CIPCity of Otsego
Capital Improvement Plan
for the Fiscal Years 2014 through 2018
Summary of Projects by Department
Summary of Projects by Funding Source
Project Details:
Administration
City Entrance Signs
Phone System Upgrade
Ballot Counters
City Facilities
Prairie Center Parking Lot
Public Works Building
Demolition of Old Town Hall
Parks & Recreation
Waterfront East Park
Trail - Queens to Riverpointe
Wildflower Meadows Park
West Lefebvre Creek Park
Park Signage
Verious Court Repairs
Darkenwald Landing
Norin Landing Project
Prairie Park Playground Equipment
Prairie Park Ballfield Lighting
Prairie Park Rough Grade Parking
Paride Park Picnic Shelter
Prairie Park NW Parking Lot
Prairie Park Potable Water & Electric
School Knoll Park Playground Equipment
School Knoll Park Pre -K Play Structure
Annual Trail Management
Public Safety
Emergency Sirens
Public Safety Fire Department
Fire Station
PAGE
I
3
7
8
9
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
PAGE
Public Utilities
Well #3 Pump & Aquifer Reehab
33
Meter Replacement Project
34
SCADA Computer Replacement
35
Stormwater Collection (in District)
36
Stormwater Collection (Otsego Creek)
37
Stormwater Collection (Otsego Farms)
38
Stormwater Collection (Culverts - Out of District)
39
West Well Capacity - extend to Riverwood
40
LS #3 (West WWTF)
41
Water Tower #1- Interior Painting
42
Water Tower #1 - Exterior Painting
43
Lift Station Pump Replacement
44
Well House #4 - SCADA
45
West WWTF Digester
46
Valve Turner
47
Wellhead Protection Plan Amendment
48
Public Works
Annual Street Seal Coating
49
Annual Street Crack Filling
50
Annual Street Striping
51
Annual Street Preventative Maintenance
52
CSAR 39 Service Road
53
78th Street Extension - Quaday to Quam
54
Nashua Ave Realignment at CSAR 39
55
85th Street Extension - Nashua to Mason
56
Micro -Surface Streets
57
70th Street Extension - Martin Farms to Oakwood
58
Preventative Maintenance - Street Reconstruction
59
Highway 101/144 Project Contribution
60
City of Otsego, Minnesota
-Capital Improvement Plan
2014 thio 2018
PROJECTS BY DEPARTMENT
Departnient Proj eet# Priority 2014 2015 2016 2017 2018 Total
lAdininistration
City Entrance Signs (3) ADM -12-001 n1a 60,000 60,000
Phone System Upgrade ADM -12-002 n/a 20,000 20,000
Ballot Counter AOM -14-001 rola 8,700 81700
Adiniiiistration Total
68,700
28,000
88,700
pity Faeflities
Prairie Center Parking Lot & Enlranoe Construction
FAC -12-005
n1a
255,000
255,000
Publlc Works Building Expansion
FAC -12-008
n./a.
50,000
1,850,000
1,900,000
Demolition of Old Town Hall
FAC -12-009
n1a
30,000
30;000
City Facilities Total
30,000
50J000
211050000
2,185,000
[Parks & Recreation
Waterfront East Park
P&R-12-047
n/a
35,000
35J000
Trail - Queens To RNerpoInte Area
P& -12,048
P/a
135,000
135,000
ffldfiower Meadows Park
P&R-12-055
n/a
640,000
640j000
West Lefebvre Creek Park
P&R-12-056
ft/a
640,000
640,000
Park Signage
P&R-13-001
Wa
13,500
13,500
'Various Tennis and Basketba 11 Court Repairs
P&R-14-001
n1a
31, 0
31,000
Darkenwald Landing
P&R-DL12-033
r9a
480,700
480,700
Morin Landing Park Project
P&R-NL12-032
n/a
477,400
477,400
Praire Park Playground Equipment
P&R-PP12-002
Na
80,000
800000
PraVe Park Ballfield Lighting
P&R-PP12-035
n/a
500,000
500t000
Prairie Park Rough Grade Parking Area & Ballfields
P&R-PP12-036
n1a
526,500
526,500
Pralqe Park Picnic Shelter
P&R-PP12-041
n/a
60,000
60,000
Prairie Park NW Parking Lot
P&R-PP12-053
n/a
152jOCO
152,000
Prairie Park Ballrields Potable VVater & Elec Svc
P&R-PP14-001
n1a
11'000
11,000
School Knoll Park Playground Equipment
P&R-8K12-003
n1a
55,733
55,733
School Knoll Park Pr •K Play Structure
P&R-SK12-045
n1a
20,000
20,000
Annual Trail Management
PW-ST12.056
n/a
25,000
25j000 25,000
25,000
100,000
Parks & Recreation Total
235,500
11205p700 60,000
2,456,633
3;957j833
JPublic Safety
Emergency Sirens (2)
PS -12-001
n/a
27,000
27,000
Public Safety Fire Department
PS -12-003
n/a
600'.000
600,000
Fire Station
PS -12-005
n/a
1,750,000
11750,000
Public Safety Total
27,000
2 350,000
21377,000
Public ]Utilities
Well #3 Pump & Aquifer Rehab
UTIL-12-028
n1a
11 ,000
110,000
Meter Replacement Project
UTIL-12-045
n1a
60,000
50,000
60,000
150,000
SCADA Computer Replacement
UTIL-12-046
n/a
15,000
15,000
Stormwate r Collection System (In District)
UTIL-12-064
n1a
50,000
50,000 50,000
54,004
50,000
250,000
Monday, October 28, 2013
Departmeiit Projeetg Priority 2014 2015 2016 2017 2018 Total
S to rrnwa te r Co I I ec Uo n System (tsego Creek)
UTIL-12-065
n/a
75,000
75,000
Stormwater CollecUon System (Otsego Farms)
'TIL -12,950
n/a
10,000
10J000
Stormwater Coll Sys (Culverts - taut of Distict)
UTIL-12-067
n1a.
10,000
10,000
10,000
10,000
10,000
50,000
West Dlstr ct Well Capacity - extend to RiveRvood
UTIL-12-074
rVa
325,000
325,000
650,000
LS #3 (West WWTF)
OTIL-12-975
n1a
55,000
20,000
75,000
Water Towe r # 1 In leflior Pa Inting
UTIL-12-078
n1a
170,000
170,000
Water Towe r #I Exterlor PaInUng
UTIL-12-079
n1a
45,000
45,000
Lift Station Pump Replacement
UTIL-12-100
n1a
54,000
34,000
70,000
158,000
Well House #4 SCADA
UTIL-14-001
n1a,
11,000
11,000
West WWTF Digester
UTIL-14-002
n1a
150,000
150,090
Valve Turner
UTIL-14-003
n/a
16,000
15J000
Wellhead Protectlon Plan Amendment
UTIL-14.004
n/a
20,000
20,000
Public Utilities Total
240,000
4390000
450j000
529,000
290,000
11964,000
JPublic Works
Annual Street Sea[ Coating
PW-ST12-059
n/a
260o000
265,000
135,000
350,000
550o000
1000000
Annual Street Crack Filling
PW-ST12-060
n1a
70,000
76,000
70,000
76,00]
70,000
362,000
Annual Street Stuping
PW-ST12-061
n1a.
28,000
29,000
29,000
30oOOO
31,000
147,000
Annual Street Preventative Maintenance
PW-ST12-062
n1a
39,000
41,000
42,000
44,000
45,000
211,000
CSAR 39 Service Road
PW-ST12-066
n1a
292,000
292,000
78th Street Extension - Quaday to Qua rn
PVI-ST12-068
n/a
360,000
360oO00
Nashua Avenue Realignment at CSAH 39
P17I-ST12-069
n/a.
86,000
86,000
85th Street Extenslon, - Nashua to Mason
PW-ST12-070
n/a
200,000
200,000
Macro -Surface 8 Vee Is
PW-ST12-073
n/a
150JO00
150,040
70th Street Extenslon - Martin Farms to Oakwood
PW-ST12-075
n1a
1,40000
1,200,000
2,600,000
PreventatIve Maintenance -'Street ReconstrucUon
PW T12-077
n1a
2, 00,000
21500,000
Highway 101/144 Project Contfibuton
PW-ST13-001
n/a
100,000
100,000
Public Works Total
2j539s000
4,1111 ,000
276j000
946,000
696,000
81566j000
GRAND TOTAL 3,11 6t200 5J85,700 3,130,000 41001,633 3;091;000 19,130,533`
11widay, October- 28, 2073
City of Otsego, Minnesota
Capital Improvement Plan
2014 tim, 2018
PROJECTS BY FUNDING SOURCE
50111-ce P1,O]CO4 Priority 2014 2015 2016 2017 2018 Total
1101 Geiieyal Fmid �-1
Ballot Counter
ADM -14-001
n1a
8,700
8,700
101 Geiieral Fmid Total
8800
8,700
�201 Pavemerit it gement Ftmd �J
Annual Street Seal Coating
PW-ST12-059
n1a
260,000
265,000
135,000
350,000
650,000
1)560,000
Annual Street Crack Filling
PW-ST12-060
n1a
70,000
76,000
70oO00
76,000
70,000
362,000
Annual Street Str1ping
PW-ST12-061
n1a
28,000
29,000
29,000
30,000
31,000
147tOOO
Annual Street Preventabve Maintenance
PW-ST12-062
n1a
393000
410000
42,000
44,000
45,000
211t000
201 Paveiticiit Alaiiagemezit Fuiid Total
3973000
41111,000
276,000
500J000
696,000
21280,000
[202 Ti -ail Maiiagemeitt. 1' L111d
Annual Trail Management
PW-ST12-058
n1a
25,000
25,000
25,000
25,000
100,000
202 Ti-aill. Maiiageiiieiit Fimd Total
25,000
25j000
25,000
25,000
1001000
203 Pads Develoeme'lit I
i
Prairie Center Parking Lot & Entrance Construction
FAC -12-005
n1a
255,000
265,000
VVildflower Meadows Park
P&R-12.055
n1a
640,000
640j000
West Lefebvro Creek Park
P&R-12-056
n1a
640,000
640,000
Morin Landing Park Project
P&R-NL12-032
n1a
310,366
310,366
Prairie Park Ballfield Lighting
P&R-PP12-035
n1a
500,000
500t00O
Pralde, Park Rough Grade Parking Area & Ballfields
PSR-PP12-036
n/a
526,500
526t5O0
Prairie Park Picnic Shelter
PSR-PP12-041
n/a
60,000
60,000
Prairie Park NW PaOng Lot
PSR-PP12-053
r9a
152,000
152,000
203 Pat -k Developiiiejit Total
7003000
2,128,866
255;000
310830866
205 Pad( Capital Eqpt Ftmd
loan Landing Park Project
P&R-NL12.032
n/a.
83,517
83,617
Praide Park Playground Equipment
P&R-PP12-002
n1a.
