SEWER
18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PER141T CONDITIONS FOR PERMITS
111 Existing Sanitary Sewer
SYSTEM. THE CONTRACTOR SHALL NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
WRIGHT COUNTY, MINNESOTA.
THE CITYS WATER SUPPLY SYSTEM.
19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST
10.
THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS
CONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
PRIOR TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT
20. CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY
Q
DETAILS 308 AND 310.
TO BEING SHUT DOWN.
11. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET
FOR THE SUBDIVISION OF THE LAND.
r I " 0.4oX (0.85)- wry.
El
MH P1-7
� RE=830.05
IE(5)=908.47 t8'IN�) of
I ' IE(N)=90 D p h(8 OU
21.65 Y
nOFB*
92 l4
LF a,
-- o
0.40X (0.79)--A,►LF924.6 928.1 F
LF92S 93 S'
MLWO I928, 928.3 LF922.7 I
II
MH P2 MLWO I l MLWO I' I 991.6 I I
RE=928.81 '� LF929.6 F 13.91 I I I 932- HYDRANT /6
IE(Y0=911.52 (8IN) 091.9 .I� 990.7 zee 8I DIP CLS? - L �- WRf1 VALVE II
IE(S)=911.52 (8' IN) I I izRt
IE(E)=911.47 (8' OUT) ,G �y;er I I 2nd G I I WATERMAIN ! \`
120 LF 8' PVC-
SOR35 DI
0.409 (0.46)
RE MH P2-1 f J
ii
O+OG - ��c a1+0O- G3+ 9. L��{-�„ - - IEV=909.34 (8-IN')I
•+` I- - IE((S)=909.30 (8' IN)
8 �_.E.
)=355 LF e' Pvc I DEPTH=21.SD2O0.419 (142) �a z G-73� I uezG.0.409 .96II10.81 Se' IN) I zde MLWO "'
EX GROUND=932.00 I ( ) t I
g3G 1 I IE((E =810.78 8 OUfJ ez I .931.8 LF929.8 206 LF 8' PVC I I
TARGET IE -912 00
E-912,0° OLPRf=1897j 926.6 SDR26 O
DEPTH=20.0° j - G mn and [, I I 931.6 LF929.8 I 0.40X (0.82)-1
♦ 932.5 I I 892.6 I I MLWO
8' DIP CL52 MLWO I --LF923.4- !- - b t -
�, - WATERMAIN I I LF924.0 I I 929.5 - 1 ��_ 1.-_..+I.
�I 174 LF S' PVC 929.6 - 929.5 �V
S°R35 O I - I --I .
228% (3.98) �� - I I _------
(b ♦------- - ------ -
_
1 I --- ---AI
------ ------------ -- -�
j `HYDRANT /22 // / 1 REH925.62
IIs=. 9711E VALVE / �/ - IE((N)=910.17 (8' IN)) I
IE(s)=910.12(9 ol>i) 1
_ e \ EK GROUND -930.50 �• / �% I ' { DEPTH=15,50
0
t � 8' PVC SDR35
IDEF TH-15,00 / / I C \t I 100 LF 8' PVC
0.40X (0 O 'J
MH P3 -f0
97
IE(N)=910.62 (831N)1 +�
IL---------_-- - -- -__-- - 934 IE(S)=91°.578-13.4011. �.
932�C �, 1
75
� SOR35 O --
0.409 (O.JO)• \
RE=915.08 \
IE(N)=91°.97 (B' IN)
`� _ � � IE(S)=810.92 e' OUT) \\ \•
SURVEY DATA
PAGE LAYOUT.
CLIENT.
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
VHF INVESTMENTS,
MEYRER ROHLOIN RMATION LAND ERVCESD BY:
C3.1 C3.2
^�� /7
LLC
SANITARY AND WATER UTILITY PLANS
708 1st AVENUE NE
C4.1 -C4.7
STORM SEWER UTILITY PLANS
. _{J
C5.1-05.2
BUFFALO, IAN 55313
C6STORM
WATER POLLUTION PREV. PLAN
Sanitary and Water
DATED: FEBRUARY 12, 2019
C3.3 C3.4
Utility Plan
14505 43rd AVENUE N.
PLYMOUTH, MN 55448
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC. NGVD
HENRY HANSEN
29 DATUM):
C3.5 C3.6
(763) 238.1610
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
C3.7
0 SD 100 150
V
AVENUE AND CO RD 38, ELEV=946.06
GRAPHIC SCALE IN FEETCl
W
7
PROJECT LOCATION
CO a
w
PART OF SEJ OF SECTION 28, TOWNSHIP 121,
RANGE 23,
LEGEND
3:w
AND PART OF SW} OF SECTION 27, TOWNSHIP
46
a
121, RANGE 23,
111 Existing Sanitary Sewer
_
0
Q •,I
WRIGHT COUNTY, MINNESOTA.
Existing Water Main
W d C
c
Z d
II Existing Storm Sewer
2 Cl
Q
► - Proposed Sanitary Sewer
I Proposed Water Main
LEGAL DESCRIPTION
-
Z i
• Proposed Gate Valve
0
SEE SURVEY.
SEE
►► Proposed Storm Sewer
4 Proposed Fire Hydrant & GV
W W al
13
¢ F-
:)Z
m
Q
-
Q F00
= W
O
N
DIP CLST / 1 1 1' I I- -I '- 1 I Lu
WATERMAIN
J I I I I I ji I I
I I.- MATCH LINE Sheets C3.1 / C3.3
I , - e
---i-- J L--- --- - z-- -J L ------_J L -------J L.------ L ------J L-- `o
__ 91B__--_- 918 gc c a
-r --- - r-- --- I -1 r r--- r-------� r' 9
EA Nm
�8.f v ��1 20'E
zs3z.o i 11 I I � I •g`�w
b& />` 2 g A m o o t_"o"o
-=•I- rr 1 I �� I -�\. .. I �' I I I �- I I ajR
.I \ I. I I 1
I I 920.9 I 922.7 I I 912.0 922.4 I I 922.4 I e a S
i I \ 92Le I LF91ea_ ,-LFateD _ 1 910.4 LF919.4 a
§24.2 I 929.1 I I LFa2L9 1 FBwo_ 1 FBLo- I I FBLO I FBLO I i FBLO I I E o
LF92L2 _ 1F929.1 _ _-FBWO- 928.8 927.7 927.0 927.4
I FBWO.I FBWO 929.9 G ue> as3 G "d
l 992.2 I I 891.1 I I {� u.e) I tea° I G ma I zm I I and '`' I I 7�'d� G v l '' G y p 3 0
jGu,4f Harv.
and ,I'
I I I I I WITH
9• o1P CL52 I I _ J _ a• aP
®I 1Df0 -. =r
Ll V-11
a= 1 1�+i ice- 13+00 4+i0�-
_ �_I�-=� ==-_=1�- 400 LF 8•PVC
I .1 s 244 LF a' Pvc_ _ SDR35 0 W
0.469
1.28X (0) MH P2-8 RE=925.43
IE(Ih=913.43 (8' IN ' - I I Z ! - ` I--- --
IE(E)=913.38 (8'IE(WI W
E(E)=911.4
DEPr11=fao� I I ;;' G 1129.0 I I8e I- °
.I 14 I �zadA' 928.9
I 'G as 1 I i G "° l ,829.9 I FBWO MLLO I I ILI I m
921.0 - I a
891.2 I I 931.2 I I FOWO LF92L0 I it LF920.3 9+ 00-
e' DIP 0152 FBWO / LF929.2 LF92t9 1 I I 929.9. 1 / ! ?? I ' - I I _ - I $ %
LF929. �, 921.9!928,9
w
MATH YAL17 a
t II ' _-'-J o, 0 11
2^
- C)
o 0 0
a A p m
o m °w
I- - - 8' OIP C152; 'o m 3 U
r
MATCH LINE Sheets C3.3 / C3.5 / / m x m mN ' I FILE NO. 00715
1 a \ m i _ I INDEX OF CIVIL SITE DRAWINGS:
� I
c 96 OF e' PVC
SDRM 0 a s -
0.40X (o.3a) <,II O°a
PJ -12
\ RE=916.7° 9206, PVC
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
^�� /7
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
/v
C3.3
C4.1 -C4.7
STORM SEWER UTILITY PLANS
. _{J
C5.1-05.2
STREET PROFILE PLANS
C6STORM
WATER POLLUTION PREV. PLAN
Sanitary and Water
C7.1 -C7.3
DETAILS
Utility Plan
I
GENERAL UTILITY NOTES
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS
FOR THE CITY OF OTSEGO AND THE LATEST VERSION OF THE MINNESOTA DEPAR1I3ENT OF
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES
REQUIREMENTS EXCEPT WHERE HEREIN MODIFIED BY THESE DOCUMENTS.
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
EXCAVATION.
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY
THE ENGINEER OF ANY CONFLICTS.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING
STRUCTURES SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE
CONTRACT.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF
THE EXISTING UTILITY.
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED
BY THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO
EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN ALL DAMAGE TO
UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR.
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE.
8. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
9. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE
CONTRACT, INCLUDING DISPOSAL OF TEST WATER INTO THE CITY'S SANITARY SEWER
SYSTEM. THE CONTRACTOR SHALL NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON
THE CITY'S WATER SUPPLY SYSTEM.
10. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS
PRIOR TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT
TO BEING SHUT DOWN.
it. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET
FOR THE SUBDIVISION OF THE LAND.
J L__ F
SURVEY DATA
L- yy�yI
1
I"
IE((S)=B9s.06 !LB' INI"
-.0.5.01018
IE/NW1-895.01 (8 01/i I
_J
_
926.52
924.17 WAT1
12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF
SURVEY INFORMATION PROVIDED BY:
Is
0
MATCH
LINE Sheets C3.1
/ C3.4 1
C3.1 C3.2
926
FOLLOWING:
708 1st AVENUE NE
- - - - - - -
----
I r-, ---97811---- ---�
I I
�E��
egg
I
I I
C3.3 C3.4
I
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
i�O
as
1 I'
` \
\I to
"`lll
\� I
N
11I
I 266 LF S' PY
I I
_
`�
--827.8. - �=-12• 927.1
OEP1H-12.0(1?9.B
FBWO
_ _
. I W
_ 0.40X (1611
v.r_
I
FBWO
-_
SHALL NOT BE CONSISTENTLY HIGH OR LOW.
W
�' 819.8
/ II
922.4
� 915.9 9115.9
I
I
9226
- - LF919.6
1 1
822.2
LFOLO-
I I LFA
I
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
LF919.4
FBL`
C3.7
I
-
-FBLO-
_ I
- _- FBLO
i l n.w
I
-�a92z
L'a.
G
''
e�27:5
G
I i
9 A
G
I 11
I
PART OF SE} OF SECTION 28, TOWNSHIP 121,
I
I
CWITH
ONSTRUCTION ADJACENT TTRAFFIC
RANGE 23
J L__ F
SURVEY DATA
L- yy�yI
L '--- ' B* Dip
926.40
_J
_
926.52
924.17 WAT1
12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF
SURVEY INFORMATION PROVIDED BY:
Is
0
3r b 0
14+00 ---
15+0
C3.1 C3.2
926
FOLLOWING:
708 1st AVENUE NE
UJC
z�92630
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL
113 F B" C
�E��
egg
UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS
DATED: FEBRUARY 12, 2019
C3.3 C3.4
2.77X (3.13) - -
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
i�O
as
1 I'
` \
\I to
"`lll
\� I
N
- REH923.55
was IE =91L55 (B' IN ryas
x..e IE(E -9f Lb0 8' ¢na
R E 920.J7,-
IE(8O-908.37 (8• IN es
IE(E)=908.32 (8 0I/»e
0
- i
--827.8. - �=-12• 927.1
OEP1H-12.0(1?9.B
FBWO
_ _
. I W
FBWO
LF819.6 -
I
FBWO
-_
SHALL NOT BE CONSISTENTLY HIGH OR LOW.
W
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
� 915.9 9115.9
N OF 75TH ST., ELEV=928.00
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
FIR SPIKE IN PP, I QUADRANT
0 50 100 150
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
AVENUE AND CO RD38. ELEVN
C3.7
14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON
GRAPHIC SCALE IN FEET
THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT
k
SEPARATION BETWEEN SEWER AND WATERMAIN.
PROJECT LOCATION
15. CONTRACTOR. SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE
L ----4--J
L_L------
MnDOT CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR
\1
J913.77
PVC
3. BX
109 LF
SDR35 rw
0
II 1 G 79.7 0.40XV
1 1' �.F971.7
gi8.7 MH I
1 11 IE(SE)-896.75 (E
1 IE(NW)-896.7 v.
I 914-�
yri 910 \\\
908 - 906\\
DRY �\
ATER-
6_STORM W-_
DA51N
I
MATCH LINE Sheets C3.4 / C3.6 e
yuo
BA
� I r j ` �� MATCH LINE Sheets C3.2 / C3.4 T
I 9
-""T
/ 11.1
_-Y'
+ _ MH P2-4 V o r AV A k
-RE
=911.66 1\ \` \ \•\,
6' 1 IE(S)-896.26 (8' IN) -
IE -602.61 (8' IN) �• \ \ \\ (\ _ <
OS DROP IE(VH=896.26 (8' IN) -
1 ) OS DROP -6.55-
\ ( IE(N)=896.21(8. OUI)`I
f Xx
Jk
- a \
8' DIP 0152
2-4 \ 'WATERMNN
NIT] \ / /� 1 \ r \
NX-girl¢ //i'/ \ �\
9X (0.44) \\ \ ✓ i'/ 3 m, �, ,' > I 1
MH P2-5
RE=912.11
IE(SE)-897.24 �B' IN .
IE(NW)=897.16 (B our
x
DEPTH -14.9
1 B• Pvc.
92 LF
/ 9's9fE 40X
0 (0.7) \
MH PJ -f
RE -913.46
\ - IE(W)-898.06 (8' IN)\ p < qp°O° �' \ I \ \ \ \ •\ \
IE(NW)-896.01 (8 0 °. o
DEPTH- ts.i�i� q \\ c '•00 ° i ' \ \
MATCH LINE Sheets C3.4 / C3.6 !I INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
U
SURVEY DATA
PAGE LAYOUT:
3
m
NEL
a
12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF
SURVEY INFORMATION PROVIDED BY:
Is
0
t
3Q
ALL CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE
MEYER ROHLIN LAND SERVICES
C3.1 C3.2
= W
FOLLOWING:
708 1st AVENUE NE
UJC
�
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL
BUFFALO, MN 55313
�E��
egg
UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS
DATED: FEBRUARY 12, 2019
C3.3 C3.4
Z
W
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
i�O
as
O
rn
DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 17 BELOW THE UPPER
BENCHMARKS (PROVIDED BY OTSEGO CITY
0
3', COMPACTION SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF
ENGINEER, HAKANSON ANDERSON, INC. NGVO.
THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT
29 DATUM):
C3.5 C3.6
SHALL NOT BE CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL
N OF 75TH ST., ELEV=928.00
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
FIR SPIKE IN PP, I QUADRANT
0 50 100 150
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
AVENUE AND CO RD38. ELEVN
C3.7
14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON
GRAPHIC SCALE IN FEET
THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT
k
SEPARATION BETWEEN SEWER AND WATERMAIN.
PROJECT LOCATION
15. CONTRACTOR. SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE
m
MnDOT CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR
PART OF SE} OF SECTION 28, TOWNSHIP 121,
LEGEND
CWITH
ONSTRUCTION ADJACENT TTRAFFIC
RANGE 23
16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING
AND PART OF SWj OF SECTION 27, TOWNSHIP
�r0
� •„
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS,
121, RANGE 23,
- - ► Existing Sanitary Sewer
ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS
WRIGHT COUNTY, MINNESOTA.
- - Existing Water Main
DEPTHS ARE ESTIMATED.
►7. Existing Storm Sewer
17. CITY INSPECTION IS REQUIRED FOR THE SANITARY SEWER AND WATER SERVICE
W
a
► Proposed Sanitary Sewer
CONNECTIONS.Proposed
LEGAL DESCRIPTION
I Water Main
18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
°
Proposed Gate Valve
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
o s
►► Proposed Storm Sewer
19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST
SEE SURVEY.
4 Proposed Fire Hydrant & GV
CONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
1-4
x0
20. CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY
DETAILS 308 AND 3.10.
cC
r)
\1
J913.77
PVC
3. BX
109 LF
SDR35 rw
0
II 1 G 79.7 0.40XV
1 1' �.F971.7
gi8.7 MH I
1 11 IE(SE)-896.75 (E
1 IE(NW)-896.7 v.
I 914-�
yri 910 \\\
908 - 906\\
DRY �\
ATER-
6_STORM W-_
DA51N
I
MATCH LINE Sheets C3.4 / C3.6 e
yuo
BA
� I r j ` �� MATCH LINE Sheets C3.2 / C3.4 T
I 9
-""T
/ 11.1
_-Y'
+ _ MH P2-4 V o r AV A k
-RE
=911.66 1\ \` \ \•\,
6' 1 IE(S)-896.26 (8' IN) -
IE -602.61 (8' IN) �• \ \ \\ (\ _ <
OS DROP IE(VH=896.26 (8' IN) -
1 ) OS DROP -6.55-
\ ( IE(N)=896.21(8. OUI)`I
f Xx
Jk
- a \
8' DIP 0152
2-4 \ 'WATERMNN
NIT] \ / /� 1 \ r \
NX-girl¢ //i'/ \ �\
9X (0.44) \\ \ ✓ i'/ 3 m, �, ,' > I 1
MH P2-5
RE=912.11
IE(SE)-897.24 �B' IN .
IE(NW)=897.16 (B our
x
DEPTH -14.9
1 B• Pvc.
92 LF
/ 9's9fE 40X
0 (0.7) \
MH PJ -f
RE -913.46
\ - IE(W)-898.06 (8' IN)\ p < qp°O° �' \ I \ \ \ \ •\ \
IE(NW)-896.01 (8 0 °. o
DEPTH- ts.i�i� q \\ c '•00 ° i ' \ \
MATCH LINE Sheets C3.4 / C3.6 !I INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
U
3
m
NEL
a
w
�RN
V W
Is
0
t
3Q
Lll a
e
°z a
= W
w y
Q}
J
UJC
�
�
ZQ
�E��
egg
ZAlmm°m>
w tl
�nb
Z
W
i�O
as
O
rn
�
y
W
0
R
FILE NO. 00715
aun'I ) 910 i�\\\. / moo° /I �w \\ '��'� \ CO PROJECT LOCATION PLAN
-^- - - - - x \ d ° C1.0 OVERALL LAYOUT AND PHASING PLAN
912 /' MH P3-3 / / / l / \ ' \ ` \ \., C- 1. -1 q, '0
-
RE-91zu. �' 12s LF B• Pvc \ r- - ° _ / -- - C1.1 -C1.7 PRELIMINARY PLAT
914~ - -� - �6 IE(W) s99.0 (B•IH)- .y / / s0R3s o -\ 7 - . - .•,� o C2.1 -C2.7 GRADING AND DRAINAGE PLANS
T ( I- _�9j \ -1 f-_--- 1 9�1• IE(E)=899.J9 (6 oup i, 0.4ox (oso) \ \ , 6• DIP CLs2o \
WATERMAN \ i C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
J I I I �' , <" 1 \ \ fib• G �� \ \ - ___ C4.1 -C4.7 STORM SEWER UTILITY PLANS C3 .
1 \\ \ yes �/ MH P. xo® /I C5.1-05.2 STREET PROFILE PLANS
ggp71 \ \\ i / RE=912.98 01 --, C6 STORM WATER POLLUTION PREY. PLAN
e 7.6 916s I 1 _ �' Igo LF e Pvc�iE(SE)=898.61 (e' IN) 7 -C s Sanitary and Water
I 1 I F907.9 MH PJ -4 \ \ B wANiPERMwr2i x ', r� sORJs o/ IE(NW)=8!8.66 (8 0 \ \ C .1 7 3 DETAIL Utility Plan
o�
Yea
m
$ §
a
w y
iDb caO
�G CW
�
�E��
egg
ZAlmm°m>
w tl
�nb
i�O
as
F
rn
�
m
i^ E
0
u
w
k
m
w
m
�r0
� •„
F-
a
Ji
W
a
V/p171
��
°
o s
1-4
x0
Z
cC
r)
N
VAI
to
N
m
m
o
2
mOu
2
8
Y
o
O
U
O
FILE NO. 00715
aun'I ) 910 i�\\\. / moo° /I �w \\ '��'� \ CO PROJECT LOCATION PLAN
-^- - - - - x \ d ° C1.0 OVERALL LAYOUT AND PHASING PLAN
912 /' MH P3-3 / / / l / \ ' \ ` \ \., C- 1. -1 q, '0
-
RE-91zu. �' 12s LF B• Pvc \ r- - ° _ / -- - C1.1 -C1.7 PRELIMINARY PLAT
914~ - -� - �6 IE(W) s99.0 (B•IH)- .y / / s0R3s o -\ 7 - . - .•,� o C2.1 -C2.7 GRADING AND DRAINAGE PLANS
T ( I- _�9j \ -1 f-_--- 1 9�1• IE(E)=899.J9 (6 oup i, 0.4ox (oso) \ \ , 6• DIP CLs2o \
WATERMAN \ i C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
J I I I �' , <" 1 \ \ fib• G �� \ \ - ___ C4.1 -C4.7 STORM SEWER UTILITY PLANS C3 .
1 \\ \ yes �/ MH P. xo® /I C5.1-05.2 STREET PROFILE PLANS
ggp71 \ \\ i / RE=912.98 01 --, C6 STORM WATER POLLUTION PREY. PLAN
e 7.6 916s I 1 _ �' Igo LF e Pvc�iE(SE)=898.61 (e' IN) 7 -C s Sanitary and Water
I 1 I F907.9 MH PJ -4 \ \ B wANiPERMwr2i x ', r� sORJs o/ IE(NW)=8!8.66 (8 0 \ \ C .1 7 3 DETAIL Utility Plan
GENERAL UTILITY NOTES
SURVEY DATA
PAGE LAYOUT.
<
a
wir
$•�
w
0W
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS
12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF
SURVEY INFORMATION PROVIDED BY:
aZa
EL
FOR THE CITY OF OTSEGO AND THE LATEST VERSION OF THE MINNESOTA DEPARTMENT OF
ALL CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE
MEYER ROHLIN LAND SERVICES
C3.1 C3.2
a
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES
FOLLOWING:
708 1st AVENUE NE
I
REQUIREMENTS EXCEPT WHERE HEREIN K40DIFIED BY THESE DOCUMENTS.
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL
BUFFALO, MN 55313
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS
DATED: FEBRUARY 12, 2019
C3.3 C3.4
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
113
pN
EXCAVATION.
DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1% BELOW THE UPPER
BENCHMARKS (PROVIDED BY OTSEGO CITY
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND
3', COMPACTION SHALL MEET 957 STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF
ENGINEER, HAKANSON ANDERSON,. INC. NGVD
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY
THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT
29 DATUM):
C3.5 C3.6
THE ENGINEER OF ANY CONFLICTS.
.SHALL NOT BE CONSISTENTLY HIGH OR LOW.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITES TO ALLOW
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING
13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL
N OF 75TH ST., ELEV=928.00
S
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
0 50 100 150
CONTRACT.
CONTRACT.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
C3.7
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE
14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON
GRAPHIC SCALE IN FEET
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF
THE EXISTING UTILITY.
THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT
SEPARATION BETWEEN SEWER AND WATERMAIN.
PROJECT LOCATION
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED
15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE
W
BY THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO
WITH MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR
PART OF SES OF SECTION 28, TOWNSHIP 121,
holly
LEGEND
EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
RANGE 23,
UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING
AND PART OF SWI OF SECTION 27, TOWNSHIP
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS,
121, RANGE 23,
► Existing Sanitary Sewer
CONTRACTOR'S EXPENSE.
ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS
WRIGHT COUNTY, MINNESOTA.
- Existing Water Main
8. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
DEPTHS ARE ESTIMATED.
►► Existing Storm Sewer
9. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS
17. CITY INSPECTION IS REQUIRED FOR THE SANITARY SEWER AND WATER SERVICE
h
N
► Proposed Sanitary Sewer
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE
CONNECTIONS.Proposed
LEGAL DESCRIPTION
I Plater Main
CONTRACT, INCLUDING DISPOSAL OF TEST WATER INTO THE CITY'S SANITARY SEWER
18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
Proposed Gate Valve
SYSTEM. THE CONTRACTOR SHALL NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
SEE SURVEY.
FILE NO.
►► Proposed Storm Sewer
P
THE CITY'S WATER SUPPLY A.
19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF U11U11ES MUST
i Proposed Fire Hydrant & GV
P Y
NOTIFY
10. THE CONTRACTOR SHALL NOTIFY 7HE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS
CONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
20, CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY
PRIOR TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT
DETAILS 308 AND 310.
TO BEING SHUT DOWN.
11. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET
FOR THE SUBDIVISION OF THE LAND.
l ` Mn
91�81219 . s r -o--. RM WATER arEe
E(N)=910.17 (8' IN)
MATCH LINE Sheets C3RE
\\
RAG/AI
,p5,5.3/C3.5 MATCH LINE Sheets C3.4 C3.5
DIP \
v 9�/
100 LF
SDR O
0.40X (0.40)
I (>
`� I/ i \ \ '\ \ I � �c�m� / � rn > o� mC m. I +I st8.o2 ✓
MH P3-10 41 11 0 /� % / �W / % n1 \\ m 1 ` , 1 _ _ I i 906 908 910 \
RE -1123.07 `
IE(N)-910.62 �8 IN ± \N N � \ \ i L - - � _
93a� TEs=9fos7e D11T)11Irm°__ 9i2 i�
I 4bb i/ _ - _ _
y - --
r.l�o
--------75 LF 8' PVC
-- �� ,.< i / 1 I \ \ ` - F - - c - i - IO b� j' -� - -\ T ---- o �jt• IL
` -- sDRss a
-
014OX (0.30)
Ai mit � •��, \ D.4oz (o.3\e`)4 .ma's / I I r �' 1 91s. i-- �', I I \\ \\ � �'
I RE -925.06 \ \ \\ MH P'wig
n I IE(N)=910.97 (8' IN) \
IE(S)-810.92(8' OIJD \ \ RE -9 8 I 1 I I` n__ _ 32J LF 8' PVC o' I I•.: I I 917.5 I 916.9 ( { LF907• \ \
I rm I m
=104 11 � \ X06 920.6 I I 920.6 SORJS O m C m I I MH P3-4 \
IE(N)=911.40 /9 IN) - [F 1 1 a: N rS LF910.6 LF808.5 LF807.9 I (p W
\ \ O y BBgp LF818.6i ro I I RE -911.93
IES -911.35(8 q/1) p:Y S \ I I LF917.6 MLWO 0.40X(1.28) m+r Yup FBCO ;y, FB` \FB 1 IE ) ��
'� OEPfH=15.3$\ O F13LO O+ rn I II P 1 B (W)=800.09 8'IN N
L- of G' 9p8 S 1 I I 829.8 1 I ) I 979.6 11917.6
HYDRANT (13 m /�x \ < • 8' DIP CL524zdez 926.6 I I chez I I I I G7 G
- wml VALVE �o WATERMAIN
� r- -- tl ------ \ \
75 918.84
0° O1 0.40% (0.30) / \ e t _ r I - J L - - - WILH v vE - - - - - - - - - - 8' LxP 0152 r+ '-
/ I) I I MH P3 -f3 ` 8' DIP UAIN _ - _ WATERMNN "- OL �,
UH P3 `\ 1 p ®� ti WA7FRMNN +o
I. I I / '/ /s2ai .� , s
.1z ` - -
_ I -_---- IES =81 L7088OUr r91 928.4 \ - �_ - e=-= _
1 _
\ �!_ _ _ � T �a�.1�-cr =T ,- r20 00
13+ 0 5 00 6+00 7 18+00 1 \
() (� ) / \ - - ` 'tia f --F- �-+ 9 ► F=-�--7 N o►\ 9 6�� -�: - -{ N \4 -
DEM -18 ►� i _ - o - ►► ® W
76 LF 8' PVC /,K - ` •-_ MH PJ -8 486 LF 8' PVD
1 I I LLM7h o. X(030) A /\ 233 SDR35 -' IE(E)=9os.o2 9ia�o,,, -- sD(5.R35 o I ---- -
I l i s o IE RE=9-24.28 F Z64X (6.14) I IE(W),906.12 (8(8' IN � 1 r - - - 1.11% (5.20 r - - - / - - - - - F - - , - - W11M VLLVE - \ 101 LF 8' PVC
_ E0,L ) I 1 ' • I SOR3s 07 \ (i ye
t• I I \ NH PJ -5 0.72X (0.72) \ N A
- (E) -x12.28 Z-01
8' W/f) I. I I I D =12. I RE=812.87 y
- - - - - - - - r 1 / 309 D 12, Ls.ey I mbs I 1z s IE(lt�-900.87 8' IN) 4 G 2 4
------- u,ec FB r f rz.as I I -�fu 1' I uss I I xA I xA s� ( q88.
- - - - .. _ I ye [R9? / / G �° I I ✓e I G �'" I C' I OD G 919.3 I I i,' IE(E)=900.92 (v OTR) I Lf8 1
G DEPTH 12.05 916.9 Y8•
r MH P3-14 924.7 921.6 918.0 FB \
I I RE 933.79 I I �1 1 83p9 / l '6Fe ,1 I �N`a FB I I FB I I F8 ( rnl vu r I I LFLF904.8,L�FB
II99988' t8P CL52 819.9 LL< wAT191MAIN\ I I\ l
11 L CO 934 .928 -i 1 926\1I I I I - -920 I 918 916 `, I-- -- ---- ----
�] I, I� � N `99�` 100 U 8' PVC i9�g W1<{ 1FE'14 I 922 C9 - -
SDR35 O 0 L--- �- --- -- - - - - - -- -
0.40% (0.40) f - _ - _ _I ---- - - _ _ - - _ IF
- - - - - - - 939.58 I - T
,
Street PVC SD R 35
I .00
8' PVC
IE=812.50 I t � ~ N
DEPTH -26.50 o i- D.7 f ntru•uf ' p El LT'••- 1 _ e!�u r
/� 1 1 ,Drfi For rf S':DA ' //\�/ \\ I Ell L& •, \
11{S ICE (q,701.) G/ 1 /%' \ \ l
l I
v v �Iw �CEi
INDEX OF CIVIL SITE DRAWINGS:
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7 PRELIMINARY PLAT
l_ 1- - ` \ \` I \ C2.1 -C2.7 GRADING AND DRAINAGE PLANS
- 1-- C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7 STORM SEWER UTILITY PLANS
C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
1 1 I 1 i C7.1 -C7.3 DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, IAN 55446
HENRY HANSEN
(763) 2381610
F-
W
<
a
wir
$•�
w
0W
to
F -
a
Wa
aZa
EL
=W
Z
i
a�
}F
111 W
A
a
� J
Z Q
O
I
Z
W
O
o
0)
W
o
M
113
pN
C3.5
sanitary and Water
Utility Plan
go<
<
a
$•�
y4 ,�
l s. No E
`lD
31t 0Nµ u
oxfI ya
to
pp
o�
o
o
113
pN
l
II
S
a
W
holly
m
0 II
e�
o
C3
1n
0
(1)
h
N
CO
m
FILE NO.
00715
C3.5
sanitary and Water
Utility Plan
1
\ w/ '4', �/ 0.40X 0.77 .,\ .P�.. .�\ . - � //� � �. ///r! ) \ '', \ ` � \. `•
MATC�H O �.oL0 I.oNE Sh�ee�ts C3.4
�.3. /.4 C/3.-6 - I(II \ . `\ \ \ � \ \ \ \ ` , `\ \C{II ` _ \ \•, \. \ $U \\ \
\\. a6H P3
?is
IE6
as
_ \ // enol y \ DFPIH-Ib.47 / \' ♦ �\ ybo'0� � r/�/� ,I 1. \ \ �� \\ tl`\\\ � \\ �\`\ v 1 ,_,� \ \t \ \ \ \ \\ \\\ •� -___ Cs•f $ N � Itn mm
I\� \ ego •�'� '\\ •.. C!�•a " E
-WN
'/ ♦ / `J ��"� _ I o ISO"'`� vm cam°
/ \'\\\ �� // /� ! � q ��.\ \\ /. //// \ I /� ,I \ � \ \� - _ _ _� . \ \ \ \\. `\ \ \. '•fib ��a � V W I Qx�°I o
10 i/ \�\• / rK� !� \ / "\ // m\ 1 //y /� I - _ - - 900 \ \ESS o$ Z�ygl lmm °e:i
912 / MH P3 -J` / A / \ ► \ \ \ _ L _n J !.n 00 �Y i i I -\_ _\-- - - - - _ _- _ - \ 8 W [moi ' o o� b
RE -912.24. - ,_ �'t- - 125 LF 8' PNC- \ ♦ ♦ \- - �=4ti o - i - -
_ IE(YO-899.44 �8' IN) / - - / i ! SDR35 O \ \ / $ �a I / 1 1 I \ .II C _ _ \ I g e a .ZE
c
D 1• IE(E)=899.39 (e OIIF) �, 0.'.- (0.50) \ �. < \ 8' MP CL52 \\ ` I \ 1 c e
�
\ \ 9<b• (2 i ,4 / -`\ • '► \ \ r I / I I I \ \ `\ `\. �� _ - - -ago.
