Loading...
ITEM 3.8C Norin Landing06 'Ty OF 0 MINNESOTA ! 7 DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks and Recreation Parks and Recreation Director Demant July 22, 2019 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.8C STRATEGIC VISION MEETS: THE CITY OF OTSEGO: the amount of $51,584.97. Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Sunram Construction's portion of Norin Landing is now completed. A punch list was tabulated and Is a social community with diverse housing, service options, and employment opportunities. The original bid amount approved at the May 14, 2018 City Council meeting was $520,943. Once the final Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Approval of Pay Request #6 (Final) from Sunram Construction Inc. for the construction of Norin Landing in the amount of $51,584.97. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Sunram Construction's portion of Norin Landing is now completed. A punch list was tabulated and reviewed with Sunram Construction. That punch list was verified completed by Hakanson Anderson. The original bid amount approved at the May 14, 2018 City Council meeting was $520,943. Once the final pay request is approved, the actual amount paid to Sunram Construction Inc. will be $508,067.12. Material removal and turf establishment are the two items that contributed to the reduction in their final project total. All material that was removed for the parking lot and storm water ponds remained on-site to build a larger berm on the south side of the park, and turf establishment was completed by another contractor. Sunram Construction's final pay request includes their 5% retainage that the City withheld on the first 5 pay requests in accordance with Minnesota state statue. SUPPORTING DOCUMENTS ATTACHED: 0 Sunram Construction Final Pay Request POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Pay Request #6 (Final) from Sunram Construction Inc. for the construction of Norin Landing Park in the amount of $51,584.97. BUDGET INFORMATION FUNDING: BUDGETED: 208 — Community Facilities Fund Yes Pay App 6 Final Norin Landing Quantity Quantity Pay 1-2 Pay 3-4 Pay 5 Pay 6 0.75 0.10 City of Otsego (2nd & 4th Monday) 0.53 LF 1 F&14" Concrete Pavement under Pavilion 24 637 $11.00 $ 7,007.00 637 427 CY Total Line Item Unit Bid Qty Unit Price Bid Mobilization LS 1 $49,000.67 $ 49,000.67 Clearing AC 0.53 $8,200.00 $ 4,346.00 Grubbing AC 1 $5,455.00 $ 5,455.00 Remove Concrete Pipe LF 24 $21.00 $ 504.00 Remove Bituminous Pavement SY 427 $2.70 $ 1,152.90 Sawing Bituminous Pavement LF 31 $3.00 ' $ 93.00 Common Excavation LS 1 $39,000.00 $ 39,000.00 Topsoil Borrow- Infiltration Basin CY 61 $44.00 $ 2,684.00 Salvaged Topsoil from Stockpile CY 512 $14.15 $ 7,244.80 Haul Excess Material CY 1612 $20.00 $ 32,240.00 Aggregate Base Class 5 TN 1232 $20.55 $ 25,317.60 Mill Bituminous Surface 1.5" SY 12 $27.00 $ 324.00 Bituminous Material for Tack Coat GAL 135 $3.00 $ 405.00 Type SP 9.5 Wearing Course Mixture TN 485.7 $72.25 $ 35,091.83 Type SP 12.5 Non Wearing Course Mixture TN 303 $72.25 $ 21,891.75 Retalning Wall LS 1 $12,600.00 $ 12,600.00 4" Concrete Walk SF 266 $10.50 $ 2,793.00 Concrete Curb & Gutter Design 8612 LF 1443 $13.60 $ 19,624.80 Truncated Domes SF 52 $63.00 $ 3,276.00 Traffic Control LS 1 $1,500.00 $ 1,500.00 Silt Fence Type Machine Sliced LF 992 $2.65 $ 2,628.80 Flotation Silt Curtain Type Moving Water LF 163 $19.00 $ 3,097.00 Storm Drain Inlet Protection