80,000
8000
School Knoll Park Playground EquIpment,
P&R-SK12-003
n1a
55,733
55f7 3
School Knoll Park Pre -K Play Structure
P& -S1
n1a
20,000
20t000
205 Part t Capitni Eqpt Fend Total
20,000
219 250
239,250
t206 Capital Eqpt Revolviiig Fu ii(I
mmm I
Phone System Upgrade
ADM -12-002
n1a
20,000
20,000
206 Capital Eqpt Revolviiig Fmid Total
20,000
20,000
Monday, October 28, 2013
3
Source ProJeety Priority
2014
2015 2016
2017 2018 Vital
1208 Commiiiiity Facilities 'mid
Darkenwald Landing
PgR-DL12-033
n1a
480,700
460,700
208 Community Facilities Rind Total
48%700
480,700
209 Street ReemistrUctimi Fujid
CSAH 39 Service Road
PW-ST12-066
n1a
146,000
146,000
0
78th Street Extenslon - Quaday to warn
PW-ST12-068
n1a
360,000 360,000
Nashua Avenue Realignment at CSAH 39
PW-ST12-069
n1a
86,000 86,060
209 Street Reconstruction Fund Total
146ffl4
446j40O 592,000
[214 Fh-e Capital Reserve
Publ[r, Safety Fire Department
PS -12.003
n1a
600,000
600,000
Fire Station
PS -12-005
ala
1o750,000
11 7501 000
214 Fire Capital Reserve Total
2j359i000
2j350,000
220 Stornmater - Out of District
Stormwater Coll Sys (Culverts - Out of District)
UTIL-12-067
n1a
10,000
10,000 10,000
10,000 10,000 50,00'0
220 Storniwater - Out of District Total
10,000
%000 10,000
lopo 10,000 50,000
1222 Storniwater Utility Fmid
Stormwate r Collection Systern (f n District}
UTIL-12-064
n/a
50,000
50,000 50,000
50,000 50,000 250,000
222 StoriiiNvater Utility Fund Total
60,000
50,000 50J400
50J000 50J004 250j000
X03 Ccollectoi• Street Fmid
85th Street Extension - Nashua to Mason
PW-ST12-070
fl/a
200,000
200,000
403 Collector Street Fim] Total
200000
200,400
1408 Otsego Creel( Water shed
Storm Ater CollecUon System (Otsego Creek)
UTIL-12-065
n1a
75,000
75,000
408 Otsego CreekWatershed Total
75,000
75,000
414 Re, irolvhig Capital Impi-V �J
City Entrance Signs (3)
ADAI.12-001
n1a
60oOOO
60,000
Demolition of Old Town Hall
FAC -12-009
n1a
30,000
30,000
Waterfront East Park
P&R-12-047
n1a
35,000
35,000
Park Signage
P&R-13-001
n/a
13,600
i3r599
Valous Tennis and Basketball Court Repairs
P&R-14-001
n1a
31,000
31t000
Prairie Park Ba I Melds Potable Water & Dec Svc
Pc R-PP14-001
n1a
11,000
11t000
Emergency Sirens (2)
PS -12.001
n/a
27,000
27,000
Highway 101/144 Project Contribution
PW-ST13-00i
n1a
100,000
100,000
414 Revolving Capital Impry Total
242,500
30,004 35,000
307,500
[601 Wat& Fla iid
Alonclay, October 28, 2613
Source Project# Priority
;2014
Oak
2015
2016
2017
2018
Total
Well #3 Pump &Aquifer Rehah
OTIL-12-028
n1a
110,000
110,000
Meter Replacement Project
UTIL-12.045
n/a
50,000
60,000
50,000
150,000
West D!sWct Well Capacity - extend to Riverwood
UTIL-12-074
n1a
325,000
325,000
650,000
Water Tower # 1 Interior Painting
UTIL-12.078
n1a
170,000
170,000
Water Towe r #I Exterfor Painting
UTIL-12.079
n1a
45,000
45,000
Well House #4 SCADA
UTIL-14.001
n/a
11,000
19,000
Valve Turner
UTIL-14-003
n1a
11,250
11,250
Wellhead ProtecUon Plan Amendment
UTIL-14-004
n1a
20,000
20j000
601 Watei- Fmid Totall.
42,250
325ffl0
375,000
2650600
160;000
11167,250
[602 Sewer Fupd
SCADA Computer Replacement
UTIL-12-046
n/a
15,000
- 15,000
LS #3 (West WVVTF)
UTIL-12-075
n/a
65,000
20,000
76,000
Lift Stagon Pump Replacement
UTIL-12-100
n1a
54,000
34,000
70o000
158J0'00
West VVVVT F Digester
UTIL-14.002
n/a
150,000
160,000
Valve Turner
UTIL-14-003
n1a
3,750
3,750
602 Sewer- Rind Total
58$750
54t000
15,000
204,000
70,000
401,750
I �L=Assessilielits
I
CSAH 39 Service Road
PW-ST12-066
n1a
146,000
146j000
PreventatIve Maintenance - Street Reconstruction
PW-ST12-077
n/a
11250,000
1j250;000
Storm rater CollecVon System (Otsego Farms)
UTIL-12.066
n/a
10,000
10,000
Assessnients Total
1156ffl0
15250,000
11406,000
I
=lei -al Grains
70th Street Extension - lar is Farms to Oakwood
PW-ST12.075
n/a
800J000
800,000
Federal Graiits Total
800j000
800,000
-
MSA State Aid
M Icro -8 u rfa ce Streets
,TUU ST12-073
n/a
150,000
150,000
70th Street Extension - Martin Farms to Oakwood
PW-ST12-075
n/a
1,400,000
400,000
1,800,000
State Aid Total
1,550j000
400,000
lj950,000
Other Aids/Grajits
Morin Landing Park Project
PS R -NL 12- 032
n/a
83,517
83,517
Other- Aids/Gi6aiits Total
83,517
83,517
[Proceeds of L-oug Terizi Debt - Tax Le
Preventative Maintenance - Street Reconstruction
PW-ST12-077
n1a
1,260,000
11250,000
P'1 -octad s of Long Term Debt - Tax Levy
1;2503000
IJ 250,0 0
Total
JUpftpided
Public Works Building Expanslon FAC -12-008 n1a 50t000 1,850,000 1,900J000
Trall - Queens To Rive rpointe, Area IS R-12,048 n/a 135,000 135,000
Afonday, October 28, 2013
Source Project# Priol-ity 2014 2015 2016 2017 2018 Total
Unfunded Total 135t000 50,000 I,8 0,000 2,035,400
GRAND TOTAL 311%200 50785,700 31136}000 4;0012633 31091,000 191 130,533
Alonday, October 28, 2013
CapitalImprove en Plan
City of Otsego, Minnesota.
Project # ADM -12-001
Project Name City Entraitee Signs (3)
2014 airt, 2018
Department
Administration
Contact
City Administrator
Type
fniprovenient
Useful Life
15
Category
Traffle Lights, Signals & Sign
Priority
n/a
Descriptimi —1
Easement acquisition, design and construction of City identification signs at TH IOI/CSAI-I 39, TH IOI/CSAH 36 and I- CAH 37.
Justification I
"City of Otsego" signs will be erected at prominent gateways into Otsego to promote community identity and economic development consistent
with the goals of the strategic and comprehensive plans.
Per the 2012 CIP review ineetings, this item was moved froni 2012 to 2013 to provide tip ie to review potential sites.
Per discussions at the CIP meeting iii October 2012, this project was moved out to 2014 to fin-ther study the signage locations mid costs.
Expenditures
2014 2015 2016 2017
2018 Total
Capital Improvement
60,000
60,000
Total
Funding Sources
60,000
2014 2015 2016 2017
60,000
2018 Total
414 Revolving Capital Impry
60,000
60,000
Total
60,000
60,000
Thursday, October 24, 2013
7
Capital Improvement Plan
City of Otsego, Minnesota
Project 14 ADM -12-002
Pt-oject Name Phone System Upgrade
Description
Upgrade phone system for City del),artments.
2014 awit 2018
Derm-mient
Administration
Confact
City Clerk
Type
Equipment
Useful Life
10-15
Cateinry
General Govemment Building
Priority
II/a
Justification I
Plamied replacement of existing phone system based on usable life of 10- 15 years and to allow exp(mision to meet. ftiture system needs,
Sept. 2012 - This project was moved from 2014 to 2017.
Expenditures 2014 2015 2016 2017 2018 Totar I
EclptNehicleslFurnishings 20,000 20,000
Total 20,000 20,000
ta
Funding Sources 2014 2015 2016 2017 2018 Total
206 Capital Eqpt Revolving Fu 20,000 20,000
TOW 1 20,000 20,000
Thursday, October 24, 2013
8
Capital Improvement Plan
City of Otsego, Minnesota
Protect Jq ADM -14-001
Project IN"Ime Ballot Counter
2014 an -it 2018
Departnicift Administration
Contact
Type Equipment
Useful Life
Category Equipmejit
Priority rola
Descriptim I
Purchase of two (2) M100 Ballot Comiters with modem. City staff is recommending used M100 Ballot Counters that have been inspected and
maintained by the state contract company, Election Systems and Software. The cost of each comiter is $4,350.
Justification I
The City currently has three (3) M100 Ballot Counters for the electim process; one for each of the three precints. After the 2012 General
Elections, City staff is recommending the purchase of two (2) additional machines one for Precinct IA and one for Precinct 2A) to help eliminate
the long fines and help manage the electim process for the 2014 General Elections.
Expenditures 2014 2015 2016 2017 2018 Total
EqpWehicles/Furnlshings 8,700
Total 81700
Funding Sources 2014 2015 2016 2017 2018 Tota I
8,700
8;700
101 General Fund 8,700 8,700
Total 8J00 8,700
7ursda),, October 24, 2013
i
Capital Improvement Plan 2014 thn, 2018 Department CIVy Facilities
City of Otsego, Minnesota Con(act Public Works Supervisor
proi cc t 0 FAC -12-005 Type finprovenient
Useful Life
Pi-oicct Nanie Prairie Center Parking Lot & Entrance Construction Category Gcneral Govemment Building
P1.101 -1(y 11/a
Reconstruction of the existing parking -circa for the Prairie Center building.
Justification I
The Prairie Center bifflding was constructed in 1993. Tile parking lot adjacent to Prairie Center has an asphalt parking area for 164 vehicles. The
pavement has been managed but has reached the end of its useful life. The project involves removal of the existing asphalt and constmetion of
new surface, repair as needed of concrete curb and painting of stripes. Project may also involve removal of existing areas and constniction of new
parking areas to better erect long term needs of city hall building and adjacent prairie park.
After discussion of future park development, this item was moved from 2015 to 2018.
Expeiiditur" 2014 2015 2016
2017 2018
Total
Capital Improvement
255,000
255,000
Total
Funding Sources 2014 2015 2016
255,000
2017 2018
255,000
Total
203 Park Development
255,000
255,000
Total
255,000
2551000EW
Thursday, October 2-1, 2013
10
Capital Improvement Plan
City of Otsego, Minnesota
proj cc t FAC -12-008
Project \'anie Public Works Building Expansion
2014 thl-11 2018
Departmeat City Facilities
Contact Public Works Supervisor
Type Buildhig
Useful Life
Ca(egory General Govenitimit Building
P1.101 -Hy Iva
Description 1
16,400 sf expansioa of the vehicte storage area of the Public Works building.