REH912.98 \ x0\� I// / I I \ \. \
MH P3 8' WP 1%.520
f x SDR35 O
WATERMAIN �ti 1 ! DEPTH -14.43
RE.911.8J \ /' 0.70X (1.33)
c&-'P
,p
/' / B'�
e(0U� \ / ✓ /' m�y°o�y / /' �. n ►�: \, .\ m 4°s''• �� / W - - J@ m
ci =11.7$ \ � / � MDRANT //t7
I r
12b L
M FSBR'35 P
RE-91136 \ •\
- - _
�\
_ \
IE(SE)=899.18 (8' IN
1b1 LF 8' PYC / / a 40 (0.60) \, \ 11�) , \\ . 060 l
IE(NW)=898DEPT 1=1J.25 ��'6;a'��
0.40X (0,60)0 -
\ZE
138 Lr
1[0AOX (0.54)
wc■■■ (0.72) \ 16+ \ \ \ \ .� \ , , - _ � I \ \ � I '- l / __ � - •\_ - -_ �
.m.
RE=911.70 \1•\ s m m 'L1 rnan \ \\
II
R
LF)=898.75 ' W), 10890IA899.70 (B
914 DEM -12o
-
912 ---- ------------
-- - - - - - - - 1 c /
----- - I r - --------\
\ sl 1.481 (2.01)\ I MATCH LINE Sheets C3.6 / C3.7 \ \ \ - �0° _ i r \- \. % c
- - t 6 st°m� \ / o m w m
/ \ 1 `� \• I a� II �l DEQ--------_-- \, \\. - .,bto
INDEX OF CIVIL SITE DRAWINGS: FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C 1. 1 -C1.7 PRELIMINARY P
LAT
C2.1 -C2.7 GRADING ANDDRAINAGE PLANS
Biu
ryp� C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS C3 6
�3� C4.1 -C4.7 STORM SEWER UTILITY PLANS •
/ s g2QnI �m C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN Sanitary and Water
- i I --------- < / C7.1 -C7.3 DETAILS
923.27 z _ - - - Utility Plan
CLIENT:
GENERAL UTILITY NOTES
SURVEY DATA
PAGE LAYOUT.
VHF INVESTMENTS,
1
STANDARD SPECIFICATIONS
12 CONTRACTOR SHALL SAHEDULE THE ENGINEER TO ELATION OF
INFORMATION BY:
MEYER
FORCITHEATIONS CITTY OF OTSICABLE EGO ANDOTHE LIATESTOVERSIONCOFRENT
THE MINNESOTA DEPARTMENT OF
ALL CONTROLLED FILLS INTHE
DENSM TESTSASHAILLTMEETRT
TIMELY MANNERS
REY
OHLIN LAND SERVICES
C3.1 C3.2
LLC
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES
FOLLOWING:
708 1st AVENUE NE
REQUIREMENTS EXCEPT WHERE HEREIN MODIFIED BY THESE DOCUMENTS.
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL
BUFFALO, MN 55313
2.
OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS1450543rd
GATED: FEBRUARY 12, 2019
C3.3 C3.4
AVENUE N.
3.
THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR
PLYMOUTH, MN 55446
EXCAVATION.
DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 17. BELOW THE UPPER
BENCHMARKS (PROVIDED BY OTSEGO CITY
4.
THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND
3', COMPACTION SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF
ENGINEER, HAKNSON ANDERSON, INC. NGVD
HENRY
HANSEN
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY
THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT
29 DATUM):
C3.5 C3.6
(763) 236.1610
THE ENGINEER OF ANY CONFLICTS.
SHALL NOT BE CONSISTENTLY HIGH OR LOW.
5.
THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING 13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTIOtJ. ANY AREAS WHICH FAIL N OF 75TH ST., ELEV=928.00
STRUCTURES SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
OF
0 50 100 150
U
6.
CONTRACT.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
TESTING AGENCY AT THE CONTRACTOR'S EXPENSE.
RR SPIKE IN PP, NW QUADRANT OGREN
AVENUE AND CO RD 38, ELEV=948.06
C3.7
W
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE
14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON
GRAPHIC SCALE IN FEET
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF
THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT
SEPARATION BETWEEN SEWER AND WATERMAIN.
PROJECT LOCATION
Q
fr
THE EXISTING UTILITY.
CONTRACTOR PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE
FL
7.
EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED
15. SHALL
FW-
BY THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO
HAS BEG DAMAGE
MnDOT TEMPORARY TRAFFIC CONTROL ZONE 2013
MANUAL AOF
CONSTRUCTION T WAYS.
ADJACEOR SFOR
PART OF3SE OF SECTION 28, TOWNSHIP 721,
LEGEND
cc
EXCAVATIONBY
YUTHE CONTRACTOR.TO CONTRATOR.
N, ALLTHE
O WILL TORASSUMED TO H AVE BEEN
OFUTS OF THE DEPTHELD
EXISTINGTED
NT
VERIFICATIONH
16T ONRRESPONSIBLE
RANGE
��Inn W
O
< Z
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS,
AND PART OF SWI OF SECTION 27, TOWNSHIP
121, RANGE 23,
► Existing Sanitary Sewer
V
Z
e
0
Q
Q J
CONTRACTOR'S EXPENSE.
ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS
WRIGHT COUNTY, MINNESOTA.
- - - Existing Water Main
LLl (L
[
2 (L
8.
FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
DEPTHS ARE ESTIMATED.
►► - - Existing Storm Sewer
2 O
Q }
9.
THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS
17. CITY INSPECTION IS REQUIRED FOR THE SANITARY SEWER AND WATER SERVICE
CONNECTIONS.I
► Proposed Sanitary Sewer
Proposed Water Main
-1
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE
CONDITIONS
LEGAL DESCRIPTION
y ;
}
CONTRACT, INCLUDING DISPOSAL TEST WATER INTO THE SANITARY SEWER
18 . CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT FOR PERMITS
Proposed Gate Valve
L
p
J
ES
SYSTEM. THE CONTRACTOR SHALLL NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.SEE
ALL WORK PERFORMED AND MATERIALS USED FOR CONSRUC11ON OF UTILITIES MUST.
SURVEY.
►► Proposed Storm Sewer
.4 Proposed Fire Hydrant & GV
UJW
0
q
0
Q H
THE CITY'S WATER SUPPLY SYSTEM.
N
10.
THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS
CONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
20. CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY
Z J
ae.
o
2
PRIOR TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT
DETAILS 308 AND 310.
Q
Q(A
TO BEING SHUT DOWN.
Q
11.
THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET
FOR THE SUBDIVISION OF THE LAND.
W
0
(n
\ w/ '4', �/ 0.40X 0.77 .,\ .P�.. .�\ . - � //� � �. ///r! ) \ '', \ ` � \. `•
MATC�H O �.oL0 I.oNE Sh�ee�ts C3.4
�.3. /.4 C/3.-6 - I(II \ . `\ \ \ � \ \ \ \ ` , `\ \C{II ` _ \ \•, \. \ $U \\ \
\\. a6H P3
?is
IE6
as
_ \ // enol y \ DFPIH-Ib.47 / \' ♦ �\ ybo'0� � r/�/� ,I 1. \ \ �� \\ tl`\\\ � \\ �\`\ v 1 ,_,� \ \t \ \ \ \ \\ \\\ •� -___ Cs•f $ N � Itn mm
I\� \ ego •�'� '\\ •.. C!�•a " E
-WN
'/ ♦ / `J ��"� _ I o ISO"'`� vm cam°
/ \'\\\ �� // /� ! � q ��.\ \\ /. //// \ I /� ,I \ � \ \� - _ _ _� . \ \ \ \\. `\ \ \. '•fib ��a � V W I Qx�°I o
10 i/ \�\• / rK� !� \ / "\ // m\ 1 //y /� I - _ - - 900 \ \ESS o$ Z�ygl lmm °e:i
912 / MH P3 -J` / A / \ ► \ \ \ _ L _n J !.n 00 �Y i i I -\_ _\-- - - - - _ _- _ - \ 8 W [moi ' o o� b
RE -912.24. - ,_ �'t- - 125 LF 8' PNC- \ ♦ ♦ \- - �=4ti o - i - -
_ IE(YO-899.44 �8' IN) / - - / i ! SDR35 O \ \ / $ �a I / 1 1 I \ .II C _ _ \ I g e a .ZE
c
D 1• IE(E)=899.39 (e OIIF) �, 0.'.- (0.50) \ �. < \ 8' MP CL52 \\ ` I \ 1 c e
�
\ \ 9<b• (2 i ,4 / -`\ • '► \ \ r I / I I I \ \ `\ `\. �� _ - - -ago.
REH912.98 \ x0\� I// / I I \ \. \
MH P3 8' WP 1%.520
f x SDR35 O
WATERMAIN �ti 1 ! DEPTH -14.43
RE.911.8J \ /' 0.70X (1.33)
c&-'P
,p
/' / B'�
e(0U� \ / ✓ /' m�y°o�y / /' �. n ►�: \, .\ m 4°s''• �� / W - - J@ m
ci =11.7$ \ � / � MDRANT //t7
I r
12b L
M FSBR'35 P
RE-91136 \ •\
- - _
�\
_ \
IE(SE)=899.18 (8' IN
1b1 LF 8' PYC / / a 40 (0.60) \, \ 11�) , \\ . 060 l
IE(NW)=898DEPT 1=1J.25 ��'6;a'��
0.40X (0,60)0 -
\ZE
138 Lr
1[0AOX (0.54)
wc■■■ (0.72) \ 16+ \ \ \ \ .� \ , , - _ � I \ \ � I '- l / __ � - •\_ - -_ �
.m.
RE=911.70 \1•\ s m m 'L1 rnan \ \\
II
R
LF)=898.75 ' W), 10890IA899.70 (B
914 DEM -12o
-
912 ---- ------------
-- - - - - - - - 1 c /
----- - I r - --------\
\ sl 1.481 (2.01)\ I MATCH LINE Sheets C3.6 / C3.7 \ \ \ - �0° _ i r \- \. % c
- - t 6 st°m� \ / o m w m
/ \ 1 `� \• I a� II �l DEQ--------_-- \, \\. - .,bto
INDEX OF CIVIL SITE DRAWINGS: FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C 1. 1 -C1.7 PRELIMINARY P
LAT
C2.1 -C2.7 GRADING ANDDRAINAGE PLANS
Biu
ryp� C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS C3 6
�3� C4.1 -C4.7 STORM SEWER UTILITY PLANS •
/ s g2QnI �m C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN Sanitary and Water
- i I --------- < / C7.1 -C7.3 DETAILS
923.27 z _ - - - Utility Plan
r
GENERAL UTILITY NOTES SURVEY DATA PAGE LAYOUT. CLIENT:
VHF INVESTMENTS,
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS 12. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF SURVEY INFORMATION PROVIDED BY:
FOR THE CITY OF OTSEGO AND THE LATEST VERSION OF THE MINNESOTA DEPARTMENT OF ALL CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE MEYER ROHLIN LAND SERVICES C3.1 C3.2 LLC
TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION AND ALL MPCA NPDES FOLLOWING: 708 1st AVENUE NE
REQUIREMENTS EXCEPT WHERE HEREIN MODIFIED BY THESE DOCUMENTS. A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL BUFFALO, MN 55313
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT. UTILIZE APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DATED: FEBRUARY 12, 2019 C3.3 C3.4 1450543rd AVENUE N.
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY DEFINED BY ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR PLY MOUTH, MN 55446
EXCAVATION. DENSITY AND NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%. BELOW THE UPPER BENCHMARKS (PROVIDED BY OTSEG0 CITY
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND 3', COMPACTION SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF ENGINEER, HAKANSON ANDERSON, INC. NGVD HENRY HANSEN
UTILITIES WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION .AND IMMEDIATELY NOTIFY THE OPTIMUM MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT 29 DATUM): C3.5 C3.6 (763) 238-1610
THE ENGINEER OF ANY CONFLICTS. SHALL NOT BE CONSISTENTLY HIGH OR LOW.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'. TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
PROPER FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING N OF 75TH ST., ELEV=928.00
13. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL
STRUCTURES SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE 0 50 100 750 F -
TO MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S
CONTRACT. RR SPIKE IN PP, NW QUADRANT OF OGREN ci
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN TESTING AGENCY AT THE CONTRACTOR'S EXPENSE. AVENUE AND CO RD 38, ELEV=948.06 C3.7 W
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE 14. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS AS DEFINED ON GRAPHIC SCALE IN FEET
WITH THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THIS PLAN (WATERMAIN TO BE INSTALLED WITH MINIMUM 7.5' OF COVER). MAINTAIN 1.5 FOOT COTHE EXISTING UTILITY. SEPARATION BETWEEN SEWER AND WATERMAIN. PROJECT LOCATION N ir rc
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED 15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE a W
BY THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO WITH MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL DATED 2013 FOR PART OF SE} OF SECTION 28, TOWNSHIP 121, F'
EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO CONSTRUCTION ADJACENT TO TRAVEL WAYS. RANGE 23, LEGEND 2 ~ 4 Q
UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. 16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING (�RR Z O Z
UTILITIES LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, AND PART OF SWj OF SECTION 27, TOWNSHIP V W p Q
ANY REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE 121, RANGE 23, ► Existing Sanitary Sewer
CONTRACTOR'S EXPENSE. ETC. ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS Existing Water Main O J
WRIGHT COUNTY, MINNESOTA. g LLI d t A
DEPTHS ARE ESTIMATED.
�a Existing Storm Sewer
C
Z
8. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES. g
9. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS CO CITY INSPECTION IS REQUIRED FOR THE SANITARY SEWER AND WATER SERVICE ► Proposed Water
Sewer _j Q }
AND METER FOR WATER SERVICE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE CONNECTIONS. I Proposed Water Main W } ~
18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS LEGAL DESCRIPTION Proposed Gate Valve J
CONTRACT, INCLUDING DISPOSAL OF TEST WATER INTO THE VES SANITARY SEWER P Z } O
SYSTEM. THE CONTRACTOR SHALL NOT OPERATE GATE VALVES OR FIRE HYDRANTS ON OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR. ►► Proposed Storm Sewer W W Ol Q H
19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST SEE SURVEY.
THE CITY'S WATER SUPPLY SYSTEM. 4 Proposed Fire Hydrant & GV rr^^
10. THE CONTRACTOR SHALL NOTIFY THECONFORM TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
PRIOR TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT v,
E CITY ENGINEER AND PROJECT ENGINEER 48 HOURS 20. CHIMNEY SEALS SHALL BE INSTALLED ON ALL SANITARY SEWER MANHOLES PER CITY J Z
Z e( 0 Q
DETAILS 308 AND 310.
TO BEING SHUT DOWN.
11. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET T Z
FOR THE SUBDIVISION OF THE LAND. W
O
VOSVVA A' I e:A
Street EIV -942.40 N 'hZ V) N.
\ I 1 I e" PNC SOR35
�, Y\ 32.0 IE -930.40 LLT a b b I O
I I I I I DEPTH -12.00 ti �b a
/1.11.70 Street EN=923.70 V -_A�+pob c "o
Po W PNC SOR35\34 88.57 \ I._ 'c'nIna;n-VE DEPTH=12.00 N \ ��
m=b>
9Z6 2p61 , 9£6 Ot•6ZS6
- - ---- - - III
G i I r - - - - �- - ~ H1vRANr 2f N k
1 0'
I I I f 1 1 I iI I I I I I wm1 WwE , n
/ I I I / I I 1 I 6 I I I 944.2 I I ns '$ �+ °ob{ y, ` t a a$ V' o �I
191s.e7916.9 I I 9fes Flo 928.1 ' I 932.2 996.9 I I 9lJ9.6 I e4os I 949.2 I I_ e43.7 I I LF996.2 a I O L 8 0 0
1 LF808.9 / I ,I LF819.9 I 1 9M2
LF929.1 ' LF927.2 LF991.9 k, LF899.8 LF895.9 I I \F9352 I CFFB I FB I SDR35 O o' `I \\ I F 33
J MLWO I I 'I MLWO F MLWO I I MLWO I MLWO I MLWO 1 MLWO I I fa
I FB I G �a� I �o Jo.4ox U(0t�.30)-
t I 591.1 896.2 (� I 9388 841.8 1 843.3 I I 849:2 I 843.7 I ,u
•,916.8 I 92 e9 I I u.eS ii , rasa use I G I u9a G I I rs e3 G I I �N \C' I {N G, \ P �j r ) MH P4-8 \\. �5 i _ i $ a
1 _- f „ RE -943.38 \
I I I I 165 LF 8" PVC _ - _
sDR3s o 1 I I "0. I I_ _ _ ! i° IE(E)=930.10 (8' IN)
„ --
RI I 1 611 I -- - - _- - --- I IIE1=830u (8' 011e..59 ;0'4x'\\ 8"DIP CL52 HYONANf 16 _ „ �r r' `/ / ` \ �_
CO) // -T-- 6"FlrC
WAIERAWN WITH VAVE,
G�
0.4ox (0.26) - y
s+ � o s+�o -v o �-�I 32+0�0 / LZ 1
4p
.r 9-1' 9
1'1`V< C
MR P4-7
tt \_ 7 316 LF 8" PVC - `
. ` I II -1----- iI I68,I I izF.e8,IE(N)=929-D.JE. 9rHi \\,� .8;"Fg3•, 1, PVC
F\P79 8 1\4\2
\ II o
MHP -5 SDR35 O E944.83_ / SDR35 E(SE)28.77 (8' IN)
4 (8"IN) 81) 929.72 (8" OUT)
242.08 (15.8-Nry - 6I1 d
MH P4v + IE 7.00 (8' 1)
Dp==E813.81
W3(e OUFe...IE(S)=811.04 (8" IN) 99.49 81 I )n 0,98 (8' O SDR35 O IE 0rH 1s) "
qn 4.82
840.6 944.0 0
7
-gala
ow'q` a
3p
I MLWO I FBLOLF936.0
LF912.1 LF819.6 I LF922.t LF992.5 p� I , I 1 O1 8440
i' I rn en.1 I t %924.5 i 1 930.31 �I 1 035.6 I I
GI / --,ds -- z� __ �`'t
__ ---- - 1 --_ m Y SOR350
�`I � o O•��
2 1- 1 I I /6s LF e" wD
_ -- - --/ -I,- g3A �'wE l0 3 0.40x(0.66) ---=�------- -'
939599 990.311
(n � f0
co
I \ \t\ ! I Street EN=939.71 \ I 1 1 a)
8" PVC SDR35 ' C) m 8 W
I \ ( \ r 117=927.71I 2 2 y
4i DEPT=12.00
\� I I j I o 0 0 0
` `Y I I o i \ INDEX OF CIVIL SITE DRAWINGS: F/LE N0. 00715
1 k ti i ; , ~ CO PROJECT LOCATION PLAN
I � SLI
C1.0 OVERALL LAYOUT AND PHASING PIAN
C1.1 -C1.7 PRELIMINARY PLAT
C2.1 -C2.7 GRADING AND DRAINAGE PLANS
C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7 STORM SEWER UTILITY PLANS C3.7
.STORMWAT
1-05.2 T PROFILE
POL UT ON PREV. PLAN IL
C6
Sanitary and Water
C7.1 -C7.3 DETAILS Utility Plan
r
GENERAL UTILITY NOTES
SURVEY DATA
PAGE LAYOUT:
CLIENT:
VHF INVESTMENTS,
i. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR
12. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO
SURVEY INFORMATION PROVIDED BY:
C4.1 C4.2
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY
MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING
MEYER ROHLIN LAND SERVICES
LLC
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.
AGENCY AT THE CONTRACTOR'S EXPENSE.
708 1st AVENUE HE
2: OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
13. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH
BUFFALO, MN 55313
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL (CURRENT VERSION) FOR
DATED: FEBRUARY 12, 2019
C4.3 C4.4
1450543rd AVENUE N.
EXCAVATION.
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
PLYMOUTH, MN 55446
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES
14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES
BENCHMARKS (PROVIDED BY OTSEGO CITY
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER
LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC.
ENGINEER, HAKANSON ANDERSON, INC. NGVD
HENRY HANSEN
OF ANY CONFLICTS.
ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS
29 DATUM):
C4.5 C4.6
(763) 238-1610
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER
ARE ESTIMATED.
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES
15. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
TNH, EAST SIDE OF ODELL LANE, IST HYDRANT
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT.
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR
N OF 75TH ST ELEV=92800
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN 16. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM 0 50 100 150 F -
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE WITH TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS. RR SPIKE IN PP, NW QUADRANT OF OGREN a
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING AVENUE AND CO RD 38, ELEV=948.06 C4.7 W
17. ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
UTILITY. RIM ELEVATIONS SHOWN ON PLAN RE GRAPHIC SCALE IN FEET
CASTINGS IN CURB SHALL BE SUMPED 0.17'. 7 Z
CT
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY REFLECT 0 Q
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY SUMPED ELEVATIONS. PROJECT LOCATIONJ
18. CASTINGS SHALL BE NEENAH R-1733 FOR MANHOLES, R-3067 FOR CATCH BASINS, AND p• d
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES LEGEND:
WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. ANY REPAIRS NECESSARY R-4342 FOR YARD INLET (OR EQUIVALENT). PART OF SE} OF SECTION 28, TOWNSHIP 121, i
19. ALL STORM SEWER IN LAVM AREAS SHALL BE HDPE DUAL WALL PIPE AND UNDERNEATH EXISTING CONTOURS �R Z
SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. RANGE 23, +•
B. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES. ROADWAY PAVEMENT AREAS SHALL BE CLASS 5 REINFORCED CONCRETE PIPE (RCP) WITH AND PART OF SWj OF SECTION 27, TOWNSHIP V Wq J
9. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR WATER TIGHT JOINTS UNLESS NOTED OTHERWISE. 121, RANGE 23, ►► EXISTING STORM SEWER to F -
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING 20. ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS. WRIGHT COUNTY, MINNESOTA. W d
SHUT DOWN. ► EXISTING SANITARY SEWER = 0
10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR i Q
THE SUBDIVISION OF THE LAND. LEGAL DESCRIPTIONEXISTING WATERMAIN 7 W W
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL Z
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING:SEE SURVEY. .106 i PROPOSED CONTOURS W W
O W�
O
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZE y to
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY N PROPOSED STORM SEWER z
ASTM D-698 STANDARD PROCTOR TEST MEETING 1007 STANDARD PROCTOR DENSITY AND Z Q O Er
NOT EXCEEDING THIS COMPACTION BY MORE THAN 17. BELOW THE UPPER 3', COMPACTION ► PROPOSED SANITARY SEWER Q F. O
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT SHALL NOT BE PROPOSED WATERMAIN � 0 �
CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
W
�� \ '\ --
75th J�treet
o
- _ _ v•. _ -
� - _ _ • -' �;" - -�' � --� _ _ass_--- o t� m
T - �!;- _
-�--- ---1 I--_ _�f y �aac°i
48 DIA CONCRETE r - - - - - / -
ce=a1 - 1 - - -I a -- I I-- - _I �t
RE=824.95 I I 1 -�. I I _ _ _ a _L . -_ _. __ __ -. - T- -i ---� }_ I. - - - -- a E m U I ^ a
___
IE(E)=920.70 (15' IN)
A. ( RE-92CONCREfE I 1 I 1 -1 -I N g I I I 1 \ g20 i 1 - _ _ _ _ - - _ - _ J
_ ) 7.4�E ° ao
906
I IE(S -920.70 (I5' IE(aj-921.00 (15'
113 LF 15' RCP 26 LF 16' RCP I 1 I I �- - 1 I_ - -I-- __ _914 __ - - ,.
I O 0.57X O 1.20X I I 1 1 1 1 1 I r 1 4 V
\ � +p I I I I I 1 1 i I I I I,
I 175 LF 15' HOPE `� I 828.8 _ 927.7 a27.7 828//� 1 922.9 \\ 821,8 I 1 920.0 918.8 - LF918.8 917 9 816.8 (,i / @@ •� ° 8
LF929.8 11 LF924.7 I I LF924.7 I I LF923.9 LF922.9 I LF921.9 LF920.9 LF919.9 1- --FBWO I LFa17.9 I LF
916.6
00.40% I I FBLO I FBI:p FBWO I FBWO FBWO I I FBWO I F8W0 EBWO
I I FB40' I I FBLO 026.0 925.9 a24:8 -
--- "L L - - - - - - - l:� 891.8 I I I 632.7 I I 8827 ( 981.8 I 1 980.8 1 1 '-926.9 926.9 927.9 I I I I
►►-- �I 1 I 1.I I
I 2-.T��•,,,�.-51
�±-8�c2Bw2�
CB -59 CONCCB-� 2x• CDNwy
' RTE RE -925.82
RE -927.10 J L J L -IE00-921.B2(15'OUT) IE(S)-91&76(15•ON.C6p B6- ► 46 I ��♦�1Q-a+ X'J s�'"RP48'DIA CONCRETE ' IN) 25 LF 15
amN
RE=923.30 IE(W)-920.10 (15
E(St)=819.70 (I2' IN) IE(WW)=118.80 (ib' IN) 28 0 1.20
O 1 7% ZIE(E)-919.50 (15' OUT) IE(S)-91880 (15' Ole
1021E 12" HOPE +00 9+06
0
e 0.49X 2k tV
�y0 S
172 LF 15' RCP e m a _ _ 0
0Z¢
OFES-Cf - g12' GNP WU
,c
OB -50 _
IE 920.00 / I I ! \ - - - - 48' DIA CONCRETE �' �""
CB -5B - - �. 48' ON CONCRETE HDP
RE -922.66 Z
48' BRA CONCRETE CB -57 T - I I - - - - - - T 7 - - - - - 11- - - - - - - RE -925.88 - O a.38X 8' E _I I -
22.68
/ RE=927.21 2'x3' CONCRLlE -I --- - - - - - - - - IE(N)=921.62 (15' IN) IE(N) 91846 (1b' IN) .182 lF 15' HDPE �- i j
IE(E)=923.00 (15' IN i0� RE -927.21 I I I I I I 11 I I 1 IE(S)-921.82 (15' OUT) 11 1 IE(S)-9/8A8 (15' W/f) O 4.53X ►I "' x
IE((N)=918.20 15' IN p i' (It) -823.30 (ib' to Tj
I. IE(S)=918.00 (18' OUT) M z O
'I
892.1 892.7 882.7 93L7 930.7 929.7 928.7 828.7 I I 828.6 I I 926.5 826.9 I I / .U°r- R ¢ 0
1 �'� rEl -O' i FBLO I I FliWO I I FBWO I FBWO I I F8W0 _ I 1 FBWO 1 I F81N0 FBWO FBWO E
WO % „a $ I I LF920.5 20.5 LF91B,9 II a, LF924.1 I I LF8241 LFB24.7 LF923.9 LFa22.8 LF921.7 LF9 0.7_ LF920.79.1 24.7 I I 824.7 I 1 923.7 922.7 Ix
I 1 921.7 920.7 920.7 920.6 0.5 N V)
/ I I I II l+� �1 0
25 LF 15' RCP 1 1 I I "I - I I. _ /- ) I i /
! _. wry. o f.zo% I I I I I I 1 ce-44 n v o 0
i' J I I I (I MATCH LINE Sheets C4.1 / C4.4 37. LF 1s• RGP 11� rxr cDNLa cn Ln In
7 // CB -54 _ _ _1 1 I I 1 1 I 150 LF 24'HOPE J� RE -917.60
o I - - - - 218 LF 24' HDPE O 0.50% 0' HDP 1 I 0 LP 30' HOPE 1 O 13. '
+ 48' DIA CONCRETE I I I I O 0.80X O 0.40% E I �IE(SW)=913 04
s LL li I /lJ <;9 I RE -929.13 1 1 1 - .. _ 1 I I I I I O 0.40X 147 LF 30' HOPE 11 �% { C7
102 LF 18' RCP iT 11E(W =917.50 (18' IN) L---\
/IL,1y1 a,J, l (tn�h o o.29X 1 ) J I- J L- J L --J L--- ---J ------ L --------I L --_----J _. - ---J L� 06.54%
BJ I 8 CO
`S t IE(E)-917.50 (18' 0111) - - - - - - - - - - - r pox ,ox a zos x O
(
It�e I ". -- 918------- / 918_---- CB -4B 918 F- CB -48 --- CB -45 I �1nn W
- / - -r' - - -1 r- - CB -53 I - r , - - - - - -, 60' DIA CONCRETE 60' ON CONCRETE ) I 60' DIA CONCRETE Q4 W 1
- O 287 lF iB' \ CB -52 I ) 60' DIA CONCRETE I RE=817.6) I RE -916.90 O U
�� CB�55 cb I 1 I HDPE O I.60X 4B• DN CONCRETE 1 I I 48' DIA CONCRETE 1 RE -917.40 RE -917.40 I i IF/NF)=909.42 115' INT 1i'9a_A
48' DU CONCRETE , 1 RE=916.8 I I I RE=917.10 1 IE((N)=910.00 (15' IN) I I IIE(W)-909.77 (30' IN) 1 IE((N) 810.21 (15' IN'
RE=829.1) 1 1 20 LF 18' RCP IE(W)-912.9 (18' IN 1 I 1 IE(11)-911.45 (24' IN I IE(W)-910.70 (24' W) IE(E)-808.77 (30' OUn I IE )-909.21 (30' IN
IE(N)=81270 (18' IN
O 0.80% 1 IE(E)-812.5 (24' OUT) I I I IE 81/A5 (24' OUT; IEE((E)-910.3 (30' 0111) I I I IE(E)-908.21 (30' OUF INDEX OF CIVIL SITE DRAWINGS"
• IE(E)-917.70 (f8' OUT) I 1 1, i r I, �� I _ LE N
I
j MATCH LINE Sheets C4.1 / C4.3 I I I I I I CO PROJECT LOCATION PLAN 0
I I I I I I I' T
---. I
1
0 OVERALL LAYOUT A
ND P
HASING
PLAN
-- -- 922.7 I I 922.0 I I 47.7. .
C1.1 -C1.7 PRELIMINARY PLAT
921.9
I I 8. C2.1 -C2.7 GRADING AND DRAINAGE PLANSg2e2sf LOe3sa9242 9 1 I
LF926.9 LFo2s.i wo I C3.1 -C3.7 SANITARY AND WATER UTILITY PLAN
LF924.2 7FBLo
-4.7 STORM S
C4. 1 T6C4.1FB) j 2
93ill I 1 2'x3' CONCRETE- C5 1-05.2 STREET PROFILE PLANS
I RE -47.4.67
LF029.6 8326 9x27. IE(S)-921.20 (15, OUT) C6 STORM WATER POLLUTION PREY. PLAN Storm Sewer
MLWO J L- C7.1 -C7.3 DETAILS Utility Plan
GENERAL UTILITY NOTES
PROJECT LOCATION PLAN
1.
SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR
12. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO
Q
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY
MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING
j
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.
AGENCY AT THE CONTRACTOR'S EXPENSE.
2.
OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
13. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH
3.
THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48. HOURS PRIOR TO ANY
MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL (CURRENT VERSION) FOR
CLJ O -7,9.
EXCAVATION.
CONSTRUCTION ADJACENT TO TRAVEL WAYS,
4.
THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES
14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES
Storm Sewer
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER
LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC.
Utility Plan
OF ANY CONFLICTS.
ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS
5.
THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER
ARE ESTIMATED.
'
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES
15. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT.
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
6.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
16. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM
h
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER VILL COORDINATE WITH
TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING
17. ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
7.
UTILITY'
EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY
CASTINGS IN CURB SHALL BE SUMPED 0.17'. RIM ELEVATIONS SHOWN ON PLAN REFLECT
IE(11�=877.50 (24' IN)
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY
SUMPED ELEVATIONS.
I `
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES
CASTINGS GS SHALL BE NEENAH R-1733 FOR MANHOLES, R-3067 FOR CATCH BASINS, AND
CASTIN.
WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. ANY REPAIRS NECESSARY
OR EQUIVALENTALENT)
FOR YARD INLET .
U
SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
19ALL STORM SEWER IN LAWN AREAS BE HDPE DUAL WALL PIPE AND UNDERNEATH
B.
FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
(RCP)
ROADWAY PAVEMENT AREAS. SHALL BE CLASS 5 REINFORCED CONCRETE PIPE RCP WITH
9.
THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR
WATER TIGHT JOINTS UNLESS NOTED OTHERWISE.
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING
20. ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS.
SHUT DOWN.
10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR
THE SUBDIVISION OF THE LAND.
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING:
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZE
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR DENSITY AND
NOT EXCEEDING THIS COMPACTION BY MORE THAN 1%. BELOW THE UPPER 3, COMPACTION
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1'. BUT SHALL NOT BE
CONSISTENTLY HIGH OR LOW.
S. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
V.F 1 I I
B \
19��.
A \ T. 0-
'-
�o.�-i'
1'q CB -44 I \ MH -41 j
32 X153 X I I 2'J' CONCRETE r i i 72' DN CONCRETE
RE=917.60 RE -888.30
�IE(SW)-913.60 (15' OUT) r IE(SW)-878.55 (36' IN) j l
HDPE ' 19 I I I ' IE(NE)-878.15 (42' OUT) I ��
♦ ') - / ' Y 66 LF 42' RCP
CB -43
_ 11 J 1 (LENGTH
M4 CONCRETE I i m £ r m 364 LF 35' RCP \\ L INCLUDES FES)
RE -916A0 IO m
09.42 (15' IN) 97 6 I
B
08.42 30' IN 1 .) - - -�� \� •FES
I4,
j�Tl'tl..lrf 1
MATCH LINE Sheets C4.2 / C4.4
1.42 (30' 0 t- - - c -r' . - " _ \ \ 42' RCP
71 LF JO' IE=878.00
RCP
6.
