Loading...
ITEM 5.3 Overlay Page AvenueOtkgoF MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner November 25, 2019 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 5.3 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: 85th Street) and 78th Street (Page Avenue to 76th Street) Overlay Project. Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Page Avenue between 78th Street & 85th Street; and 78th Street between Page Avenue and 76th Street are Is a social community with diverse housing, service options, and employment opportunities. pavement is 17 years old and is experiencing thermal cracking (transverse and longitudinal) due to its age. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends ordering the preparation of plans and specifications for the Page Avenue (78th Street to 85th Street) and 78th Street (Page Avenue to 76th Street) Overlay Project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Page Avenue between 78th Street & 85th Street; and 78th Street between Page Avenue and 76th Street are existing paved streets. The existing streets consist of 4 1/2" of bituminous surface that is 44' wide. The pavement is 17 years old and is experiencing thermal cracking (transverse and longitudinal) due to its age. These thermal cracks have allowed water to rehydrate the recycled concrete base. The trapped water has caused these cracks to heave or tent in recent years and severely in winter months creating a very poor profile and very poor rideability. Staff has addressed the issue by providing weep holes through the recycled concrete base allowing water to drain downward away from the pavement. Cracks have been filled with a premium type of crack filling material to minimize water penetration to the base. Staff will evaluate how the preventative methods work over the winter, but are confident the severe tenting will not return. In order to return the rideability back to an acceptable level, a mill and overlay will be completed in 2020. The project consists of milling the edges so the overlay will match the existing curb. Concrete aprons and curbing will be reviewed and any portions in poor condition replaced. Catch basins will be rehabbed as needed. The Capital Improvement Plan has a budget estimate of $333,400.84 for this overlay project. Attached is an exhibit showing streets which are currently proposed for renewal in 2020. With approval to complete, the City Council should expect plans and specifications available for approval and authorization for advertisement for bid in February 2020. The project could potentially be awarded to the lowest responsible bidder in March 2020. SUPPORTING DOCUMENTS ATTACHED: • Map of 2020 Street Renewal Project POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THEM IN UTES: Motion to order Hakanson Anderson to provide for preparation of plans and specifications for the Page Avenue (78th Street to 85th Street) and 78th Street (Page Avenue to 76th Street) Overlay Project, City Project No. 20-06. BUDGET INFORMATION FUNDING: BUDGETED: Fund #201 - Pavement Management Yes LOCATION MAP �w FOR 2020 STREET RENEWAL PROJECT TY OF (PAGE AVENUE AND 78TH STREET OVERLAY)Ot§e O MINNESOTA LEGEND STREETS TO BE OVERLAID TAT Nov 20, 2019 2: 29pm K:\MUNICIPAL\OT392\2020\OT392-2019 FEASIBILITY.dwg 400 0 400 800 SCALE IN FEEF EXHIBIT A 392-2020