Ristifleation I
The Public Works building was constructed in 2005 Nvith a 16,400 sf, vehicle storage area. The vehicle storage area is at capacity with additiomil
area needed for equipmeiit to be added as development of the City contimes. The Public Works building was designed Nvith a p1mined 16,400 sf.
expail sion of the vehicle storage area to the north of the existing building.
E xp end it u res 2014 2015 2016
2017
2018
Total
500000
1,850,000
1,900,000
—Building
Tota 1
Funding our 2014 2015 2016
50,3000
2017
11850,000
2018
13900po
Total
Unfunded
60,000
1,850,000
1,900,000
Total
50,000
lgo;000
1�900,000
Monday, Oclober 28, 2013
Capital rmprove ent Plan
City of Otsego, Minnesota
Project 9 FAC -129009
Project Name Demolition n f Old Town Hall
2014 thru 2018
Description I
Demolition of City owned former Town Hall building and site restoration.
Departilleut
CityFacilities
Con(act
City Administrator
Type
Unassigned
Useful Life
30,000
2015 2016
Category
General Govemment Building
30,000
30,000
Justification
The Town Hall building has been basically unused for City purposes since constniction of the City Hall building in 1993. The City has not
identified a viable public or private long terin use for the building, The building is substantially deteriorated, does not me t ADA standards and
its condition continues to decline with replacement of the roof, heating system and broken Nvindows known repairs required for reuse, The project
proposes to demolish the ex isting buiIding and remove the existing septic system.
Oct 2012 - An additional $10,000 was added to this project for site restoration.
Expewlitures 2014
2015 2016
2017 2018 Total
Other
30,000
30,000
Totai
Funding Sources 20014
30,000
2015 2016
30,000
2017 2018 Total
414 Revolving Capital Impry
30,000
30,000
Tota i
300000
30,000
Thursday, October 24, 2013
12
Capital hupro menPlan
City of Otsego, Minnesota
Project 4 P&R-12-047
Project Name Waterfront East Pal -k
Desuiption I
Install tion of landscaping and site amenities.
Justification
2014 2018
Department Parks & Recreation
Contact Parks and Recreation Manager
Type Improvement
Useful Life
CaUgory Park Development
Priority iVa
Outlot A, Waterfront East was developed with a regional stommater pond and surrounding one -mile trail, existhig trees mid turf grass. The City
was initially grmited park and trail easement over the parcel but acquired fee ownership from the three ownership groups in 2011. The Waterfront
East project approvals included a landscape plan for outlot a that was not completed by the developer. City staff has revised the landscape plan to
lower costs, provide more appropriate plantings and allow easier maintenance. The project involves implementation of the landscape plan in
phases, Phase I was completed in 2012 and included installation of plantings and site furniture on the east side of the regional stormAvater pond
overlooking the Mississippi River. Improvements on the %vest side of the regional storniNvater pond will be completed by the City in subsequent
phases as adjacent lots are developed.
Per the 2012 CIP review meetings, phase 2 (west side) of the project was pushed out to 2016 (orighially 2013) to coincide Nvith the commercial
build out of the Waterfront East area. It was also decided that the funding source should be changed from 203 Park Development to 414
Revolving Capital Improvements.
Expenditures 2014 2015 2016 2017 2018 Total
Capital Improvement 35,000 35,000_
Total
35;000
35,000
Funding Sources 2014 2015 2016 2017 2018 Total
414 Revolving Capital Impry 35,000 35,000
Total 35,000 35,000
Thursday, October 24, 2013
13
Capital IFlan
City of Otsego, Minnesota
Project iqP&R-12-048
Project NaTlie Trail ` Queens To Riverpointe Area
Description
Acquisition of easennent and construction of an off-street trail.
2014 tiro, 2018
Department
Parks &Recreation
Contact
Pcuks Bald Recreation Manager
— - -- ----- -- � Type
[narovt7int
Useful Life
20-25
-- JCategory
Park Trail Systeni
PI-101ity
11la
Justification
There is a need.for a trail comiectlon between the. I verpointelRiverp]aee subdivisions and the rest of the City trail system. These neighborhoods.
are currently isolated fi-oni the City's street and trail system requiring pedestrians ,uid bikers to use CSAH 36. CSAH 36 lacks shoulders in son7e
segments, has limited visibility its others and average traffic volume consistent with that of a collector street making travel by pedestrians or bikes
dangerous. An overland trail connection from the existing trail at the north tennitaus of Randolph Avenue to Queens Avenue at 62nd Street,
generally following an existing utility easement 1s phurged to provide needed coruiection for these rleigllborhoods to the City's tail s stein. The
project includes acquisition of 30 foot wide trail casement and constRiction of the trail surface.
August 2012 - This project Nvas moved from 2012 to 2013.
October 2013 - Because the proiect was not realized in 2013, it was moved to 2014 for discussion.
Expenditures
2014 2015
2016 2017 2018 Total
capital Improvement
135,000
135o0F0a
Total
Funding omee-s
1359000
2014 2015
1359000
2016 2017 2018 T o.titl
Unfunded
135,000
135,000
Total
135,000
Mi000
.Vbnd a3� "ctobei- 28, 2013
14
Capital Improvement Plan 2014 t1?I-Ij 2018 Departnicift Parks & Rccreratioll
City of Otsego, Minnesota Coittact Parks mid Rere ation iMonager
Type finprovellient
Project 9 P&R-12-055 US&II Life
Project Name Wildflower Meadows Park Category Park Developineitt
Priority Iva
Descriptioll
Developnieiit of a neighborhood park within the Wildflower Meadows SUbdivision.
JUSt i fIC( 'It i 0 )1 1
The City accepted don ati mi of 6.38 acres of land for developinent of a neighb orho o d p ( a rk wi t Iii a the Wi I dfloNver Meadow S Ubdivinion based on
the Future Parks and Trails Plan. A concept plate for development of the neighborhood park was prepared to provide equipment, facilities and
ainenities based oii the park classification SYS(elli ill the C0111preliensive Plaii and approved by the Parks and Recreation Commission and City
Coiiiiell. Construction of the park iniprovenients will occur at such times additional lots are final platted within the subdivision and pay a
prorated ca ll fee in lieu of Jand equal to 41.7 percent of the current park dedication fee hi effect at the time. The thniiig for developineiit of
iieigliborhood park Nvill be evaluated based on the buildout of existing shigle fainily and townhouse lots aiid final platting of additional tots, NvIlicli
Neill cause hicrease deniand for use of the park as well as provide additional park dedication cash fees iti lieu of land to fund the project.
Expenditures 2014 2015 2016 2017 2018 Total
Capital Improvement 640,000 64 0,00 0
Total 640j040 --- 640,400
Fun(ling Sources 2014 2015 2016 2017 2018 Total
203 Pa(k Development 640,000 640,000
Total 640,000 6401000
Thursday, October -24, 2013
15
Capital Improvement Plan
City of Otsego, Minnesota
P1.0ject 4 P&R-12-056
Project Name West Lefebwe Creek Park
2014 tin -a 2018
2017 2018
Depai-finent
Parks & Recreatioti
Contact
Parks and Recreation Manager
Type
Improvement
Userid Life
203 Park Development
Category
Park Development
Priority
11/a
Description I
Development of a neighborhood park facility at hland Avenue and 75111 Street.
Justification I
The Parks and Trails Plan identifies development of a neighborhood park facility near the intersection of Obland Avenue and 75th Street, adjacent
to Lefebvre Creek, The City acquired 10.69 acres as part of the Crimson Ponds West subdivision and will acquire additional property through
park dedication requirements as suiTou tiding parcels are subdivided for residential development. The neighborhood park will also serve as the
westerly trail head for the planned Lefebvre Creek Greenway. Timing for development of the neighborhood park will be dependent upon
subdivision of surrounding parcels and construction of residential d%velling units in the area that Nvould utilize the park,
Expenditures 2014 2015 2016
2017 2018
Total
Capital Improvement
640,000.
640,000
Totat
Funding Sources 2014 2015 2016
640,000
I
2017 2018
640,000
Total
203 Park Development
640,000
640,000
Total
640,000
640,00019
Tlwrsdq)lobe?-24, 2013
Capital Improvement Plan
City of Otsego, Minnesota
proj cc t P&R-13-001
Project Nanie Pa I -I( S*
ignage
2014 ain, 2018
Department
Parks & Recreation
Contact
Parks and Recreation Manager
Ty 1) e
Improvement
Useful Life
20
Categoi-y
Park Development
Pflorl(y
n/a
Description I
The Heritage Preservation Commission (HPC) is developing interpretive signage regarding community history to be located in City parks.
Justification I
The jAssion of the FPC is to discover, preserve, interpret and coniniunicate Otsego history. The City has been iniplenienting a policy to designate
City parks with locally historical significant names. As part of this effort and its broader mission to educate about tsego's history, the HPC. is
developing interpretive signage that will be installed in City parks with information regardiiig coninninity1iistory. This project is to be Rinded by
proceeds the. City received from the sale of the John McDonald property in 2012 that was allocated to the Revolving Capital Improvement Fund
(#414).
Expenditures 2014 2015 2016 2017 2018 Tota!
Capital Improvement 13,500
Total 13500
Funding Sources 2014 2015 2016 2017 2018 Total
13,500
13,500
414 Revolving Capital Impry 13,500 13,500
Total 113o500
17
113,500
Thumday, Oclohei- 24, 2013
C it .l m)ro men lan 2014 t1wit 2018
Department Puks &Recreation
City of Otsego, Minnesota Contact Parks and Recreation Manager
Project # P&R-14-001 TyVe Maintenwice
Useful Life
Proj cc t Na m c Various Tennis and Basketball Court Repairs Categuy Park Maintemince
1"Hority n/a
Description
iels air of multiple tennis atid basketball courts in thu parks system.
Justification I
Over the past year, sta ff has noted that several of the court surf e are forming moderate to severe cracking and are iii ticed of some level of
repair. These include the tennis courts at Becaudry Meadows, its Park and School Kroll, and the basketball courts at Prairie Cejiter.
El xpenditut-es
2014 2015 2016 2017
2018 Total
Maintenance
31,000
31,000
Total
Funding Sources
31,000
2014 2015 2016 2017
31,000
2018 Total
414 Revolving Capital Impry
31,000
31,000
Total
31,000
31,000
Timrsday, Ouobet-21, 2013
18
Capital Improvement Plan 2014 awt, 2018
City of Otsego- Minnesota
Project 4 P&R-DL12-033
Proie.ct Name Darkenwald Landing
Description I
Construction Of COIIIIIILII)ity Park facility at Mississippi River/River Road (CSAH 42).
D c pa r I n i c n t Parks & Recreal i o n
Contact Parks and Recreation Manager
Type Jinprovenient
Useful Life
Cat gory ParkDevclopmejit
PHority iVa
Justification —I
The City acquired property from D&Y Family Pmlnership as part of a land donation for expansion of TH 101 to freeway states. A. concept plate
and cost estimate to construct an improved boat landing and add passive site amenities, including a dog park, leas been approved by the Parks and
Recreation Conuiiission mid City Council. The planned Darkenwald Landing Park will provide needed conununity parks and recreation facilities
consistent with the future parks and trails plan. This parcel is also highly visible frons TH 101 and its planned development Nvill promote a
positive conuminity identity.
August 2012 -'This project was moved from 2012 to 2013.
This project Nvas moved to 2014 per discussions at the October 2012 CIP inetitin g.