DN CONCRETE1 60' DN CONCRETE L 1 - \\ •1 �, BASIN DATA:
RE -914.43 °� 1' RE-915.15
BOTTOM=876.0
)03, 0.20 (30' IN)
57 IE(SW)-910.20 (30' OUT)OIE(N)= OUTLET=879.0
J
ARTICULATED CONCRETE \ \\ 100YR HWL=880.0
BLOCK OR CABLE
CONCRETEAT
(T STORM,
\
PIPE M \
913.78 / +II 1-73 \
48' DIA CONCRETE \
®Ilk R RE -910.46 \
\ - DRALNAGE SPILLWAY
EIV=879.0
ARTICULATED CONCRETE
BLOCK OR CABLE
CONCRETE
SURVEY DATA PAGE LAYOUT:
SURVEY INFORMATION PROVIDED BY:
MEYER ROHLIN LAND SERVICES C4.1 C4.2
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019 C4.3 C4.4
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC. NGVD
29 DATUM): C4.5 C4.6
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT -
N OF 75TH ST., ELEV=928:00
RR SPIKE IN PP, NW QUADRANT OF OGREN 0 50 100 150
AVENUE AND CO RD 38, ELEV=948.06 C4.7
GRAPHIC SCALE IN FEE7
PROJECT LOCATION LEGEND:
PART OF SEI OF SECTION 28, TOWNSHIP 121,
RANGE 23, - - - EXISTING CONTOURS
AND PART OF SWj OF SECTION 27, TOWNSHIP
121, RANGE 23, ►► EXISTING STORM SEWER
WRIGHT COUNTY, MINNESOTA.
► EXISTING SANITARY SEWER
LEGAL DESCRIPTION EXISTING WATERMAN
SEE SURVEY. 908 PROPOSED CONTOURS
N - PROPOSED STORM SEVIER
► PROPOSED SANITARY SEWER
PROPOSED WATERMAIN
/ PIPE OUTLET (TYP.)
,,FES -At
24 RCP
IE=875.00
x-44 LF 24' RCP
CL3 O 0.45X
(LENGTH
INCLUDES FES)
IE, =B:0<
W
3. ---------------
INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763) 238-1610
t -
U
PROJECT LOCATION PLAN
Lli
0
OVERALL LAYOUT AND PHASING PLAN
Q
N (L
(L
�Zlr
d Ltl �
j
Z
�
1
I
20 LF 24' RCP
ap unu
a[
'
y
CLJ O -7,9.
Z>
0
�l
INCLUDES�F'ES)
WATER POLLUTION PREV. PLAN
Storm Sewer
C7.1 -C7.3
FES -A2
Utility Plan
Q 1=
I
o
'
IE -878.00
V)
W
m
11
OCS-t�
M
h
45' 041 CONCRETE
RE (TOP)=85150
N�
RE (BOTTOM) -880.75
O
I
IE(11�=877.50 (24' IN)
I `
IEo.;B75.20 (24' OUT)
BASIN DATA:
U
BOTTOM=876.0
OUTLET=877.5
i
VU}
100YR HWL=880.0
O
WET
5TORM WATER
DA5/N
j�Tl'tl..lrf 1
MATCH LINE Sheets C4.2 / C4.4
1.42 (30' 0 t- - - c -r' . - " _ \ \ 42' RCP
71 LF JO' IE=878.00
RCP
6.
DN CONCRETE1 60' DN CONCRETE L 1 - \\ •1 �, BASIN DATA:
RE -914.43 °� 1' RE-915.15
BOTTOM=876.0
)03, 0.20 (30' IN)
57 IE(SW)-910.20 (30' OUT)OIE(N)= OUTLET=879.0
J
ARTICULATED CONCRETE \ \\ 100YR HWL=880.0
BLOCK OR CABLE
CONCRETEAT
(T STORM,
\
PIPE M \
913.78 / +II 1-73 \
48' DIA CONCRETE \
®Ilk R RE -910.46 \
\ - DRALNAGE SPILLWAY
EIV=879.0
ARTICULATED CONCRETE
BLOCK OR CABLE
CONCRETE
SURVEY DATA PAGE LAYOUT:
SURVEY INFORMATION PROVIDED BY:
MEYER ROHLIN LAND SERVICES C4.1 C4.2
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019 C4.3 C4.4
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC. NGVD
29 DATUM): C4.5 C4.6
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT -
N OF 75TH ST., ELEV=928:00
RR SPIKE IN PP, NW QUADRANT OF OGREN 0 50 100 150
AVENUE AND CO RD 38, ELEV=948.06 C4.7
GRAPHIC SCALE IN FEE7
PROJECT LOCATION LEGEND:
PART OF SEI OF SECTION 28, TOWNSHIP 121,
RANGE 23, - - - EXISTING CONTOURS
AND PART OF SWj OF SECTION 27, TOWNSHIP
121, RANGE 23, ►► EXISTING STORM SEWER
WRIGHT COUNTY, MINNESOTA.
► EXISTING SANITARY SEWER
LEGAL DESCRIPTION EXISTING WATERMAN
SEE SURVEY. 908 PROPOSED CONTOURS
N - PROPOSED STORM SEVIER
► PROPOSED SANITARY SEWER
PROPOSED WATERMAIN
/ PIPE OUTLET (TYP.)
,,FES -At
24 RCP
IE=875.00
x-44 LF 24' RCP
CL3 O 0.45X
(LENGTH
INCLUDES FES)
IE, =B:0<
W
3. ---------------
INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763) 238-1610
t -
U
PROJECT LOCATION PLAN
Lli
0
OVERALL LAYOUT AND PHASING PLAN
Q
N (L
(L
�Zlr
d Ltl �
a
Z
O
e o f M
i11 $
Lu
Lu
LV�
ap unu
a[
Z 0
y
l W 3
Z>
0
3
Lu Lu
co
WATER POLLUTION PREV. PLAN
Storm Sewer
C7.1 -C7.3
DETAILS
Utility Plan
Q 1=
o a
o
0
V)
W
M
h
k
Is]
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
�Zlr
d Ltl �
moE
c o
2 wI
'R
e o f M
i11 $
�F�
LV�
ap unu
a[
C o
y
l W 3
C5.1-05.2
STREET PROFILE PLANS
F o
WATER POLLUTION PREV. PLAN
Storm Sewer
C7.1 -C7.3
DETAILS
Utility Plan
o a
h
O
II
U
}O
S
i
VU}
O
G
a
U)
J �
'Q.
o°
o
GO v0i
Vpl
b
N
�
7.11
M
o
m p
W
z z
p
W
3 �
x
W
O
o O
U
FILE NO. 00715
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3,7
SANITARY AND WATER UTILITY PLANS
C4.2
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6STORM
WATER POLLUTION PREV. PLAN
Storm Sewer
C7.1 -C7.3
DETAILS
Utility Plan
GENERAL UTILITY NOTES
EXISTING CONTOURS
- ►r
1.
SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR
12.
THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO
EXISTING WATERMAIN
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY
PROPOSED CONTOURS
MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING
PROPOSED STORM SEWER
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA,
PROPOSED SANITARY SEVER
AGENCY AT THE CONTRACTOR'S EXPENSE.
2.
OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
13.
CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH
3.
THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
(} ILL
MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL (CURRENT VERSION) FOR
Wa c
=W
EXCAVATION.
Z% O
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
4.
THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES
14.
CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER
=
LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC.
W
OF ANY CONFLICTS.
ui
W
ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS
5.
THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER
ARE ESTIMATED.
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES
15.
CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
oIR
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT.
C5.1-05.2
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
6.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
16.
ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE WITH
TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING
17.
ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
7.
UTILITY.
EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY
CASTINGS IN CURB SHALL BE SUMPED 0.17'. RIM ELEVATIONS SHOWN ON PLAN REFLECT
I i
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY
I I
SUMPED ELEVATIONS.
920.6
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES
16.
H
CASTINGS SHALL BE NEENAH R-1733 FOR MANHOLES, R-3067 FOR CATCH BASINS, AND
En
WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. ANY REPAIRS NECESSARY
R-4342 FOR YARD INLET EQUIVALENT).
N
m
SHALL B E PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
19.
ALL STORM SEWER IN LAWAREAS
BE HDPE DUAL WALL PIPE AND UNDERNEATH
8.
FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
�
(RCP)
ROADWAY PAVEMENT AREAS SHALL BE CLASS 5 REINFORCED CONCRETE PIPE RCP WITH
9.
THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR
WATER TIGHT JOINTS UNLESS NOTED OTHERWISE.
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING
20.
ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS.
SHUT DORM.
10. THE CONTRACTOR: SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR
THE SUBDIVISION OF THE LAND.
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING:
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZE
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR DENSITY AND
NOT EXCEEDING THIS COMPACTION BY MORE THAN 17. BELOW THE UPPER 3', COMPACTION
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT SHALL NOT BE
CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
1021F f8 RCP
-� }I rkkr//r�� jtps2 O 0.19% I 1
CO -55 1 �o
48' D
\
- - ONCRETE
CO -JO i J IA RE -12.1.1 I
27' DU CONCRETE. _ �� _ ----- IE N)=917.70 (18' N) f )
IE(E)-917.70 (18. OUT) I I \
IE(S)-920.30 (12. OUT)- I I
IP zoz - aoz -_z 2.26x.,.1 I +1
LFazss 9925
FB - I- I 1
I 933:9- - - -
9288 I I
I
LF928.8 I I 992.6
g2a 928.3 I 927.7 I .il MLWO
1 MLWO I I I69��z P' 1 I 991.6 I ' I I of
LF823.6 932 I 1
I 931.9 1' I HDPE O 0.56% I I I '- +
I 1 930.01
\ \ I I I I 930
48' OC9-29
N CONCRETE I I - ifiOfJ - R 9 -
.928.39
IE((N)=919.35 (12' IN) 928.11
` ! IE(S)'819.15 (f5' OUT) - q+00 t► �� '931.05
I =_
0+0o I ' � i�o ss iF fa•RCP-�ooi =1� 3+
O 0.50% jl
_929.38 9 .51 L' a 928.66 �� r I i 1•, r9
931.8
1 .408, DM RE -22716 I I 129 LF 1b• RCP I i MLWO 1
IE(N)=919.02 (15' IN) I I 00.5 I I 1 931.8LF923.11 I I
IE(S)-919.02 (15' OLTP) I I i i I I MLWO '
931.5 LFnn.. < CB -26 I -
992.6 1 1 992.6 I I MLWO I 1 48' 014 CONCRETE
1 �_ MLWO ( MLWO R-923.70
T- j�-ff924:0 I I LF924.0 I 926.6 IE(N)=916.62 (15'
IE(S)=916.42 (18'
Q. 2� s2a N II
Q7 - CB -27 - - - - - - - _,_b' RCP - _ O 0.RCP I N I
3 I 48' ON CONCRETE /
RE=926.00 O 0'60% 73 LF iT1�i 1
I' IE((N)=916.35 (15' IN) _ CL3 0 7.63X
IE(S)=918.35 (15. 01% � '
C \ I ) CB -24 -.
60' DIA CONCRETE I
923.17
IE(N)-910.58 (10' IN) iJ
•
IE (E)-910.58 (18. OUT) I
;I 1 1
1CLLF'18- ROP
J O 0.50X1 a
1 � N
9343
L------------
I \
II � � II WNW
SURVEY DATA
SURVEY INFORMATION PROVIDED BY:
MEYER ROHUN LAND SERVICES
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC. NGVD
29 DATUM):
TNH, EAST SIDE OF ODELL LANE, IST HYDRANT
N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38, ELEV=948.06
PROJECT LOCATION
PART OF SEj OF SECTION 28, TOWNSHIP 121,
RANGE 23,
AND PART OF SWj OF SECTION 27, TOWNSHIP
121, RANGE 23,
WRIGHT COUNTY, MINNESOTA.
LEGAL DESCRIPTION
SEE SURVEY
PAGE LAYOUT:
Fc4.1 I C4.2
C4.3 C4.4
C4.5 I C4.6
C4.7
0 50 100 1,150
GRAPHIC SCALE IN FEET
LEGEND:
2f0 LF 21' HOPE I I I O 0.50X4' HDPE 132 LF 30' HOPE
48' DIA CONCRETE - - I I I 1
RE<92B.I3 I I I O 0.50% I I I -- O 0.40%
IE =91250 (18' IN) I I - - - -
UE=81250 (18.0 L--- ---J L---=�--J L---- -J L --/� J L--- _ -J -- L' --s J a--- M
--I 918.-- -- / ------T 918----- CB -49 9Tg r CS -•18.
- - - - r 287 LF 18' CB -53 I - r ; CB_5Y 60' DIA CONCRETE 60' DU CONCRETE
1 I RE=917.40 I I
�I I HOPE O 1.60X 48' DIA RCONCR&8 ,\ i i u-tza I I 48' DIA 17.40 IIE(N�=909.77 (30' i� I
I IE((N)� 910.00 (15' IN) I
25 LF 18' RCP IE(W).912,9 (18' IN I �I IE(YO'910.70 (24' IN) IEE 909.77 (30' OUT)
I . - I I IE(W)-911.45 (24' IN I ( ( )
O 0.50X1 I 1� IE(E)t 912.5 (24' I I j 1 IE(E)-911.45 (24' IE E)<810.J (JO. OUT) I I I I
i- MATCH LINE Sheets C4.1 / C4.3 ! �_ -� i _
t I I
� I I I IDF
I-1- T
920.6 I i 922.7 I I 922.0 I I I I 922 4 I i
\ 821.9 LF920.8-LF919.7 LF819.0 LF91B.4
`924.2 923.1 I LF92f.9 FBWo_ FBLo- -('I FBLO I LFa29.1 _-F8WO 927.7 828.8 827D
�9 0- _ - _ 929.9 - -. C8-16 I- L
_ �. L. - 1 _ 2.3' CONCRETE
IE(s)4,67
=921.20 (1s?
e
U �.�
-- L-- L----- J -..L_ -- -J L-- -- L- 928.7 �� _ 925.95 926.40 M 928.52
J L - 927.82 25 LF ib' RCP �
931.14 83012 - =.1..saee
c 11+0 12+0�1 r =-is+off a+off
'9r1II2I I 7 .95 L 928-00 - _ II I 91II2I 6 .7I9
926.64 26.64 -
--
LFBFe._BP.O1.
bZ
46' DIA CONCRETE -9
1.79
(s)916.59 Ila- OUn93FBWO za-
r
% BwO F92LO
FBWO WO 921.
L?r LF9232 F9
923.2 WJ
--
-
1 I I -- - - --
I
L-- -- -----. Ce 22�----\
-- -- --__ -
DO 25 - 60' DIA CONCRETE ., - o I I + O M I -
48'8DIAC7NCRETE IE(W)-908.74(24'1 IN)
IE 918.15 18' IN IE(S)=908.74 (24. OUT) CB -14'
((NN�� (( ) 91 .3fi------- -
IE(S)-916.15 (I8' DUI) II \. 84' DIA CONCRETE
RE 91721 BO
,�
1 -� 238 LF 24' ROP IE(6=907.58 124' I=907.96IW)" OL
0.50% IE 6=907.56 /. _ -
1 U0}
MATCH LINE Sheets C4.3 / C4.5
r '\ OO
CO-21TE 43 42' _- �T 918.68' I r I r m a „!
265 C43 040.50%l J 60' DN RE-9MCONCRETE �, ; RCP. ' -I 25 LF 42' RCP O ro N I
_ 3 CF10OB.00
O 0.40% J
CB -23 IE(N)-908.74 (24• IN) ) ) CC 1. RCP
CL3 O 0.32%
146. OIA CONCRETE IE(E)-908.74 (24' OUT) °' , 1 ai - :R - I `
EEE929;046
Ll!: N) °gym I� 64 DIA corrcREi� I I INDEX OF CIVIL SITE DRAWINGS:
CLIENT.
EXISTING CONTOURS
- ►r
EXISTING STORM SEWER
r
EXISTING SANITARY SEWER
F
t
EXISTING WATERMAIN
908
PROPOSED CONTOURS
►► -
PROPOSED STORM SEWER
►
PROPOSED SANITARY SEVER
E
;b tlU
o`xfn p
PROPOSED WATERMAIN
2f0 LF 21' HOPE I I I O 0.50X4' HDPE 132 LF 30' HOPE
48' DIA CONCRETE - - I I I 1
RE<92B.I3 I I I O 0.50% I I I -- O 0.40%
IE =91250 (18' IN) I I - - - -
UE=81250 (18.0 L--- ---J L---=�--J L---- -J L --/� J L--- _ -J -- L' --s J a--- M
--I 918.-- -- / ------T 918----- CB -49 9Tg r CS -•18.
- - - - r 287 LF 18' CB -53 I - r ; CB_5Y 60' DIA CONCRETE 60' DU CONCRETE
1 I RE=917.40 I I
�I I HOPE O 1.60X 48' DIA RCONCR&8 ,\ i i u-tza I I 48' DIA 17.40 IIE(N�=909.77 (30' i� I
I IE((N)� 910.00 (15' IN) I
25 LF 18' RCP IE(W).912,9 (18' IN I �I IE(YO'910.70 (24' IN) IEE 909.77 (30' OUT)
I . - I I IE(W)-911.45 (24' IN I ( ( )
O 0.50X1 I 1� IE(E)t 912.5 (24' I I j 1 IE(E)-911.45 (24' IE E)<810.J (JO. OUT) I I I I
i- MATCH LINE Sheets C4.1 / C4.3 ! �_ -� i _
t I I
� I I I IDF
I-1- T
920.6 I i 922.7 I I 922.0 I I I I 922 4 I i
\ 821.9 LF920.8-LF919.7 LF819.0 LF91B.4
`924.2 923.1 I LF92f.9 FBWo_ FBLo- -('I FBLO I LFa29.1 _-F8WO 927.7 828.8 827D
�9 0- _ - _ 929.9 - -. C8-16 I- L
_ �. L. - 1 _ 2.3' CONCRETE
IE(s)4,67
=921.20 (1s?
e
U �.�
-- L-- L----- J -..L_ -- -J L-- -- L- 928.7 �� _ 925.95 926.40 M 928.52
J L - 927.82 25 LF ib' RCP �
931.14 83012 - =.1..saee
c 11+0 12+0�1 r =-is+off a+off
'9r1II2I I 7 .95 L 928-00 - _ II I 91II2I 6 .7I9
926.64 26.64 -
--
LFBFe._BP.O1.
bZ
46' DIA CONCRETE -9
1.79
(s)916.59 Ila- OUn93FBWO za-
r
% BwO F92LO
FBWO WO 921.
L?r LF9232 F9
923.2 WJ
--
-
1 I I -- - - --
I
L-- -- -----. Ce 22�----\
-- -- --__ -
DO 25 - 60' DIA CONCRETE ., - o I I + O M I -
48'8DIAC7NCRETE IE(W)-908.74(24'1 IN)
IE 918.15 18' IN IE(S)=908.74 (24. OUT) CB -14'
((NN�� (( ) 91 .3fi------- -
IE(S)-916.15 (I8' DUI) II \. 84' DIA CONCRETE
RE 91721 BO
,�
1 -� 238 LF 24' ROP IE(6=907.58 124' I=907.96IW)" OL
0.50% IE 6=907.56 /. _ -
1 U0}
MATCH LINE Sheets C4.3 / C4.5
r '\ OO
CO-21TE 43 42' _- �T 918.68' I r I r m a „!
265 C43 040.50%l J 60' DN RE-9MCONCRETE �, ; RCP. ' -I 25 LF 42' RCP O ro N I
_ 3 CF10OB.00
O 0.40% J
CB -23 IE(N)-908.74 (24• IN) ) ) CC 1. RCP
CL3 O 0.32%
146. OIA CONCRETE IE(E)-908.74 (24' OUT) °' , 1 ai - :R - I `
EEE929;046
Ll!: N) °gym I� 64 DIA corrcREi� I I INDEX OF CIVIL SITE DRAWINGS:
CLIENT.
VHF INVESTMENTS,
LLC
a
14505 43rd AVENUE N.
F
t
PLYMOUTH, MN 55446
N
HENRY HANSEN
' N°r
(n m N
(783) 238.1610
V
E
;b tlU
o`xfn p
Ee�
C1.1-11.7
�a
a
Z Al
(} ILL
J
Wa c
=W
Z)
Z% O
w
� O
0
QPCl
o
=
W
V)
ui
W
C4.1 -C4.7
STORM SEWER UTILITY PLANS
I
b
RE -917.21
IE(N)=906.50 (42• IN) I
IE(E)-906.50 01I<7
a
F
t
o'F
866 $
N
' N°r
(n m N
�••W
(wc� 1�„
E
;b tlU
o`xfn p
Ee�
C1.1-11.7
Ztg,I°°m°�>
j
u
C2.1 -C2.7
C3.1 -C3.7
c EJY�n
0
C4.1 -C4.7
STORM SEWER UTILITY PLANS
IE -910.06 24
RE -917.21
IE(N)=906.50 (42• IN) I
IE(E)-906.50 01I<7
F
t
PROJECT LOCATION PLAN
OVERALL LAYOUT AND PHASING PLAN
AS
(42'
-�
C1.1-11.7
II
j
u
C2.1 -C2.7
C3.1 -C3.7
GRADING AND DRAINAGE PLANS
SANITARY A14D WATER UTILITY PLANS
C4.3
5
a
C4.1 -C4.7
STORM SEWER UTILITY PLANS
j
oIR
I
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREV. PLAN
Storm Sewer
� o
I i
I I
920.6
I
y
N
En
N
r
m
z s
o
�
O
O
O
U
FILE NO.
00715
IE -910.06 24
RE -917.21
IE(N)=906.50 (42• IN) I
IE(E)-906.50 01I<7
CO
C1.0
PROJECT LOCATION PLAN
OVERALL LAYOUT AND PHASING PLAN
(42'
-�
C1.1-11.7
PRELIMINARY PLAT
C2.1 -C2.7
C3.1 -C3.7
GRADING AND DRAINAGE PLANS
SANITARY A14D WATER UTILITY PLANS
C4.3
C4.1 -C4.7
STORM SEWER UTILITY PLANS
j
I
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREV. PLAN
Storm Sewer
/ s2p
I i
I I
920.6
I
rn
C7.1 -C7.3
DETAILS
Utility Plan
r
z s
GENERAL UTILITY NOTES
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
EXCAVATION.
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER
OF ANY CONFLICTS.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE WITH
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING
UTILITY.
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES
WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. ANY REPAIRS NECESSARY
SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
8. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
9. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING
SHUT DOWN.
10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR
THE SUBDIVISION OF THE LAND.
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING:
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZE
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR DENSITY AND
NOT EXCEEDING THIS COMPACTION BY MORE THAN 17 BELOW THE UPPER 3', COMPACTION
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT SHALL NOT BE
CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
32 IF 15• Ra
_ O 13.001
132 LF Jo' HDPE
o D.4oX _ MATCH LINE Sheets C4.1 / C4.4 r'301 HOPE I 1
68 ).OS i
abs o nx
7CB-4B - - - 60' OU CONCRETECO-45 18-11 I - - 60' DIA CONCRETE!
I 60' 014 CONCRETE I RE=917.63 1 RE=916180
I I RE=917.40 I IE((N)=810.21 (ib' IN)) I 1 IE(NE)-909.42 (15' DI)
IIE(W)-909,77 (30' IN) IE(W)=909,21 (30- IN) 1 1 IE(W)-908.42 (30' IN)
IE(E)=909.77 (JO' OUT) I IE(E)-909.21 (30. OUT) {I 1 IE(S)=908.42 (30' 0111),
71 LF 30'
CB -42
I I 922.4 1 1 922.5 - ( 1 .' 922.2 . - 1 84' DM CONCRETE
LF919.4 - LF91.6LF1 RE -914.43
FBL�
I I FBLO I I - IF 917./L I IE(S,W)-903,57 (30' IN)
I I 9262 IE(N)-903.57 (30'
__
70 LF 30' RCP
I I I 1 "I o o.3oX
913.78
J L-_ - -J L
_ 928.40 926.52 924.17 , 918.63 -
- -1/ - - 1 +OOT
3+0+� = d4+0 _ 15+0 �y_ or
- 926_
Z c 6.20 92.5 105 LF
-- m
CS -72-
60' DIA RCONCRETE'
IE(NW)-904
I .09 (30• IN)
IE(E)-905.09 (15' IN)
I )
12. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO
MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING
AGENCY AT THE CONTRACTOR'S EXPENSE.
13. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH
MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL (CURRENT VERSION) FOR
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES
LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC.
ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS
ARE ESTIMATED.
15. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
16. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM
TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
17. ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
CASTINGS IN CURB SHALL BE SUMPED 0.17'. RIM ELEVATIONS SHOWN ON PLAN REFLECT
SUMPED ELEVATIONS.
18. CASTINGS SHALL BE NEENAH R-1733 FOR MANHOLES, R-3067 FOR CATCH BASINS, AND
R-4342 FOR YARD INLET (OR EQUIVALENT).
19. ALL STORM SEWER IN LAWN AREAS SHALL BE HDPE DUAL WALL PIPE AND UNDERNEATH
ROADWAY PAVEMENT AREAS SHALL BE CLASS 5 REINFORCED CONCRETE PIPE (RCP) WITH
WATER TIGHT JOINTS UNLESS NOTED OTHERWISE.
20. ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS.
L��1:19�'D_�l_�
SURVEY INFORMATION PROVIDED BY:
MEYER ROHUN LAND SERVICES
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC. NGVD
29 DATUM):
TNH, EAST SIDE OF ODELL LANE, IST HYDRANT
N OF 75TH ST., ELEV=928.00
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 38 ELEV=948.06
PROJECT LOCATION
PART OF SEI OF SECTION 28, TOWNSHIP 121,
RANGE 23,
AND PART OF SWj OF SECTION 27, TOWNSHIP
121, RANGE 23,
WRIGHT COUNTY, MINNESOTA.
LEGAL DESCRIPTION
SEE SURVEY
PAGE LAYOUT:
C4.1 C4.2
C4.3 I C4.4
C4.5 I C4.6
C4.7
0 50 100 150
GRAPHIC SCALE IN FEET
LEGEND:
- -9i+:
EXISTING CONTOURS
►►
EXISTING STORM SEWER
►
EXISTING SANITARY SEWER
N �
(L
EXISTING WATERMAIN
908
PROPOSED CONTOURS
►►
PROPOSED STORM SEWER
I>
PROPOSED SANITARY SEWER
j
PROPOSED WATERMAIN
;?'CONCRETE % I 1 I \ � \ 72' DLA
CONCRETEH-41 \ \, \. 1 I /\/ STORM WATER
1 //�
wj=813.80 (15• our) ) \ \ IE(SW)-878.55E(3 / MATCH LINE \Sheets C4.2 / C4.4 ' BASIN �) T
( IE(NE)=878.15 (42' OUR)
�/'/ _
7 1 364 LF 36' RCP
;t A �• - /
►►�
_.�-A3
L_ _ 66 LF 42" RCP \ 42' RCP
CW O 0.23X \ IE -878.00
L',6ROE GTH
INCLUDES NFES)I . DRAINAGE SPILLWAYu CONCItE7E BASIN DATA? ELV_ 5.15 \ BOTTOM=876.0 n'ULATEO CONCRETE903.77 (JO' IN) // lT7 }BLOCK OR CABLE
=903.77 (30' OUT) �� OUTLET=879.0 CONCRETEARTICULATED CONCRETE100YR HWL=879.9 BLOCK OR CABLE\j]CONCRETE AT STORM PIPE OUTLET (TYP.)7380N 4CONCRElE)=907.46 (12' IN)=907.26(15'Ol/r)TCO-7427' ON CONCRETERE=911.4IE(L»-90 .80 (12our)
1
V 44 LF 12NOPE '� Rc ✓ _ _ - (.
25 LF 15' HDPE
W I I 1 IE(SE-BO4.OD (30 011e 41 LF 30' RCP
-
_ FBWO I IFBWO ���...FFF 911.7 J \ L7�2' ON CONCRETE
I Fewo 1 1 \ 1 \ITE 9fo.67
LF919.8 - -_ LF919.1- --- I- I-' -- LF916.9 / / I ► IE((NNWW))=903,80 (30' IN))
819.8 _ I I 919:1- I 916:97 1. 1 IE(SI'Q=904.20 S24' IN) -
IE SE =803.80 Jt
�r
- 0 0.86x 181 LF 30' RCP ` ► \ " m / / I + j
-- .=l _ CB -78 Y /m O 0.35x \ \ Y - / I \ •°� , 1 , - i..
9\6 I' 48• DA coNCRETE Co @ \ \ / , '1f
-L-r-----j- ----J RE=912.50 m°O� \�-91 ✓ mi! i°iD
- I IE(511�=905.60 (18' IN) s �`• ` 2 / m yi \ n' \ \ / / ' I I ` I
IE(NE)-905.20 (24. Our) \ '� '� / �. \ ` •m O / \ ? �\ \ / I \ I I
I s1a -` - 18• RCP // v� IN
O 1d4X
I r,,a--- _0 (�NOTM �� / _ oo �7u v /�' �I � \°;\, ,� ;i y I`V I � t � 1 / / as - --_ �. ,•.
�1
908 -- INCLUDES FES)
906�\r\ \
-- Y FEB -BI \ /
BASIN DATA: DRfB' 48• DIA CONCRETE
- -i • IE=806.00 / /
V �\ 6 (24".98.
eorroM=sos.o STORM WATER .� � /\ . ` � �, � <' ,� �•'' I \, � ` I i � � j �• i �.
I IE(SE)=904.78 (24' IN),
OUTLET=906.0 v IE -904.38 30'
100YR HWL=911.6
PES -82 ARTICULATED CONCRETE. MATCH LINE Sheets C4.4 C4
/ .5 r/ // ° \ \ �� ` // !L`'o
142' RCP BLOCK OR CABLE q / / - Rel JOB LF 24' RCP W ax u� mmm� / /, •` \ \\ \ \ \�\ e s\
�IE-906.00 CO pC =TIT
=l 24' RCP
- \ \�� / / gd�g08 O 0.50X , `L \ \ 'D�Q�O O •� / / i • / / \ \ \ \, \\ .0 9 I
IE=906.00 C4.6
/ / s "9x \ MATCH LINE Sheets C4.4 /
22 IF 42. RCP 906 / R► �� INDEX OF CIVIL SITE DRAWINGS:
CL3 O 0.23X \ \i /� \
INCLUDES FES) - 188 LF 24•RCP. /�°°/ i' \\` '\e �. \\..//• \ \ /'\� I- -) - - CO PROJECT LOCATION PLAN
cLJ o o.z3X912 / / a \ \ m C1.0 OVERALL LAYOUT AND PHASING PLAN
(LEN.TH _- -- �- -- ---� - ,, _._/ - _ _\ _ ao•O_ „ - C1.1 -C1.7 PRELIMINARY PLAT
72' DIA CONCRETE
RE=9u.3o --- -- INCLUDES FE� \\y' -�\-\ mdo � I \\ \ '
\ C2.1 -C2.7 GRADING AND DRAINAGE PLANS
~ I
T)(42• IN) r 914•' .11. \ �� \ \� / / / \ •\ •O /' T 1 C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
I J. (42' our) I I \ \ T�6> ✓�/ // \ \\ \ I C4.1
�:E(E)=36'0060"5�
-C4.7 STORM SEWER UTILITY PLANS
--J I
1 I \ \ // / A +✓ / \ °\ xoa ' / I I \ / C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
\ ` C7.1 -C7.3 DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55448
HENRY HANSEN
(763)238-1610
N
V
LU
N �
(L
`0 8
��Ir
W�lo'e^fny
vio
sCo
LU
W
O
j
IL
0
e
fr
big �
n�e�i
W W
C
o
46
W
0
m
ro fc°3
I�
QP
o
O
Lu
<E^�V)
4D
cl
/f
ticlI
6)
Lu
2
C4.4
Storm Sewer
Utility Plan
`0 8
��Ir
W�lo'e^fny
vio
sCo
2°
�E�E
>o
�Almmee
big �
n�e�i
ylw°a•u-.os
`
o F
m
ro fc°3
I�
VggA
o
a
<E^�V)
/f
ticlI
60
Q
j
II
� t
S
EL
U
yoN
a
e
.c
121
O
o
N
�
O
m
p�
W
W
O
ow
U
O
FILE NO.
00715
C4.4
Storm Sewer
Utility Plan
GENERAL UTILITY NOTES
SURVEY DATA
PAGE LAYOUT:
CUENT:
VHF INVESTMENTS,
1.
SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR
12. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO
SURVEY INFORMATION PROVIDED BY:
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY
MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING
MEYER ROHUN LAND SERVICES
C4.1 C4.2
LLC
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.
AGENCY AT THE CONTRACTOR'S EXPENSE.
708 iat AVENUE NE
2.
OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
13. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH
BUFFALO, MN 55313
3.
THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. FIELD MANUAL (CURRENT VERSION) FOR
DATED: FEBRUARY 12, 2019
C4.3 C4.4
1450543rd AVENUE N.
EXCAVATION.
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
PLYMOUTH, MN 55446
4.
THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES
14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES
BENCHMARKS (PROVIDED BY OTSEGO CITY
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER
LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC.
ENGINEER, HAKANSON ANDERSON, INC. NGVD
HENRY HANSEN
OF ANY CONFLICTS.
ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS
29 DATUM):
C4.5 C4.6
(763)238.1810
5.
THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER
ARE ESTIMATED.
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES
15. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT.
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
N OF 75TH ST., ELEV=928.00
6.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
16. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM
0 50 100 150
(-
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE NTH
TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE CO RD
C4.7
V
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING
17. ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
AND 38, ELEV=948:06
GRAPHIC SCALE IN FEET
W
7
Z
7.
UTILITY.
EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY
CASTINGS IN CURB SHALL BE SUMPED 0.17'. RIM ELEVATIONS SHOWN ON PLAN REFLECT
0
Q
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY
SUMPED ELEVATIONS.
PROJECT LOCATION
(A M
'4
a
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES
18. CASTINGS SHALL BE NEENAH R-1733 FOR MANHOLES, R-3067 FOR CATCH BASINS, AND
LEGEND:
IL
WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR ANY REPAIRS NECESSARY
R-4342 FOR YARD INLET (OR EQUIVALENT).
