Loading...
ITEM 3.3D Needham Ave} t� Request for Ot ITS' OF City Council Action MINNESOTA DEPARTMENT INFORMATION ORIGINATING DEPARTMENT: REQUESTOR4 MEETING DATE: Public Works City Engineer Wagner October 28, 2013 PRE ENTER s : REVIEWED BY: ITEM #: Consent Agenda City Ad rn 1 n istrato r Johns n 3,3D AGENDA ITEM DETAILS RECOMMENDATION: City Staff recommends approval of Pair Estimate 1 in the amount Of $29,251.45 for the Needham Avenue Drainage Improvements — Phase 1 Project to Dare Perkins Contracting, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT'S IS A PUBLIC HEARING REQUIRED? No O BA KGROUNDIJUSTIF[CATION; Daae Perkins Contracting has completed the culvert replacements rid ditch grading for the entire project. Site restoration and bituminous street patching remain to be completed. Needham m Av nue Stora Sewer is a private system which has failed and is In need of improvement t alleviate flooding and improve quality Of life in the area. The existing pipe system has ar section which has collapsed and the existing culverts and ditches are at grades which do not promote drainage. The Citi has held a public hearing on this project and at the May 13, 2013, Council meeting. The Council authorized requests for quotes for the project. Needham dham Avenue Stora Sewer Improvement is in the 2013 CIP for ars estimated amount Of $44,000. The quotes cane in above that estimate. A phasing Option was determined ined tO be an alternative which may work. Phase 1 entails re -grading the ditches and resetting culverts. The outlet pipe would be replaced to just beyond its current break and attached to the remaining existing section. This would remove the most costly portion of the project. That portion would be considered phase 2. Phase 2 would be needed if that portion Of the pipe collapsed Or could be completed in conjunction when the street is reconstructed. The section of the pipe remainingin a future Phase 2 was televised and deemed structurally intact. The Council opted to re -quote for Needham Avenue Stormwater Improvements ements - Phase I only. It is expected that this project with be completed at or slightly below the bid price Of $39,234.00 SUPPORTING DOCUMENTS: N ATTACHED a NONE 0 Pair Estimate #1 POSSIBLE MOTION ------ - ------ Wase luorgd motion as you would like it to appear In the minutes. Motion to approve payment to Dave Perkins Contracting, Inc. in the amount of $29,251.45 for the Needham Avenue Drainage Improvements — Phase 1 Project. BUDGET INFORMATION FUNDING: BUDGETED: xYES Assessment 2 20-Sto rm Water- 0 ut of District NO ACTION TAKEN ....... . . ............ ......... ....... ..... I ......... APPROVED AS REQUESTED DENIED ij TABLED o OTHER (List changes) COMMENTS: PAYESTIMATE #1 OWNER CITY OF OTSEGO Needham Avenue Drainage Improvements October 1, 2013 Honorable Mayor & City Council City of Otsego 13409 90th Street Otsego, MN 55339 E; Needham Avenue Drainage Improvement Contractor: Dave Perkins Contracting, Inc. Contract Amount: $39,234.09 Award Bate: August 1r 2013 Completion Date: September 9, 2013 Dear Honorable Mayor and Council Members: The follovring work has been completed on the above -referenced project by Leve Perkins Contracting, Inc. Rid RrhnrhiIn All _ . frnMet nnri rytirlinrT ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACTAMOUNT USED T BATE EXTENSION EXTENSION 1 Mobilization ation i LS x1,200.00 1 1 19 1,200.00 6 Remove Existing PVC Storm Seger Pipe 135 LF $10.00 $ ___1j200.00 1,350.00 135 15" RC Pipe Apron 1 360,00 3 Remove Bituminous Pavement 106 sy $5.00 530.00 49 2 245.00 4 Sawing Bituminous Pavement Full Depth) i50 LF $3.00 454.00 154 LF 462.00 5 Ditch Gradin 'I LS $4,000.00 4,000.00 1 $38.00 4,000.00 6 Haul Exoess Dirt tq 's Stock p 11e 231 cy $12.00 $ 2,772.00 $38.00 1,216.00 - 7 Aggregate Base, Class 5 37 T $23.00 1,036.00 20 32 560.00 8 1101 Bitu minous Surface (1.6") 0 SY $25.40 150.00 1 $ 1,650.00 27 9 lype L114 Waadng Course i bdure 20 T $200.00 4,000.00 600.40 - 10 Bltumlnous Material for Tack Coat 9 GAL $10.00 90.00 .. 11 Traffic Control i L 600.00 $ 600.00 1 600.00 12 Silt Fence, T e Machine 811ced 62 LF $4.00 248.00 248.00 13 Seedin 4 AC $1,500.00 500.00 1 'i 500.00 14 Seed Mixture 270 g0 LBS $3.50 280.00 40 140.00 46 Mulch Matedai T e 1 1 Til $350.00 350,40 0.4 140.00 16 Erosion Control Blanket Category 3 225 S $2.00 450.00 144 $ 282.00 '17 Fertilizer, Type 3 264 LBS $1.00 264.00 100 100.00 Total BId SchedUlo "A" 19,270.00 10,827400 Rir r_lintfilln ""111 . Rfnrm Antunr~ ENO. ITEM D IPTi 1 ESTIMATED QUANTITY UNIT NTI T UNIT PRICECONTRACTAMOU IT USED TO DATE EXTENSION 18 15" CS Pi ron 1 BA $250.00 250.00 1 250.00 19 12" RC Pipe Apron 6 EA $650.00 3,900.00 3 900.00 20 15" RC Pipe Apron 4 FA $700.00 2,840.00 4 2,800.00 21. 24" RC Pipe Apron 2 EA $950.00 4,940.40 1,900.00 22 15" HDPE Pipe Sewer 138 LF $30.00 4,140.00 138 4,140.00 23 12" RC Pip a Sewer Des Ig n 3006 CL 111 46 LF $38.00 1,748.00 46 4,748.40 24 15"RC PIp a Sewer Desig n 3006 CL 111 32 LF $38.00 1,216.00 32 $ 1,216.00 25 24" RC Pipe Seger Design 3005 CL M 32 LF $55.00 $ 1,760.00 32 $ 1,760.00 26 Catch -Basin 1 EA $1650.00 1,650.00 1 $ 1,650.00 27 Connect to EAsUng Drainage Pipe 1 FA $600.00T $ 800.00 1 600.40 Total Bid Schedule 11813 $$ 1964.00 $ 19,964.00 T435 PE - Phase 1 PE - I Bid Schedule "N' Bid Schedule "B" TOTAL_ Total Work ompleted to Date LES % RETAINAGE: AVE RECOMMEND PA MEI T OF: PAY ESTIMATE #1 CITY OF OTSEGO Needham Avenue Drainage Improvements 19, 270.00 193964.00 APPROVALS: CONTRACTOR: TOR: DAVE PERKINSTI A TIN , INC. ertifi tf ontracto + rt` that all items and amounts are correct for the wort completed t abate. Signed+01 0 Title: Dade ENGINEER: HAKANSON ANDERSON Certification by Engineer: We recon Signed: Title: d OWNER: CITY OF OTSEGO and payment for %vork and quantities as shown. Gate Signed: Titre: Date OT435 P - Prase I PE -2 OWNER $ 10,827.00 $ 303791.00 30,791,00 $ 1,539.55 29,251.45