October 2013 - Proiect nioved to 2015 for further discussion.
Expenditures 2014 2015 2016 2017 2018 Total
Capital Improvement 480,700 480,700
Total 4803700 48OF700
Funding Sources 2014 2015 2016 2017 2018 Total
208 Community Facilities Fund 480,700 480,700
Total 480,00 480,700
Honda)), October- 28, 2013
19
Capital Improvement Plan 2014 thvjr 2018
City of Otsego, Minnesota
Project P&R-NL12-x'32
Project Name Norin Landing Park Project
Department Parks & RecreEition
Co n In c t PaTks mid Recreation Manager
Ty ji e Improvement
Useful Life
Ca tegory Park Development
Priori(y n/a
Descriptioji I
Construction of a collunti 11 i ty park facility to include an improved boat land i ng and veh Me parking facility at M iss i s sippi River/Kadter iWeime.
J11 S t i ri C -it ioll I
The DNR established a designated boat landing to the Nilississippi River at Kadler Avenue. The existing boat k-uiding consists of Kiri unimproved
gravel Nvater access without provisloii of parking or other amenities. The City acquired additioiial property through park dediccritimi as part ofthe
Norin Landing development consistent with the recommendatimis of the Future Parks and Traits Plan. A concept plaii aria cost estimate to
improve the boat landing and add passive site atneiiities have been approved by the Parks and Recreatimi Commission crind City Cotincil. Plans
and specificatiojis were prepared and approved for construction of the boat handing aria vehicle parking, areas to bo COI)StrUcted in partnership Nvith
the DNR u sing possible grant finidi ng. The project cost of $177,400 includes the improvements the park, boat landing aiid vehicle parkiag.
October' 2012 - These projects were comb ined pito oiie and moved to 2017 in order to seek DNR flinding and a change in park developniciit
wiorities. Tho oriahinl vrolect number for the Norhi Landing Boat Ramp Nva s P&R-NL12-042.
Expenditui-es 2014 2015 2016 2017 2018 Total
Capital Improvement 477,400 477,400
Total4770400.. 477A00
Ftuidhig Sources 2014 2015 2016 2017 2018 Tota 1
203 Park Development 310,366 310,366
205 Park Capital Eqpt Fund 83,517 83,517
Other Aids/Grants 83,517 83,517
Total477,400 477F400
Thursclay, Ocloher 24, 2013
20
Capital Improvement Plan
City of Otsego, Minnesota
P1.0ject 4 P&R-PP12-002
ftoject,Name Pi-aii,iePar-lc Play gi-oiiildEqtiiptileiit
Descriptimi I
Replace Prairie Park playground cquipment.
2014 awu 2018
Deparlment
Parks & Recreation
Contact
Pubi ic Works Stip rvisor
Type
Maintenance
Useful Life
15
Categuy
In
Park Maintenance
PI-101-Ity
II/n
Justification .1
Park playground equipment is scheduled to be replaced on a fifteen year schedule.
Expenditures 2014 2015 2016 2017 2018 Tota I
Maintenance 80,000 80,000
Total 80,000 .80,400
Fuading Som -ices 2014 2015 2016 2017 2018 Total
205 Park Capital Eqpt Fund 80,000 80,000
Total 80,000 80,000
Thursday, lob i• 24, 2013
21
Capital Improvement Plan
City of Otsego, Minnesota
P1.0ject 14 P&R-PP12-035
Project Name Prairie Park Bellfield Lighting
2014 thru 2018
Description I
Construction of exterior lighting for four existing ballfields at Prairie Park,
Department Parks & Recreation
Contact Parks and Recreation Manager
Type Improvement
Useffil Life
Category Park Development
Pdovity tela
Ju S tide at i oil I
The additioji of exterior lighting to the existing ballfields at Prairie Park will increase the capacity of the facilities to host local recreation programs
and improve capacity and attraction for recreational baseballIsoftball tournaments.
August 2012 - This project Nvas moved froin 2016 to 2017.
Expenditures 2014 2015 2016 2017 2018 Total
Capital Improvement 500,000 500,000
Total 500,000 500,000
Dui in Sources 2014 2015 2016 2017 2018 Total
203 Park Development 5004000 500,000
Total 500,000 — 500,000
Thursday, October- 24, 2013
22
Capital Improvement Plan 2014 thi-ii 2018 Depa-rtnient Parks & Recreation
City of Otsego, Minnesota Contact Parks and Recreation Manager
P1.0ject U P&R-PP12-036 Type Jinprovenient
seful Life
Pro cctNanie Prairie Park Rough Grade Parldng Area & Ballfiblds U
Category Park Developinent
PHOFI (Y Iva
Description
Development of three additional ballfields and parking facilities at Prairie Park.
Estimated costs:
Rough Grade Parking Area - $198,500
StomiNvater Irrigation Basins - $128,000
3 Additional Ballfields - $200,000
Justification
The Prairie Park master plan identifies development of three ballfields west of the existing four ballfields on area previously used for neat vial
storage. These facilities are to be developed to nicet increasing fief needs for local recreation programs and improve the capacity to host
recreational baseball/softball tourn,-unents. The project includes site grading, turf and infield surface development, fencing, benches for players
and spectators and additional off-street parking.
This project was originally proposed in phases as two separate projects, Nvith the final site development identifted as P&R-PP12-034. However,
due to changes in park development priorities and limits on available funding the two projects have been combined and scheduled for 2017.
Expenditures 2014 2015 2016 2017 2018 Total
Capital Improvement 526,600 526,600
Total 526,500 526,600
Funding Smire 2014 2015 2016 2017 2018 Total
203 Park Development 626,500 526,500
Total 526;500 526;500
Thursday, October 24, 2013
23
Capital IFlee
City of Otsego, Minnesota
P1.0j et11 P -PP1 p 41
Pi -eject Name Prairie Park Pienic Shelter
Description
Con struction of a second pi 1aie Shelter.
Justification
2014 awa 201
2015 2016 2017
epai-finent
Parks & 1 ecreatioli
Contact
Parks mid Recreation
I Type
Improvement
Useful Liffe
Funding Sources 2014
Catecyou
Park Development
Priority
a/
o' x 30' picnic shelter was eonstnieted at Prairie Park hi 1995. ".Hie shelter is reservable. The City has expertienced increased demand for
reservations andobserved increased unscheduled use of the shelter as (levelopment of the city has occurred. To meet increasing demand for picnic
shelter use, the Prairie Park master plan illustrates construction of a second 0' x 30' shelter to the northeast of the splash pad.
Brut 2012 - This project was moved Froin 2015 to 2014.
xP ell (I it ti res2014
2015 2016 2017
2018 Tote
Capital Improvement
60,000
60,000
Tota
60,000
0;000
Funding Sources 2014
2015 2016 2017
2018 Total
203 Park Development
60,000
60,OOD
Tote
60,000
601000
Thursday, October 24, 2013
24
Capital Improvement Plan 2014 thi-it 2018 Department Parks & Recreation
City of Otsego, Minnesota Contact Parks mid Recreation Manager
Project # R -PP 12-053
Project Nnnie Prairie Park NW Parking Lot
Description
Constniction of parking area providing 74 stalls.
rype iniprovenient
Useful Life 20
Category Part Developnient
III-101-ily 11/a
histification I
Tfic Prairie Park mast plan identifies area for expansion of parking as demand increases at the facility overtime, The planned parking area west
of the cuiTent parking area and nortli of the skate park would add 74 stalls in proxinifty to the developed areas of the park including the existing
picnic shelter, splash pad aad existing four ballfields. Tfils parking area will likely be constnicted at the sane time as other additional. parking
areas to add econoniy of scale to ffie. project.
August 2012 - This project was nioved from 2016 to 2017.
Expenditures 2014
Capital Improvement
Total
2015 2016
2017
152,000
152jOOO
2018
Total
152,000
152,000
Fmiding Sources 2014 2015 2016 2017 2018 Total
203 Park Development 152,000 152,000
Total 152,000 152)000
Thursday, Odobei- 24, 2013
25
CA -)if jj-Vj' ' 1j1 j1t pjqj-j 2014 t1iru 2018
I
City of Otsego, Minnesota
NAM H P&R-PP14-001
P 1A ect Nq [I] e Prairie Parllfields Potable Water & Elec Svc
Department
Parks Recreation
Co n h c t
Parks and Recreation Mmiager
Tylie
Improvement
Useful Life
112000
Category
Park Development
priovity
I I/a
Description I -
Instal I Datable water and elects 1c al services to the Prai ric Park baseb ral I/softba I I field s.
JUStifiC'Mi011 I
At the Jure 2013 meeting, the Parks and Recreation Conunission recommended upgrading the water and electrical services at tiro Prairie Park
baseball/softball fields. This recommendation comes after many requests from the athletic associations to upgradethe services.
Expenditures
2014 2015 2016
2017 2018 Total
Capital Improvement
11,000
11,000
Total
112000
111000
Funding our
2014 2015 2016
2017 2018 Total
414 Revolving Capital Impry
11,000
11,000
Total
i11000
113000=1
Thursdayt Octobew 24, 2013
we
Capital Improvement Pbrcin 2014 ihiw 2018
City of Otsego, Minnesota
Project 14 P&R-SK12-003
Project Name School Knoll Par Playground Equipment
Descrid timi
Replace School Knoll Park playgromid equipinwit.
Department
Parks & Rectecition
Contact
Public Works Supervisor
55,733
Tylle
m"1111tenalice
55,733
2016 2017 2018
Useful Life
15
55,733
Category
Parkk Nfa i ii te n ai i c e
Priority
i Va
Justificatioll I
Park playground equipmeiA is scheduled to be replaced on a fifteeii year schedule. Parks maintenance staff will monitor the coadition ofthe
equipmejit. mid propose advancing the replacement date if warranted.
EI xPenditures 2014 2015
2016 2017 2018
Total
Maintenance
55,733
55,733
Total
Ftni(Iffig Som-ces 2014 2015
55,733
2016 2017 2018
65J33
Total
205 Park Capital Eqpt Fund
55,733
55,733
Total
55,733
55,33
I-hursclay, October 24, 2013
27
Capital Improvement Plan
City nf,^Otsego, Minnesota
Project 4
P&R-SK12-245
Project Name School Knoll Park Pre -K Play Structure
2014 awt, 2018
or»n,mnot
Parks &mecrenno
Contact
P arks and Recreation Manager
------ -----''— Type
Equipment
Useful Life
10-15
| cotegon
Park Maintenance
Priority
n/a
Description A
Replace existhig pre -k play stnicture with a new, more age appropriate struchire. that is geared toward the older demographic that exists in the
uoighhodmod.
The existing pre -k play struettire at Scliool Knoll Park Nvas histalled in 2002. The play strixture has a life expectancy of 10- 15 years. Sigtifflicant
deterioration of the existing play structive is resulting in frequent repairs and increasing maintenwice costs. The existing stnicture will he replaced
with a play structure for older childreii as reconmended by the Parks and Recreation Commission.