}
E
D U
LL A
BE HDPE ALL STORM SEWER IN LAWN AREAS SHALL ALL DUAL WAPIPE AND PART OF SE# OF SECTION 28, TOWNSHIP 121, I, p
SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 19 :c
R RANGE 23, EXISTING CONTOURS /�RZ 1'
8. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES. ROADWAY PAVEMENT AREAS SHALL BE CLASS 5 REINFORCED CONCRETE PIPE (RCP) WITH AND PART OF SW3 OF SECTION 27, TOWNSHIP V W $ J
9. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR WATER TIGHT JOINTS UNLESS NOTED OTHERWISE. 121, RANGE 23, ►► EXISTING STORM SEWER x 0 H
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING 20. ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS. WRIGHT COUNTY, MINNESOTA. W it C :a
SHUT DOWN. > EXISTING SANITARY SEWER 2 0
10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR -J IX
THE SUBDIVISION of THE LAND. LEGAL DESCRIPTION w w
I EXISTING WATERMAIN 7
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING: SEE SURVEY. -908 PROPOSED CONTOURS W W O W
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZEco o a y
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY ►► - PROPOSED STORM SEWER -1 z
ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR DENSITY AND Z Q O
NOT EXCEEDING THIS COMPACTION BY MORE THAN 17. BELOW THE UPPER 3', COMPACTION ► PROPOSED SANITARY SEWER Q P 0
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT SHALL NOT BEPROPOSED WATERMAIN Q (~/)
CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
�,- r I o1JIlUM=000.0 ✓I 111\I VI'.(vmI L_ r\ _ ���` �� I IE(SE)W
I 236 LF 24' RCP'1 - IE(',N 7.96 18' IN i I I OO'jLET=906.0
O 0,50X �- �� % •�•r'1 (!�i. 1 CW O 0.50X,1 IE(E)=BOZ66 �24' IN % I I J (NLN)=
73 LF 18' RCP I I E(s)=906.36 (42' o N I 100YR HWL-911.6 MATCH LINE Sheets C4.4 / C4.5
CL3 o 7.63X 4� I = MATCH LINE Sheets C4.3 / C4.5 _,� I �. I y\ \ . \ .
1111 �. ..
7 ,I �. I
_ yy�� FES -82 \
CO 24 A 265 LF 24' RCP 60" 1 1- - - '�T 25 LF 42' RCP O Fu b �' I ARTICULATED C��
60' DIA CONCRETE \ 60' DN CONCRETE -j 1, 12' RCP c c
_ 43 LF 42' RCP. CL3 O 0.40X CONCRETE AT STORM
RE=923 17 `. CL3 O 0.50X RE=914.00 1 \ - - _ /// IE=808.00
- 7 i1 t0 CL3 O 0.32X o - - -
/ \ ; IE(N)=910,58 8' IN) 'I Ic 111 CB -23 IE(N)-908.74 (24' IN) \ o L- - t PIPE OUTLET (IYP.) FES
% fE(E)=970.58 (18' OUT) 1 1 .48' Olit CONCRETE . IE(E)=908.74 (24' OUT) °' ` 1 o� F,�m o,- I - I 918.02 . 24' RCP •/ ° 8C N '47 I >, �Mo
R-03.17 i/ l I ..... C ..
111 �� 1 rn CB -13 _ _ _ - 157 LF 42' .� IE -908.00 � B m I o
IE(N .910.46 (18' IN) j rp / n 84' DIA CONCRETE I -- i Lxx:1 O 0.35X- 22 LF 42' RCP 906
I- - 25 LF l8' RCP 4 )) I a c
CL3 O 0.50% p IE(E)-910.06 (24' OUT) / 1 RE -917.21 _ - I _ - - , CL3 O 0.2JX 908 \ C 6 2 o
/ / L: - - I - (LENGTH a b 6 W E x I
1 \ L IE R)-908.50 (42' IN) r p CL3 O 0.23X 912 i / E o
(( BF
�1 � i \ / / � I \ \_ IE(Ej=906.50 (42' Ol/h I _ I I I N � m m INCLUDES FES) 188 If 24' RCP / �. R ° �' C3 Q I m m c
/ i
i
i
4 �
93 --
---
CONCRETE CONCR - - - - \ ° a a gt "' w m ° ;
rRE-911.30 -- 9 \ NCl DES - 8161 n p $
o p c o \. (IENOTN f5i
\ - -_ - -. l } \ -�m� ..moi /// .. 1• G CB -12 IE(W =906.05 'IN
14 V
'� A -d• - \ \ ` I �_ I 172' DH CONCRETE I IE(E; 808.05 �42' OUh I t 1 I 1 UI
FES .
0
�
48' OIA CONCR V t d a
RE=810
(
IE(N)=)808.40 U!
�t
I 1 _ .,. oro o •. 1. O \ � I I 2k3'CONCRELE I3�II 1 I---_.__ -_ I I \ - - � x
II r ��y 28.60. 1 �w 2s LF 75 -RCP. 1 I IE(S)?918�81 (12'O L_ _--979.6 91 ----------� L - -- _J L_ -,\
9 `
I--- ------
928.43�1� - 13+ 14 0 '1500 (� +00 c = r= 17 01 18+00 1904
-I - r - � r - - - - - -_ - -- - - � � -gyp, i --f -►-� ry- � _ a -►0 ♦ ; 6 � I� -T� I--�-I9\4-�N I,
_ v, _ 9` _!i_oo -�►_ ---__= 1=_�= Z \ c
I I I14u �^ / ' • - CB -35
4Of LF 15' RCP . _ _ _ 48' DIA CONCRETE - - - - - 07 123X18-
O 1.85X RE= F- - - - I 7 r - - -, - ,� 1 4BIXA' CONCRETE \ \ �i _ O 0.50X4 LL
48' DIA CONCRETE I I I I I IE(S)-817.86 (18' IN) I I , RE -915.52
RE -923.11 IE(E)-911.81 F 7
8 (18' OUT) 7 I I IE S)-907.29 (IB' IN) Q 916• ..S
IE N 919.48 (12' IN) I I I E9
IE(E -81..28 (15' OI/T)�9�' 2 v A
S )- I I I IE(N)-908.89 (24' OUn g 7 ¢
) I I 928.7 I I 924.1 I I 921.6 I 919.3 ( I I 918.0 I 916.9 \ I 9
76� ZI x
I m 1 i F8 I I I I F6 x y o p
FB 1 1 \ W
I f. 1 FB rn I'. I I I LF908.9
_ _ \ I I-LF91g.7 I I LF910:1_ I I LF918b I LF904.8,' -1 LF910.0 �, I 1 V LL
`.816.8
928.8
\ I I mea 4p0 y g3 - ) I I \ \ --- ---- 1 ---- NUN
- - I I \ I I --920 .918 '�'� 976 �•� I -\ 2•�
I
938 834 .928 1 I 926\ - ------ -822 . �9\6 - - - o
1
91O I J
'9g� - I �- t - ----- --- -- -- -- - - -
L----- - -----_ -J R L-- _- - _ - - - - ----- - -
-939.58 --B 1939.27 T Ln co Ln
vD
-
Gr,i t q p
/� - o � � ff' r 111-I :t F• 1 LL '.. 2 "' 41
Fr rr
I� J Ai�,{ ,7
\ W �
;r INDEX OF CIVIL SITE DRAWINGS: FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7 PRELIMINARY PLAT
_ - I C2.1=C2.7 GRADING AND DRAINAGE PLANS
I C3.I _C3.7 SANITARY AND WATER UTILITY PLANS
C) t, i C4.1 -C4.7 STORM SEWER UTILITY PLANS C4. ✓
C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN Storm Sewer
li C7.1 -C7.3 DETAILS
� I Utility Plan
GENERAL UTILITY NOTES
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY
EXCAVATION.
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER
OF ANY CONFLICTS.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACIU11ES TO ALLOW PROPER
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WALL COORDINATE WITH
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING
UTILITY.
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES
WALL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. ANY REPAIRS NECESSARY
SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
B. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES.
9. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING
SHUT DOWN.
10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR
THE SUBDIVISION OF THE LAND.
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING:
A. NITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZE
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY
ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR DENSITY AND
NOT EXCEEDING THIS COMPACTION BY MORE THAN 17« BELOW THE UPPER 3', COMPACTION
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE WITHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT SHALL NOT BE
CONSISTENTLY HIGH OR LOW.
8. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'.
our)YCRETE
CABLE
, �4.- JOB LF 24' A 0 0.5OX
° v
-03 49
/ I
0.23X
\ \
NS FEST- -\ - 49, a;
12. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO
MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING
AGENCY AT THE CONTRACTOR'S EXPENSE.
13. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH
MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL (CURRENT VERSION) FOR
CONSTRUCTION ADJACENT TO TRAVEL WAYS.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES
LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC.
ENGINEER AND OWNER SHALL NOT 13E RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS
ARE ESTIMATED.
15. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS
OBTAINED BY THE OWNER AND FOR PERMITS OBTAINED BY THE GENERAL CONTRACTOR.
16. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM
TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS.
17. ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
CASTINGS IN CURB SHALL BE. SUMPED 0.17'. RIM ELEVATIONS SHOWN ON PLAN REFLECT
SUMPED ELEVATIONS.
18. CASTINGS SHALL BE NEENAH R-1733 FOR MANHOLES. R-3067 FOR CATCH BASINS, AND
R-4342 FOR YARD INLET (OR EQUIVALENT).
19. ALL STORM SEWER IN LAWN AREAS SHALL BE HDPE DUAL WALL PIPE AND UNDERNEATH
ROADWAY PAVEMENT AREAS SHALL BE CLASS 5 REINFORCED CONCRETE PIPE (RCP) WITH
WATER TIGHT JOINTS UNLESS NOTED OTHERWISE.
20, ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS.
SURVEY DATA PAGE LAYOUT:
SURVEY PROVIDED
MEYER ROHLOIN RMATION LAND SERVICES BY. C4, 1 C4.2
708 1st AVENUE NE
BUFFALO, MN 55313
DATED: FEBRUARY 12, 2019 C4.3 C4.4
BENCHMARKS (PROVIDED BY OTSEGO CITY
ENGINEER, HAKANSON ANDERSON, INC. NGVD
29 DATUM): C4.5 C4.6
TNH, EAST SIDE OF ODELL LANE, 1ST HYDRANT
N OF 75TH ST., ELEV=928.00
0 50 100 150
RR SPIKE IN PP, NW QUADRANT OF OGREN
AVENUE AND CO RD 3B, ELEV=948.06 C4.7
GRAPHIC SCALE IN FEET
PROJECT LOCATION LEGEND:
PART OF SEJ OF SECTION 28, TOWNSHIP 121,
RANGE 23, - EXISTING CONTOURS
AND PART OF SWJ OF SECTION 27, TOWNSHIP
121, RANGE 23, r7 EXISTING STORM SEWER
WRIGHT COUNTY, MINNESOTA.
EXISTING SANITARY SEWER
LEGAL DESCRIPTIONEXISTING I
SEE SURVEY. 908 PROPOSED CONTOURS
N PROPOSED STORM SEWER
► PROPOSED SANITARY SEWER
PROPOSED WATERMAIN
I 1 I ( I•
I \
v / MATCH LINE Sheets C4.4 / C4.6
\ \ L' %.� - \ I ) \ \ \` •� X'J?.0
v vv� �. `��
/
-
\ ♦ \ / '/ xp / � 48' DIA CONCRETE , / \ I \
15J \ ♦.♦ / �ryi 1J RE -914.28\\ 4\ \\ \ -
/ IE(SE)=905.90 (24' IN)J\
CB -31 •\\ i / / i / / IE(NW)-905.90 (24' OUT) / m
f7DA CONCRETE y •, /' / R \ \ �\ p°a•'�� \ w
= M-911.42
I 1.40 124' IN)
J�IE(r )6.40
i7f1 .JO% LF 24RRC ♦ \\ i/ /� 9\6 \ R. \ \ \, �.� .oa 1� Y\
S fkpO r CB J2\ / \ \ \ li' ' 223 IF 24' RCP
9\i - 72• INA CONCRETE ,� \ / /' / m w o• O 0.50X
911.44
U)
- U) �' \ IE(S)=906.47 (12' IN) \
IEE)- 906.47 (24' IN) \ I
? \ \ IE�N)-906.47 (24' OUCf
T)
\ O 0.60X \ \ ♦� / \ \ \ \ O
DIA CONC 1 I \ \ ♦♦// \ \ / c
89 (2(18 FB eA - \ 192 LF' 15' ` \ \ CO -78
NOPE O 0.5OX 60' Dl4 CONCRETE \
918.9 \ \ �9�181 \ \ \ / RE=911.19 \ 1
\ \ _ \ / IE(E)=805.J9 (15• IN)
FB \ \ _ \ - - \ ` 'E(S)=805.19 (18' IN)
LF008.9 \ \ - " \ \ \ IE(N)-904.79 (24' OUT) \
9\A \ \ \\ \ 50 LF 18'
\ \ \ \ \ \ � O 0.50--� I
-- - --.t�- CB -82
27' DIA CONCRETE
CB -33 RE=909.95
27' DIA CONCRETE - _ - - IE(E)=907.45 (15' OUT)
RE -909.95 _
IE(N)-907.43 (12' OUT) - - - 126 LF 12- HDPE
- - O 1.28X�-•.... ♦�
.. m N• N rel
I >t
r
I I _
I
I I
I m
y�
- - - - ( V
\ � 0 A
1
\ C8 -BO
1 2k3' CONCRETE .
T RE -911 19
j IE(W)-907.19 (15' OUT)
( 25 LF 15' RCP
I 1 I I •
tI t � II
m I I
m
MATCH LINE Sheets C4.6 / C4.7
lal
' 8j8'
923.27
T
INDEX OF CIVIL SITE DRAWINGS:
CLIENT.,
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRYHANSEN
(783) 235.1610
h10
-6
W
;ono
rrAA
�a
[y
d -4
2 � w
�X10 p�pQ
B �pi
fig' V Q
Imm O�>
111 (L
lei S
20 �
ocO
Z>Lu
3
Lu
co
C6 STORM WATER POLLUTION PREY. PLAN
W
Za o
-
Q 1-
Utility Plan
= ui
W
lI V
gp
d1
W
It
rgg�
COPROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
h10
-6
C1.1 -C1.7 PRELIMINARY PLAT
;ono
e
[y
d -4
�X10 p�pQ
B �pi
fig' V Q
Imm O�>
ycQ `E n
lei S
rnU
W
Ia °cT
g0
C5.1-05.2 STREET PROFILE PLANS
IM
C6 STORM WATER POLLUTION PREY. PLAN
Storm Sewer
-
m
Utility Plan
ami
a o
Wd
B pi
lI V
gp
W
N
C c
S
UU}
O
t
qU
J v
3a
3
v�ioQ
J
eZZq
N
CO
O
m
zz
�
O
3
O O
0
U
FILE NO. 00715
COPROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7 PRELIMINARY PLAT
C2.1 -C2.7 GRADING AND DRAINAGE PIANS
�`Q i/
C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
/`/i!-_
C4.1 -C4.7 STORM SEWER UTILITY PLANS
.
C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
Storm Sewer
-
- C7.1 -C7.3 DETAILS
Utility Plan
1
GENERAL UTILITY NOTES SURVEY DATA PAGE LAYOUT: CLIENT:
1. SPECIFICATIONS APPLICABLE FOR THIS PROJECT: CURRENT STANDARD SPECIFICATIONS FOR 12. THE OWNER SHALL PAY FOR ALL TESTING OF SOILS COMPACTION. ANY AREAS WHICH FAIL TO SURVEY INFORMATION PROVIDED BY: VHF INVESTMENTS,
THE CITY OF OTSEGO AND THE LATEST VERSION OF THE STANDARD UTILITY SPECIFICATIONS BY MEET THE ABOVE STANDARDS SHALL BE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING MEYER ROHLIN LAND SERVICES C4.1 C4.2 LLC
THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. AGENCY AT THE CONTRACTOR'S EXPENSE. 708 1st AVENUE NE
2. OSHA REQUIREMENTS SHALL BE FOLLOWED FOR ALL WORK ON THIS PROJECT. 13. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS NEEDED IN COMPLIANCE WITH BUFFALO, MN 55313
3. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL 48 HOURS PRIOR TO ANY MnDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL (CURRENT VERSION) FOR DATED: FEBRUARY 12, 2019 C4.3 C4.4 1459543rd AVENUE N.
EXCAVATION. CONSTRUCTION ADJACENT TO TRAVEL WAYS. PLYMOUTH, IAN 55446
4. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES 14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES BENCHMARKS PROVIDED BY OTSEGO CITY
WITH UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION AND IMMEDIATELY NOTIFY THE ENGINEER ( HENRY HANSEN
OF ANY CONFLICTS. LISTED ON THIS PLAN PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC. ENGINEER, HAKANSON ANDERSON, INC. NGVD
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER ENGINEER AND OWNER SHALL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS 29 DATUM): C4.5 C4.6 (763) 238-1610
FUNCTIONING DURING AND AFTER CONSTRUCTION. ANY REQUIRED SUPPORTING STRUCTURES ARE ESTIMATED.
SHALL BE SUPPLIED BY THE CONTRACTOR AS WORK INCIDENTAL TO THE CONTRACT. 15. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS TNH, FAST SIDE OF ODELL LANE, IST HYDRANT
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFUCTS BETWEEN OBTAINED BY THE OWNER AND FOR PS USE OBTAINED CON BY THE GENERAL CONTRACTOR. N of 75TH ST., ELEV=928.00
16. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM 0 50 100 750 F -
EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE WITH TO THE CITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAILS. RR SPIKE IN PP, NW QUADRANT OF OGREN L Q
THE UTILITY COMPANY IN QUESTION TO DETERMINE THE NEED FOR RELOCATION OF THE EXISTING AVENUE AND Co RD 38, ELEV=948.06 C4,7 ' W
17. ALL MANHOLE CASTINGS IN PAVEMENT SHALL BE SUMPED 0.03'. ALL CATCHBASIN
UTILITY. GRAPHIC SCALE IN FEET > Z
7. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY CASTINGS IN CURB SHALL BE SUMPED 0.17'. RIM ELEVATIONS SHOWN ON PLAN REFLECT 0 Q
THE CONTRACTOR AND THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY SUMPED ELEVATIONS. PROJECT LOCATION(q ([
THE CONTRACTOR. ONCE CONSTRUCTION HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES 18. CASTINGS SHALL BE NEENAH R-1733 FOR MANHOLES, R-3067 FOR CATCH BASINS, AND LEGEND: a (L
HILL BE ASSUMED TO HAVE BEEN CAUSED BY THE CONTRACTOR. ANY REPAIRS NECESSARY R-4342 FOR YARD INLET (OR EQUIVALENT). ,-
PART OF SE3 OF SECTION 28, TOWNSHIP 121, }
19. ALL STORM SEWER IN LAWN AREAS SHALL BE HDPE DUAL WALL PIPE AND UNDERNEATH F- «N
SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. RANGE 23, = f.
B. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES. ROADWAY PAVEMENT AREAS SHALL BE CLASS 5 REINFORCED CONCRETE PIPE (RCP) WITH EXISTING CONTOURS �R W � J
9. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND PROJECT ENGINEER 48 HOURS PRIOR WATER TIGHT JOINTS UNLESS NOTED OTHERWISE. AND PART OF SWI OF SECTION 27, TOWNSHIP V
TO STARTING WORK OR AS REQUIRED BY THE LOCAL JURISDICTION OR BE SUBJECT TO BEING 20. ALL FLARED END SECTIONS 24" AND LARGER SHALL BE FITTED WITH TRASH GUARDS. 121, RANGE 23, -- PF EXISTING STORM SEWER 0
SHUT DOWN. WRIGHT COUNTY, MINNESOTA. LLI IL C
10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR - EXISTING SANITARY SEWER 2 0
THE SUBDIVISION OF THE LAND. LEGAL DESCRIPTION - EXISTING WATERMAIN W W
11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL Z � O
CONTROLLED FILLS IN A TIMELY MANNER. DENSITY TESTS SHALL MEET THE FOLLOWING: SEE SURVEY. 908 PROPOSED CONTOURS W W p W
A. WITHIN THE UPPER 3' OF STREETS OR PAVEMENT, THE GRADING CONTRACTOR SHALL UTILIZE rr^^ O 0 (A
APPROVED SOILS THAT ARE WITHIN 1% OF THE OPTIMUM MOISTURE CONTENT AS DEFINED BY vJ
III - PROPOSED STORM SEWER
ASTM D-698 STANDARD PROCTOR TEST MEETING 100% STANDARD PROCTOR DENSITY AND Z Q 0
NOT EXCEEDING THIS COMPACTION BY MORE THAN i%. BELOW THE UPPER 3', COMPACTION ► PROPOSED SANITARY SEWERIx
Q F- 0
SHALL MEET 95% STANDARD PROCTOR DENSITY AND BE VATHIN 3% OF THE OPTIMUM
MOISTURE CONTENT. GRADING TOLERANCES SHALL AVERAGE 0.1', BUT SHALL NOT BE PROPOSED WATERMAIN 2 W �
CONSISTENTLY HIGH OR LOW.
B. GRADING TOLERANCES FOR THE REMAINDER OF THE SITE SHALL BE 0.15'. 9
M
27.0 coNCRE1E I I I �- 95? a I I o Pi - O !° E
� I � � W;e���
34 88.57 UT I I ; !c o z w I ° win 6
-py)e
-
2 7f
II � ,{9 Z9�J1.1 IIIII I l 99/5.2 Lp6lIIIII r I .II Ob6 I II �-\L,Z9Fb4F9699B.62 . 2 III I1II CF9_4939-
.67 -- -- o-maJ -.- - -
ss°
O
m$
8o-a'
IIw�a
ji
06 E� R---- - ---- a
62 IF s' RP
Nlil3�1 4906O3 MLWI0 0.50% I
918.9 9
M'W
I 93OLFBO 3II
MLWO I I I
433 I I 9 I I I
916 FBMLwO
MIL
CO -88
•
RE -938.70
z
E=938.70Z 0
M IE(SW)=934.7(ib' OU )
51 LF 15'-IIL
-
-fiJ
4o 15' RCP
(15 OUF) lL - JI 1 -9--40�II =rI JII --L' - ----- ---- - -_-- Q /�T^II IL . 1-IIi_ e - 1rI-,,\. '•`�t- a,-- _ �-o�/'//-r L'
,
.\ y . 3\•3/ 1 rrf'
'-
l i
+ 0+00 32+0
25+ 3
,
91 + vi
is�
48' 8DA48 014 CONCRETE - R277 LF 15RCP E9.CNCRETE
n 5.IE9.49 .IIEE((NE934.47(ib'IN)
IE(N)=932.84 )- ' OUE)N=1881.842.6(1our) (15 o 34.47E(Io (15
1 4 +pq -1 45.3
CONCRETE 844.0 F7 927.5 I 44.7
FBLO
LFB22.1LF919.6 II LF992.6'-f 905.84 (12' MLWO FS 937D11 9406 9680 L 7 90.6LFIE
IE(N)=905.44 (18
'I
O2oe4zqZ�>gZi
0ggU��a-
44
I\
--- - -- ----
--
1
Oki
CID
In
I
N 77
i
1
h
INDEX OF CIVIL SITE DRAWINGS: FILE N0. 00715
COPROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
\ C2.1 -C2.7 GR IINGARY ANDP
LAT
DDRAINAGE PLANS
II
\! C3.1 -C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7 STORM SEWER UTILITY PLANS C4.7
C5.1-05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN Storm Sewer
ff, o C7.1 -C7.3 DETAILS Utility Plan
OHLAND AVENUE
952
960 HIGH POINT ELEV = 931.26
958 HIGH POINT STA = 2+11.70
s5s PVI STA = 2+00.00 -'_ _ I_ �'� HORIZ: 1"=100'
PVI ELEV = 931.60
954 A.D.-2.917. I-� _ 4 , - -VERT. -1 =10'
952 , -
950 K - 34.32 HIGH POINT ELEV = 921.5¢
948 100' VC - -I- - J - - HIGH POINT STA = 11+OD.00 _
946 - I - { PVI STA = 11+50.00 I I, LOW POINT ELEV = 911.72
0 0o a o0 1 PVI ELEV = 921.OD LOW POINT STA = 22+43.18
944 n . A.D. = -2.3B% - LOW POINT ELEV = 91 00
LOW POINT STA = 14+96.39 PVI STA = 23+25.00
942 + m + _j- - I_ - _ K = 41.94 HIGH POINT ELEV = 913.54 PVI ELEV = 911.26
940 N - - -- J PVI STA = 14+50.00 _ -
938 ed •• r, �. _. _ - I PROPOSED - I =- PVI ELEV
V 4.327.50 HIGH POINT STA = 18+50.25 -- -- -. A.D. = 5.507. - - - - - -
y U m I 100' VC _ PVI STA = 18+37.99 K - 36.36
936 - > o PVI ELEV = 913.70
934 _ - - �l- Ne _ - cw + o-- A.D. -1.327. 1 o 200' vc N
m L� I
m °1 �i K '= 34.68 -_ -
932
930 � .1.807. ', K - 75.49
926 - -Y a
- N N
926 ! _ _._ _. _ 1 - _. L12%_ --_- -l�c�i �� INo _ o No100' VC m II- TIN mN
150' VC���oo-
m
924 I ; olsnNcWM m �+ ^mom w� WPI 922 920 GRouND - v w N�� IIt918 _ - � IIELEVAtION Im >- 916 - - - - -T _ _ _ 5 ��\ mw914 -- ----'i- -- - - - - j - :. 4 T��'' 0.827. - . - - 0%_ > w>
912 - � f _.
908 L
906
904
soo
I
- - -- ;-- - - -
898
896
qj4_F - - -
892 1-
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+0027+00:
OHLAND AVENUE
964
962
960
958
956
954
952
950
948
946
944
942
940
938
936
934
932
930
928
926
924
922
920
918
916
914
912
910
908
906
904
902
900
898
896
894
892
127+0028+0029+0030+0031 +0032+0033+0034+0035+-'ffG- 50
74TH STREET
960 LOW POINT ELEV = 92%.73 HIGH POINT ELEV 930.74 960
958 - LOW POINT Sl`A = 2+52.63 - HIGH POINT STA k 6+40.92 _ _ _ -_ LOW POINT ELEV = .925.16 HIGH POINT ELEV =. 926.16 958
956 PVI STA 2+50.06 PVI STA = 6450.00 __ LOW PONT STA 11+46.64 HIGHIPOINT STA = 13+63.76 ��-
954 - - PVI ELEV = 927.50 _ PVI ELEV.= ,1931.00 - PVI IISTA = 11;+25.00 ! PVI STA =, 14+25.00 HORIZ: 1"=10b' 956
A.D, =I 1.85% I__ _ A.D. _ -2,149 _ PVI ELEV = P25.00 PVI ELEV 1= 926.50 ii_ Ir 954
952 K = 54.13 K 46.7 - -
D. = 1.76R AD - I-5;45% - VERT: 1 -10 952
950 _
i -- -- I PK - 58.2 '� K = 27.52 950
948 10011 VC -1 100'. VC 948
946
944
w w
oNw toocn ciG
1501 VC 946
944o
942 0 942^o o
940 nm0 o �0 940
8 + o
93 n u) N 0 93
6 v+
> 63
93 936
934
932932 934
m930 .97 0 930
928 -1.26%,
TERLI0.50% �
926
- 2
924 92
6
922 I _924
920 _ 922
918 - PROPOSED
0
1STREET gg
NE96 - EXISTING ELEVATION 916
914 - -r GROUND 914
912
ELEVATION - - - _ _ 0°�^ _
-
906 II i I- -- 908
I 910
908
906 j I 1 -I 906
904--
902-
04 904
- 902
900 I 898 I 900
896 - - -- 1 -I - - - --I I -- _ ___898
892 -- -1- - - - - 896
894 - -- - I- - - - j -
- I- - - - _ 892
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+0010+0011+0012+0013+0014+0015+0016+0017+0018+00
GENERAL NOTES:
INDEX OF CIVIL SITE DRAWINGS:
1. STATIONING REFERS TO PROPOSED ROAD CENTERLINE,
CO
PROJECT LOCATION PLAN
2. THE CONTRACTOR SHALL CONTACT "GOPHER STATE ONE CALL"
C1.0
IN- a
OVERALL LAYOUT AND PHASING PLAN
PRIOR TO ANY EXCAVATION (1-800-252-1166.)
C1.1
-C1.7
PRELIMINARY PLAT
3. ALL CONSTRUCTION TO COMPLY WITH CITY OF OTSEGO
C2.1
-C2.7
GRADING AND DRAINAGE PLANS
SPECIFICATIONS.
C3.1
-C3.7
SANITARY AND WATER UTILITY PLANS
4. CONTRACTOR SHALL VERIFY ALL CONDUIT REQUIREMENTS FOR
C4.1
-C4.7
STORM SEWER UTILITY PLANS
SITE ununEs PRIOR To PAVING
C5.1-05.2
111
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREY. PLAN
3
O
C7.1 -C7.3
DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)236-1610
H
m
111
7
y
u
a
IN- a
a
ui 2�
a
Lu
Lu
W_ It
0
f
w
� U
a
Lu
m�
°o
Lu
W
ZQ
O
111
N
m
p
3,
m
°w
O
3
O
e
W
U
It
oca
m
L li
y
u
a
s
a
V
h6
SE�� �
p zw�mbob�
° ° e f•1
� U
I '- a
rn
N
�
on
N
m
p
3,
m
°w
O
3
O
co
y
u
a
s
a
2
W
a
rn
J�X
� R
e
� II
0
rn
N
�
on
N
m
p
3,
m
°w
O
3
O
y
O
W
U
FILE NO. 00715
Profile Plan
968
966
964
962
960
958
956
954
952
950
948
946
944
942
940
938
936
934
932
930
928
926
924
922
920
918
916
914
912
910
908
906
904
902
OGREN STREET
950
HIGH POINT ELEV = 939.77
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
CO
950
948
C1.0
LOW POINT ELEV = 917.71
PRIOR TO ANY EXCAVATION (1-600-252-1166.)
948
946
- d
LOW POINT STA = 3+09.81
GRADING AND DRAINAGE PLANS
946
944
1I
PVI STA = 2+75.00 -.
C4.1 -C4.7
944
942
-
1
PVI ELEV = 917.50
960
942
940
2
3
A.D. = 3.29% !
958
940
938
K = 30.39
956
938
946
O
O
954
946
934
0 954
100' VC
934
932
- --942
o $ N oo-i
-
932
930
928
°RIDunD
ELEVATION
a0 N t N
F, + m ry
I
930
928
926
3.
w
- l_
926
924
'?.2g�
w-
m
l
924
922
928
m
i -
922
920
926
924
O%
920
918
PROPOSED
922
920
918
916
CENTER,
STREET CENTEEWNE
918
916
914
EiEVAnal
914
IL
= 0
914
912
934
912
W
912
910
- --
-
---
910
908
930STREET
ELEVATION CEKTERUNE 93D
W W
908
906
928
ELEVAn0H 928
y
-,
906
904
-
OIFE
924
922
-
904
902
--
- -
920
-
902
900
918
HORIZ: 1'f=100' 914
190D
898
-
912
VERT: 1I'=10' 912
2
898
-�,896
894
-
894
892
-
I
892
0+00 1+00 2+00 3+00 4+00 5+(EGF50
HORIZ: 1"=100'
VERT: 1"=10'
ORDELL AVENUE
71st STREET
HORIZ: V=100'
VERT: 1"=10'
960
HIGH POINT ELEV = 939.77
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
CO
960
958
C1.0
OVERALL LAYOUT AND PHASING PLAN
PRIOR TO ANY EXCAVATION (1-600-252-1166.)
958
956
- d
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
956
954-
1I
4. CONTRACTOR SHALL VERIFY ALL CONDUIT REQUIREMENTS FOR
C4.1 -C4.7
954
952
-
1
STREET PROFILE PLANS
960
952
950
2
3
C7.1 -C7.3
958
950
948
y
956
948
946
O
O
954
946
944
0 954
944
942
- --942
<
940
940
938
---
938
936
o 950
N
936
934
934
932
Exlsnec
r GROUND
932
930
/ ELEVATI0N
930
928
m
928
926
I
926
924
'3 o.6t%
924
922
99
922
920
PROPOSEDJ
920
918
STREET CENTEEWNE
918
916
ELEVATION
916
914
IL
= 0
914
912
934
912
0+00 1+00 2+00
72nd STREET
CLIENT.
VHF INVESTMENTS,
LLC
0+00 1+00 2+00 3+00
968
966
964
962
960
958
956
954
952
950
948
946
944
942
940
938
936
934
932
930
928
926
924
922
920
918
916
914
912
910
908
906
904
902
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00
GENERAL NOTES:
HIGH POINT ELEV = 939.77
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
CO
PROJECT LOCATION PLAN
HIGH POINT STA = 1+31.70
C1.0
OVERALL LAYOUT AND PHASING PLAN
PRIOR TO ANY EXCAVATION (1-600-252-1166.)
C1.1 -C1.7
PVI STA = 1+50.00
HENRY HANSEN
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
PVI ELEV = 939.94
C3.1 -C3.7
(763) 236-1610
4. CONTRACTOR SHALL VERIFY ALL CONDUIT REQUIREMENTS FOR
C4.1 -C4.7
A.D. = -1.58%
SITE UTILITIES PRIOR TO PAVING.
