Loading...
ITEM 3.8 Water Tower #2OtSezoTyOF MINNESOTA C7 DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier August 26, 2019 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.8 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: authorization for advertisement to obtain bids. Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Water Tower 2 serves the West Public Water System providing for one million gallons of water storage and Is a social community with diverse housing, service options, and employment opportunities. expectancies for towers built during this timeframe. The past two inspections conducted in 2015 and 2019 Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff is recommending approval of Water Tower 2 plans and reconditioning specifications and authorization for advertisement to obtain bids. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FICATION: Water Tower 2 serves the West Public Water System providing for one million gallons of water storage and fire protection needs. The tower has been in service since 2003 meeting interior and exterior coating life expectancies for towers built during this timeframe. The past two inspections conducted in 2015 and 2019 forecasted recoating needs in 2020. The 2019-2028 Capital Improvement Plan (CIP) includes $1,345,000 for the tower reconditioning in 2020. The bid package will offer two options; a single 2020 reconditioning of an estimated 14 weeks or as a 2020 exterior coating project and a 2021 interior coating project each 7 to 8 weeks. Pending bid amounts, option 2 offers two shorter construction periods to minimize irrigation influence as the tower would need to be offline for any recoating work. Bid advertisement will initiate in September with Council approval. Staff has reviewed the reconditioning specification for water tower 2 with recommendation to proceed with advertisement for bids. The Public Works Subcommittee was verbally updated regarding this item at their August 21, 2019 meeting and recommended this be place on the consent agenda for full Council approval. SUPPORTING DOCUMENTS ATTACHED: 0 Advertisement for Bids POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve plans and reconditioning specifications as prepared by KLM Engineering, Inc. for Water Tower 2 and authorize advertisement for bids. BUDGET INFORMATION FUNDING: BUDGETED: 601— Water Utility Fund Yes ADVERTISEMENT FOR BIDS 1,000,000 -GALLON WATER STORAGE TANK REHABILITATION TOWER NUMBER 2 CITY CONTRACT NO.: 20-01 KLM PROJECT NO.: MN3289 OTSEGO, MINNESOTA JULY 2019 MANDATORY PRE-BID DATE: September 24, 2019 CLEANING, REPAIRING, & PAINTING BID OPEN DATE: October 15, 2019 The City of Otsego, Minnesota will hold a mandatory pre-bid conference at the Lilly Pond Conference Room, City Hall, located at 13400 901 Street, Otsego, Minnesota 55330 followed by a visit to the project site on September 24, 2019 at 2:00 PM, at which time the Owner's representatives, bidders, and subcontractors will discuss the project. Attendance by prospective bidders or their designated representatives at the pre-bid conference is a pre -requisite to bidding the proiect. The City will receive sealed bids for the furnishing of all tools, labor, materials, and equipment necessary for elevated water tower rehabilitation until 2:00 PM CST, October 15, 2019 at the City Hall, 13400 90th Street NE, Otsego, Minnesota, 55330 at which time and place all bids will be publicly opened and read aloud. Bids shall be marked as to indicate: Name of Bidder; Date and Time of Bid Opening; Proposal for Cleaning, Repairing, and Painting 1,000,000 Gallon Water Tower; KLM Project No. MN3289; City Project No. 20-01; Water Tower Number 2. Plans and Specifications are available at www.Questcdn.com. You may download the documents for $30.00 by inputting Quest project #6456300. Please contact QuestCDN.com at 952-233-1632 or info(a)guestcdn.com for assistance with registration, downloading, and working with this digital project information. All costs for either electronic or paper copies are NON-REFUNDABLE. All costs associated with the preparation of the bid are to be borne by the bidder. For clarification and/or additional information not included in the specification contact Jerry Tell, P.E. at KLM Engineering, Inc., 1976 Wooddale Drive, Suite 4, Woodbury, MN 55125, Phone 651-773-5111. No bid will be considered unless sealed, filed with the City Administrator, and accompanied by cash deposit, certified check, bid bond, or cashier's check payable to the City of Otsego, Minnesota in the sum of at least five percent (5%) of the total amount of the bid, such deposit or check or Bidder's Bond to be forfeited to the City in the event that the successful bidder fails to enter into a contract awarded to them in accordance with the terms of their bid, or fails to furnish bond as provided by law, within ten (10) days after the award becomes final. ADVERTISEMENT LOCATIONS & DATES Online Quest CDN: September 9 & 16, 2019 City Website: September 9 & 16, 2019 Elk River Star News: September 9 & 16, 2019 R\2019\2019 Projects\Ostego MN3289 1 MG Tower No. 2 REG\Specification\REV 2 W1P\o4 Ad For Bid- Otsego MN3289.Docx rv�. Copyright 2019 by KLM Engineering, Inc. Page 1 �i t :w