Expenditures 2014 2015 2016 2017 2018 To firi I
EqptNehicles/Furnlshings 20,000 20,000
Total 203000 203000
Funding Sources 2014 2015 2016 2017 2818 Total
205 Park Capital Eqpt Fund 20,000 20,000
Total 203000 203000 rM
13
fluirsday, Oclohei- 24, 2013
CapitalImprovement Plan
City of Otsego, Minnesota
Project # PW-ST1 -058
Pmjec(Nnme Annual Trail Management
Description
ritual maintenance of trail system.
Justification n J
2014 thi-it 2018
25,000
Depar-tment
Parks & Re reition
on(act
Parks and Recreation tion IMmager
U efkil Life
20-25
- -- _ ntegoi-y
Park Trail System
PHDI-iy
lif(I
The City has established a Trail Maintenance Program to mcw imine the useful life of trail improvements within the City to maintaiii access, ensure
safe travel and minimize, maintenance costs for the City and property miers, The Trail Maintenance Program includes seal coating, crack filling,
surface repairs, micro -surfacing, overlays and reconstniction of existing trails. Those trails and specific projects that will be undertaken each year
will be recommended by the City Enghieer based mi the trail maintenance program schedule and conditim of specific trails within the City.
Expenditures 2014 2015 2016 2017 2018 Total
Maintenance 25,000 25,000 25,000 25,000 100,000
Total 25,000
25,000
25,000
25,000
100,000
Fun(Iiii g S our{ees 2014
2015
2016
2017 2018
Total
202 Trail management Fund 25,000 - - 25,000 25,000 25,000 100,000
Total 25 004 25,000 25,000 25,000 100,000
Monday, clober• 28, 2013
Capital Improvement Plan
City of Otsego, Minnesota
Project P. PS -12-001
Project Name Emergency Sirens (2)
Description
Installation of additional emergency warning sirens.
2014 awu 2018
Department
Public, Safety
Contact
City Administrator
'r3,pe
Equipment
Useful Life
Category
Equipment
Priority
11/a
The City replaced one. and installed two iiew emergency warning sirens in 2011. These eniergency warning sirens, as Nveji as SeVeraL CIIICI'gCIICy
warning sirens operated by Xcel Energy and others iii adjacent titles, provide coverage for over 90 permit of the parcels iti the City. Additional
emergemy wanflng sirens will be added iti coordinatim with siren locations in adjacent cities to avoid coverage area overlap to minhAze capital
investment while providing high level of public safety protectioll.
Two additional sirens were added and are planned for histallatim hi 2014. Tile locations will lac along 70th Street itear Nadala. Avenue and along
60th Street mar Ochoa Avenue. The latter of the two will be shared 50% Nvith St. IMichael. I
Expenditui-es 2014 2015 2016 2017 2018 Total
Capital Improvement 27,000 27,000
Total 27,000 271000=3
Funding Som-ces 2014 2015 2016 2017 2018 Total
414 Revolving Capital Impry 27,000 27,000
Total 27j004 27,000
Thursday), October 24, 2013
I
Capital Improvement Plan
City of Otsego, Minnesota
Project # PS -12-003
Project Name Public Safety Fire Department
Description
Acquisition of fire light lig equipment.
Justification
20t4 t1wu 2018
Depar(ment
Public Safety
Contact
City Administrator
Type
Equipment
Useful Life
Ca(egory
Equipment
Priority,
]I/',I
The City currently contracts with fire departments in Elk Rim, Albeilville, and Rogers for fire protection services. As development of Otsego
continues, the City Council has begun preliminary discussions to plan for establishment of a fire substation in the City in partnership with one or
more adjacent fire departments, Establishment of a local fire depailment or fire station Nvill require acquisition of equipment including vehicles,
fire fighter gear, tools, etc. Purelmsing of used vehicles would be a significant means to minimize startup costs where apartnership Nvith an
existing fire department may be advailtagcous.
This item Nvas moved out to 2016 (originally in 2015) per the 2012 CTP review meetings. An additional $100,000 was added to the amomitthat
was originally allocated to project number PS -1 -002 (emergency response vehicle) which has been deleted.
E xPeliditures 2014 2015 2016 2017 2018 'total.
EqptiVehicles/Furnishings 600,000 600,000
Total 600,000 600,000
Funding Som -cies 2014 2015 2016 2017 2018 Total
214 Fire Capital Reserve 600,000 600,000
Total 600,000 600,000
Thursday, October 24, 2013
31
Capital Improvement Plan
City of Otsego, Minnesota
Project PS -12-005
Project Nnme Fire Station
2014 1
Department Public Safety
Comaet Uy Administrator
- ---- -- - - -- _-
Type Bxdiding
Useful Lite
-- -- - Category General Govery ment Building
Priority n/a
Description
onstni tion of building and incidental facilities for staging fire vehicles, equipment, and staff needs.
Justification
The City plans staging of fire equipment in partnership with one or more adjacent juri dictions or as ati independent department to increase fire
protection services in relation to continued roN th mid development of urban residential, conunerolal, industrial and iIIstitLItiolYal uses Withitl tlIC
City.
This item Nv s moved out to 2016 (originally in 15 per the 2012 CIP review ineetings.
Expenditures 2014 2015 2016 2017. 2018 Total
Building 1,75OjOOO 1,750,000
Total
1J50,000
1,750,000
Funding Sources 2014 2015 2016 2017 2018 Total
214 Fire Capital Reserve I,750,000 1,750,000
Total 117505000 1 j75DO 0 Om"
Thursday, October 24, 2013
32
Capital Improvement Plan
City of Otsego, Minnesota
Project 9 UTIL-12-028
Project Name Well 93 Pump & Aquifer Rehab
Description I
Well #3 pump and aquifer will require maititenance,
2014 tlwu 2018
htstification L
'rhe Nvel I primp s and aquifers are on a ten year repair and mai men ance sched LI I e.
Department Public Utilities
Con(a c t City Engineer
Ty 1) e Maintenance
Useful Life 10
Category Water Distribution System
Priority 11/a
Expendittives 2014 2015 2016 2017 2018 Total
Maintenance 110,000 110,000
Total llopo 1100000=1
Ftinding Som -cies 2014 2015 2016 2017 2018 Total
601 Water Fund 110,000 110,000
Total i101000 110,000==I
Thursday, Ocloher 24, 2013
33
Capital Improvement Plan
City of Otsego, Minnesota
Project UTIL-12-045
Project Name Mete. Replacement Project
Description
tion
Scheduled utility meter rep Iaeenient,
2014 tht- [ 2018
2015 2016
Department
Public Utilities
Contact
City Engiiieer
Type
M inteilam
Usefid Life
15
Category
Water Distribution Systein
Priority
n/a.
Justification
Utility meters assigned to sanitary sewer and water customers are replaced on a regular schedule to ensure accurate readings. Utility meters Were
first installed in 1999. The City will develop a program for regular replacenient of utility nieters to be implemented stailing in 2016 and
continuing each year thereafter.
Expenditures 2014
2015 2016
2017
2018
Total
Fgptf hicl s/Furnishinags
K000
50,000
50,000
150,000
Total00,000
50,000
50,000
160000
Funding Sources 2014
2015 2016
2017
2018
Total
601 Water Fund
x,000
50,000
50,000
150,000
Fetal
50,000
60,000
50,000
150,00O
Thursday, October 24, 2013
34
Capital Improvement Plan
City of Otsego, Minnesota
Project # UTIL-124046
Project *,`me SCADAComputerReplacement
Description
Computer upgrade for SCADA systen).
2014 thn, 2018
Department
Public Utilities
onlaCt
City En inn r
- —
.F ype
Maintenance
'15,000
2015 2016 2017
Useful Life
6
15,000
Ca(egory
Wastewater Collection System
Priority
r a
Justification
The City's water and sewer utility systems are monitored and operated utilizing a SCADA system. The hardware of the computer from which the
SCADA system operates has a life ex eclancy of six years. The project involves purchase of new computer hardware with compatible operating
system, installation of SCADA soffivare and program implementation. i
E xPenditures 2014
2015 2016 2017
2018 Total
E pVVehicles/Furnishin s
95,000
15,000
Total
Funding Sources 2014
'15,000
2015 2016 2017
15,400
2018 Total
602 ewer Fund
15,000
15,000
Total
155000
150000
lhiirsday, October 24, 2013
35
Capital IFlag
City of Otsego, Mimesota
Project T -1 -0 4
Project Name Sto1"n1water Collection System (fit District)
t
s riptimi
AI mal. Innitit n mice of Stornmater Utility District collect im system.
2014 t1wi, 2018
Department Public Utilities
Contact Public Works Supervisor
-- --- — -- — -
Type Improvement
L? eful Life
Category t nmvater Collection System
Prior by Wa
justific tiol
The NPDES program mandates that the City inspect and ma iitaiii a minfimini of 20 percent sof its stormwater collectioii system each year. Th
project iiivoly s ins ectim of facilities, debris removal, structure repair/replacement, dredging wid restoratim to eilstire proper functioli and
capacity within the stormwater system. The City has established a Stormwater Utility District acid fee to fined this mahit nance program for those
portions of the stormwater collection system constnict d after 1991.
Expenditures 2014
2115
2016
2017
2018
Total
Maintenance 50,000
50,000
50,000
50,000
50,000
250,000
Total , � 50,000
501000
503000
50,000
50,000
250fflO
Fundhig Sources2014
2015
2016
2017
2015
Total
222 Stormwater Utility Fund 50,000
50,000
50,000
50,000
50,000
250,000
Total 50,000
500000
50;000
50,000
50,O00
250,000
7hursc co,, October 24, 2013
36
Capital firnrovement Plan 2014 an -it 2019
City of Otsego, Minnesota
f Project # UTIL-12-065
Project Name Storinwater Collection S r m (Otsego Creek
]seriptioii
Regular r a i intenance of Otsego Creek.
Justific tioll
Del)artnicnt Public Utilities
Contact Public Works Supervisor
--- `ryPe Improvement
Useful Life
Category tonnwater Collection System
PI-101-Ity t
Otsego Creek provides discharge of storniwater runoff for areas of Albertville and Otsego (i[ICILIdillg the West Service District) id is the
discharge for the West WWTF. Otsego Creek requires regular maintenance to niaintaili the flow and capacity of the channel. The project hicludes
gnibbhig of Misli, retiioval of trees acid debris, repairlreplaceiiient of structures and channel restoration. Tfic extent of the project ct re uir d at each
service interval is to be d terr]3ined by the City Engineer,
Oct, 2012 - $253000 added in year 2013. Due to the extreme drought cowlition and the lacy of flow Nvithiti Otsego Creek, staffi recommending,
time aiid weather permitting, that public works sp xxd up to $25,000 iii renio al of dome limbs and trees along the Vetscli portion of the creek,
ppro , '/4 Illito in length frons 83rd S t south to the Sectiori 30 wetland.
El penditures 2014 2015 201+6 2017 2018 Total
Maintenance 75,000 75,000
Total 75k000 751000
Funding Sources 2014 2015 2016 2017 2018 Total
408 Otsego Creep Watershed 75,000 75,000
Total 75,000 751000
i+ mrs(loy, October 24, 2013
37
Capital hnnrovement Plan - 2014 tly,it 2018
City of Otsego, Minnesota
Project 4 "SII -1 -066
Project Name Stormwater Collection System (Otsego Farms)
Description I
Replacenient of culvert at driveway to Jaber Avenue.