C5.1-05.2
STREET PROFILE PLANS
960
K = 63.40 960
WATER POLLUTION PREY. PLAN
2
3
C7.1 -C7.3
958
958
$E °
y
956
too' vc 956
f'
L:
O
O
954
0
0 954
952
<
o 952
950
n
O
o
o M
°
o 950
N
0
co
948
946
W
948
a
Z
Q
944
m
G
m
946
' 944
=
«
d
942
0.5D7�
I. d-.
99
ttRR Z
=
m
940
938
r
0% 0
�� 936
W
J
936
936
IL
= 0
C
(y
934
934
1
W
x
a
932
EXISTING GROUND PROPOSED 932
930STREET
ELEVATION CEKTERUNE 93D
W W
Q
928
ELEVAn0H 928
y
W
926
926
Z J
OIFE
924
922
924
922
Q
Q �-
W
920
920
= Z
918
914
918
HORIZ: 1'f=100' 914
w
912
VERT: 1I'=10' 912
2
0+00 1+00 2+00 3+00
968
966
964
962
960
958
956
954
952
950
948
946
944
942
940
938
936
934
932
930
928
926
924
922
920
918
916
914
912
910
908
906
904
902
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00
GENERAL NOTES:
INDEX OF CIVIL SITE DRAWINGS:
1. STATIONING REFERS TO PROPOSED ROAD CENTERLINE.
CO
PROJECT LOCATION PLAN
2. THE CONTRACTOR SHALL CONTACT "GOPHER STATE ONE CALL"
C1.0
OVERALL LAYOUT AND PHASING PLAN
PRIOR TO ANY EXCAVATION (1-600-252-1166.)
C1.1 -C1.7
PRELIMINARY PLAT
3. ALL CONSTRUCTION TO COMPLY WITH CITY OF OTSEGO
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
SPECIFICATIONS.
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
4. CONTRACTOR SHALL VERIFY ALL CONDUIT REQUIREMENTS FOR
C4.1 -C4.7
STORM SEWER UTILITY PLANS
SITE UTILITIES PRIOR TO PAVING.
C5.1-05.2
STREET PROFILE PLANS
W
C6STORM
WATER POLLUTION PREY. PLAN
2
3
C7.1 -C7.3
DETAILS
a
b �
boa
a
�u
it c
od0
nn,E
N
Ea,�
2
G
z°Imm°e
°
c
n?a��
Jv=lwa..ua
Z. F
so
O
b
W
W
c
�
2
3
2
Y
$E °
y
W
O
O
U
I
k
�u
it c
a
N
a
m
e
0
O
m
W
W
c
FILE NO. 00715
CS.2
Profile Plan
N
m
m
O
m
W
W
2
3
2
Y
y
W
O
O
U
FILE NO. 00715
CS.2
Profile Plan
I '
VEGETATION GROUND COVER SCHEDULE
- AFTER COMPLETION OF INFILTRATION t. slobinz.ewn of oil exposed soft areas must be Initiated immemtery but In no
BASIN GRADING, CONTRACTOR SHALL ca a ...o.ted let., mseem en (7) days aft., the con.trucr. activity b that
- REMOVE ANY SEDIMENT DEPOSITED IN - portion of the site hos tempa.Hty or permanently ..osed. Seeding and
BASIN, RE-STABWZE SLOPES, AND mulching shall conform to the latest NPDES requirements for installation
- INSTALL SEDIMENT CONTROL AROUND �'., - schedule with regards to grading.
r BASIN. REMOVAL OF ANY SEDIMENT ;p 2. Permanent turf ground eov shall iacbdc all disturbed are., be covered with a
�. NECESSARY SHALL BE CONSIDERED r em 6• topsoil and sodden seeded flowed by City, or os propose an
ROCK CONSTRUCTION - INCIDENTAL TO THE GRADING CONTRACT, smty opproneed landscape pian for ts he project. if not otherwise specified, turf
ENTRANCE I I seed to ba MnDOT mix 25-151 applied at 120 lbs/ac. Infiltration basin
seed to be 33-261 applied of 35 lbs/oc with bottom of basin mulched
- i • I with clean gran straw (Mn/DOT Type 3) applied at 2 tons/ac. IAnDOT
7 7-77 75th She t a',• _ _,_,_,_,_,� - �L�•�•�• - 1�--� - Type 1 mulch shall be applied at 2 tons/ac and disc anchored I, rens
•�'�•�•� • •r• •:• • • •• not Covered by sod or erosion blanket. Seeding and mulching shall
r`' conform to the latest NPDES requirements for nstollation schedule with
- _-T�.-�R ,-1�. --r__- _-, .\; - LT NC ( B" WOOD FIBER LOGS OR <yards to grading.
` a I FENCE TYP.)
T---- ,
3. Te poro r grove Wer to be d by seed "nix T 111 shpt be applied at 31
-`~ \ \ WOOD CHIP BERM FOR las/a a equv.tenl as approve by City. MnDOT Type 1 mulch shall be applied 0 150 300 450
al 2 tans/ac and a e anchored In area met covered by sod ar ,msl,n blanket.
REDUNDANT SEDIMENT '
4. Disc ter for Lodi shell be Mn00T Type 322-5-10 am applied T 357 Ib/aa.
i\ WOOD FIBER CONTROL WITHIN 50' OF mea renaaer kla by 3 of nal. sPean<.uon relere we h MnDOT 2s74. GRAPHIC SCALE !N FEET
5. Dormant see m;, "hag be led offer Bovember 1 or when tem
ti \ \ pee Alas do mot
L Jl _ �' _�_J� --jl- _ ( - _ I BLANKET AT INLET G J SURFACE WATER (TYP.) on.. 40• F, eater rater rates •penned abuts. Na eeee a au be ek=ed
- e seeded Ica m..greater man 2 t depth.
I ,
. -- an.
-� '- '-^» -'- ^--+-_• •a / 6 I.seedt Conireetc that ,'s ext become established wAh vegetalbn aholl be
pence.
7. Erasion bknkel shall be 'natall<d In see areas with ground nada« atop,. of LEGEND
t INSTALL FILTER LOGS 411 IV a, steeper.
,, .. AROUND INFILTRATION s. After cam and guile" i, backrlkd, soft tolerant sod to be plated in the boulevard
�, �, ', �• , for 3 feet behind the curb.
BASIN AFTER COMPLETION -
OF BASIN GRADING Bch - - Existing Contours
_1' n r INFILTRATION BASIN NOTES
!� _ I - �[- - .,. �' -I t �• J I J1 - - L i l >F . _ WU i,= I I fy,. - ., .. Existing Storm Sewer
1. 1,7ttrmrea lon ashall be staked .1( dear ....t -flan to ",strict heavy equipment
-- - - � j 1 lilt �, i 1, _, U,t Iy �I � : II •_t`f.
from
eoempactkg native sane.
ROCK CONSTRUCTION INFILTRATION z. entteero gpepriaie temporary an
-tial ml aevite" o pevnt edimene from
_ •- •-•-•-•-
Proposedosed Contours
BASIN entering the Practice during construction.
Gmdmg or the tmtati.n oan mtow Impact tiProposed Storm Se
w
eraENTRANCE INLET -in it itaNpadbins nee,1Im9aes. m
hockoraoIemwa ,f<ersmd aeks ae,mena
PROTECTION 4. In the event that sediment is introduceinto the Be.b" or immediately ------------__- Proposed Silt Fence
fogowing
expennifio,, this. material wig need to be removed from the basin poor
��) /, to Initk,tAg the most step In the conslruclbn process.
(TYP.)
•�, ,� i� j S.
-•_.-._.- _._._ Instal sediment control around eosin after completion of basin great". _._,-
- Proposed Fiber Logs
6. Seeding and Installation of erosion control shelf be completed within 48 hours of
final roc of eosin.
- I` / / ) Pro osed Inlet Protection
M
• -- SILT FENCE
..1
F^t
1rf,
SWPP NARRATIVE
This retldential project construction will eormi of elle clearing, ode u il' e o ne
P o)ee 9 gracing.
t d s. and tit el
eonslrucl;on. Construction (skneed for 2019.
P
Flrsl meter sfit fence and rock construction enhance shell be installed. Then site work
pen
shall commencee The contractor shall dispose on debris all -bile within 24 hours. Then me
site can be railed nand l installed irtbulkingconstructed cumin ala o menta,steed
enol grade tolerance, and landscape i al stbi6za6 mulch need renal grade v a ation Is dna
est.1,ed, d. site shall be stobifentr vrlth seed aeeo bad. Once vegetation k
,stab%"heel, temporary erosion control measures Shall De removed.
POLLUTION PREVENTION NOTES
Soria waste: collected sediment, ospholt and concrete milnngb, floating debd., paper, plastic,
fabric, construction dehrh and other wastes mush be disposed of props off-site and must
comply with MPCA requirements.
H ...
rdeu, m lariats: ib, ubstance g.sollM, point, and any hazardous ssl be Drapery
stored, including secondary containment, to prevent spills, leaks or other discharge. ftslrkted
ss to store a must be rovided to event vandoaism. Stores. and die ...I must
in compll.- with
bet o4PG regulations. Mp
External washing of trucks or other construction vehkles i not allowed on site. No engine
degreasing 1, nlowe on site. No concrete washouts are allowed on it,.
2ncret truck x11hout is not to be ailowe on ill unless washout waste is contained with
discharge to ground surface or site drainage facilities. Containment systems are to be
located a minimum 50 feet awoy from drainage facilities and watercourses. Containment
system. hall have an impermeable liner Con inmen
sys a p la l system shall be clearly marked with
stglwge.
A% ...aa waste must be collected from adabl, toilet units on fife a licensed w.bie
ry P by
msis .. a ed to tor,prevent
The unite must De aecwed and halt be maintained on a regular
Dash as needed
to prevent overfilling.
DESIGN CALCULATIONS
Design calculations, Imiudtg sell type, are on fie with: civil E.gbeerbg Site Design
SWPPP Design.: Scott D.hike (Expire, 2022)
RESPONSIBLE PARTY
Contact Information for the responsible
Party far erasion control is:
O,a,xr: VHF investments. LLC
1450543rd Ave. HE
Plymouth,
th, MN 55446
Cmbeckr. On -Site s.br.e
5470 Duo. Avenue NE
SL Michael, MN 55376
%[,nage,. Henry Hansen
763-23a-1610
f WOOD FIBER
1 I- BLANKET AT INLET
r ,'oRY
STORM WATER
BASIN
II I,
EROSION CONTROL NOTES
1. NI devices n to control erosion and s�ment I.E. perimeter silt fence rock
necessary osbn (
construction nst-n entrances, swots, ponds. berms, ETETC.)ahshallbe installed prior to any other
ansr operations.
fir
2. Alter completion of final rade sed cogs s be e m
mut hent stab ted whin 7
g g, ,apo permanently b
do,,. . erosion
shall It sial of oras -anchored seed mulch.
8 mu h. HECP with ober reinforced
matrix erosion b kept 1, seed or sod.
3. The site must be kept Ina well drained condition at all,s Umes. The contractor shoal ebe
.
responsible for temporary ditched, or other mean, nefile,, to en Proper drainage.
The bugling pad use be provide with a positive .ul(low. This work shall be Iacldentai
to me /exiti, roll the s
4. Enlerg/exiling of the site shoal ce,or only nt rock construction enrollee is educe
must
of did onto pawed tacrap Sediment tracked onto Meals daring eking hour.
moat De rec%cho win street scraping and ....ping t the ee of h working ith
5. Slontity, r dplace a pipe outlet energy with
City tit hall . Provided tit dip -rap with size,
gthrn�t24 and
of pipe inst0.15 honied with City standards. Rip-mP installation stroll be
6. Install sin fence ..and all tempora, � Inactive stockpiles 010ore trot place within existing
silt fence or ar other perimeter stn controls.
7. St,bigsalkn of temporary ar permanent drainage ditches that drain water from the
construction site meat be iniliolId within 24 hours of connecting the drainage ditch to any
.term rooter conveyance system and must be completed using erosion blanket.
6. Sufficient personnel, equipment. and materials shoal be mobilize within 24 hours of written
order 0s. email) by the owner r rs ew.... let,, to conduct corrective work and
Instal temporary -i- control work in the cane of on emergency.
EROSION CONTROL INSTALLATION SCHEDULE
i. Sill fence shall be insl.11ed or restored prior to any construction. Silt fence shag be
located as shown to intercept runoff. The urea located beyond the per'uneler silt fence
shell at be disturbed during construction.
2. Rock Construction Entrance shall be installednor to rad erations.
P trading op
3. All storm 1, inlets shall ln- Wet Gutter" I incepts fiction d. Insert man be
p e Road
rain -Tap Sbb'tar •Rood Drain -Curb h Cutler' Inlet protection devices ,t manufactured by
WIMCO (or control
equal) and tslalkd Per place c and
b "eco ta ndalin g
4. All in. < ., Inti) theioru "hog remain in place and be which
time 1 t good condition
by the contractor unlit the sale has d s -vegetated, at which time it shall be remove
by the contractor. for proposed pave surface area", the contract." mat rem ve
n cry sill fencing to c-buct roadway, while maintainug adequate rasion control in
adjacent or as.
5. S.M."" tops' shell be stockpited to allow far the replacement of fi• topsoil for
disturbed a os to be - gelated.
6. The contractor shall schedule cite grading, uUlity Installation and roodwW construction -
m.l the general site can be mulched and re --deed , n after disturbance. Meas that
w91 not be subject to construction traffic for 14 days shall be seeded and mulched or
sodded with•, 7 days of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. En,,,, control measures shall be inspected by the contractor's repee,ent,t,, and
maintained by the contractor every Friday and within 24 hours after any romfon vent
lege, man 1/2• until the project Is complete. M.interwnc, requIr .... is . as follows:
,ill fence - 1/3 height W fence or damaged, remove
sediment and/or repair fence within
24 hours; rock entrance - r fresh as necessary Ifconform to deloii; inlet ppolect',on
Inserts - remove sediment after each r in event, clean or replace filter when clogged;
,urrace water - drain .IW stabilize, within 7 days of discovery, and street sweeping -
remove a% sediment tracked onto poved surfaces within 24 hours or os direted by City
Engine..
2. Replacement - Fabrb .hall be replaced promptly when it decompose,or becomes
Ineffective before the barrier is ro bng< recess ry.
3. My set -M ren n'ng fn place oiler e11 fence is no longe, required shell he dressed to
cenrorm with the exuling grade, prepared, and seeded with appropriate seed m , s
directed by the engineer.
4. Removal of the sill fence- Silt rents shall bere oved when they have served their _
...1.1 purpom, but not before the upward sloping are. has been p.maneMly stab%iz.d.
INLET i� l
PROTECTION ) lilt
(TYP.)
/, II
777 l l
yl
I�
•i
G�l�J Rn.
�a
�s ti
I�l
V
1
SILT
FENCE
(TYP-)
- JI
l
PROJECT LOCATION PLAN
e
�( T
SITE DATA:
ooa
p
CO a
AREA OF PROJECT:
92.4 AC
- AT FINAL RESTORATION AND ..
b
°
o a
SEEDING, INSTALL MN/DOT •
C
INSTALL MNDOT CAT 6--- I \ .� 4-
CATEGORY 3 EROSION
EXISTING TOTAL IMPERVIOUS AREA:
0.6 AC
CONTROL BLANKET (TYP.)
PERCENT EXISTING IMPERVIOUS AREA:
0.6%
i)� I
7J�
(0.6 / 92.4)
9
\
p
¢a
I I j
PROPOSED NEW IMPERVIOUS AREA:
20.5 AC
(
(buildings, and pavement)
I
tPERCENT
, 8 " WOOD FIBER
NEW IMPERVIOUS AREA:
22.2%
1�-
LOGS OR WOOD
(20.5 / 92.4)
ROCK ENTRANCE 2
CHIP BERM (TYP.)
PROPOSED PERVIOUS AREA:
71.9 AC
LF
PERCENT PERVIOUS AREA:
77.8%
I
(71.9 / 92.4)
EROSION BLANKET CAT. 6 10
^"'.i •-•'�'�'�-i,---�-r
AREA OF DISTURBANCE:
57.3 AC
V
1
SILT
FENCE
(TYP-)
- JI
l
P
Proposed Articulated
Concrete Black
Flow Direction
Proposed Erosion
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, h1N 55446
HENRY HANSEN
(763)236-1610
N
W
PROJECT LOCATION PLAN
e
C1.0
OVERALL LAYOUT AND PHASING PLAN
ooa
p
CO a
PRELIMINARY PLAT
1O
7 Z
I-
(7 w
b
°
o a
IL tl
C
INSTALL MNDOT CAT 6--- I \ .� 4-
= W
SILT
FENCE
EROSION BLANKET TO I-;' ! -J
RAIN GARDEN BOTTOM I �-�-� --
'
I-
(TYP.) -
i
. LLl(JNiY ROAD 3�,(7•QjQ,$jE �ejf "
W LU
L
P
Proposed Articulated
Concrete Black
Flow Direction
Proposed Erosion
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, h1N 55446
HENRY HANSEN
(763)236-1610
N
W
PROJECT LOCATION PLAN
e
C1.0
OVERALL LAYOUT AND PHASING PLAN
ooa
p
CO a
PRELIMINARY PLAT
1O
7 Z
I-
(7 w
b
°
o a
IL tl
C
121, RANGE 23,
= W
HANSEN HEIGHTS; 1 MILE RADIUS
M
FP
C5.1-05.2
\
A:s.7 WO 6 107
6. % ,an
r.rmwr, 21mn
5
W LU
L
Q
9
PROJECT
p
¢a
SITE
EROSION CONTROL QUANTITIES:
UJ
E (t
I
V)
ITEM: QUANTITY
NO IMPARED WATERS
�,a
ROCK ENTRANCE 2
Q
WITHIN 1 MILE RADIUS
SILT FENCE 5,300
LF
uo 0
`1 OF PROJECT SITE
LF
v E
c�
EROSION BLANKET CAT. 6 10
Cad G:uds.
C<n "ERC. (ta nn
%4iM•J
IIP M
P
Proposed Articulated
Concrete Black
Flow Direction
Proposed Erosion
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, h1N 55446
HENRY HANSEN
(763)236-1610
N
W
PROJECT LOCATION PLAN
e
C1.0
OVERALL LAYOUT AND PHASING PLAN
ooa
p
CO a
PRELIMINARY PLAT
1O
7 Z
I-
(7 w
b
°
o a
IL tl
C
121, RANGE 23,
= W
o ,
M
FP
C5.1-05.2
E
��C
TOWNSHIP 121, RANGE 23,
W LU
L
Q
�>
W
Z JUJ
p
¢a
EROSION CONTROL QUANTITIES:
UJ
E (t
V)
ITEM: QUANTITY
LU
�,a
ROCK ENTRANCE 2
Q
SILT FENCE 5,300
Control Blanket
PROJECT LOCATION PLAN
e
C1.0
OVERALL LAYOUT AND PHASING PLAN
ooa
p
PROJECT LOCATION
PRELIMINARY PLAT
:Ls
a a
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
/��
PART OF SEJ OF SECTION 28, TOWNSHIP
SANITARY AND WATER UTILITY PLANS
121, RANGE 23,
C4.1 -C4.7
o ,
AND PART OF SWJ OF SECTION 27,
C5.1-05.2
E
��C
TOWNSHIP 121, RANGE 23,
C6
atoll
WRIGHT COUNTY, MINNESOTA.
C7.1 -C7.3
DETAILS
Prevention Plan
EROSION CONTROL QUANTITIES:
E (t
V)
ITEM: QUANTITY
�,a
ROCK ENTRANCE 2
EA
SILT FENCE 5,300
LF
uo 0
WOOD FIBER LOG 3,700
EROSION BLANKET CAT. 3 17,500
LF
v E
c�
EROSION BLANKET CAT. 6 10
SY
SY
C
; $
INLET PROTECTION 100
EA
F�
Nm
W
K
as
Z
i
K
a
Os
O
Cht
04
N
O
INDEX OF CIVIL SITE DRAWINGS: I FILE NO. 00715
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
/��
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
/v
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREY. PLAN
Storm Water Pollution
C7.1 -C7.3
DETAILS
Prevention Plan
N
�I o
I
;iaztl iotnTliD o=
I �OPOSt�U4ND.N0
iN'Iacsz
7 ms imae'� mw. ( lr
r
da
m Il'
ER IT
.IDIE�
5 0
......... AAAA lA
SWLI Nr[OI(R S[M[5
PIAC1. MIA THE .,IS
WATER 1-0W
�SWE
_� AAavi c si � As
AV NW
BMAttM < FO
11'HIT. 2X_ITM
COPE TWL �
TYPICAL RESILIENT
111
Ov4 E[
RECVDI
pCN - l A0 1 DIIN(
n O Stti�viq
( ) - O NIm1f0-V.94FM1 0 n Ong N O). Zi' wDix
RAR
I w. z 1A•[Rs OF
IN
10" k UNDER
WATERMAIN
saw
OR
STANDARD PUTS NO.
205
t[ rN-1
k -'
[ t1A AACY. IN
v1- 08 ROTES:
Lij
O
•SURI[<T ,0 fNM' EY UR.DD SOLS T-11
•uN. W -LE-.-A
Mt. -A
•(W TON -DON SPILL T E S CAADT . C
•• pSt- ISTNL, A D(P C •O[
fi
• C euLalN caTHA1 a . '' DCVII
h9IE5:
t N-- .1 Trf
N-11LL5 .MNG. 11
-1. xI S. -"'I'D
??w SXau A C.", -..,W 3,8
ET, J,ETI.
1 MIN." e�Hvf. YND T. IT IN D[3)Dv UR Or
NG ![ IAE1 [v4 N [n ,R-UENa (MF) EI'LL
HYDRANT AND VALVE
LOCAL R[SIDEN7IAL
L nX
URBAN STflEET SECTION - 9 TON
FD acALL
•
STANDARD
tSe
l
11NO.
�I o
I
;iaztl iotnTliD o=
I �OPOSt�U4ND.N0
iN'Iacsz
7 ms imae'� mw. ( lr
r
I I / ILtFe.tix I STANDAR200UTE NO.
G�va[lCD
�I
S E<t VIALS
S•NtIFt 5En[R �
YO:IOE cDNCF[iE E.Oc
.IDIE�
- SCUD C TTE R •�
uN 6'iv L
SWLI Nr[OI(R S[M[5
PIAC1. MIA THE .,IS
WATER 1-0W
A UD [Ov65fM
(Stt SID 0411 EO))
DETAIL
I I / ILtFe.tix I STANDAR200UTE NO.
ate- c•�
P' 1u ,)
r'. u•
T
au Aw
OR Sir A-
NAH UI
II
u
SECno,1 - u
N si•m, Nr,T rut c[ NO u Ox ros, w E•
...'A .:o 'Ni 'ai�ilc A eaici5i'iI'-.A Nlxo:iM.mio:
T - tt1µ. ", °N1Avyi NDt�, F°LlRLOaWcls uta 0 T SADN[tR
P RONl I ' OR fLLleµy LT NO• i�FaEdtO.
6p •T TPII M -.11
L to A x[s RYLLO-v[n5.
5 0 480¢5 V LL K FJLED (JL -M -XS.
URBAN MAIL BOX LOCATION
No E-
�•• (� OlSO71Y1 STANDARD06UTE N0.
XT<9ANr -I,OR AOS DULLY YRAFPEl
BfA043S) 5 " UGp FFD/tlWIE ARN
T,..- -T, OCE, IT- S TRO uCUNI
/]-I Ill' NONE (-c ION
1/1' EA LCTLLfCF,ON
zEIDT HAND,O.E rn `1.11 .D
ALI
A. M Oe It
<Xllr'a! oD N4
€ Ltxtt[IND uDc x,E�
A ]/A [ 5 n& /AND tN NOCiICA�
_ scll= EE -1.
R -
LL
` ONCv D E - A1. IT.
rHEttiS
vll. S`Ini[
! � s
PACER TRAFFIC FLANGE HYDRANT
(OR YOT I, Ay
AGs
0{'SQ,?0 STANDARD PLATE 110.
TEMPORARY-.QLILkE-SAE
URBANO .FETICH
It
4aj / �J.Se<N,O STANOARD08 LATE NO.
G�va[lCD
�I
S E<t VIALS
inD4avi0ritiiTO, r..D
OVERALL LAYOUT AND PHASING PLAN
o
- SCUD C TTE R •�
uN 6'iv L
AAAA
N'Ituu',
®a uwartu [u
ate- c•�
P' 1u ,)
r'. u•
T
au Aw
OR Sir A-
NAH UI
II
u
SECno,1 - u
N si•m, Nr,T rut c[ NO u Ox ros, w E•
...'A .:o 'Ni 'ai�ilc A eaici5i'iI'-.A Nlxo:iM.mio:
T - tt1µ. ", °N1Avyi NDt�, F°LlRLOaWcls uta 0 T SADN[tR
P RONl I ' OR fLLleµy LT NO• i�FaEdtO.
6p •T TPII M -.11
L to A x[s RYLLO-v[n5.
5 0 480¢5 V LL K FJLED (JL -M -XS.
URBAN MAIL BOX LOCATION
No E-
�•• (� OlSO71Y1 STANDARD06UTE N0.
XT<9ANr -I,OR AOS DULLY YRAFPEl
BfA043S) 5 " UGp FFD/tlWIE ARN
T,..- -T, OCE, IT- S TRO uCUNI
/]-I Ill' NONE (-c ION
1/1' EA LCTLLfCF,ON
zEIDT HAND,O.E rn `1.11 .D
ALI
A. M Oe It
<Xllr'a! oD N4
€ Ltxtt[IND uDc x,E�
A ]/A [ 5 n& /AND tN NOCiICA�
_ scll= EE -1.
R -
LL
` ONCv D E - A1. IT.
rHEttiS
vll. S`Ini[
! � s
PACER TRAFFIC FLANGE HYDRANT
(OR YOT I, Ay
AGs
0{'SQ,?0 STANDARD PLATE 110.
TEMPORARY-.QLILkE-SAE
URBANO .FETICH
It
4aj / �J.Se<N,O STANOARD08 LATE NO.
w . eI• x T•<ARA
--[�y�'� RRLYCYJAY SC[igN
AURAL. DRIYCWAY _SECTION
a0tau
iaA49 -
IN. vL r
"`- TYPICAL DRIVEWAY SECTIONS
-,- OLS.�<Fyl� STANDARD PLATE N0.
I• �0 09
G�va[lCD
�I
S E<t VIALS
inD4avi0ritiiTO, r..D
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
- SCUD C TTE R •�
uN 6'iv L
LIVE N0a t
N'Ituu',
®a uwartu [u
_� AAavi c si � As
AV NW
BMAttM < FO
It
COPE TWL �
TYPICAL RESILIENT
J' -O•
FIuroI'.T. //
.I TON "
_i
I
1
VITT'--I,%iraI
Y.rT O..A
I w. z 1A•[Rs OF
IN
10" k UNDER
WATERMAIN
saw
2
STANDARD PUTS NO.
205
t[ rN-1
k -'
[ t1A AACY. IN
v1- 08 ROTES:
Lij
O
YNRIRt 3aLR X1iHiK14 IIS�GOTHE "O IINOE]L"DO
p aCv
1. E..
fi
}4a�
-1. xI S. -"'I'D
??w SXau A C.", -..,W 3,8
ET, J,ETI.
'
HYDRANT AND VALVE
INSTALLATION
L nX
OISe
STANDARD PLATE No.
ISE
l
204
w . eI• x T•<ARA
--[�y�'� RRLYCYJAY SC[igN
AURAL. DRIYCWAY _SECTION
a0tau
iaA49 -
IN. vL r
"`- TYPICAL DRIVEWAY SECTIONS
-,- OLS.�<Fyl� STANDARD PLATE N0.
I• �0 09
EL�(eNu�A' PLAN ,A•
SECTION SECTION 'A
uJlC ., O
d4• pAY - [a J
NOT
LLSS�
IWN a'
�
SECTION 'M'
\ l
ON, LD
PIAN ,M' �illn.iN`[ e'P
o� (S t eO1 STANDAR%2P-E N0.
-ID SERIES A LID COYER
FINISHED GRADE
(BITUMINOUS)
\. cuss s
CURB STOP COVER FOR
DRIVEWAY INSTALLATION
is O{.se' STANDARD PLATE NO.
G�va[lCD
�I
S E<t VIALS
D
4 A-
-E
�BI 1.-1
N°u is" mriD �wmi'
CCVXCw
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
- SCUD C TTE R •�
uN 6'iv L
f
3
L41ES:'fXeS ENLL
THE
FIND - .-is
RE N NED ANN Lx,tRLON S,CNS. 10
TO BE [' 11
A.L�I-T.
t
SANITARY AND WATER UTILITY PLANS
COPE TWL �
TYPICAL RESILIENT
]If Si•rILLSS
WEDGE
C5.1-05.2
VALVE do BOX
INSTALLATION
Ly
l
10" k UNDER
WATERMAIN
Wa
Ioul
ESQ'
1•
STANDARD PUTS NO.
205
EL�(eNu�A' PLAN ,A•
SECTION SECTION 'A
uJlC ., O
d4• pAY - [a J
NOT
LLSS�
IWN a'
�
SECTION 'M'
\ l
ON, LD
PIAN ,M' �illn.iN`[ e'P
o� (S t eO1 STANDAR%2P-E N0.
-ID SERIES A LID COYER
FINISHED GRADE
(BITUMINOUS)
\. cuss s
CURB STOP COVER FOR
DRIVEWAY INSTALLATION
is O{.se' STANDARD PLATE NO.
YIPAl1 til. YLIN. AI AFRI
CN(Im.fa RTND), AAD 11 APID iI.S•1
PROJECT LOCATION PLAN
F' tlEi [ Y! IS C.R.
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
A' A r o]s c cA
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
_ -I-
,o• o.0 ore. aal 1.-
u• n -1. - -
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
IJ' ass CUTd. IOdt CUYL .'c,
C5.1-05.2
STREET PROFILE PLANS
C." I.JS <uTd. u�ct
STORM WATER POLLUTION PREV. PLAN
C7.1 -C7.3
14' I.Ja CuvN J.]f LuYO 1.63 [�Yd.
Wa
Ioul
I. c- N1,IA45 IN(MLp W 1- 11 .1.
,I° - M W -b.10 PULP MOR ID
v1O SN•l MIAT1
I<ro°iVRH0 4 l
NAIL u[N T T
S 0 I.
AIA NccnL 111. NN/.'
. mAMS R iC FODM II
OR 0111..n1.
I ISFNATK nv[ A--
WATERMAIN CONCRETE BLOCKING OUANITIES
STANDARDOZ LATE NO:
`S OLSe"
�
o
9
�
Lij
O
�
Q
}4a�
e
�
111
. IN -PAS
W
W �3
yl
O
D
U
to R
a
IO NO
uU[ MC 551 6 D
Or N ,�
y+�u"`�'� Y-1 It't v[%1�t4 [P[NWF
- /
PA4[N.[Ep MRi I.5' CE. )
'RAtP RDCN' DR c" SA, Soca
i
---�--
s APuO.Np c[nwI
Froxo sr
ixr cm cNCF¢m.
ROA
1p'
TO a0'�
C xa [M1x ]u�
V
STAKES PLACD BEHIND
SOCK TO PROYEDE ADORIDIIAL 1
II
0'
nJ[A ¢aN SXut P[ FIaC[p InU S,AFU➢
/
6' VNw'Jv -
AN !'•.Or LL
P1fU �AeONp YO.000
2'k i� AW S1ULL0.
SUPPORT AS NEEOCD (OD NOT
PENETRATE SILT SOCK FABRICNAIER)
VL
IPeON
AU... TO Y+ _/DOT TMCdKAM ES]S.TC1 11
Ma•COf S. [D:[5
( AIIElf
Ip q1l[ M[ SPALL K """
6' NK 4AMLA W aLL
- [ ttM[m.
P�P1gN5.
F • C .
t -E wA3Mtl A0.'A
SMt9 p T'LLVT N lnL.t�F¢ `. I
put
VAS. SLOPE
A.IT I4Mi,
usn[AM a00o cN0[DRAOMLL S, 1 CA S,AnlS
1. (p .\
OF LS% -
T
O[ v.w1 JJeA
S HI1 YJEO IN Mtt Or vttA RIR[ T,ML[5.
P' xYONo warz N'mH
S
-
-
AK ACC[I,IB.F FPODUCR
tpF u5[t TO 'AAT NEM AVMv[r.
M ROI. Sro[s.
T
-
_• 'REIGII
`
ROCK CONSTRUCTION ENTRANCE
! V: U<[�rN.T[ON wTMoaPw,cttrasv.0 u
pAtcilMS.
=
4
Sjl-_FENCE
fY-
WOOD FIBER BLANKET 1N TALUTION ON A CUT SLOPE
AD SCAE
sP[c.:PRS
€ Fa VAMN S1KTD:
;' (b vnvCDS V•Y At US[D IA Fuc[ cmID.
RsR
BRCANS IN 51T SOCK SHALL BE LOCATED A MINIVUV Of 10 fEF7
FR°V ANY SHARP BOND CHANGE IN BOCK DIRECTION.
@ II�L IF. o -1 s�,1 `ON R- PI cfvartp
I R
f
AP ED
ry sacr.-s suuL BE oVCaLMPED A ulHNuu of z4' wlrH THE
UPSLOPE SDC IHfRONT.
N [
s
s DROP INLET PROTECTION
-
IS SED:vENT AcC.VULA.TIEN of 1/= THE -1 HEIGHT uusr BE
I;.
Ar
L+
AO SUE[
}`
� a
aEY0YC0.
SIL1pS�OCK
E
J. STANDARD PLAT[ N0.
I SQ 501,
[1 p p STANDARD PUTS N0.
r 502`
� � /t STANDARD. PLATE N0,
4i �S m 505
xf d {-ppa�ll STANDARD PLATE N0.
] 507
r
,{ J.�• STANDARD PLATE NO.
i`
508
YIPAl1 til. YLIN. AI AFRI
CN(Im.fa RTND), AAD 11 APID iI.S•1
PROJECT LOCATION PLAN
F' tlEi [ Y! IS C.R.