EA 5 $150.00 $ 750.00 Stabilized Construction Exit EA 1 $1,200.00 $ 1,200.00 - Erosion Control Blanket Category 0 SY 526 $1.65 $ 867.90 Pavement Message (Thru Arrow & Handicap) Paint EA 6 $27.00 $ 162.00 4" Solid Line White Paint LF 502 $0.35 $ 175.70 15" RC Pipe Apron EA 5 $920.00 $ 4,600.00 18" RC Pipe Apron EA 1 $1,070.00 $ 1,070.00 15"HOPE -Pipe Sewer LF 275 $34.75 $ 9,556.25 15" RC Pipe Sewer Design 3006 CL V LF 293 $45.00 $ 13,185.00 18" HDPE Pipe Sewer LF 64 $41.00 $ 2,624.00 18" RCP Pipe Sewer Design 3006 CL V LF 37 $51.00 $ 1,887.00 Connect to Existing Storm Structure EA 1 $815.00 $ 815.00 ,Construct Drainage Structure Design 2' x 3' EA 1 $2,135.00 $ 2,135.00 Construct Drainage Structure Design 48" -4020 EA 4 $2,735.00 $ 10,940.00 Construct Drainage Structure Design OCS EA 2 $3,750.00 $ 7,500.00 Random Rip -Rap Special CY 155 $95.00 $ 14,725.00 Articulated Interlocking Block Open Cell Type SY 8 $175.00 $ 1,400.00 Concrete Plank Boat Ramp LS 1 $15,500.00 $ 15,500.00 F&I MnDOT Class 2 Aggregate Trail SY 352 $16.25 $ 5,720.00 F&I 6" x 12" Concrete Edger LF 92 $27.00 $ 2,484.00 F&I Brick Pavers SF 292 $14.25 $ 4,161.00 F&1 Limestone Block Seating EA 13 $725.00 $ 9,425.00 F&I 6'x 34' Boarding Dock w/Abutment EA 1 $15,200.00 $ 15,200.00 F&I Conrete Fishing Platform EA 1 $1,250.00 $ 1,250.00 F&I 2'x 3'x 2' Glacial Boulder EA 3 $250.00 $ 750.00 F&i Trash Receptacle EA 2 $1,025.00 $ 2,050.00 F&I Picnic Table EA 4 $2,080.00 $ 8,320.00 F&I Game Table EA 4 $1,955.00 $ 7,820.00 F&I Grill EA 2 $760.00 $ 1,520.00 F&I Type ASeed Mix AC 0.3 $1,310.00 $ 393.00 F&12.5"Deciduous Tree EA 28 $565.00 $ 15,820.00 F&18'ConiferousTree EA 17 $520.00 $ 8,840.00 F&12" NMC LF 600 $7.50 $ 4,500.00 Alternate Bid Items F&I Bituminous Trails - MnDot Class 2 Aggregate 11/20/2018 2/5/2019 5/31/2019 7/10/2019 Quantity Quantity Quantity Quantity Pay 1-2 Pay 3-4 Pay 5 Pay 6 0.75 0.10 0.15 0.53 LF 1 F&14" Concrete Pavement under Pavilion 24 637 $11.00 $ 7,007.00 637 427 CY 31 8/23 Additional Clearing 1 1 $2,425.00 1 512 1627 - 12 Pay App 1$130,078.49 150 117 318 284 1 278 Pay App 4 $13,280.00 1443 56 0.5 0.25 0.25 650 165 3 1 500 6 606 5 1 275 293 64 37 1 1 4 2 155 61 100 9 0.10 28 17 75 Trails SY 352 $35.00 $ 12,320.00 F&I Wood Overlook Deck LS 1 $32,000.00 $ 32,000.00 F&I 6' High Vinyl Coated Chain Link Fence LF 792 $35.00 $ 27,720.00 F&14" Concrete Pavement under Pavilion SF 637 $11.00 $ 7,007.00 637 Additional on site material moved to berm CY 1500 $8.00 1800 8/23 Additional Clearing LS 1 $2,425.00 1 11/27 Hay Bales & Labor $8•00 - $ 526,663.00 Pay App 1$130,078.49 Pay App 2 $170,860.61 Pay App 3 $126,047.32 Pay App 4 $13,280.00 Pay App 5 $40,241.10 Pay App 6 $27,559.60 1st Payment $123,574.57 2nd Payment $162,317.57 3rd Payment $119,744.96 4th Payment $12,616.00 5th Payment $38,229.05 Final Payment $51,584.97 192 Total Complete $49,000.67 $4,346.00 $5,455.00 $504.00 $1,152.90 $93.00 $39,000.00 $0.00 $7,244.80 $0.00 $33,434.85 $324.00 $450.00 $31,428.75 $20,519.00 $12,600.00 $2,919.00 $19,624.80 $3,528.00 $1,500.00 $1,722.50 $3,135.00 $450.00 $1,200.00 $825.00 $162.00 $212.10 $4,600.00 $1,070.00 $9,556.25 $13,185.00 $2,624.00 $1,887.00 $815.00 $2,135.00 $10,940.00 $7,500.00 $14,725.00 $700.00 $15,500.00 $0.00 $1,647.00 $4,161.00 $9,425.00 $15,200.00 $1,250.00 $0.00 $2,050.00 $16,640.00 $0.00 $1,520.00 $131.00 $15,820.00 $8,840.00 $562.50 352 $12,320.00 1 $32,000.00 792 $27,720.00_ $7,007.00 610 500 $23,280.00 $2,425.00 $0.00 $508,067.12