Departnicift Public Utilities
Coutact Public Works Supervisor
Type Iinprovenmit
Useful Life
Category Stonnivater Collectim System
Priority ii/a
Justification
Am existhig culvert at a residential driveivay to Jaber Avenue that is part of the City's trunk storniNvater collection systeni has collapsed and inust
be replaced to maint aiii storniwater flow and capacity. Otsego Farms is located within the storinwater district.
Expenditures 2014 2015 2016 2017 2018 Total
Maintenance 10,000 10,000
Total 10,000 10,000
Funding Sources 2014 2015 2016 2017 2018 Total
Assessments 10,000 10,000
Total 101000
I
10,000
Thursdq�� October 24, 2013
Capital Improvement Plan 2014 awn 2018
Deparfi-nent Public Ufflifies
City of Otsego, Minnesota Contact Public Works Supervisor
Project 0 UTIL-12-067 Type Improvement
Useful Life
Project Name Storinwater Coll Sys (Culverts - Out of District)
Category stomiWater Collection System
Priority n1a
Description I
lplacemeiit of culverts outside of the Stormwater Utility District.
Justification I
E-Nisting concrete and nietal culverts at Jaber Ave./70th St., Jalger Ave./77th St., Kadler Ave./77th St., Kidler Ave./77th St., Odell Ave./ 3rd. St.
require replacement to maintain stoniiwater collection systeni flow mid capacity. The storniNvater collection system along Needhain Ave. within
Vassuer's Oak Grove Estates 3rd mid 4th Additions also restricts flow causing floodhig issues on adjacent propertieand is discussed on UTIL-13-
002. These projects are outside of the Stora water Utility District and must be funded by other sources.
Expendittires 2014 2015 2016 2017 2018 Total
Capital Improvement 10,000 10,000 10,000 10,000 10,000 50,000
Total %000 10,000 10,000 10,000 A000 50,000
Funding Sources 2014 2015 - 2016 2017 2018 - Total
220 Stormwater - Out of Distric 10,000 10,000 10,000 10,000 10}000 50,000
Total %000 10,000 10,000 10,000 100000 50,000
1
A fo) i da);, Octo be i - 28, 2 013
39
Capital Tlllpl•ovement Plan
2014 thn, 2018
City of Otsego, Minnesota
Project M UTIL-12-074
Projeetmanic West District Well Capacity - extend to Rivenvood
Description I
Expansion of well capacity for the West District.
Departnieut Public Utilities
Copitad City Engineer
Type Iniprovemetit
Useful Life
Category Water Distribution ystein
Priority n
Justification I
The City E ngineer estimate that the existing Nvater system within the West District will reach its design capacity of 1,746 recs in 2016. This
estimate is based on the present rate of development, which is likely to accelerate as economic conditions linprove. Development of single
conunercial or industrial use Nvith high water demands would also affect the available capacity of the water system within West District. The cost
to drill another welt and construct the necessary facilities to add water system capacity is estimated at $350,000. Ail alternative option is to
connect Well #7 to the West District water system for a cost of $650,000. The alternative option would provide needed Nvater capacity for the west
sewer district and also address on-going water pressure is Lies experienced by water users at Riverwood National during periods of peak use. The
plan would consist of a 16" waterline from 70th Street to 80th Street and a 12" waterline from 80th Street to 90th Street.
This project was originally scheduled for 2014. As discussed at the 2012 CIP inectings, an annual review of the continued water issues at
Riverwood National Neill need to be done to determine the actual timeline of this project as well as review of the financing options.
Sept. 2012 - This project was moved from 2012/2013 to 2013/2014.
October 2013 - vrolect moved to the 2015 - 2016 time frame for further discussion.
Expenditures 2014 2015 2016 2017 2018 Total
Ca p1ta I Improvement 325,000 325,000 65OtOOO
Total 325p000 325,000 650,000
Funding Sources 2014 2015 2016 2017 2018 Total
601 Water Fund 325,000 325,000 650,000
Total 325ffl0 325,000 650,000
Afondaip, October 28, 2013
40
Capital Improvement Plan 2014 1/wit 2018
lpai -Inient Public Utilities
City of Otsego, Minnesota CoWad City Dighicer
Type hiiprovemeiit
Project 0 UTIL-12-075 Useftil Life
Project Nartic LS #3 (West WWTF) ca(egory. Wastewater Collection System
Priority Iva
Description
Lift station #3 at the West WWTF leas an existing capacity of 1,881 rec.'s. The actual rec's served total 1,383.
I
Justiff catioll I
Based on 100 rec's per year, the system would reqWre additional pumps, variable freqtiency drives and exterior cabinet addition.
October 2013 - staff reconunends moving a portion of the. project up to 2014. Item will require ftirther discussion.
Expenditures 2014 2015 2016 2017 2018 Total
—Capital Improvement 65,000 20,400 75,000
Total, 55,000 20,000 753000
Funding Sources 2014 2015 2016 2017 2018 Total
602 Sewer Fund 55,000 20,000 76,000
Total 550000
20;000
75,000
Alonciv, Oclobet-28, 2013
41
Capital Improvement PIan
pity of Otsego, Minnesota
Project 4 IL -12-078
Project NRTIIC Water Tower ill Interior Painting
Des riptiotr
Painting the interior of Water Tower # 1.
2014 thiw 2018
Department
Publio Utilities
Contact
City Engineer
'rype
Maintenwice
Useful Life
15
Category
Water Distribution System
Priori(y
]I/,'I
Justification
Water Tower # I was built its 1999 and was decommissioned in 2010. An inspection iii 2010 identified a need to repaint the interior of the water
storage tank. The need for this project Nvill be evaluated in 2014 based oil the treed for additional East Nvatcr system storage.
Per discussions at the 2012 CII' review meetings, this item has beeii moved out to 2016(originally 2014) and the status will be re-evaluated at that
t i xrie.
August 2012 -This project �Nl s moved from 2016 to 2017.
Expenditures a 2014 2015 2016 2017 2018 Total
Maintenance 170,000 170,000
Total 170,000 1701000
Fundhig Sources 2014 2015 2016 21117 2018 Total
601 Nater Fund 170,000 170,000
Total 170,80 1703000
Th urs ay, Ocloher 24, 2013
42
Capital linprovement Plan
City of Otsego, Minnesota
Project 0 UTIL-12-079
Project Name Water Tower HI Exterior Painting
Description L
Painting the exterior of Water Tower # 1.
2014 an -ii 2018
Departnimt
Public Utilities
Contact
City Engineer
Tylie
Maintenance
Useful Life
15
Category
Water Distribution System
Priol-fty
Iva
Justification I
Water Tower #1 was built in 1999 and was decommissioned in 2010. Although deconunissioned, Water Tower #1 is highly visible frons TH 101.
necessitating continued maintenance of the facility. The exterior finish off ester Tower #1 is on a 15 year schedule. The need for this project will
be evaluated in 2014 based on the condition of Water ToNver # I and its status as a needed component of the City's water system.
August 2012 - This project was moved from 2012 to 2017.
Expenditures 2014
2015 2016 2017 2018
Total
Maintenance
45o000
45,000
Total
Funding Sources 2014
45ffl0
EEHENEM=30�
2015 2016 2017 2018
45,000
Total
601 Water Fund
45,000
45,000
Total
45,000
45,000
El
Thursday, October 24, 2013
43
Capital Improvement Plan
City of Otsego, Minnesota
Project 9 UTIL-12-100
Project Name Lift Station Pump Replacement
2014 tiwu 2018
2015 2016
Department
Public Utilities
Contact
City Engineer
TyVe
Maintenance
Use fti I Lire
8
Category
Wastewater Collection System
Priority
11/a
Descriptioti I
Lift statioji pump replacement scliedule as follows:
A) 2015 - replace two pumps at Lift Station #7 - former project 4UTIL- 12-007 - $14,000
B) 201 - replace two pianips. at Lift Station # 1 - former project # UTI L- 1, 2- 0 03 - $40, 0 00
Q 2018 - replace three pii mps at Lift S tat im 4 5 - former project 4 UTIL- 12 -0 10 - $5 1,000
D) 2017 - replace 40hp pump 43 at Lift Station fi I (Qu da' - $20,000
E) 2 0 1.7 - replace 5hp pumps. 4 1 and #2 at Lift Statim #8 QUatitrelle) - $14,000
F) 2018 - replace 121iminivs. # I and #2 at Lift Statioa #2 (River -pointe) - S 19,000
Justification I
A) PLinips # I and #2 at Lift Statim 47 (Otsego Preserve) are 5 lip. units. These ptimps have a useful life of eight years. The project will replace
the existing units Nvith two similar 5 lip. units in 2014 to maititaiii operations as part of the City's wastewater system.
B) Pumps 41 and 42 -tit Lift Station # 1 (Quaday Aveme) are 40 lip. units. These pumps liaNte a useffil life of eight years. The project will replace
the existing units Nvith two similar 40 lip, units in. 2015 to maintaiii operations as part of the City's wastmater system,
Q Pu nip s # 1, #2 and #3 at Li ft Stat ioii i# 5 (Riverp lace) are 2 5 lip. unit . These pumps have a us fu1I ife of eight yenrs. The proj eet will replace
the existing units Nvith three similar 25 lip. units. in 2016 to maintain operations as part of the City's wastewater system.
D) PLIMP #3 will have been in use for eight years -ltd should be replaced based on estimated useffil life.
E) Pumps 4 1 and 42 at U ft Station # 8 should be replaced based oii est 1 mated useful I i fe off` 8 years,
F) Pumps 4 1 mid #2 at Lift Statim #2 (Riverpointe) should be replace based oa estiniated useful life of 8 years.
August 2012 - project dates changed as follows based on use and annual itispections:
Item A) moved fi-om 2014 to 2015
Item 0 moved from 2016 to 2018
E xPeilditures 2014
2015 2016
2017
2018
Total
EqpVVehicles/Furnishings
54,000
34,000
70,000
158,000
Total
54,000
34,000
70;000
MjODO
Fmidhig our 2014
2015 2016
2017
2018
Total
602 Sewer Fund
54,000
34,000
70,000
158,000
'rotat -
54000
34,000
70;000
158;000
Thursday, October 2-1, 2013
44
Capital Improvement Plan 2014 a7ru 2018 Department Public Ufllitirs
City of Otsego, Minnesota Contact Lead Utility Systems Operator
Type hnprovement
Project 4 UTIL-14-001 Useful Life
P roj cc t Nam e Well House 94 SA Categoi-y Wastewater CoNction System
PHOT-Ity II/a
Description I
Incorporate reinote monitoring to well house 44.
J11stificatioll L -
Well House 44 supports the water systeni for an individual development. The systein is in its second year of Nvater restrictioiis due to deiiiatids of
the building in the developiiient. The addition ofremote nionitoritig for Well House #4 completes Supervisory Control and Data Acquisition for
the water system. System beliefits include securityaild alarni iiionitorhig, water production and equipflient. status.
El xpeinditures 2014 2015 2016 2017 2018 Total
Capital Improvement 11,000 flocoo—
Total ii,000 ilpom
Funding Sources 2014 2015 2016 2017 2018 Total
601 Water Fund 11,000 11,000
Total 11,000
11,000
Thw-sday, Oclobei24, 2013
45
Capital Improvement Plan
City of Otsego, Minnesota
i
TIL -1 -002
11,roject imame West WWTF Digester
Description Iof digester at Ilio West WTF.