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
A' A r o]s c cA
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
_ -I-
,o• o.0 ore. aal 1.-
u• n -1. - -
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
IJ' ass CUTd. IOdt CUYL .'c,
C5.1-05.2
STREET PROFILE PLANS
C." I.JS <uTd. u�ct
STORM WATER POLLUTION PREV. PLAN
C7.1 -C7.3
14' I.Ja CuvN J.]f LuYO 1.63 [�Yd.
Wa
Ioul
I. c- N1,IA45 IN(MLp W 1- 11 .1.
,I° - M W -b.10 PULP MOR ID
v1O SN•l MIAT1
I<ro°iVRH0 4 l
NAIL u[N T T
S 0 I.
AIA NccnL 111. NN/.'
. mAMS R iC FODM II
OR 0111..n1.
I ISFNATK nv[ A--
WATERMAIN CONCRETE BLOCKING OUANITIES
STANDARDOZ LATE NO:
`S OLSe"
FOUR [ovcrli
AA
,O INCIORt'ttvRD ] CMC ,E
-Q f ._
�Q, .// TRONTA- n
ii4 a B
✓ _/ E[LBACN[ht[D
+FnDMaL
rmCN [ rs DHtE• ��rl
D. PL 1100 ! JI 16.
i
L=
PLOCA -ULI IS
AT TOP AIR,
T -SO. EEE . D TM TON M.NX
L J,1. IM IWn. DSRt
TTr AT.
4[O,UI MHC A
A-1 - Oc•�tI1t CONN[(t OWNTET[ - Yt� FM _ alt•[
�I tt0t[xTBC rUF�KRTINRPtR Vv/00i SP[C.OJ... USE ].O�R [ Orte 0'D A
2 AN.v w_ I] ro ccnR a T[ -RE A'. Uxa.N n' alitA NA• IAD urtrO
L� n TAR R, I-
RAN ¢ UstD.�wSLTlAmneini UnO�o ni irn'iA
4 HCA IIUNR[AS TP[C. AM CA
ItEV
ARTICULATED CONCRETE BLOCK AT R.C.P. OUTLET
STANDARD PLATE IN).
Soo
INDEX OF CIVIL SITE DRAWINGS:
CID
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREV. PLAN
C7.1 -C7.3
DETAILS
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 56446
HENRY HANSEN
(763) 238.1610
U
$o
�g
A
<
N �
IN
oY W
Sae
d LTi ti
2 W
MOi
Dm�tl u
Ip° it
'�
p
t
n u
La
r
Z
4
IT
W
C
Wa
Ioul
c
C
i
�
o
9
�
Lij
O
�
Q
O
e
�
111
W
W �3
yl
O
O
c
Y°
$o
�g
A
<
N �
IN
oY W
Sae
d LTi ti
2 W
MOi
Dm�tl u
Ip° it
'�
p
t
n u
li
Quo
WImmDID,
�y�Wg0m;
IT
O
V�)Ni
o
i
°g
o
9
�
$p�O °
ED
Q
e
S
a
FILE NO. 00715
C7.1
Detoils
u
yl
N
m
GO
9
�
�
ED
e
S
a
W �3
yl
O
O
U
to R
a
�
0
FILE NO. 00715
C7.1
Detoils
N
m
GO
ED
O
O
U
FILE NO. 00715
C7.1
Detoils
=1111=1 "ZI w
N
II Yi0 Aviv„ vrt Na am rn
SANITARY SEWER STANDARD MANHOLE
STANDARDDPLATE NO.
o
MANHOLE AIUVUMENI RINGS
STANDARD PLANE NO.
309
. 12
PLAN VIEW OF RAMP
PEDETR At -C-Lifl-R-RARP
Qt�eko I STANDARD PLATE NO-
IYPILAl,_WATER TIGHT SEALS
STANDARD PLATE 110.
.1
0
INTERNAL,C
Uj�NEY SEA
STANDARD PLATE No.
3D.
SURMOUNTABLE CONCRETE
STANDARD PTE NO.
ot
I j 11
M 11 ------
1HAU-0—SANITARY MAI
SERVIC�.q"ECTION
0
STANDARD PLATE 110.
ot 3o2
utl
Sk Z 11 1- 1- E .11.
EXTERNAL CHIMNEY SEAL
STAN -RD PLATE NO.
310
KIM
Ii I -D 1111 1
N
A.
CURB TRANSITION (0619) At CATCH BASIN
STANDARD D5 PLATE
7
PLAY
DEEP SANITARY MAIN
SERVICE COYNECTION
num` J
eko I STANDAR.D PLATE NO.
'.3
F MNT If -1-I
-E
T- I'
l-, -1.-All T.
T
WE$
I-- 1-T
04
_M A N H O -L E LN T_ _U_ A I,
STANDARD,P
LATE NO.
3 4
toltl
sleN
filgElff
A a-"
SANIeLSEWER '
PIPEYI1TESERVIGES
STANDARD PLATE NO..
30
4
2 ".;'!
.'RUF'Sj
STANDARD VANAOLE rROE AND CASTnm ING
WATCPPROOf FRKYE AND CASIINQ
few
L.
SANITARY MANHOLE FRAME
STANDARD P�LATENG.
1 AND CASTING
INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, PAN 55446
HENRY HANSEN
(763) 238-1610
O
r
M
oo
� 6
lci
tic
".F o IO i•- a
C) cl
co En
FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
2 ".;'!
.'RUF'Sj
STANDARD VANAOLE rROE AND CASTnm ING
WATCPPROOf FRKYE AND CASIINQ
few
L.
SANITARY MANHOLE FRAME
STANDARD P�LATENG.
1 AND CASTING
INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, PAN 55446
HENRY HANSEN
(763) 238-1610
O
r
M
oo
� 6
lci
tic
".F o IO i•- a
C) cl
co En
FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, PAN 55446
HENRY HANSEN
(763) 238-1610
O
r
M
oo
� 6
lci
tic
".F o IO i•- a
C) cl
co En
FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
".F o IO i•- a
C) cl
co En
FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
C) cl
co En
FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
FILE NO. 00715
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
CO PROJECT LOCATION PLAN
C1.0 OVERALL LAYOUT AND PHASING PLAN
C1.1—C1.7 PRELIMINARY PLAT
C2.1 —C2.7 GRADING AND DRAINAGE PLANS
C3.1—C3.7 SANITARY AND WATER UTILITY PLANS
C4.1 —C4.7 STORM SEWER UTILITY PLANS C7.2
C5.1 —05.2 STREET PROFILE PLANS
C6 STORM WATER POLLUTION PREY. PLAN
C7.1 —C7.3 DETAILS I Details
4ROVi fOROu 10 SlOi[
SEfDON21
,•a1 COKErPA,N ! GAERNP (5[[
-1 F[P Nra/w): I %� NN a ca suan
E[)
tcuWi< a"rN'Ns f
- IN9Mn,RalE A),
-YI)aL•v DSUVC[ Fu
• .. 51[05 Ib" O.C. ro (VE1 SRI IC ],•"..
VAxNOt[ ra f[ c011TR+N1[D Oa
Wuu E[FLR As F
AL Tsai - ie DAssm ovist x- us
1 1 I FII
e ` fl N' I'MRI SXMh f[
+ tl ,1. �u Su00M
iC wuVlu aLL NCxI ,5 11, rt all to -11,
SUB -TOP MANHOLE
Is noalS�EmF
OtSC' STANDAR400PLATE N0.
rcsN ,n nIr u'TwX a /
was+ P.N[n. nE
I: 1
won EDnor ios sXmF
�lOxAVD PEF .
SECTION A -A I, (PAYE A CaE,Nq ([[
% 1 A <! --E 1.
OrySTESTD 041[ Ai
�- w STE.0 (FW Fq
F[GUCCR SLCIgNt y LO
P15]i .
i E FE LGi VN„�i
- 51iLAPxDMP R 1
•oLT i R•N'Xtn TD BE C.11111TED
1 lr "Ell 5 0 [T
SxARLLFtW
' `ESC P[s i i[e ASIu AA)[
•-- �[GyL COVtffi[
w.wwK vs�
s NrNaL IX RI xxAt� [4;� FSP NY,P, ,,.
.� n4x ff<v F�� ro WJrt[i
6
:3 STORM SEWER a..... MANHOLE
® OtSe STANDARD PLATE 10.
l/ L 401
tY [ OA � ^, • ,� if[u5+ wNMLL 5[C'IA.
o ME
�� r Y --�cUltrE FFE
�aWl ^MCR rLOx
Il N'Hl i� -
NppIE: \ FSAt a/sl
tll[ OKFFIAx
fRwAf�H[ P[M[t1E Al
1-11-R 1 - CR
Mkt
SKIMMER STRUCTURESTRUCTURE
HAA4 Al -51 IUT1 Ae fFCCA51 VANIgI[ SfntMT
i'oLRt+E'r n�a '�
Rn �
!' fKsvAl w ,[Iro1L � rtr antra M[
,r r� Row
{ Ra a,n RPE �xnuul ars
'NNLDD.TS�STN[ iF12'F�R� - It 11
�
IF [LEVA1gx, Y IW [G IXY, iIR
F Ico-YS/R nEVAmNx
SKIMMER STRUCTURE
• xp SUC[
STANDARD PUTS NO.
f� L 402
OPINIONS
CLt [! N C.- A,,,
COVER ) aF,M PL OR CN GRAB 1N, ) V
/Do DJ)
(
ITT
CFsA1V-C11,lWo 1E
w1
2IT nnE
`(SbLL Nra0.ltr
e y�a)^t s xDAro oiE NDs
W[ pA DPF fi0)SR
SFCIION A A l S! � lT-
uxuW ! __...
46 INCH DIAMETER SHALLOW
DEPTH CATCH BASIN
MAXIMUM 24 INCH DIAMETER PIPE 52[
lSC ao STANDAR405LATE NO.
1 - "I-
I
x • irk > PsE�F: SP1
S.CTIolt-A-A
C`SFFVS NC:xaN !>bI / N5, NG
Ll
CA -11
` �i`CO ER S:wJ
Vn/rol J
tVal STEP SAv S [P !' Eu51 S1turMs .S
Fiou.. ror
]•••. PuiiD,ni `01 Nusrat5 H
�- IF" O.t' iWUSr "Ei s[cTgx
A A,
YTX 4MY1 A aBuiLNIG SV /WI g4iF VV
� tic°ru ttzxunE
• lOISA: -A _ XaE xn(FI CrALL 0[
S 1Ei0+nDOa� ivm[ I[ -OfRLT T
PC I lo
`L
Snitl AT MR
,1. une1. 1111 ISE[ 1111 F -1)O .
STANDARD STORM MANHOLE - CATCH BASIN
MXMUM COVER ROW UNE - TO TOP OT PIPE = 2 FCR
xo sc
-' i u Lsc'•e ' STANDARID6tATE N0,
V 1
ulVAN2E0 CMl(
A OT
.... .tOP K[W ....
HOGfS 4Ui[
'/ ruiF
�•I
5� J
[YliOv[V
Irtviti .
7
5 .: ..
PLATE_STYLE GRATE F_OR-.4B•-.DU__0UT1_ET .STRIICSURE
OLSae ' O s STANDARD PLATE NO.
D
NEW SIONS
�\ Sinn All,
I ITS
sON
D -
Pi F Px[[F�� £CCCxPMT SqN
Y'
•'•'• (DSI EN/4 H RACED W A
' ---' 1]• DA. R ] DEEP
xOLL RLIAD +Dill COxfF[1E
FURNISH AND INSTALL
CWv(WS
_-....-__.
!D'F ro• - _
RE Cg0[E'Jm 116 fi.E[ NOW Of, 116 PAD fsETSEa UNF TO
51181(1( fM•E). OIA [MMR mTs, 50[ LOFRCLINry SH41 EE
snm NArI[
W` [
v nJrzs
Au nnEFsslwn
Lij
S' ON EACH SC6 OP iM PAO OR Af x£IXtRPED DF" TNF
TYPICAL BUILDING PAD GRADING DETAIL
N / \`�
t,
1 •/�
-
\•/ `:1
L
u 1/T RPE -, `
w5GE1 Wulf F RC `
1 . t
1 � - •1-
5 / W /RROFSGv
� \ TDWMD •n[ AS Sxalx
` F1 I `4
T -�
I � '
.\i 4FOUPo601rW 5 SSL
STT Ava0W5. A
A A 'qYR
/ P
;[
IFavC a u CR a
nStR„C[ULC
O MUS. CMKcnLO;ttTM) f DS[N CX aAitt
F� RF[L6IDPN4 AlS..I)SrH .p f..[W`C p[M,rG F[FT VS[ C
FWI[iMMN[ (NPPE
S+i,9 c.1 a Stilt G.wFN FF VWl ],a9 e1
OYRNED G OGxD
t OtS ,P STANDARBOS(ATE NO.
".. soul EonCa to sto•r
eiiAao�rc As Swr.N
SECTION A -A
o
/WWZ Lu
_ nP[
TMV1[W
may_
Details
-
.TOP EV[W �
[Don,luR W. -N w w oo ccnt
0
'c [ q,5.4f. � .. PFv[YFN,
pDu %oar
ioiu
WF Fa WS. W •- �' C91xn
a ...S
- y� J4
i
nF[ nDDFO
-\\ • �- -
u 1
\ /
-�-� r-- -
' •
-VET FNF iG
[O.11r
V /[OFOI,Sap1..OD ,US
CA -.1 SI
A
FVsr Ctt9AFTr[[RP VGD4RV DFf'. :Oia I�inu(„AI/rtE�-O�-n.t-s. W TA•YDAIO 6eu
W
. CA>DNG lI- RN]
5 .. .a no
IPMq
. TC0E[
..........l.......... W -s SRT, raP[lR.
I jw:m coon NErwos- - A. ws
m
U510
c RAR u :aYyCL ' cFWt V[nroDCv a%,AU[
RMrf
3i1
ifaePS,/NC- F[uOn
5itpCD
FF I--LAY 0
1D M ix
•. •-� � v Ji•• .3a
eC4iOP SaRHlST!tC
IT P I' -
�
, _
•-NfD• iPDtv1B[OWEKY
I. 10
t;Y)
:........_9.
1 at -•..-
)
--Lj".,�\('!\.`/�y.\��-'-(_•.j
n -
y
_..-se..-.. _.
f DAR z)iox
N A.
-•l
6[
-RUL PVC
.1N Of Wt
5 /Mi
vanE MNOB EIRt nIPOK,p
W [ F[a
11SNOAX MOK ..). [,
+r WGU'1aI
!'-1- % a'-6'
r. Pc[[A Ca[R OR fi UWh[T Rl'Yu5 LAY US(D FOP RLL
NEEAL.U, 4 £inu Vixi0Lt5. /xD AVEC N[W MANNDR$
'v
v FW h'al .1 vAx R ,S• FCR Alo. S['tlUl AND C-1,11.
I�.NLI ,.
F
ASiv Cnt.
� A -A
-_
-A. n 1-1 M[a5 ANO YONIV [GPO raw cwln_
J
SAxD fUR X9 n� ENUC tliF u[FE •F✓Snc• FLAGS
A%V CVE.-INT IJFIICLE LMC TOTN.V 3 n, n 14571: Ill IS 1%
- Mt WF1W rMl[. W IAI I[FfOFV
RC
f'MSIAW.IgIvgCu%OVJ.' COVYFt 1 M IT -1- 1[5110] PI
iP Vt.lu .i nlX EHE
IiiF"v
-_•
L -
fFy
] F" EC1C11 O'P.1[YGF/LL DRNFP[
F[R-1.
NOTES:
ER 6/5[ SH,LL BF E' FPJB[0 a a4CF OR
SU
(Fi
£
f
tONOW 10 E10
EAMR OJ6
ANS US[tl OLMUW SWLLIf vnL OF <ONCFnE
F
zz
11-
IllR x. O
.EON3.W111
SW!CCtON
T[NEOR,
LIr" n
DYq
uCpl/uAt¢
,.
-
-
5
1.113;
R_OwtfFTOS �x4t D�� Oii't[,
.HAttu FP
rR CM)e
i
27"PRECAST CATCH BASIN YARD INLET
--
J 5T[(t FDulu
C,)e.
P
t
ClaPTL,D
NAKoCvR.
,DACRKDY5]1
UgfFCxW.ho1LumRU K910MUMLL
1a
i.9W
11[[R/[ PilWE, 1.1
DW.AIAWIttxY[O
PLASTIC PIPE COVER ANDED
BDING REQUIREMENTS FOR
-
.o.:.�.v..........uun.a.:.r•+,....,.
_ ., _,. .,_.,... t,s`M F. N•^ _^ _•p•
2' % 3' CATCH HAS
ra sua
_
STORM MANHOL OUSTMENT RINGS
t(
-••••-• ••••.'.•"n•. •.••� .. .••--•••P•.•+..wo,...,...
STANDARD STORM MANHOLE -YARD INLET
Xa -uu
STORM DRAINS AND CULVERTS
Ef
Tr
J. STANDARD PUTS N0.
l•Sea 406
-
``�� JTI. �/AA
>64 od •
STANDARD PUTS N0.
409
F:• STANDARD PLATE N0,
{' Otse A 410
- -
�j STANDARD PLATE N0.
{� SG • 474
- /J STANDARD PLATE N0.
tS�e� 415
t �T
%/'nv 'P•�!ei'C
_ _�-.i ._•_
""'t"'•"t`�''"•""•
'<vNOIE LF C0.T(XP?ASitl <iEP
JO4
.h.
.c
,1801
•
Ij
NEW SIONS
�\ Sinn All,
I ITS
sON
D -
Pi F Px[[F�� £CCCxPMT SqN
Y'
•'•'• (DSI EN/4 H RACED W A
' ---' 1]• DA. R ] DEEP
xOLL RLIAD +Dill COxfF[1E
FURNISH AND INSTALL
CWv(WS
_-....-__.
!D'F ro• - _
RE Cg0[E'Jm 116 fi.E[ NOW Of, 116 PAD fsETSEa UNF TO
51181(1( fM•E). OIA [MMR mTs, 50[ LOFRCLINry SH41 EE
snm NArI[
W` [
v nJrzs
Au nnEFsslwn
Lij
S' ON EACH SC6 OP iM PAO OR Af x£IXtRPED DF" TNF
TYPICAL BUILDING PAD GRADING DETAIL
Wa
NO SCLLE
kaFS:
],i/ENI O,VY ttw F Ileo aiwriNi s,�a
INDEX OF CIVIL SITE DRAWINGS:
.M.aGP,Ha'a�;lG ISTSIGN AN� ET NAME
W
t OtS ,P STANDARBOS(ATE NO.
-
o
NEW SIONS
xSGx[F
sON
CIXOe
OMRF[0
SVf
CWv(WS
_-....-__.
!D'F ro• - _
RE Cg0[E'Jm 116 fi.E[ NOW Of, 116 PAD fsETSEa UNF TO
51181(1( fM•E). OIA [MMR mTs, 50[ LOFRCLINry SH41 EE
snm NArI[
W` [
v nJrzs
Au nnEFsslwn
E
f
-0M_•_VfA� I PEPuI)EENt BARNICAJE I -
16�02C
Y== In
NN
O� a W U• I OV]NU) O
vAimDo,,,
1=
N i
� T O
�l� C
e ea, o IpQQQAJ
W �
F Q
t �
K 1
a
k
W
In IR
CL �
of O II
b
O
O] co
PROPosm rAKslm GRADE
� 0.3' IIYD OONN• � A�
HCVD OOx)! S/VLL FXIEIA iROFI 10' L4 fh1VR OP
AA>E- IJ INE DFS•CILIIFD HOUJ DOWN, SLAKE BE COVPLETFD ACMI55
INE FIERRE M>DIN OF 1)6 PA0. 1A0[0 OOENI It1Y tt IKCVMD
EaetOWG PAD TO ro' [61MA REA4 LND OF PI.IDNfG PAD
f0 LC4N/AN OW3VIOE OfE C1` i!¢ PM
• AAx/SF N11fPE HECBSit% ro NWIAN ORWNGF
7.) 504 CA9)ECDOW TAP EACH BUtDAG P/D SHVL AS A NJOINV
•• D.S' 11>m WMI TOR RC/R a Pb ON
RE Cg0[E'Jm 116 fi.E[ NOW Of, 116 PAD fsETSEa UNF TO
51181(1( fM•E). OIA [MMR mTs, 50[ LOFRCLINry SH41 EE
OCT AN9 100N0Vr L01E
••• CF! Atl'6 AS A60URm BY EIXtS
LOYPU]FD F'AP 116 PAD AS S4DIV/
LI•YAN'EEE1P
.LJ sa cneRFcr1AP AHD sFPucNJPA[ eAo1FRL sJw[ a atxvzm
Lij
S' ON EACH SC6 OP iM PAO OR Af x£IXtRPED DF" TNF
TYPICAL BUILDING PAD GRADING DETAIL
Wa
NO SCLLE
INDEX OF CIVIL SITE DRAWINGS:
CLIENT:
VHF INVESTMENTS,
LLC
14605 43rd AVENUE N.
PLYMOUTH, MN 65446
HENRY HANSEN
(763) 236-1610
r
PROJECT LOCATION PLAN
W
OVERALL LAYOUT AND PHASING PLAN
co IL
PRELIMINARY PLAT
2 Z
4
11j /�.
Lij
O
b
/`/ /
Wa
e
= UA
STREET PROFILE PLANS
W
>
O
o
/WWZ Lu
13
Details
Q
0
la-•
W
W
m
FILE LA0. 00715
t sE,RE�
��- 1lUaf5 ttiEDxC PAD
GER,IY
yel 10 13' SS' 10
OARAI.E R0,J5 QEYADAV rARDP.G [O!/TRALTpp TO GPIQE TO T/4S nEVAMW
S• S• ggJ,qh D' f8 f8 Fu'I DOAemN.f
PMYOSLD J' /ICNA YU115 NYIx-[mal WPJtx4
m'Nr+tTF c1ATe I s•moEtta FW &-I LoOkON
A, ----- IT.fSltl FBNO Fva BasemenF N'eM1w1
10------
II.
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
11j /�.
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
/`/ /
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREV. PLAN
C7.1 -C7.3
DETAILS
Details
(F)
(Fi
t0
N
o
m
I�
m
8
L¢mC
V
�
i
FILE LA0. 00715
t sE,RE�
��- 1lUaf5 ttiEDxC PAD
GER,IY
yel 10 13' SS' 10
OARAI.E R0,J5 QEYADAV rARDP.G [O!/TRALTpp TO GPIQE TO T/4S nEVAMW
S• S• ggJ,qh D' f8 f8 Fu'I DOAemN.f
PMYOSLD J' /ICNA YU115 NYIx-[mal WPJtx4
m'Nr+tTF c1ATe I s•moEtta FW &-I LoOkON
A, ----- IT.fSltl FBNO Fva BasemenF N'eM1w1
10------
II.
CO
PROJECT LOCATION PLAN
C1.0
OVERALL LAYOUT AND PHASING PLAN
C1.1 -C1.7
PRELIMINARY PLAT
C2.1 -C2.7
GRADING AND DRAINAGE PLANS
11j /�.
C3.1 -C3.7
SANITARY AND WATER UTILITY PLANS
/`/ /
C4.1 -C4.7
STORM SEWER UTILITY PLANS
C5.1-05.2
STREET PROFILE PLANS
C6
STORM WATER POLLUTION PREV. PLAN
C7.1 -C7.3
DETAILS
Details
REQUIRED PLANT MATERIALS
-I-
2 OKASTORY SHADE TREES PER SINGLE FAUILY LOT
LOTS 116
L2 87
TREES 232
PAGE LAYOUT:
LANDSCAPING REWIRED
LANDSCAPING PROVIDEO
232 OVERSTORY/CONMOUS TREES
273 OYER./CONIF./ORNAY. TREES
17{ OVERSTORY STREET TREES
!
21 OVERSTORY BUFFER TREES
-ONE ADDITIONAL TREE PER LOT TO BE
INSTALLED BY THE BUILDER.
60 CONIFEROUS BUFFER TREES
It dINANENTN. TREES
(TREE NOT SHOYM ON PLAN)
03 SHRUBS
LLC
BUFFER TREES 6 SHRUBS (INSTALLED BY DE\4 MER)
N-
ur mlem Nur auMmr
11rWn.n Yrwraf
Ro
RN Saul YN4 to, BA9
xrwm RN br, 20• 9A9
na ,wa
a7 w. any an'pway be 11,
P
ie M n a
Nca sand ]-4' BAB
MVn, Pm ]-{' B AB
C I'll"I"
91. sYNeP .,qrb. rP
.e.... baaaP,w 13M
• e
[emmw lBor, mW A Mal. s Gal PPI
I,.. tz�s3 rrrq�S"3p Z O .i
STREET TREES (LION ON NA96 WNLED BY N6AR AT DL OF "UK OOeRYCTON) ..- - ...,�� a ^-. --- - --�••• - r f um...w n,.m n fD a
w usr ear x9 rao AO 1 mGGs sura ea OF nr sur vsoLs xa Ho _ _- Pur.. W a C w
' uaRE incl m a iK mus a TIC eLobl sNul u a nE e...a sxbLa i3RUDSHD CONSULTING _ (r ' /" us,..,m,re,s
ttnYW ,1,YC MIA1a1'x xee[ 9L:,PPGi ..1 \ 7
606 NORTHBRIDGE COURT C ��. - r.. osseus .1 = Q ! t
2o• Ba0 F/GAN. BN 06123 1 •` L \ / i
uek,vr 9.:d uaxe Aw NPa,ovn Yb. er 20' BAB PHOIE 651-066-6073
.eea xWevry are enw„wr a2.u• FAX: 651-004-4702
nr waea Tiawa! m
yyP-.w . .www vara,' zo• eAe W W 0
a.e;.�.r om eP.lawe .: ePwlw rosN..,/ 20• 99-"°' O m
J O
YARD TRFES OW 610N N Fs/9tl WA LID n m6Dq AT Tel O' NOL oaa1R10Ba)
Ile en r,•r fAOY Usr ear No m0 AOMCOrt mus BINL BE Q BE Sur u[OES rr.a m,Pr ve m r ru. r.e, a nrPa
obmw was rarAuul xur
..,mm' REG. N0. 23849 DATE 08-05-19 Z
ualr.vs swr Nap. Av waaAeum Yw. Yn• go' e19 CONIFEROUS TREE PLANTING DETAIL DECIDUOUS TREE PLANTING DETAIL SHRUB PLANTING DETAIL 0
Rnr Fµ m,irl-urn e4wN kpe 20" W
Bw B.aN Ge,P'mm mtlYJrw 20• BaB
a �xwPAPrmr b.rrm wawbN rrmr nrw: zo• eAe W
mu.uN orwm.as sarw 20• em
bPrupeP Ww Tiq arNra Yv.wwYP 20" BaB
am!\A
=66a y
�' la's? .:
%917.1 1 -• �.� ! i Ca' - -� _ _ _ - _ �- - _ - - _ - _� _ _ - _ _ _687.6 I
_ L----- -_- _-_ mo C=ass6T }a2
L=4151--� - _ � - - _ - - [=91aP•, 1 / \ � _!f 14.r>�l! ' 4� 7
/-7 pp =- - wok♦\ _ e 2�
...7.3 `97G� 9a]6.` o I6 �� _.gZ6\♦ Sr \ / 9 �./9l^li VvV ?O �' mm 'Q\ 916.0 \� " 9101 �0 m\ ��� 898 \\ S- 13Q. 1.1 ..__. 1 x89 ' [� J ami' - _8901 _ 'r 1. e'1jo E
887. JJJ
-�7 ' J 1 1 _
176.7 9263 . - 9N.0 u . 7 - a (z�
- - . RO r --xT- - , ro°g ! e '..r
rrn -�� /// IrrAP., RD__ _BH / __ - _. - - - i--- __. sd dd W 7n
PFC c. 7 -- `` - `. � lj 1.l. 1 - ♦ /1,9 _ ', ;� ,_•.- _ _7�9 � �'•�..- � 96 �-.-i - - ri jq7 lOpo anls
_ , 1 C9j -- = 240 -_ - - _ - _ __ '_ _i �T+_� _ _ _ _7� _ _ ..5_ _B`= --_ - - - -_- �• Iii Fi ..6]
.. -_ •> -'- =r-.- �I,- T -.c7 =F-= - F �=1=--ice ��r-. G--= - __ s��4-�, ^r-�__•''� - / o_u^.D
i`o ! t ! ; T'Da 9?4 I \ f 1 ♦♦ 920 - L- _ - ----- _ _ - �- ♦\♦♦\�
I , x9!10
rn ! j 1 u, Bl ) I � • � / � f I � 3 i / I t i `♦ - - ` ` ''---X-vz..r - � I -9 n! \ \ \ '^ � C .. �
t 1\ 191 ' /' /! B2 ' 1 i ! i I L5, 62 ,\ 1 ! L6, 82 I X92:Bu, B2 ` `LB,'82, Ls, B2 L10, 82 , a LI1, 82 - i J \ \.' s:
I 27.091 SF / I L2, 82 L3, B2 v_ 1st I ; 1st ll, / a
I
x919177 , d , I ' tat ,tsl }}i I ' t �s}! -48.$
i_
6 e1 T /16,39 15.111 `SF , 151
Y_____________
•
r
1 4z3o` x9768 i ( ! x , ! 1! ! I 1 ,j se P JJ 1
, 1
I EE ! , , I 1 ♦ ` x 921.1 `f E ' 1 I'
1 i i ! E 1 x.16. 1! u9251 1 t' /
' 1 N09.19'43' 6 �' t ♦ 1 ! //
\ / 1 I '•• t; t t�__._.__ __._ ._]_____ ___ ____________ ________ ice!__ ___.__.__ __.__._____ �_.___ ...... _ _ _ _ ____..__.7 _ _ __ __ _ _ _ -_ ____`;______ _. _______
cmn
-
I
x9286 h k. 1
0 0
9/1.7X� 1 919 IxIf
V �p >1T7F
/ N o
9,i�J FOOL 1 '
/i/ 14Y
a ! B151DE ! 2
J, X"300
9P73 / •I/ / EMIPIC
'
0u IAXSC Ds 1
9312
/x9749
bJO! 1
�FLT&1 5 931.5® Xq�AF\♦x9J 1.7 XSi�li
930.4 (jl-', 3L ♦ s
I �9lOJ x9J0.Y/ \ P�
117 x19.1
X 931.7
1.5
�f
�I9
L4,
2nd I ,75 rR'_. • _ !'
L3 Bl- 1, 12019 SF I
--
2M- 7x 111 1
PD1657 SIF ' - ♦1
6tti6i
I 1
447x83
1 !
L2 87
l
PAGE LAYOUT:
,3
L3 83
CLIENT:
L4, 83
L5, B
!
VHF INVESTMENTS,
L6, 83
L1.1
L1.2
LLC
L1.3
0.4
i
14505 43rd AVENUE N.