2014 thn, 2018
Department PublicUfflifies
Contact Led Utility Systems Operator
-- -
1')' 1) e Improvement
Useful Life
C'a#egory Wastewater Collection System
P1.101'i ty It/a
Justification I
Based on a study conducted in 2013, additional digestion space is needed prior to facility expansion. The digestion process ensures pathogen
reduction requirements aro maintained and aerobic conditions are met.
Expenditures 2014
2015 2016 2017 2018
Total
Capital Improvement
150,000
150,000
Total
Funding Sources 2014
1501000
2015 2016 2017 2018
1 0JO00
Total
602 Sewer Fund
150,000
150,000
Total
1503000
+1500000
Thursclay, October 24, 2013
46
Capital Improvement Plan
City of Otsego, Minnesota
P1.0ject a UTIL-14-003
Project Name Valve Turner
2014 airs, 2018
Department
Public, Utilities
Contact
Lead Utility Systems Operator
Ty [) c
Equipment.
Useful Life
15
Category
Water Distribution System
Priority
I i/a
Des criptioii I
The purchase of a valve turner provides the tools to miduct preventative valve niaititeiiance on the distributim system,
Justification L
The collection and distributim systems are comprised of 1700 inain valves used for isolation ptirposes. 20% of the valves are operated aiinually
per valve mahitenatice policy to ensure flinctimiality mid accessibility of the strLICtUrCS. Each valve requires a mitifinuin of full turns to close
acid opera The devise turns the valve stenis, counts the turns wid identifies required torqiie to operate.
U, xP ell (I it ares 2014 2015 2016 2017 2018 Total
Eq pVVe h lcles/ F u rn is h ing s 15,OOD 15,000
Tota 1 15,000 15,000
Futidhig Sottrees 2014 2015 2016 2017 2018 Total
601 Water Fund 11,250 11,250
602 Sewer Fund 3o754 3,750
'rot,ai 15,000 15;000
Thw�shy, clobe)- 24, 2013
47
Capital Improvement Plan
City +t, Minnesota
Project H UTIL-14-004
Project Naine Wellhead Protection Plan Amendineitt
2014 ain, 2018
Departnient
NblicUtilifics
Contact
Lead Utility Systems Operator
Type
Unassigned
Useful Life
10
Category
Water Distribution System
Priority
rola
Descripti.oii L
The W'ellhead Protection Plan is required to be updated in 2014 mid Nvill be done in two phases. Pait one of the Wellhead Protection Plan update
includes updating the delineation of source water and assessinent of vulnerabilities, Part two of the update provides potential contaminant source
information and manageinent strategies based on the finding from part one of the study.
Justificaboll
The City adopted a Wellhead Protection Plan in 2006, which is required by (fie Minnesota Departnient. of Health to be reviewed and updated every
10 years. The extent of the changes required to update are significewit in that the City has added several new wells that will result in establishnient
of another Drinking Water Supply Managen-ient Area (DWSMA). Part one of the Wellhead Protection Plan update will include review ofthe
ground water flow patterns around the, new wells to determine the extent of the new DWSNIA. Part two of the update will evaluate if there are any
possible sources of contaminates within the DWSNIA and, if any changes to the City's land use, Official Controls are required to eliminate or
prevent potential contaminate sources within the DWSMA. The City Engineer's services and those of a hydrologist are required to complete the
update of the current Wellhead Protection Plan, The cost to complete Part one of the project in 2014 is estimated at $20,000. The Wellhead
Protection Plan update is to be paid with ironies froni the water fund #601.
Expenditures 2014 2015 2016 2017 2018 Total
Other 20,000 20tO0O—
Total 203000
20,000
Fumling Sour-ces 2014 2015 2016 2017 2018 Total
601 Water Fund 20,000 20,000
Total 20ffl0 20*000
ThursdojOctober 24, 2013
al:J
C i llan
City of Otsego, Minnesota
P1.0i cc t 4 PW-ST12-059
ProjectName Annual Street Seal Coating
Description
Annual seal coating of City streets.
2014 thiw 2018
Department Public forks
Co it ta c t Pub I i c Works Supervisor
Type Maintemice
Useful Life 5 - 7
Category Street Mainteiiazice
Priority to
Ju of I
Tile City leas established a street niaintenwice progrWil to maximize the 11sefill life of street improvements within the City to illaintain access,
el)SUre safe travel and minimize maintenance costs for the City and property owners. The Street Maintenance Program includes scheduled fog seal,
seal coating using both new or salvaged rock and seal coat with a fog seat of City streets. Those streets to be seal coated each year will be
reconunended by the City Engineer based on the Street Maintenance Pro rain schedule and condition of specific streets. The recommendations for
those streets to be seal coated and the bid process for completing the project will determine actual annual costs. A fog seal over ajust placed seat
coat has been shown to hold the rock in place better mid cause feNver issues witli rocks migrating into homes or lawns. It will also reduce snow
plow stripping of the seal coat. In the fiiture the retention of rock will reduce the need for a future seal coat. Rather than afruture seal coat a
simple fog seat cavi be placed creating a savings in neon in addition to longevity of the road surface.
Oct. 2012 - 2013 cost increased from $390,000 to $500,000 due to the addition of fog seal.
E xpenditures
2014
2015
2016
2017
2018
Total
Maintenance
260,000
265,000
135oOD0
350,000
55%000
1,560oODO
Total
26%000
265,000
135,000
350,000
5509000
1,50,00O
Funding Sources
2014
2015
2016
2017
2018
Total
201 Pavement Management F
260,000
265,000
135,000
350,000
560,000
1,560,000
Total
260,000
265;000
135,000
350,000
550,000
11560,000
Thia-slay, Oclobev 24, 2013
49
Capital Improvement Plan 2014 thri, 2018 DepartineW Public Works
.City of Otsego, Minnesota COMM Public, Works Supervisor
Type Mahitetimice
Project # PW-ST12-060 Useful Life 2-3
Project Name Annual Street Crack F Ming Category Street Mainteiiance
Priority II/a
Description
Aiinstal crack filling of City streets.
Justification I
The City has established a Street Maintenance Program to maximize the useful life of street inn provenients within the City to inaintain access.,
ensure safe travel and minimize, maintenance costs for the City and property owners. The Street Maintenance Progrwii includes scheduled crack
filling of City streets. Those streets to be crack filled each year will be recon-miended by the City Engineer based on the street maintenance
prograin schedtile and condition of specific streets within the City,
Oct. 2012 - 2013 cost reduced Froin $76,000 to $50,000.
Expenditures 2014
2015
2016
2017
2018
Total
Maintenance 70,000
76,000
70,000
76,00
70,000
362,000
Total 70j000
0
76,000
70,040
769040
70,000
36 ",440
Funding Sources 2014
2015
2016
2017
2018
Total
201 Pavement Management F 70P000
76,000
70,000
76,000
70j000
362o000
Total 70,000
I
76,000
70,000
76,000
70,000
362;000
Thursday, October 24, 2013
50
Capital Improvement Plan
City of Otsego, Minnesota
Project 9 PW-ST12-061
Projects ame Annual Street Striping
Descriptioii I
Auinual painting of directional stripes on City streets.
2014 lhiw 2018
Department PublieWorks
Contact Public Works Supervisor
Type Mahituatice
Useffil Life 2-3
ottegory Strut Mainteiiatice
Priority ii/a
histificeation I
The City has established a Street Maintenance Program to maximize the useful life of street improvements within the City to maintain access,
ensure safe travel mid niiiiimize: maiiiteiiance costs for the City and property owners. The Street MaHiteriance Prograni includes scheduled
repainthig of directional stripes and traffic markings on City streets. Those streets that require stripe/markings to be repainted each year will be
recommended by the City Engineer based on the street mainteiiatice program schedule mid conditimi of specific streets within the City.
Expenditures
2014
2015
2016
2017
2018
Total
Maintenance
28,000
29,000
29,000
30,000
31,000
147,000
Total
28,000
29j000
29,000
30,000
31,000
147,000
Fu n d ing Sou i -ces
2014
2015
2016
2017
2018
Total
201 Pavement Management F
28,000
29,000
29,000
30,000
31,000
147,000
Total
28�000
29,000
2%000
30go
31,000
147,000
NEEM
Thursdoy, October 24, 2013
51
Cad ital Improvement Plan
City of Otsego, Minnesota
Project 9 PW-ST12-062
9
Project Name Annual Street Preventative Maintenance
Description I
Annual preventative maintenance of City streets.
2014 ain, 2018
DePRI-01101t
PUblic Works
Contact
PLiblic Works Supervisor
Type
Miintcnance
Useful Life
5-10
Category
Street Maintenance
Priority
n/a
Justification I
The City has established a Street Mainteiiaiice Program to maximize the usefid life of street iniproveniciits within the City to maintani access,
ensure safe travel atid minimize iiininteiiwice costs for the City and property owners, The Street Mainteiiatice Program includes preventative
maintenance of City streets. Those streets that require mahitenance or iiihior repairs will be recommetided by the City Digincer based mi the street
maltitenwice program schedule and cmiditimi of specific streets within the City.
Expenditures 2014
2015
2016
2017
2018
Total
Maintenance 39,000
41,000
42,000
44,000
45,000
211,000
Total 3%000
41,000
42,000 zp�
44,000
45,000
211,000
Funding Sources 2014
2015
2016
2017
2018
Total
201 Pavement Management F 39,000
41,000
42,000
44,000
45,000
211,000
Total 39j000
41,000
42,000
44,004 ICEWWVEEWW�
45,000
211,000
Thea-sda)), Octobe)- 24, 2013
52
Capital Improvement Plan 2014 thrl, 2018 Department Public Works
City of Otsego, Minnesota Contact City Engineer
Type Linprovenient
Prof ec t 4 PW" ST12-066 Useful Life 20 - 25
Proj ed Narn c CSAH 39 Sei-vice Road Category Nfew Street Constnicholl
Priority nla
Descriptim
Paving of CSAH 39 service road.
histification I
There is a gravel service road parallel to CSAH 3 9 betty ea Nel maxk Avenue and Oday Avenue that provides access to ei glit developed niral
service single family residential lots. The gravel roadway annually requires extensive maintenance to restore the surface after winter mid regular
grading during non -winter nionths incurring substantial costs in excess of costs to maintain an asphalt surface, The project involves construction
of an asphalt surface street with a rural section design.
This project was nioved tip one year franc 2015 to 2014.
E xpenditures 2014 2015 2016 2017 2018 T o ta I
Capital Improvement 292;000 292,000_
Total 292,000 292,000 an
I
Funding Sources 2014 2015 2016 2017 2018 Total -
209 Street Reconstruction Fun 146,000 146,000
Assessments 146,000 146,000_
Total 292,000 292,000
il
Thursday r October 24, 2013
53
Capital Improvement
City of Minnesota.
Project 14 PW-ST12-068
Project Nnnic 78th Street Extension - Quaday to Quam
Description
Extension of 78th Street froniQUaday Avenue to Quwn Avenue.