St
14.850 SF
''
191
14,850 S
'I
PLYMOUTH, MN 55446
191
14,850 S
111111
I924
an
/
i
HENRY HANSEN
L 1.5
L1.6
(763) 238-1610
' :: NarsF
x931
\ ,"J; � ierl:malir+i
1 IY �w..-•---
L1.7
0 50 100 150
SCALE IN FEET
V
w
I
jGRAPHIC
O
�_____
_.____� i_ _-�___.-_ ..� l__--------- �___-__--_ ' _______.f______.._____l
II_
______
I,.. tz�s3 rrrq�S"3p Z O .i
STREET TREES (LION ON NA96 WNLED BY N6AR AT DL OF "UK OOeRYCTON) ..- - ...,�� a ^-. --- - --�••• - r f um...w n,.m n fD a
w usr ear x9 rao AO 1 mGGs sura ea OF nr sur vsoLs xa Ho _ _- Pur.. W a C w
' uaRE incl m a iK mus a TIC eLobl sNul u a nE e...a sxbLa i3RUDSHD CONSULTING _ (r ' /" us,..,m,re,s
ttnYW ,1,YC MIA1a1'x xee[ 9L:,PPGi ..1 \ 7
606 NORTHBRIDGE COURT C ��. - r.. osseus .1 = Q ! t
2o• Ba0 F/GAN. BN 06123 1 •` L \ / i
uek,vr 9.:d uaxe Aw NPa,ovn Yb. er 20' BAB PHOIE 651-066-6073
.eea xWevry are enw„wr a2.u• FAX: 651-004-4702
nr waea Tiawa! m
yyP-.w . .www vara,' zo• eAe W W 0
a.e;.�.r om eP.lawe .: ePwlw rosN..,/ 20• 99-"°' O m
J O
YARD TRFES OW 610N N Fs/9tl WA LID n m6Dq AT Tel O' NOL oaa1R10Ba)
Ile en r,•r fAOY Usr ear No m0 AOMCOrt mus BINL BE Q BE Sur u[OES rr.a m,Pr ve m r ru. r.e, a nrPa
obmw was rarAuul xur
..,mm' REG. N0. 23849 DATE 08-05-19 Z
ualr.vs swr Nap. Av waaAeum Yw. Yn• go' e19 CONIFEROUS TREE PLANTING DETAIL DECIDUOUS TREE PLANTING DETAIL SHRUB PLANTING DETAIL 0
Rnr Fµ m,irl-urn e4wN kpe 20" W
Bw B.aN Ge,P'mm mtlYJrw 20• BaB
a �xwPAPrmr b.rrm wawbN rrmr nrw: zo• eAe W
mu.uN orwm.as sarw 20• em
bPrupeP Ww Tiq arNra Yv.wwYP 20" BaB
am!\A
=66a y
�' la's? .:
%917.1 1 -• �.� ! i Ca' - -� _ _ _ - _ �- - _ - - _ - _� _ _ - _ _ _687.6 I
_ L----- -_- _-_ mo C=ass6T }a2
L=4151--� - _ � - - _ - - [=91aP•, 1 / \ � _!f 14.r>�l! ' 4� 7
/-7 pp =- - wok♦\ _ e 2�
...7.3 `97G� 9a]6.` o I6 �� _.gZ6\♦ Sr \ / 9 �./9l^li VvV ?O �' mm 'Q\ 916.0 \� " 9101 �0 m\ ��� 898 \\ S- 13Q. 1.1 ..__. 1 x89 ' [� J ami' - _8901 _ 'r 1. e'1jo E
887. JJJ
-�7 ' J 1 1 _
176.7 9263 . - 9N.0 u . 7 - a (z�
- - . RO r --xT- - , ro°g ! e '..r
rrn -�� /// IrrAP., RD__ _BH / __ - _. - - - i--- __. sd dd W 7n
PFC c. 7 -- `` - `. � lj 1.l. 1 - ♦ /1,9 _ ', ;� ,_•.- _ _7�9 � �'•�..- � 96 �-.-i - - ri jq7 lOpo anls
_ , 1 C9j -- = 240 -_ - - _ - _ __ '_ _i �T+_� _ _ _ _7� _ _ ..5_ _B`= --_ - - - -_- �• Iii Fi ..6]
.. -_ •> -'- =r-.- �I,- T -.c7 =F-= - F �=1=--ice ��r-. G--= - __ s��4-�, ^r-�__•''� - / o_u^.D
i`o ! t ! ; T'Da 9?4 I \ f 1 ♦♦ 920 - L- _ - ----- _ _ - �- ♦\♦♦\�
I , x9!10
rn ! j 1 u, Bl ) I � • � / � f I � 3 i / I t i `♦ - - ` ` ''---X-vz..r - � I -9 n! \ \ \ '^ � C .. �
t 1\ 191 ' /' /! B2 ' 1 i ! i I L5, 62 ,\ 1 ! L6, 82 I X92:Bu, B2 ` `LB,'82, Ls, B2 L10, 82 , a LI1, 82 - i J \ \.' s:
I 27.091 SF / I L2, 82 L3, B2 v_ 1st I ; 1st ll, / a
I
x919177 , d , I ' tat ,tsl }}i I ' t �s}! -48.$
i_
6 e1 T /16,39 15.111 `SF , 151
Y_____________
•
r
1 4z3o` x9768 i ( ! x , ! 1! ! I 1 ,j se P JJ 1
, 1
I EE ! , , I 1 ♦ ` x 921.1 `f E ' 1 I'
1 i i ! E 1 x.16. 1! u9251 1 t' /
' 1 N09.19'43' 6 �' t ♦ 1 ! //
\ / 1 I '•• t; t t�__._.__ __._ ._]_____ ___ ____________ ________ ice!__ ___.__.__ __.__._____ �_.___ ...... _ _ _ _ ____..__.7 _ _ __ __ _ _ _ -_ ____`;______ _. _______
cmn
-
I
x9286 h k. 1
0 0
9/1.7X� 1 919 IxIf
V �p >1T7F
/ N o
9,i�J FOOL 1 '
/i/ 14Y
a ! B151DE ! 2
J, X"300
9P73 / •I/ / EMIPIC
'
0u IAXSC Ds 1
9312
/x9749
bJO! 1
�FLT&1 5 931.5® Xq�AF\♦x9J 1.7 XSi�li
930.4 (jl-', 3L ♦ s
I �9lOJ x9J0.Y/ \ P�
117 x19.1
X 931.7
1.5
�f
�I9
L4,
2nd I ,75 rR'_. • _ !'
L3 Bl- 1, 12019 SF I
--
2M- 7x 111 1
PD1657 SIF ' - ♦1
6tti6i
I 1
447x83
1 !
L2 87
l
,3
L3 83
!
L4, 83
L5, B
!
,`
L6, 83
I !
L7, ♦@3
i
1st
14,850 SF 'i
St
14.850 SF
''
191
14,850 S
'I
191
14,850 S
111111
I924
an
/
i
® +
14,li1St
14,850 SF ,; ;; 14,850 SF ! ♦ 15R SF
' :: NarsF
x931
I
�_____
_.____� i_ _-�___.-_ ..� l__--------- �___-__--_ ' _______.f______.._____l
II_
______
______________________-----------------
_------
- --; _
----MATCH
LINE Sheets Li.i /L 3
j -- 1 ---
1 ___`_
L ---} L ------- - I -- j
.
_!.
t7!'JL .i7�. 9S2 - SEI'JL
' - -
-
,`
i
1 , 1
.�-•'"
®ua1�
�!!®!nom
1
�' OKI
moa
83 I ! t ,
L8"'
5l I, i
L9, B3 I L70, 83 I
1St
an
/
i
® +
14,li1St
14,850 SF ,; ;; 14,850 SF ! ♦ 15R SF
' :: NarsF
I
t7!'JL .i7�. 9S2 - SEI'JL
' - -
-
,`
i
1 , 1
.�-•'"
�
moa
83 I ! t ,
L8"'
5l I, i
L9, B3 I L70, 83 I
1St
♦ U'g 83 I i •� �:
1 19,085 S
/
i
c
14,li1St
14,850 SF ,; ;; 14,850 SF ! ♦ 15R SF
I
I I
II_
1 I
'
bH.7'3•
�
L71
L71
1 ___`_
L ---} L ------- - I -- j
.
----------- 9197
____x814J_____ _____,)_.__.__.___.9) •. rl_______________I.____.___._._!..� t
LINE
' I
0
0
U
U
!
MATCH Sheets
L1.1 / L1.4
INDEX OF DRAWINGS:
FILE No. 00715
I`~
I rr
11.1-11.7 LANDSCAPE PLANS
Le, 83^�Jn�II
L9, B3 ' ItD,
I I
14,850 S -'d
-2nd" " -' 21
14,850 S ` 16,31
T -/
-/
L1 1
•
1'I;
t..--',••••-
I
L
-
- • -
Landscape
Plan
REWIRED PLANT MATERIALS
2 OYERSTORY SHADE TREES PER SWGLE
FAMILY LOT
LOTS 116
TREES 232
R
LANDSCAPING REWIRED
LANDSCAPING PRONDED
232 OVERSTORY/CONIFEROUS TREES
273 OVER./CONIF./ORNAM. TREES
Z I. M
0w a
1 OVEASTORY STREET TREES
21 OVERSTORY BUFFER TREES
-ONE ADDITIONAL TREE PER LOT TO BE
INSTALLED BY THE BUILDER.
60 CONIFEROUS BUFFER TREES
14 ORNAMENTAL TREES
(TREE POT SHOMN ON PLAN)
93 SHRUBS
y~
. W e. �....�_•'•s
116 Sf 0 TAW UST evr x0 T'e0 AOL. 1 1REE2 SHALL BE OF T E SAYE SPCCES
BUFFER TREES ! SHRUBS (INSTALLED BY DEMUOPER)
arr m wrNeul 4iwE
wYol x.Yc aanlmr
i) Rol Am rubvn TrWrM
RM SMnI Mope 2o• Bae
e Ao ar... w"e
xwll.re as 0rA zo• eae
ti !6 Pteo gN,rn bgnle'
BY.d Na. 1- 3-1' Beg
le w a ,,. uy
Amvlen P.. 0-.• Bee
e n Y.w. YYei.r.:
9i SXFO• glOorN. 4
Ikwxr., owgp. is eae
<enTo, lior. mbp Dupe k Mile 3 Gel Pot
1
>'s r)vV
i
BTREET TREES ON0�1 fN " 11Y &Lun r NIDI AT - OF R01E C0T611eROIlOM)
T rxal IrsT wr NY T.a Alu a T TREe slkl eE aP rHc sglE srcta un xe BRODSHO CONSULTING •1 •, f� i
1T• YORE TXAN .t0i OF THE MES W THE B SH•ML M Of iME SAYE -E5.
arYW Mux eOrNr_r. xux.Alm, 898 NORTHBRIDOE COURT
s..q ow ogle . kerPni •sane a 20' BU, EA11M. YN 55123
YOkevr froom Y•PIe Am eoc.Awv�'ll•. Mw 20• Bae
t.m..,m Nw.ry Flu wcagwa 20' eee
e,.em Re wNrkq 'enA..wr zo• Ilae
VW
5
PHOFB 651-088-8%J-
FAX: 861-9"M
Eqs., p�o.�rNe v.rtn,' 20• eae
R
w`I;IO�OU
Z h
I D�iMD
Z I. M
0w a
m1xY A m
w..i 'wY.ee�
IL°e
W
n+a 1 I a� w.:a In•<wlrge
Md�gMl wbr VY len N W SINe al Ymewtn
YARD TREES OW 0" ia/IC WrA m, or eVie01 AT Te[ D NO& ODm1UGnw1)
3�
y~
. W e. �....�_•'•s
116 Sf 0 TAW UST evr x0 T'e0 AOL. 1 1REE2 SHALL BE OF T E SAYE SPCCES
ika
..�
mna lu.x Iwruau xux asAEnT
23649
REG. N0. DATE 06-05-19
CONIFEROUS TREE PLANTING DETAIL
Y•Mh s,ew u.p. Aw .•me,•m Tx. Yv zo' 148
s.ew .w0 -n... e.lw ruse 20• aas
sjne xe,e SAI"• mai+bw 20' Bae
o4AY t•IllemYi�l �1•d•e+V�'�n YWmb '91mi 200' W
OemgRe UMq Ra ewNlo'Fieggie 20' Bag
/ 1
69 2-
�% / IxEBI_J(---- x8».o
T
1 4-F87.J-- •-` .(' f t I �66l6-
675.7
- -__ +-}�\1 \1\\•• I 1 1 j anus
L
X8IR6
i 1 \
f t3,? r 1 �' t \ \ 1 \ 1 + 1 \ Il \ ` \` \ •,:� \ `.\ . `\ / /
I I 7. 62 Z 1^;
• essay � mX;',�\
076 1j/ J
U) : ",' 1 I 1 + 1 + 1 + + $ \ \ \ \ \ . `. •.: ' \ \ \ \ \ ' I
I,J T I 1 +\ + + 1 + \ \ \ \ \ \ \ \
' N 1 I 1 1 I \ 1 \ `\ `\ \ `, /'•` ., .i-� \ \ \.\ \ 8759 \ _ Y
(/ 1 > ryoi x3,\ \ \ \ +�'.%'••,.-•% �' ''\ \ \ ` `\ \ �\ L� � . `\ \ I I 1
DECIDUOUS TREE PLANTING DETAIL
\
X8 1 I inUlJ
\ BUFFER
X 872.8
X871.1 1
x. 873,7
l
875,7)y
1
41
Onll 1
1
\
a6rruvu I
BUFFER r
/ r
X871.7
/
1
1
1
1
I
/
/
/
/
I
1
1
1 x871.1
1
1
1
1
1
\
\
PAGE LAYOUT.
L1.1 L1.2
L1.3 L1.4
L1.5 L1.6
L1.7
SHRUB PLANTING DETAIL
()T �)T
X871.3
, \
OUTLOT A
3rd
1,093,940 SF
25.11 AC
\ \\\ \\ \\ x970e
------
,-_--
T-.1-� 1 Ft i ` \ \`\ \ 1 - 7 x6988 � \\\ •, \\ 1 \\
I I • !O^•IDR i 1 1 I I 1 1 1 I f ....��
I1 � 1 '3,:S. T - .!•- � J.' �• \ 7 A \, \ \\\ '_ _ ` es It) \ 11 1(
I / - i � - +"•1�1 - 1 \\ \ \\ \\ 1+ \I 1 \\ / Y\ \\ \\ 1 111\ / i\\ \ 1 ,,\\ \ \I \ \I', 1 1 `\ 1 1
'87?
I7 / I I / / 1 1, 1 i \ 7 ,J i `\ \ \ \\ xea7c Wff t906�D!
.."-------T" I 3,i I 1 ' I 1 1 I 7/ \ I I \ \\ \
' t 5TORM � A ER
� ���/�(695.1 `\ \ \\ \\ WV
-----------
1.., � 1 N N S 1 I I ` � \\ r. 997.5 1 1\ l \ 1
� `1
Ilr n / .7'_---
�' �• 1 j � / _ ..---><...---; ' / - _ _ . -.P • nom_ .D---•a••\�__ �.._� y
4N.
1 1 6U I l \ 1
' •_ .. �' o��`` \`\\ 11 I \"\
/ i 1x 73b \fc E4C @,
I: - / ...G.-;gGr---_ _ - • \ \
-4-'LIY ------------���x889J / 11 1
d MATCH LINE Sheets 1-1.2 / 1-1.4
9 5F I I. 1 ,(Js \ \ //' \k3, I 1 111 \` 1 1+ + >\
rx60NG v� III I 4 1\ V V + I
I: I 1• II •\ 5 `` ` �°� �Il./x / WeGAG 9/ 111' \ \ \ \ \ \ \ \ • I \ I l \ \ \� \ X987.0
\`
76 � / � rlrv.=9x3,7 ' ) \ \'\ \ \\ `\ \ \ \ � \ • R :, bsD 7 � \ � \ / \\\ \ �� `\ \\ . I I \ \\
\ J\�\\\• I
1• .' 15.9 + I1 ]�6 ' ��� \ \ ..7I
N 1 1 1 Y\
f I• � .s !��� `9116- /-_ \ `� \\`�\\\\\\\1\\\\`\\ �\Y`•`. 1
x8705
8708 x
43777
CLIENT:
VHF INVESTMENTS,
LLC
1450543rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763) 238-1610
0 50 100 150
VW
5
GRAPHIC SCALE W FEET
� IL
R
w`I;IO�OU
Z h
I D�iMD
Z I. M
0w a
ILW
IL°e
W
a
wW g
3�
y~
IWaVO
ika
t� o
2w
I� a`
FA0FAY
q/
liC
N 89'44'15'* IT
---- 491.94_..
Tg 6
a
N MO N
R
w`I;IO�OU
Z h
I D�iMD
d
3�
y~
IWaVO
ika
U
I� a`
II
K
Plan
8
2
NAm
II
K
u
O
-A"'
W
olq
S
a
g�
fop (ti JO• CU
Top or 30. CTIP OEv.=870.1
LUY.=870.3 8?25 _ -- - -
1A)
(n
1n
R7o- - - '-- •..-EOG[ of WWI,
t0
-672
N
03
03
x5766
_- x87]1
FILE N0. 00715
INDEX OF DRAWINGS:
x 971
r3, L1.1 -L1.7 LANDSCAPE PLANS
1
L1.2
Plan
REQUIRED PLANT MATERIALS
2 OVERSTORY SHADE TREES PER SINGLE FAMILY LOT
LOTS 118
TREES . 232
LANDSCAPING REQUIRED LANDSCAPING PROVIDED
232 OVERSTORY/CONIFEROUS TREES 273 OVERJCONIF./ORNAI. TREES
171 OVERSTORY STREET TREES
21 OVERSTORY BUFFER TREES
-ONE ADDITIONAL TREE PER LOT TO BE 60 CONIFEROUS BUFFER TREES
INSTALLED BY THE BUILDER. 14 ORNAMENTAL TREES
(TREE NOT SHOWN ON PLAN) 93 SHRUBS
BUFFER TREES ! SHRUBS (INSTALLED BY DEVELOPER)
Olr. iav s2rNarx PAxrA. -AIwr
1) R91 Am NPr✓n Yre a RN Tru, INA 201 BPB
eAO Ours. 1 b xro,.n, A. 8a 20• BPB
.2 Br6 Psr e/wea 'dnoe,e' Bea xu Some.
le wo r .. rq.. A.ieen a.. 3-r eP8
,. PR Ytlue AeVefn Pawri. nmyp. 13' BPB
n a sYr,N ..qrY. a re.,,oe, 1Pu, .Hee P.rP'. • .Nu s ceL P.1
t
STREET TREES OeIDBr ON KAM; NRN22D eY IIIBDG AT 111E OF HBC 0OWINUC11010 11-- -..-. _ .S'LR93,:•Pw
n. EnECI mw lar wr 1ro lRo AexaXr mus TINT x 6 nc sNrt suras ano x11 BRODSHO CONSULnINGJL I ( I `
uau rxur m o' nc Bus a nc NDa 91Au N rc Irc spur sxDLs ,.�..,r....,,..., �i i'
mIYB, 1wY Aur TaAmr Bee NORTHBRIDGE COURT - l \ A �l
s.re B., u,p, tlr ....e,T •Dw,: 20• Bee EAGAN. MN 55123
WF'Vr Tpr Ylpo A<r 000cnrvn Yle. YY 20' Be8
PHONE_- 651-0118-8023
C �Ho40rry ulY eeeenwY io' Bee FAX051-B9i-4732
R:e snrim YfrN,r! B' BPB
Im
AaIMe Br IN.n }gyYa . wlero Yrlm' 10•
eYee•rr aB, a br u,+ame .. )s.+lu baeowi 20' BiB e Im e
N
ArWt=_ Bw im el Su
le el rn,.la`� ��• w.
YARD TREES OW \LOIN ON PLN! WALLOP BT 81BDOI AT M W HOM COQRe1CIlON) . •,a, m„ • ��'�
Ile -1 mW USr BYr AO TM AONOar TRFa BALL BE M iK BA11i SPTOEB
mnw wart 1nrAArx xaYr Ba,Aoor 23849
YIHe1ry S,yer uyY Aur Iuawr Yv. YM 20• BPB REG. N0. DATE 06-05-19
CONIFEROUS TREE PLANTING DETAIL
R:ar ba, rJll-Hrn eewe NYe
Bue 8wa ferPNn mtlrbw 20- BP9
NYNe MmeAoonl Ogiob lrfeemlBea MrrY •$Y,m: 20• BPB
bat Frl,eule OfnrWOM (oco 20' 11!8
6ynyia Utln TiY srMle'banyk: 20• BeB
• II ' 1 �9P7.5" r x r/i%i %� �
x911.1 ��/ Y17.�4JI.2
-'/9228 x( \ _ %92¢4
\✓
(\ \\ T,.OJR / ' i 971.5® 9�T9 \ X 971.7 x i 117 IC
Ye92).Q--_--. .--_�1917i� \ CTEV' IM1R, j__. -•..; 9309x X
TC 92x6. \\\
.9Z4 x92!.2 ; 4M1n. / J/o ^i I 1 oA • h0
16 ..5
916.7
� 911.8 921.6. 911.9 9155 272 1 .2 x930:y �1'"Vc� �-( wo •
PC 926.9 / 9217 -- 9' To' 9z7 x9!9.7 I %9327 1
I I .--- �x91SB+ x9147 _••5 6.59 =-_-' � wu. � _�
� ,
ti ..
� -
572-5
ndBI
I `�\ J 7 jnd1. II 7I-14619 -'W 12.9
U• I 1
L91 I L2, 81 41 PS(657 SF
\ 2nd I� I✓ 2nd II I I
`\ 23.189 S I til 14,585 SIFI-� ' I w,_' I 932GIL t/ 1
„ !
n ,
I
tf'' 30 =� I
30
1 r - 7 --- _ _ _ _ gyp f: _ .'�M-_ _ _ • \ �.
1400
� I. .. .929. ••x 9: (- •x9-•$.. '�••! x 16. � `� 9,28
I v 976.6 • _ _ _ � - I I
L5. 82
Q' I9�0 1 1 I I I I I t 2nd
ry 0 pRSN cl ••'� 1 1 11 L4. 112 ( I 16,255 S t
o� 1 I i x929.2 > 9� x9286 I 2nd I x12!9 '
' i' I I L3, B2 I 13,428 SF
2L058 -SF - - I '
1
1�QQ9 SF x 9 � , I 926 7 m-
�� Iif
--------------
_------------- ---------------- ------ - --- --------------- -1�
�''�, ;Y.•------ r, -�
\I �.
- - - - - - - - - - - - - -
I /// - I -_- 1` _- w- - -
1✓ o, �\ \ M1eh
I I 1 i / ! \\ \ rn
/
I \V _----+937)%8,\350 SF
JI 1 \ 7
t I
\ U I I ,' �' ---.J .-•-------•-• --- -• 934 9 0^
I----------------------------------•-•--------------------•-"---------- 928------ - `\
------------.-L4\81--- --
II
iiIcl
, I m IFI nx9Js7 18,39 SF
PAGE LAYOUT:
L1.1 L1.2
L1.3 L1.4
0.5 L1.6
L1.7
0 50 100 150
GRAPHIC SCALE W FEET
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, !AN 55446
HENRY
HANSEN
(763)238-1610
W
, I
L
TcoLa
re •ri
i
V
z
0
20
a
WIL
.
a
t
4,543 SIR
/
ZW
_
2nd
)13.010/ F
/2nd
z
2;j
o
Tai
YL
I-__....I :� ______._._._
\... ...
B�Be�
v/
W
____...--- -'- ---/ -. _..._____ _--.�_'_'-._-•-....-'-=----_.
cc
---""" ter•--"'
---- - ' --
__________________ __ ______________...._ __...___..._ = L.____ _ ___
_9797
-----) I 918"-----'---'•--- •-- _ - _ --'-•-'---^ 918 ' ----------
-"""-"--1 t i H mN
IT
I ooU^t
)g. '� h Wa�u3
11 L6a3 :A2e.711 it .
113 I L2nd3 1�a 3 U I° �L
2nd
4s5oR s I 14,850
.I i C) { C a
.______ ."--•-----" -_--•X
..... o ............. ... .. .................... ... ..• - - N ..
�I
- - W
LWU
a --- --
-- \
IE I '9M11 ' L7 e5 I.- - 3
2 ` a
I
+ i 13,451 SF
' .----- i - 12.41 a1 --
: 1
,r_ l
; q�
-
' L1, 83/'
x Its I 1 91r o p •��,
' - 3rg
_I1 I I / 12,0 SF
E / o
�a 1
0 ODO
O
I DO
M m W O
�0. r.9111212,`83- I x W
3rd 12. I O cYi
' 12,015 SF
II I it x9tu^b
11 INDEX OF DRAWINGS: FILE No. 00715
t`+ L1.1 -L1.7 LANDSCAPE PLANS
T_ -L-1.3
Landscape Plan
, I
L
l5, 84
I 'j
/
/( 84:1
I
' 11
L2(B4
1
x9 ^6 I
21184
1 927 SF
�•
t
4,543 SIR
/
,
/
_
2nd
)13.010/ F
/2nd
z
12,433 S
I-__....I :� ______._._._
\... ...
____...--- -'- ---/ -. _..._____ _--.�_'_'-._-•-....-'-=----_.
-----
---""" ter•--"'
---- - ' --
- ----
-
`Tam
3rd
20.4058E
`
tIMATCH
m 1
LINE Sheets L1.3 / L1.5 `° m
L7, 112
;.
\ ,,-• :' �
3rd'
18.529 SF
B2
�I
- - W
LWU
a --- --
-- \
IE I '9M11 ' L7 e5 I.- - 3
2 ` a
I
+ i 13,451 SF
' .----- i - 12.41 a1 --
: 1
,r_ l
; q�
-
' L1, 83/'
x Its I 1 91r o p •��,
' - 3rg
_I1 I I / 12,0 SF
E / o
�a 1
0 ODO
O
I DO
M m W O
�0. r.9111212,`83- I x W
3rd 12. I O cYi
' 12,015 SF
II I it x9tu^b
11 INDEX OF DRAWINGS: FILE No. 00715
t`+ L1.1 -L1.7 LANDSCAPE PLANS
T_ -L-1.3
Landscape Plan
REQUIRED PLANT MATERIALS
2 OVERSTORY SHADE TREES PEA SINGLE
FAMILY LOT
LOTS115
TREES 232
�a
LANDSCAPING REOUIREO
LANDSCAPING PROIADED
232 OYERSTORY/CONIFEROUS TREES
273 OVER./CONIF./ORNAM. TREES
C 8�
174 DYE fl STORY STREET TREES
'00e
21OVERSTORY BUFFER TREES
'ONE ADDITIONAL TREE PER LOT TO BE
INSTALLED BY THE BUILDER.
60 CONIFEROUS BUFFER TREES
14 ORNAMENTAL TREES
(TREE NOT SHOW ON PLAN)
93 SHRUBS
°°
w
U)
BUFFER TREES d SHRUBS (INSTALLED BY DEVELOPER)
oTr. Rn m ttYRo. xAIE BaA600T
IJ RSu Arr nbnan' .wref
R» 1 uapa 2G BAB
B RO Wrwr nMef
n R« Op, 20' BaB
M pose Dn»re'
Bed Ne< Spwa 1-1' Bae
Ie AP Pn1- ar nye
A,.ua Pu. L -v em
Ype Rei<fe'
PJ IZ sf" W, a
P.prirbe bNapp< IAS• Bae
Cenro1 Lxat mbn ! «el4 !Gal P 1
PLANTING NOTES
rr «« < p penes m•wwq a« pulp
u pn14 Ie « wlrrn-von w neer Pmu u « HIIer•e r w .tw< AW pwp ranw
nH1.a IY� rn�p d ... Yd .• n rn.<
,.• ... r,r. r .I r« P,. » xYw,Ye a rrlA
sup a ur atw.t .aaia Y .etlrsne ew a p,
a+, to a w n m ,.trc ,AAAA. eel n ww rnlc rB w r«l aY1 wt Mt.
hw M«u « e4«rwf - w uwr< r✓wr P..ala
G..M v« » .rowbr4 Ir meHtn«<e ARM «eotvw a w .e, er w a.w.
oMI4 res « rr vIa'x» a« .Ata et .i< Psv«r � H metres Y e.es.r
snlMpe,se ,mAf '•� n"'Oe ( mamn<a) Oa•)Y«x w1 <eeN! M W4 ra eves
we..er mAr <• e•r ra « retia Ler w .e. vr. ne b er
v✓n i., «' wr a�«'.y bf°Iw. Ie « nr rry« wt u» »« em.« » w pu rx
Sv�i<i�Y n w w pniN e'."r �Ra er�v<Ins .M�'It'xn t'ew� ..2N0.e'w»bF«<P v'i"'w<dw.
w p I_ Te»«, ren r w•,� « pe.I» er w uw <rw w <e,.u,.tw M w w
.P w
MW
STREET TREES L\IOM OR RNt WALED B1' YDFA AT TILE W NOC MQntucr "
114 -11 mou UBI .1 NO IRO --I TREES 91ALL 0< 6 LIE SMO: SPECES AM x0 BRODSHO CONSULTING
OS THAW JOR OE TK NEES W RE 81001 SHI11 BC U THE SNE SPfOEi ,.�,.,rn r,..r
mRNa xNE eorANc•A xuE BTEAmr 896 NORTHBRIDGE DOUBT
a,. r<r < vrv,w,R `swi xC BAB EWAN, YN55123
Yek4v tlsaev ep< Aw waAeum Yrr YV 20' Bae PHOLB 651-6ee-8077
co...« Nwxrn ulb «<Ynwb x00• Bae TAX. 631-994-4792
Yn TAa«.orf BxB
Vn ae nm lir )ape+Ye <.eWr,e 1>Mn' x0" BAB
ObawnY Om uiru< eed6ene <. kCe'•Iaa buee.s j 20" BAB
lYr rel ur ar «. rav« er w v Yes mr
N�[i �gvYe1 M uel I em a eJF »r••e lm«<ae
NMa«I var w lee a w u.I. el res»Te
YARD TREES DRIFT 1111091 O1 RNC WT 6T s}DBI AT IYC W HOkE 000161COM)
IIe SELECT FAOY MST BOT NO 7110 AD -IT TREES SHALL BE OF W SAYE WEMS
rDYNEN xAYE eolNarx xNIE
..A-,
Yapevy se,o. Yep. Aw »<uv„m Tla. Yrc 2o• eaB REG. N0. 23849 DAIS 06-05-19
GaA, nalFrltm BelYe Npe 10' 8x9
M 8rop, LarpiAn wu'nb» 20' 8x9
4 �Nr<Mwnl O ,w Vle<mUer Mrmb 'SS«tli 20' Bag
Gn114V» CyrvMebr 1'.pce 20' BM
bera'rr Wn LTs <v«Ie W<naii 20' Bee
I I 17111
MATCH LINE Sheets C2.1 / C2.4 -i- I 1
...............�.a�l_Tr=IIrTITIr16LtT- 1
___ _\_ _________.918_ L__________-- ______________�
-______________________-_, •_ ____. .. _._.._� _ . .
T, rI I I" it i� � �
t, 919.1'-
1 il_ - -' •�°��.�I I1 !I-- - - )t 4��'1��1;,8Y I / i1
L8. ,B300 po
I 4 I L9. 83 i I I ; _ 2nd.3
i 14e85d S ldl. x- )4.850 00
Se 91t.e 76.367
- J -q
'-i 1 6
'g
... � .. AAAA .. .. .. ... _ -'_" - - •// -
3
........,. r .~ ....,.....,. �.. �.... !............ a AAAA.. ' / .r _
\ Z
BS
n - 12,216 _SE_
,
914
' 910- '•
908 906",
877625,479 SF---5A51N ` - -
m 1 I 1.73 AC �
Ol -
MATCH LINE Sheets C2.4 / C2.5 .®
910
\ •sozs 912-
\ \ `♦ \
_914 - ---t -•-'---- ,
_ '--- 1, i.t 1 i, i 1 ` ' 1 1 II `g• 1
i L8; B3 ' L7 83 \q
9i 3rd 12.
CONIFEROUS TREE PLANTING DETAIL
DECIDUOUS TREE PLANTING DETAIL
PAGE LAYOUT.
L1. LL1.2
L1.3 L1.4
L1.5 I L1.6
SHRUB PLANTING DETAIL
L1.7
0 50 100 150
GRAPHIC SCALE IN FEET
I 1 \ \ I \ 1 , \ u; %/,/ \%\,/\
%�,/ V\ ray,., �-1 I '
1 t 1 I \MATCH LINE \Sheets C2.2/C2.4 X' ,\ "97.6,r �xB�O' `I II'\
199 I� T� LTi I�-5
\ \ 1 I E708
/r� ', ''\ `\ \\ \ I� STORM WATER
xE�75 x OA5/'N \I \\ \ I \\
g,�� �. •-• 1 `� - Bei
/ /N 1 / / 7 /..sem$-,8f��•'4-�'. 89 09 \
`\
x$v6. \
xBe6L
X870.9
1 j1i x9 Js
1 x DTSING 111 1 \ \ x61a1
1\ I \ / 7u.1 BLaDwG / I, 1 \ \ \ \ \ \ \ \• _ .K0qi \ \ `I \ \ \ ` \ Y. 597.0 `♦\ � \ ?(674.1 \
��1 / EL[V. 91J 7. •. ) \\ \ \ xad07
91/.0 bbut \ \ \ \\ \ x675 S \ \ kB7Q1 \ \ \ 1 1 I \
\ ` � •.� 11 91J.7 91Ja �5 \
.'x�k.J .. \\I\�\ \\\ \\`\\ 1 \1 \\ �\\ i ,,,8' �e�\ . ` ') 1 1 1 `\ x871.7
1 ,' .-\/ / A/ .969?• \ \ \ \ \♦\ . \ \ 1 1•, \ ,\ � / \ 7 \ \
'� A , 9091 ® \ \ \ \ \ \ . ♦ `\ ` \ \.`, `. j1 O 878J \ x - _ \ \ \`\ \
T X91(.7 \O I \ \ \ \ \ \ \ ♦ �_- i O 7- 1 I 1 P \I
\ � s! 7 \ I \ \ \ \ \ \ \ `� \ ♦ \. - -eaz. � ,x x771.
\ t waL 1\\ \\ \ \ �, -_
?1��1'L ! wH Wx 9077 \ \\ \ \ \\ ` -.-. �\ `♦ i \ \ -•�r�Ble9`\ `♦7'� l LS
x9071 / \ \ ✓ \ `.. 1 I • % 8735 �\ \ \ -- -� \ \
rEty•r9oB.7 f m, -x East ---x 1-- e79�♦ � E
L t I\\`y�\• ice,` \ 1\t�, ••`'•.^ \ I I °'__ \ � (_ , 9� \ \
x8711
ql? , �Ae9 0 / PROPM[''� x � \ , a T1 \ \ � ,y"' • Y \ \ I \ 1 I I r 1 1 I 1 7 r � • � l � \ I• `
<\ \ / ✓ 1 \ j: \ \ I I I I I 1 / X800` - �_�MI`
�1+� �`\ � �rAAw/ \ Jc \ .I1 yY,,\•' )>)s''1� � \ I \\'' 1 7 I �1 I I I 1 1 I / � `` '`` " �
•\• :\ 7 •• ISS%tJ^\ \`*411A� /X \\ \ `-_-- \, '•`a: \'W,aa, `\ \V \ V1 l i I I ♦,/,• / ; 8751 I ) I 1 I / 7^`eg1�_ \ ``�` -
0••i`�ttRS x T1 - -. �: =�\�� \ , \, \ � \ \,,�:-- � I` � � � , ; I ; � � - --894_` , � �r
. ><• � !, ... `-q�. �: '' 1 1 1 1 \ \ \ \ \ \ \ )•'' :' E 1 0 1 , I I I 1 1 / / - � TI`;`�
1 '`^g13.1 / ,9 J• 1 1 �7 \ \ 1 \ i 1!i�; ,7 I / I I I I I
•, ^,t,� '� , - � �;rP � N \ \ � I I \\ I\ x8718 I 11
i'!•• I.5 T .v'•. \\"b\ \ \ \ ,.� \ 1 \ 1\ \ \ I V
xI l1 -1------- , I I / -- --yy ♦ �.
els.i 1 1 (-
-- _
x ''••� I \ 1N \\ \;/.%:�\ i \ \ \ tl \ \` \ �tBr5.6\' 1 11 I I i /I �/r
/ �. r 91 \ • �• •'•(\, �?�,, C� \ � t'Y,': \ \\ \\ `� \\ \\ \\'\' \ \\ \` \ / 1 11 1 ` 11 I I I I � � - - _I I \
/•''', % ..,• • ' 'A'gP o•w ` \�/'0 ; L'% �\ \\ \ \ j\ \ \ \ 4 \ \ \ `♦ XB75J
It
It -
/ I 9 a •r �: / \ '� r'♦ I ,. �\ 1 \ \ \ 1 \ i1 %'• 77 \ \ \ `` / e76.15x
-- / ��Sp ,�j /: \ '•..` ;\ x0.• ` " .a' ' 1 \ \\ \\ `\ \ \\ `. •"''yam "///{��� \ \ `♦� \ `.\ xe75s \ \ \ \ 1 1 1 \\ 1 \ \\ o , 1 9fid"Ix <....-
/ � " -1' \ \��� \ ..r•''• \ �� 1\ \ \\ �-;..tom \ `. `. �\ ♦\ \\ \ 1\ 1` \ \ \\ \\ \\ \` \ \ ` \
`�.-`�/•�, i' /iR, J 9 �/I %'R��r, I ''•\ O' >r I \ �' .��•C \,1 T\ 1 11\i \ \ �\ `\ \\ \\ \ \ 1\ 1 \ \\ \\ \, \\ �s 'e{
LINE Sheets C2.4 / C2.6 INDEX OF DRAWINGS:
.• .` x /• \\�.\ 7 i // �.• Y-1 C\_ + �__\}--�---- - L1.1 -L1.7 LANDSCAPE PLANS
\ ••'t\\ ♦ry0�h %! t<' , 1,,'/I \\ _ .91fi;.\ ` •I �c�0X7. � 1 1� � ` • I 1 I l I \ \\ \
\ ,i .. /i"0(\'•, /' \ 7\ �'D I \ ; •T I i I 1 II y 1 1 I •1 \ \ \ 8f
\ 1
CLIENT:
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY HANSEN
(763)238-1610
V
�a
I•+
z
y
C 8�
'00e
IL
LU IL
LZxI [WPI
Z'LU
°°
w
U)
g
O
E �
Q <
0
2
W
L1.4
Landscape Plan
I•+
W tj
W 'o
b olb,n I o
L d U
i
C 8�
V A
mDan;
O1_b•_
I
LZxI [WPI
Nx01U
E �
W
11
In
.
a
8 3
W
a
plp
7�
N
O
}}
W
W
zm
3
TJ
U
�
Q
V
FILE NO.