'.2014 thrit 2018
Dep rtnient
Public Work
Contact
City Fligilleer
- - - 'rype
iinprovement
Useful Life
20-25
Category
New Street CO S tructiot1
Priori ty
n.ia
Justification
The City will construct an extension. of 78th Street between Quaday Avenue to Quani Avenue at the tinic of development of property owned by
Y Family Partnership pursuant to an agreement between the parties related to donation of !raid needed for the upgrade ofTff 101 to freeway
status and maintaining of access at C AIS 42. A portion of the cost nlay he assessed to abutting properties.
Pker*the agreement dated September 13, 2004 between the City of Otsego and MY Family Partnership (page 3, paragraph "City agrees, that at
the time it becomes necessary to constnict a connecting street along the southerly boundary of tile MY property on which Parcels 1, 2 and 3 are
located from Quaday Avenue to the frontage road to be constructed as Dart of the interchange improvernents to State Highway 101, that said road
will be constructed as a City project and that the City will assume any casts that would be nonnalty assessed to MY for said road project. MY
will provide the City with the necessary and reasonable easements upon the above described parcel for said road project,"
Sect. 2012 - This vroiect was moved from 2016 to 2017,.however, completion of the project is dependent on the development in the area.
Expenditures 2014 2015 2016 2017 2015 Total
Capital Improvement 360,000 350,000
Total
360,000
360,000
Funding Sources 2014 2015 '2016 2017 2018 Total
209 Street Reconstruction Fun 360,000 360,000
Total 360,000 360,000
Thursday, October 24, 2013
54
Capital Improvement Plan
City of Otsego, Minnesota
Project # PW—ST 12-069
Project Nanis Nashua Avenue Realignment at CSAH 39
2014 thiw 2018
Department
Public worts
Contact
City Engineer
Type
finprovernent
Useful Life
Category
New Street Constniction
Priority
n/a
Descriptim I
Constniction of new street and removal of existing street to realigqi Nashua Avenue, north of CSAH 39.
Justificatioll
Nashua Avenue, not-th of C 39 is currently off -set froin Nashua Avenue, south of CH 39 by 400 feet creating unsafe intersection spacing
along CSA14 39, which is a minor arterial roadway carrying significant. traffic volunies, with a 55 mph. speed line t, Moreover, the intersection of
the north segment of Nashua Avenue and CSAH 39 has poor visibility due to existing horizontal and vertical curves in cast -west directions along
CSAH 39. To correct this issue, the City will remove the existing Section of Nashua Avenue between CSAH 39 and 96th Street and constnict a
new neral section gravel surface street between CSAH 39 and 96th Street aligned Nvith Nashua Avenue, south of CSAH 39, The City owns the
property through which the new street section will be constructed so no right-of-way acquisition costs will be recurred" This project will
significantly improve safety for vehicles traveling oil CH 39 and Nashua Avenue.
Per discussion at the 2012 review Meetings, this project was moved out to 2014 (originally 2012), Neighborhood notification prior to project
approval is reconunended,
After further discussion at the April 23rd CIP meeting, this project was moved to 2016.
Sept. 2012 - This project was moved from 2016 to 2017
Expeitditures 2014 2015 2016 2017 2018 Total
Capital Improvement 86,000 86,000
Total 86,000 86,000
Fmiding Sources 2014 2015 2016 2017 2018 Total
209 Street Reconstruction Fun 86,000 86,000
Tota 1 86,000 86,000
Thursday, October2-4, 2013
55
CapitalImpro men lan
City of Otsego, Minnesota
Project # PW-ST12-070
Project Nanie 85th Street Extension - Nashua to Maso-ii
2014 tinw 6-!'4f
Depailmeni
Public Works
Contact
City Engilicer
Tylie
Improvement
Useffil Life
20-25
Ca(egory
1eNv Street Cons(niction
Pity
riori
n/a
Description -1
Prelinihiary design and ROW acquisition for 85th Street frons Nashua Avenue to Mason Avenue,
Justification I
The Transportation Plan identifies the extension of 85th Street from Naslitia. Avenue to Mason Avenue as a future parkvay serving a collector
street flinction. This street is included on the City's MSA street Alai and is eligible for MSA Aindhig. The City Engineer will prepare preliminary
plans and specifications for an interim rural collector street that will allow the City to seek acquisition of ROW froin willing sellers. Acquisition of
ROW now based on current Imid values maximizes the cost effective use of City MSA ffinds and makes the project "shovel ready" used on Riture
transportation needs and funding availability.
Ex enditure 2014 2015 2016 2017 2018 Total
Capital Improvement 200o000 200oOOO
Total 200,000 200,000
Funding Smirces 2014 2015 2016 2017 2018 Total
403 Collector Street Fund 200,000 200,000
Total 2001000 200,000
A-fonday, October 28, 2013
56
Capital Improvement Plan
City of Otsego, Minnesota
Project PW- ST12-073
Project anis Micro -Surface Streets
Description
Micro -surface of -
2014 thri, 2018
A) 85th Street from Page Avenue to Parrish Avenue (CSAR 42) - $50,000
B) Page Avenue from 79th to 85111 - $50,000
Q Nashua Avenue, from CSAH 39 to 85th - $50,000
Depar(nictit
Public Works
Contact
Pkiblic Works Stipervisor
Type
Wintenance
Use gill Life
10-15
Category
Street Maintenance
Priority
n
histification I
This seginent of 85th Street was constnicted in 1993 & Nashua Ave was constructed in 1992. Based on the City's Street Maintenance Program,
micro -surfacing would be a cost effective way to maintain the condition and capacity of the street and maximize Usefill life. The project Will
include micro -surfacing of the asphalt street surface and repair/replacement of any damaged concrete curb on 85tll.
Page Avenue has experienced minor nitting and some major transverse cracks which heave and/or CUP. Micro -surfacing would be a cost effective
method to fill ruts and add additional strength to the street. The project Nvill include micro -surfacing of the asphalt street surface and
repair/replacement of any damaged concrete curb on Page.
Sept. 2012 - This project was originally to overlay 85th Street and pay froin #403 Collector Street Fund but Nvas revised (per above) and the
funding was changed to MSA State Aid. The prqject was also moved from 2016 to 2014.
Expenditures 2014 2015 2016 2017 2018 Total
Maintenance 150,000 160,000
Total 150,000 150,000
Funding Sources 2014 2015 2016 2017 2018 Total
MSA State Aid 150,000 1501000_
Total 150,000 150,000ma
Th ursdv, October 2 -4, 2013
57
Capital Improvement Plan 2014 thl-11 2018 Devartnient PtiblicWorks
City of Otsego, Minnesota Contact City Engineer
Type Improveillent
Project a PW-ST12-075 Userul Life 20-25
Project Name 70th Street Extension - Martin Farms to- Oakwood Category New Street Construction
Priority n/a
Descriptim I
Construction of 701h street from Martin Farms Avenue to Oakwood Avenue (CSAH 37).
Justification I
The Trailsportation Plan identifies 70th Street as a future arterial street from TH 101 to 1-94. This s(reet is included on the City's MSA street plan
and is eligible for MSA funding. The section between Oakwood Avenue and Martin Farms Avenue currently consists of gravel surface roadway
and an incomplete V2 mile section. To improve the transportation system within the City and access to regional transportation routes, the City Nvill
construct an interim improvement of 70th Street frons Oakwood Avenue, (CSAII 3 7) to Martin Farms Avenue as a hvo -lane rural section collector
street. The project also includes a trail along the north side of the street extending from Odean Avenue to Lambert Avenue connecting existing
sidewalks and trails within the Hast mid West Sewer Districts. 'Ilse project, which includes ROW acquisition and construction, will be designed in
2012 for construction beginning in 2014 and the final lift applied hi 2015. Funding will include existing City street funds, existing and future
MSA funds and federal grant nionies of $800,000. Actual federat reimbursement would be received in 2016.
Due to federal funding criteria, this project was extended one additional year (2015) to make it a four year versus a three year project. This would
hi lode the desigiVengincering beginning in 2012 through the final stages of construction in 2015. This project was discussed by the City Council
mid n1aiis and snecificat ions for the proi ect were ordered on May 24, 2012.
Expenditures 2014 2015 2016 2017 2018 Total
Capital Improvement 1,400,000 11200,000 2,600,0r00
T o Un 1 11400,000 11200,000 22600,000
1
Funding Sotirces 2014 2015 2016 2017 2018 Total
Federal Grants 800,000 800,000
NISA State Aid i t400,000 400,000 1,800,000
Total 11400,000 11200,000 NOW 2ffl0,000"
Afondv, Octohei- 28, 2013
58
C'9nitn] p1ni-I 2014 thrix 2018
Cly of Otsego, Minnesota
PW -T1-077
Project Name Preventative Maintenance .. Street Reconstruction
Description I
Recojistruction of streets that are wi preventative maintenance watch list.
Depat-Mient
Public Works
Contact
Public Works Supervisor
Type
Maintenance
Useful Life
20-25
Category
Street Maititew-uice
-Priorilly
ii/a
Justificatioii I
The streets deemed to be beyond regular street maintenance are placed on the preventative maiiitetimice list. These streets are inahitahied by
patchingwid selective crack fillitig, Once the costs of preveiftative maintenance' ecomes prohibitive the street isthen placed oii the preventative
inahitemance Nvatch list and resconstructime costs are determined and added to the ClP to await petition and approval from the Cowicil hi
accordance Nvith the street assessment policy.
Expenditures 2014 2015 2016 2017 2018 Total
Maintenance 2,500,000 2,500,000
Total 2,500,000 2t500ffl0.:::.
Fundinoui-ces 2014 2015 2016 2017 2018 Total
Assessments 1,260,000 1,250,000
Proceeds of Long Term Debt - 1,250,000 1,250,000
Total 21500,000 2,5001000 =A
ThursdaY, Octobe?- 24, 2013
59
Capital Improvement Plan
City of Otsego, Minnesota
Project 4 PW-ST13-001
Project Mime Highway 101/144 Pmiect Contribution
2014 thi-it 2018
Departmeat
Public Works
ConMet
City Digmeer
Type
Unassigned
Useful Life
Category
Unassigiied
Priority
n/a
Desuiption I
On Aine 13, 2011, the City Council approved resolution 2011-30. The resolution provided firiancial supp oit to the City of Rogers efforts to
hilprove the safety of the TH 101/ SAH 144 i ntersection. The City of Rogers has notified the City of Otsego that the project Nvi It proceed and the
$100,000 of finmicial support pledged in the resolution will be paid in equal installments of $50,000 each in 2013 and 2014.
Justifleation I
The improvement of the interchange at TH 101 and CSAH 144 will improve safe axed efft cient travel for area residents, students within ISD 728
attending Hassan Elementary School, Rogers Middle School and Rogers High S cho ol and regional commuter traffic by el imin at hig an at grade
intersection.
After the October 2012 CII discussions, the split payment ($50,000 each in 2013 and 2014) was moved to 2014 (both payments). The filial
payment of $50,000 Nvill be made at completion of the project.
Expenditui-es 2014 2015 2016 2017 2018 Total
Other
Funding Siources
100,000
Total 100,000
2014 2015 2016 2017 2018 Total
i001000
100,000
414 Revolving Capital lmpry 100,000 1000000
Total 100,000
10,000
Tlmrsda)0ober 24, 2013