00715
L1.4
Landscape Plan
REQUIRED PLANT MATERIALS
2 OVERSTORY SHADE TREES PER SINGLE FMILY LOT
LOTS - 116
VHF INVESTMENTS,
TREES = 232
LLC
LANDSCAPING REOUIRED
LANDSCAPING PRONDEO
232 OWRSTORY/CONFENOUS TREES
273 OYER./CONIF./ORNAY. TREES
HANSEN
(783) 238.1610
171 OVERSTORY STREET TREES
U
21 OVERSTORY BUFFER TREES
-ONE ADDITIONAL TREE PER LOT TO BE
INSTALLED BYTHE BUILDER.
60 CONIFEROUS DUFFER TREES
IL ORNAMENTAL TREES
GREE NOT SHON4 ON PIAN)
23 SHRUBS
a
BUFFER TREES A SHRUBS (INSTALLID
BY DETIFIDPI R)
on. sn sorufni NATE
wYa Hwr >Te0loor
t] e>I ear nevn Y,wv.f
e RO owp. n.O,o
47e.rs PYa peas roe,r•la'
to AP Kwf nqe
a Rft Y•fr T4et.r-'
13 o. S/Y9r r ww 4
Red Saul W" 20• uB
Hw Nrn Red Od 20• afB
Bwf Hn, SRnaa ]-.• etl
U,.vw P.,. ]-P 9Ae
Pr•ter.e GeogR'a IS• W
tx ucc ml,.e !Mau 3 Oa 1 1
PLANTING NOTES
w lea.•mwM „rwi�i,••e.: �api, �: lua, �a ;d 1•ro. nt•, aM. n aN J
rr'H^f WDLL.• ynl wl. u, «.
q raw • w Im psnw m••.evW •a.• rn�Hf.
N rqu la a mtm.�-Tr•n w H++r rinv le a waw _ r fwr, Aul rnlN wauw
tuew� IY Ima rnlN W n vr, w e• n tlnAf
(NIIg1Y M NMI •w0ea +•. a .Yfw wr a IWw1M .l rnlf
SIJ,p M Yw giWNt rq•Min Y nN re•a Jv w p.
- ,- M n .q w Allen blur fr ARs t.
Opn Ip J weal a M wwe •ww IJ n ,Jw tlnu IPI w afY, qrl wl MLL
o.v uJu n ..q.rrr - w .New tiu'r r.em.
w ,wMw. a w•Hluae• .nv eewuu..1 W Mn M ti e.,r.
ra,,. w a a, r*a.e .rn .•Nr J r. Ngnr Hw-. waw Y •.•we.
MiN �Y. r..a wf• awl• f wivm.fr) Wal s qr •fY,F m. •aN ++ � � _
r°e".. e..dar .e, ...� mNw .Jen .• arr r.. a r.+rd .... a ... Yw w H va w r: �`.l.i "_'a
ru.
aur wrl.egweme Nww.uuMr„ryM wJ w, aw .q..ruww. rn �Y�I ~�.J7"-"• ,.�r.•a:Li•+`-
vMN pn n Jnr Ve Wal 1 I JJ
f vae p M �' a•• Y uAst a pnf,f aur a Wewnl J vl>af w slrwrf � ' '' s'�"-.
Pwa edr •nr a >.P.s .I.W, tnrluf e,Y„e w efw•.w e. frlwd. / �
w Irl ra al w., M e. a r s .A.e .ne w mraaad a w w - >, s.a nr , ra ra
MW -.'••.amu' rfur
STREET TREES GH6a1111 FLAK MAID IT 44OOL AT rlF[ O' HaE 000m Om) - L ! �_$~ A w,.. ... „•Y , b
174 ]u EM mal Inr wr No T Al -ENT TREES >IUL a a ,K SAYE -S Aw rro BRODSHO CONSULTING
YOAE IMAN .IDR O THE tats w THE 4eol WU, BE Or THE su1E woom er•... -r.•r ��%' - .mnf eMrwNas
NYYaI xAY[ BerNC NUE 9utmr 6D6 NpRrlBlepCE COURT
ser• on Y.r. Am . Y.enmY '9eni 10• BAB MAN, NN 55123
Yo1,Vr >qo. YN. Aw o•eUavn 'ila. Y>' 20' Bee KIONE: 651-066-6071
r .dm tl'r y enrYn�gv..v! 27 ue FAX- 651-061-4792
ActleP. un IAtr p�pWegoe e,.euv,•1rb,' x0• W ,e
oYa•rr Dm ..,�•oude.Mi zo•T�e "---'-•-'_'-•" __ -
Wf Ndl NY fb. wf d•mN orw s,.tlr m1 �T�J���9.�'d . . n �l
Cadl >gtltlrM I NrbwW lsMfeyo �'- a>o Dei Y[>Onl
NtMKT ,nP.r W le.o of M slab of YYna•Is _ 'EPS Irav+nea ,w .Ma a .a, roe a w
YARD TREES Oar 4441 W Kft PWMIO BY MM AT Tec W IIaC COammWoo '� �-�- �, ra,a,ai u1•f°'Ne-° ®�w'wif r�.f-e' i•'i�"mww.
11e ]OEOT mW NOT WT W M ADL.CENT TREES SHALL eE Q TIE SAYE SPERs •� • • • � •• 4 rr..>w s m a „u ev q wr
mural xfYE nrANRA, N,YE a7Rmr REG. NO 23849
n1••h sHw Yap. Aw .•fowm Tlo. YY > WW GATE 06-05-19
z,Pr ewN ntlo-Men e.w• UV• zo• eea CONIFEROUS TREE PLANTING DETAIL DECIDUOUS TREE PLANTING DETAIL SHRUB PLANTING DETAIL
ayr 'i1q.A•w,rt oE"°.aIYM• v"i•tldenua IwmY TRtm: W W
wn�va orrw•.tlN f xo• IW
o..wyrt. lo'rv.r"ngt: .,. zo• eee .. _ ; ; _ _ _ \ v r \ N _ _ :.' ! W
T .t lam-_- L 20,405 8F I ' I Jo;
_ \ f7.jlJ%�7/1 .9� \\ \\ t i , 7 C I 1 �______ -•=� �� 914 L
OU3dT-6o�a__ STORVl 'VV.ATLR9J �'0\�_.---• s) _ �MATCH LINE Sheets L1.3 / L1.5 ---- %" T„ ? x91d1Lz e3-76It.i39ACF MATCH LINE Sheets L1.43rd12,015SF L5? Bt \ I \ I\�'\\-1-Tf^ 61 ..1.\3rb\\ a n, >..%•„ �1I ` T a0 m L7. B2_ 906 -pp��t2400+P33N78,�50 $F \\ t� L� i ' rn3rd' . -I _ _ W((( T_.___18.8'19 SF _�_ - . \ 908 X I�2n
\YV
l
1 \I 1 or t T L3, B3 910 d W " l
934 1 1 1 •t•�• �•'. - �Y _ �1 ' I - r,r Q I _m8m'i
;., 2� /` A 9 / ' ---------- ----- --_--_--------------- - 3rd- _ I � 907 s 912
------ --- ___....._93._ 930!928 -__...._._T �' .''k - -- 20 ,' I _ 12,0 SF' ' F 914\ \ - W Hg�^I
T� S
` \`\ \ °��a? 7,• ' 1 ) i z.
.-�'\a' '� �� a � I � 31d s \ � \5. �. ''•. \\ ` � ! a� I1 i I 1 'I (_ . _ -_ -- _ --- I I �� 17 '111 � `s � ' I `s T t' `'83rd �f•���
• m Mx9J57 fl �' .\ ..' < t �N \'� �- I7 I jf- \` 4v IS 42 f rI
L5. 82 I ; 6` - L6. B2 L7, 83 I \ 5 ,1■
jj
N tl rd rd
xM.S89
(/ 1
/ 9398 L___._ '----• N '• \ $F 1 ,!
16'r/8 $F �`d�Y SF13 5'i \ i � �lsi ` \ hi,63515F I `; 1\1,732 SF
_ _ v I r Y
)jj
1l \ L3 81 \ \1 O \ \ 1x9•]
940fix q ,•? 9'� 3rd.
213,649 $F ,. ,�, . ,---- ` --- - ----- --- ---- ---- - -------- - r ---- ----------------------- ---- -- - - ---
t \28 \ �, �....
IwI I . I /
------
.�„3
\ +00
- - - - •E(y,� N I � ,� ' (r -x ena - - - - / i i +''P• .g � �9'1.1' _ _ 9176 ���`� ~� 9�6
L2 ii i B
' 17,474
t1I �
.1910.0
- I f x 9112,
I.9 4 1 � 1 \9,0$`d
9791 ' I I -� • �r Q SF t L2� Q5
3rd L3BS\ 1 I h \ > 9190 f tt I L6, B5
1 f x0 '.T t' �� �• .(/, /. \ - °j , - 1 !, Cor B5 , j ;, L5, B5 i t 3rd .I
18,'OQ9 SF ` 21' i. I 3rd ` \ i Z , 3rd , {/ 11221aF '
8,02'1 5F 8,022 SF � 18,022 SF
20,928 5E i N ia \I � i \\�� • L•• I 8 9 I,j'-926 - l --- - - L' 918 a 1 I • :� :\ gg0 - _ � /N 938 - - - - - < - - I i - - � - - - -----------� � ` ----------- - 22 - ---
1
rt t
_ ____ _ ____ _ _ _. _ . _ _ ____ _
J
, --
1
--rE POSIS
-� s \ IS',g7PF s�,r. `\--•�___ N 89.23'00" E I / o5A
x910.1 4 ) 11^ y, XP 910- �s , �s -- -- rr
JyP x9.95 r47 l 'rC \ ZY97yy 6-' J0- _ xe), 1____-��� _ X9716 - x911.7
1 X939.5 X939.4 x9395 X �I�. \396 910.5 x9777 �, I x9131 x97211 x91)0
9400 ch I cA%or PAwmrPk[ or �tirnj 1 I Insim 1 14=_ I 6 ' IN aviGS' �' 1
V/)/ll1- 9f I \ R'E (JIN. 1019)/V rJ I I I
I l uv 911.6�a I 'o l ��"(1..' I 4 1 I1 1
D9
gn %
i✓%� 1lJLZ 1
It
r I i Yea U1L� ( I LIN 1 IBER ESTATES I
�/lU�LC I ��� x II 1 I
I 1 1
I d ��, o�------------- T -
i
o
PAGE LAYOUT.
L1.1 L1.2
L1.3 L1.4
L1.5 L1.6
L1.7
0 so 100 150
GRAPHIC SCALE IN FEET
CLIENT.
VHF INVESTMENTS,
LLC
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY
HANSEN
(783) 238.1610
U
i
a
TCID
C7
0
a
W1
a
W
z>
V
°
US
c
b
g
z�
0
2�
0
A.....
z
�.......ST `....... ., a ........ ....... ..
\ - Z
1
0-�
\ \\ 1 \\ \\ 1 3185
8 \ I F\ t,
L7, 3 \ t , \ LB. 85 2_0
0 4
k;3rd3rd
2 $F \� I I 17,718
rl9\� 6
- - g `�-
---- -- --------
/yy0 x9793 ��ll1(9i7..------- X917.1 EV }.
` !� �X9166� r
' _--____-____x9121 m
X9150 X9152
( 7
INDEX OF DRAWINGS: nLE No. 00715
Ll.1-L1.7 LANDSCAPE PLANS
L1.S
Landscape Plan
REWIRED PLANT MATERIALS
2 OYERSTORY SHADE TREES PER SYICLE FAMILY LOT
LOTS - 116
TREES a 232
LANDSCAPING REQUIRED LANDSCAPING PROVIDED
232 OVERSTORY/CONIFEROUS TREES 273 OVER./CONIF./ORNAY. TREES
174 OVERSTORY STREET TREES
21 OVERSTORY BUFFER TREES
'ONE ADDITIONAL TREE PER LOT TO BE 60 CONIFEROUS BUFFER TREES
INSTALLEDBY THE BUILDER. 14 ORNAMENTAL TREES
(TREE NOT SROM ON PLAN) 93 SHRUBS
97REET TREES OHM M ON RNC WAUID rr muLoot AT Tt1E Or N01E cmnm W
]. SEIFD1- MSr aur NO - MWfErIT -S SNM3 BE 6 M SME SPECES Aro NO
YME TI- 30C OF THE MS M M 0- 91N3 IN OF THE IME 9EOES
4rNYr YitN r1eMrJ1 reYE EAtoar
s.me O« Yq/. Aw • I-
'S : 20• a aAB
Ye}.Vr ager Yep. Aw iovAwvn-Ylr YY 20• BA9
t Nmwn fNetY ralnuY zo' eAe
AarPb [m �.�Fq N e .aWdw lalen' io' W
ISrawl Dm, MJ6re •. YOe^Y<TY,r.rj 20' BA6
YARD TREES DNR !OM M MM NITTN330) W a1ED01 AT TIE OF NOW 00a11E0700
11e SDECi iN01 U>i
INT NO Tao AOMOFNT ..I SNNL BE OF M suE SPCOfY
wrea. iiYE rrNNx aMN E,aaor
Y k.rF Fuger YaeN a.r ertl.m,« file. Ytf 910• BAe
wew. E.en wao-H.. a.We pye zo• aAe
ayv�xe•ermwT ocO'0•ptw ux.we�wm 1w«Y npn: io' w
w.er ceu.v« ortr,mea. re¢e
10
trergxe thew Fre carte Y...rar. 20' Bee
x J6 '`� • ; �,. ASF
1
:�) /\5 \ I \t \ \ .ti'^!.• t \ \
♦ `� `'.� x8763
\ \ \ •\ 1 1 \ 1 \ \ $ •\ I 7x
I
I
x 91 I------------
--''.'-"�1' . \ .-.
(:
MATCH LINE Sheets! -1.4/1-1.6 ^� �!p `�
`♦ \ \
`\ `♦ `♦
\ \ ` , \ \\ \ \ \ \ \ ` `\ `.q
\\ \\ tt `\ \ \
\�
M
•.T. -
-
1 S +.+-�+-rte
W
�•�
x907
°�
BUFFER TREES t SHRUBS (INSTALLED BY DEVETDPER)
a� rrY�M .iaE L�Ya, aME aTFAAOr
13 av Nr nat•n 'rrcarM
1 Yep. 20' aee
e as ar... ,.nr•
lN.- aw orA xo• 6A6
42 Pk. V- -W
etm N!e Spn,n 3-1• Bee
t.o r ..p.
un:.f.:
A,.Vw, v:Y a36
arc .. w.
,-.•
p -r'. n««p. s• e2e
.3 0. 11" v4.x1 p.
Cermet t3e.• wt«e P.N. A aunt > - Pit
97REET TREES OHM M ON RNC WAUID rr muLoot AT Tt1E Or N01E cmnm W
]. SEIFD1- MSr aur NO - MWfErIT -S SNM3 BE 6 M SME SPECES Aro NO
YME TI- 30C OF THE MS M M 0- 91N3 IN OF THE IME 9EOES
4rNYr YitN r1eMrJ1 reYE EAtoar
s.me O« Yq/. Aw • I-
'S : 20• a aAB
Ye}.Vr ager Yep. Aw iovAwvn-Ylr YY 20• BA9
t Nmwn fNetY ralnuY zo' eAe
AarPb [m �.�Fq N e .aWdw lalen' io' W
ISrawl Dm, MJ6re •. YOe^Y<TY,r.rj 20' BA6
YARD TREES DNR !OM M MM NITTN330) W a1ED01 AT TIE OF NOW 00a11E0700
11e SDECi iN01 U>i
INT NO Tao AOMOFNT ..I SNNL BE OF M suE SPCOfY
wrea. iiYE rrNNx aMN E,aaor
Y k.rF Fuger YaeN a.r ertl.m,« file. Ytf 910• BAe
wew. E.en wao-H.. a.We pye zo• aAe
ayv�xe•ermwT ocO'0•ptw ux.we�wm 1w«Y npn: io' w
w.er ceu.v« ortr,mea. re¢e
10
trergxe thew Fre carte Y...rar. 20' Bee
x J6 '`� • ; �,. ASF
1
:�) /\5 \ I \t \ \ .ti'^!.• t \ \
♦ `� `'.� x8763
\ \ \ •\ 1 1 \ 1 \ \ $ •\ I 7x
I
I
x 91 I------------
--''.'-"�1' . \ .-.
(:
MATCH LINE Sheets! -1.4/1-1.6 ^� �!p `�
`♦ \ \
`\ `♦ `♦
\ \ ` , \ \\ \ \ \ \ \ ` `\ `.q
\\ \\ tt `\ \ \
\�
M
•.T. -
-
1 S +.+-�+-rte
W
�•�
x907
°�
,\
I 11\ \
\
/
\ \ \ \ \
W
\ r
l•♦o jia
\
I :� \ \ \
• Y• `
\`tp� ��
97e.ex �
xg7e
v �
peY w.Wu. «wa.,«w«ua
e roti. w..Ya�w«a1: vs«rrr«i,��i.ai«�pniN la,M aV«:.�.,� ✓«, me,v«• rw
N rmnY m w a.u.+-Yw, w firer ra • r w Ywre A.N print rru_
fr,•w++, ,Y mw YruM .a « r_ w 4• r .I+,M
aerir wa «vr xrY.. rN « rTY« .+r t. WWW W ., Ywi.
Sxwy a v_ «uw.e r«e«a a rt rwri .r.. w t_.
' •- h PYH t.
ro« Yr a t.w.. •, r .«Nuc rr... w I« raze 0
M=.-
wti
) mAeric s« w w rrt r«i wi
w rro«.n. W n•xNtw .nr rw�rp a w .e'. h ti O..r.
rw,. waw rr piwt•e M« emp .1 r. rr«•'N rw-x •.tw Y n«v}
.- - >• •1 e.x• r..eer arP
M pw w 41 ra.w `iwu eew.�� a Wr aW4 m. •MM pv
v.A•3 v.• ..Tar wm. artw u « «r ww«..., •»r •«. e«.r N w w. r..
Sim�l 4w w�a w prt« a Y uye wryn� w Ya«v„ p „tit« w mv.•«
r •nr r Y•eM .t Y,glb. e.etq w an.e..p _ .eNNa
n mar". Ci.Sa W �a wPa:t», w.� "w".l«« .::.,•'..°"«.°'o','..��e�•.',I ::.'mr:3w Y,
ey �
BRODSHO CONSULTING
W8 NORIIBRIOGE COURT
EW N, MN 53123
RHONE: 631-686-11027
FAX 651-994-4792
I N V.x PW. w• Y.wN h m• v ,nCv mr
Ar WT« wN.e N W Stell elI Ym.ply «'
REG. NO 23849 DATE 06-05-19
y -v:Zp 1� F'37L5r"`Si ,
CONIFEROUS TREE PLANTING DETAIL
ors[.o�K u,nr tet r • n_ qo eppdgrl
DECIDUOUS TREE PLANTING DETAIL
PAGE LAYOUT.
L1.1 L1.2
L1.3 L1.4
L1.5 L1.6
L1.7
SHRUB PLANTING DETAIL
V
:�) /\5 \ I \t \ \ .ti'^!.• t \ \
♦ `� `'.� x8763
\ \ \ •\ 1 1 \ 1 \ \ $ •\ I 7x
I
I
x 91 I------------
--''.'-"�1' . \ .-.
(:
MATCH LINE Sheets! -1.4/1-1.6 ^� �!p `�
`♦ \ \
`\ `♦ `♦
\ \ ` , \ \\ \ \ \ \ \ ` `\ `.q
\\ \\ tt `\ \ \
\�
M
dl'\
\`
�ai•`1?a ail "\ " • �la� i ate\ a \
S°. r �!�•,• t\I 1\ 11 `�\ \ \♦ `\
\ \ t\ t\ t\ Yap''°.
t\ \
e77sx , \ \ \
\ \
x907
°�
,\
I 11\ \
\
/
\ \ \ \ \
W
I
R7B9
\
I :� \ \ \
• Y• `
\`tp� ��
97e.ex �
xg7e
v �
N
o
\ '•.` \ \ \ \ 1 \ \ \j
\ \ ) \
:
\ \ `, ♦\ \ `♦ \ \`X AT2.0
.
_'
-•'TA7 tRr9PA5SIM SY4H
1
\ '• -1• 1 \ \ - -
t\\
�``` .8�` \\ \\\
� X79.6
Q
\\ \ ♦1� Y '�� _
• 1 '"�'� \
_� \ \�� \\\. ♦\\ `
_ - �
879.7
/�•\.
`/\` I I:% II, I! 11 I
; t\\ \,` ♦
�\79.9x \ ♦� \`�`,
\.
Y
79:9
-- I
T
I
� 1
J•.n
I
I
x 91 I------------
a
I , 1 el \ \
x Id
LB, 135
Vv 8 SF _ ~t' , 9111- �•` : \' \
3rd _ - -
_
9tA •\, x 9111.6 � \ �•` \
----_----\ -�!------- -�,-alA911 2 - _._.-- -�- ---------- \a ' ._.
--' J - '- .----•-'---._._._._._.
--976-- - - - - ..._
11917.6
yy917.6 %�17�
6--__---__\r x91i
/x9150 x415.2 ----
I / �
I LIN -BER ESTATES // 9
I
I / I
I / I
/
I /
/
----------------
0
0 50 700 150
GRAPHIC SCALE
''� •-' •-I
\I ` `
\
X880 ``
j�
`..1
/
a
I , 1 el \ \
x Id
dAOx1-
2 zto
M
dl'\
\`
\ D6D.4x
L
WiLu
°�
\OtY
L•,
\ \ t
\
/
V
W
I
R7B9
\
I :� \ \ \
• Y• `
\`tp� ��
97e.ex �
xg7e
v �
N
o
\
UJ
W
1
\ '• -1• 1 \ \ - -
t\\
�``` .8�` \\ \\\
� X79.6
Q
\\ \ ♦1� Y '�� _
• 1 '"�'� \
_� \ \�� \\\. ♦\\ `
_ - �
879.7
(•
\ \ V, ?Y• \ \ \ �� _
\\ O\ ♦. \ ♦\
\\
cr
79:9
��•I t
` � \ ` �i?` ~�
\899. \\ \ ` \
`\\
`898.
`\
i�/
\ \ ♦
` i
z
9o4-
O6-
06Bi
1.9 (•911
1\
\
91 L8 _
-99
N 89.23.001 E
I I
MATCH
LINE Sheets L1.6 / L1.7
\
1
16
L --
------------
I 1
I
(yI
r
\„\\N
I I
I I
• 9ti
1
I I
IN FEET
---491.35---- Fro rKSPAsswr.'
S 89'55'52' E
I
INDEX OF DRAWINGS:
11.1 -1-
/
a
�
2 zto
M
L
WiLu
1.7 LANDSCAPE PLANS
CLIENT:
VHF INVESTMENTS,
LLC
14505 gird AVENUE N.
PLYMOUTH, FAN 56496
HENRY HANSEN
(763)238-1610
U
a
�
2 zto
M
L
WiLu
°�
a
W
>
�
o
V
g
2�
UJ
W
cc
FILE N0. 00715
L1.6
Plan
REQUIRED PLANT MATERIALS
2 OVER TORY SHADE TREES PER SIN" FAMILY LOT
LOTS r 116
al
TREES 232
�I
LANDSCAPING REWIRED
LANDSCAPING PROVIDED
232 OVERSTORY/CONIFEROUS TREES
273 OVER./CONIF./ORNAU, TREES
HANSEN
(763) 238-1610
171 OVEASTORY STREET TREES
,�y� XIII
21OVERSTORY BUFFER TREES
'WE ADDITIONAL TREE PER LOT TO BE
INSTALLED BY THE BUILDER.
60 CONIFEROUS BUFFER TREES
14 ORNAMENTAL TREES
(TREE NOT SHOYN ON PLAN)
93 SHRUBS
I
I
�
6 I
B1RER TREES t SHRUBS (INSTALLED BY
DEVVODPER)
GIC BLY BOTF,ef NeN[ fdN01
NNC ,¢MOD,
is ASB Arm nA,u'n Y,vAr•f NNS
BO Q,nge Mrs n
i GMS Iiw Ghsa'dnp,e' Bm
,.M Pews Nye MVa
FR We YMelern' PruNF.
N Q sow -.W* IP C+nma
i YepY 20' B15
Ab e(A 20- Be8
N4 spnw S-.' BM
Piu ; _.' Be8
Oee•pr• S' BeB
UPS mbe wr,pN a rule S G Pot
PLANTING NOTES
e b..`•sw_wu.i• •mw m�• r�e`I r» rwibra�rN IWa,.,r,l Vml mu.r, e+
.+ pau m w wlrw,-ywn w rosr Pau • wu»e r w «NB.• AAx rnlb oa
mua.., ,r ur„ oa,Ne w
s,rMBlr um m aw, ,p»Ta B w oN..A •nn w w.
_ _ n W ua rlwn enw q Are I.
ron w r w.Br n r mewwN ...«. w n ww rnlN w w e»r •pNI w, r,N
on. w•e r ..r,rn - w e,»eNr x,wr rr».
» r•eweb• M M.uwn •nN »win» » M rr• H M Ow.
�a.,IN'ro ealnl.e •w� .�,nrr� n�,yl wN..• - B' r wsl• •rw» a»
r r.re .r •,rw .p. mew vn. ve»7 erod. ror � M •Dewe w
,I..�.,,.., Ter �,«» m,m ,• e, rm w r.»r n..e. ». N_ er w..r
»�, e,n.....» .�. Nr,a• m » nr nNN,. w, �r wm mr B w. rw r.,
rti rn r ewr Brw
r n. www.
STREET TREES OHM ON FINB WhILE) W BMLIEII AT TBC O7 HOW OWDIBC1100
ne e,..r mBB lrsr Bur xo no Aoumlr mrBs sxNz x or nE SAIL SPEOtS A10 No BRODSHO CONSULTING
BOBS MAII .RB of 1K TAPES OH RIE s6oE 91ALL x R TIE SANE SKOVIL
F4N,Ib• NNE esrN•v. NABS B1EAtl0t ON NORIFBRIDGE COURT
S.me ar Bpl. Aw . uwnP.c `BNwe 20' Bee EAGAN. NN 55123
Beirh S_ Bpe Aw eeWvwl, YI» W 20' BeB PHONE 651-065-E073
NoaByn uw eeeu•ewB zo• Bae
FAX- 051-991-1792
Ayre» Ea � Ip.»e1.r�pa.w Twin• io' w
Oeee,nr Ea INNm 4e..rane .. 1NN^,m YAwwi 20' BAB
rn«I ran u.. lew. ei u,: snl• of rw»l.
YARD TRWB OIOT U101N 01 RNC wNum BY ouu mF a TBC Or NOC OOOIAIRI00
116 SflEti mw lir BOT 0 TYO A -HT i S 91ALL eE Di BE SABE SPECES
ewlBm xNIE BGIA,rx xABF B.. T REG. N0. 23849 DATE 06-05-19
Beyeh ` e. BeW Aer ee»Nuum Yb. Br zo' see
p,» a.rt mrlM»Nn B•w• Nye lo' Bae
B,m B•erA G'PEw wrFbn 20' BkB
4rnn�Hneraoml Oer,re VbcnU» M'mY 'Aytli 20' BeB
r tell•Vr Oymwre»e FrYP 20' BM
Oenpee IAra Ire or»,e'O,enpYe 20' Bee
----------------
J-4
-I
� I I
c-
926 /
,
. 1 ,
1 ,
IV,
o
jT
CONIFEROUS TREE PLANTING DETAIL
.•�w.pM:ilmi -
4.a0�•YY✓Aio[r If
t',e ieaAE enmrAs ec eu.pNB ea
DECIDUOUS TREE PLANTING DETAIL
I ql al
XI x
-�b/,ZE.00 N I /
K
L3,
JB L�. 3 L5, 83
4th2,15121150 11 I 12,150 5
SF „
1
1
- R i
it 1111 1 �
4th 1 4th
0,790 11 0,828 SF 1
It o,l
.__-------
-------- �
X0£6 g3A 1
1 I
S -DMSA 833—Nle\\
\
F.9", >_—
BBB��/�'/ BBBBBBBBBBBB�BBBB���
"" Ii':i► B:SI
AN--_ _
_WWI
PAGE LAYOUT.
L1.1 L1.2
0.3 L1.4
L1.5 I L1.6
SHRUB PLANTING DETAIL
x 9320
34
x I
' a
i r
I L7, B I I L2, B4
f N 4 h 4t11., / 1 3
I .1
\ c
I�q
o� I
41
I'---/6'OZE/---
I '>j3 „01,8CB00 S x
al
Is
�I
o e I
01Ld w
i 1\11u11
uj
nLo
HANSEN
(763) 238-1610
20 2E
l =env u
,�y� XIII
I
I
I
� I
I
I
I
�
6 I
r
,
G
M
�I'
=
p
a
L
I
C�
a
1
Ul
w� I
I x
I
II In
Imo■
^ I
e---_
<
2Z
x Q
x
W
��i;�+
`a%i►.
1
fill
lu
a
,
1 1
N
IV,
o
jT
CONIFEROUS TREE PLANTING DETAIL
.•�w.pM:ilmi -
4.a0�•YY✓Aio[r If
t',e ieaAE enmrAs ec eu.pNB ea
DECIDUOUS TREE PLANTING DETAIL
I ql al
XI x
-�b/,ZE.00 N I /
K
L3,
JB L�. 3 L5, 83
4th2,15121150 11 I 12,150 5
SF „
1
1
- R i
it 1111 1 �
4th 1 4th
0,790 11 0,828 SF 1
It o,l
.__-------
-------- �
X0£6 g3A 1
1 I
S -DMSA 833—Nle\\
\
F.9", >_—
BBB��/�'/ BBBBBBBBBBBB�BBBB���
"" Ii':i► B:SI
AN--_ _
_WWI
PAGE LAYOUT.
L1.1 L1.2
0.3 L1.4
L1.5 I L1.6
SHRUB PLANTING DETAIL
x 9320
34
x I
' a
i r
I L7, B I I L2, B4
f N 4 h 4t11., / 1 3
I .1
\ c
I�q
o� I
41
I'---/6'OZE/---
I '>j3 „01,8CB00 S x
'a
Is
I
o e I
01Ld w
i 1\11u11
uj
nLo
HANSEN
(763) 238-1610
20 2E
l =env u
,�y� XIII
I
I
I
� I
I
I
I
�
6 I
to]
L1.7
0 50 100 150
GRAPHIC SCALE /N FEET
---------I I I z l
L.1111\A
i i I Q I
x 1 v x
x I I
I I = I
I
I ILInCV AC AAA\R/1 \I/'�[N.
CLIENT.,
VHF INVESTMENTS,
I
�I
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
li
HANSEN
(763) 238-1610
20 2E
l =env u
,�y� XIII
I
I
11�
z(,yl$oin%
O
r
�a
G
M
�I'
=
p
a
L
I
C�
a
1
Ul
w� I
I x
I
II In
ry _Jos
^ I
e---_
<
2Z
x Q
x
W
M0YeS
vJ
1
x 1 v x
x I I
I I = I
I
I ILInCV AC AAA\R/1 \I/'�[N.
CLIENT.,
VHF INVESTMENTS,
LLC
�I
14505 43rd AVENUE N.
PLYMOUTH, MN 55446
HENRY
HANSEN
(763) 238-1610
20 2E
l =env u
U
7
F
z(,yl$oin%
m_es
�a
G
M
�I'
=
p
a
W
a
a
W
�
V
W/� W
co 0
o
b
Z
<
2Z
W
M0YeS
vJ
L1.1 -L1.7 LANDSCAPE PLANS
P��E E-1. 7
Landscape Plan
�I
V! b N
y
20 2E
l =env u
F
z(,yl$oin%
m_es
a
n
a
N
FlLE N0.
00715
L1.1 -L1.7 LANDSCAPE PLANS
P��E E-1. 7