ITEM 6.1 Pay Estimate #10 RL Larson Excavating40 OtsTY F o MINNESOTA.� DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner January 13, 2020 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 6.1 STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends City Council approval of Pay Estimate #10 to RL Larson Excavating, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? lS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Pay Estimate #10 includes partial payment for Change Order #5, an increase in the amount of $194,487.60: Extra Draintile Work = $29,589.00 Existing draintile was anticipated and shown on the Plans where it could be determined during design with the goal of maintaining the existing drainage flows and patterns. A number of additional existing draintiles were discovered during construction that were either removed (when appropriate), connected to the new storm sewer system, or reconnected to the existing draintile system. Change Order #5 pays the contractor for the additional lengths and sizes of draintile not shown on the plans as well as the number of connections made for the additional draintiles discovered. Existing unit prices were used for all existing pipe removals and new 4" and 8" draintile placed and these items are not part of the change order. Where no existing contract price existed, (i.e. the additional 6" and 12" draintile pipe as well as the field connections and connections to the storm sewer new manholes), negotiated unit prices were agreed upon with the Contractor. A few storm sewer structures required adjustments as draintile was discovered or finish grading was completed. Extra Topsoil Depth = $161,885.90 Additional suitable fill (19,174 CY of Common Borrow) was needed to construct the project. Design quantities depicted an excess of material for the site with only a small amount (1,000 CY) of Common Borrow potentially needed. Additional material, unsuitable for placing within the road bed, was encountered across the site. The majority of the excess unsuitable soil was due to thicker topsoil than was determined by the soil borings. The soil borings were completed approximately every 500 feet during the design phase of the project and consistently showed approximately 12" of topsoil. When the topsoil was stripped in the field it averaged closer to 14" to 18" thick. Seventeen of the soil borings were within existing farmed fields where exact topsoil thickness can be difficult to determine as ground level undulates with the row crops and topsoil and subsurface materials are tilled and mixed on a regular basis during farming. Additional material was also rendered unsuitable due to the wet weather and the inability to dry material to be used as road embankment. This excess unsuitable material resulted in needing an additional 19,174 CY of Common Borrow as well as needing to haul away 14,135 CY of excess material. The contractor has requested that the unit price for the Common Borrow exceeding 125% of the contract amount be paid at a unit price different than the original contract price. Per the contract, items that exceeds +25% of the contract quantity may be renegotiated. The contractor has requested a unit price of $6.60/ CY instead of the contract price of $4.00/CY. Costs for trucking the material was exasperated due to no existing suitable routes to move the material across the site. The contractor was not allowed to haul down existing City streets (Mason Ave) and the new 85th Street subgrade was too wet and soft from the continuous rain to haul on using normal means. Hakanson Anderson has reviewed this unit cost increase and believe this is a fair price for the material and work involved for delivering and placing the material. In comparison the average unit price for Common Borrow per MnDOT in 2017-2018 was $20.00 CY. The Haul & Dispose of the excess material unit price will not be adjusted but the extra quantity has been added to the Change Order #5. The final Haul & Dispose Excess Material quantity will not be paid until the work is completed in 2020. Miscellaneous Items = $3,012.70 Deductions for 7 failing density tests on the wear course pavement. MnDOT Standard Specifications 2360 for Plant Mixed Asphalt Pavement provides for reduced payment for bituminous pavement not meeting minimum densities. These tables indicate that the Contractor shall receive reduced payments in the amount of $5,694.38 for wear course pavement. An 18" hydrant extension was required on an existing hydrant that was installed with the Otsego E-8 School interim lift station project. The contractor is being paid $1,200 for this extension which is a fair price based on other projects. There was 756 feet of 2" and 6" conduit placed beneath the road and trails to supply power to the lights at both roundabouts. The conduits were supplied by Wright -Hennepin (at their cost) but installed by the Contractor, RL Larson. The unit price per lineal foot is an average price from conduits installed in developments over the last 2 years. SUPPORTING DOCUMENTS ATTACHED: • Change Order #5 • Pay Estimate #10 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #10 in the amount of $98,782.83 to RL Larson Excavating, Inc. for work completed on the 85th Street and Maciver Avenue Improvement Project. BUDGET INFORMATION FUNDING: BUDGETED: 403-Municipal State Aid for Construction Yes 408-Otsego Creel<Trunk Storm Water 601-Water Utility 602-Sanitary Sewer Utility M1 STATE AID FOR LOCAL TRANSPORTATION Rev. February2018 RANSIO`"'°' CHANGE ORDER SAP(s) 217-102-009 & 217-113401 MN Project No.: Change Order No. 5 Project Location 851h Street and Maclver Avenue, Otsego, MN Local Agency City of Otsego Local Project No. 17-03 Contractor R.L. Larson Excavating Contract No. Address/City/State/Zip 2255 12'h Street SE, St. Cloud, MN 56304 Total Change Order Amount $ $194,487.60 Existing draintile was anticipated and shown on the Plans where it could be determined during design with the goal of maintaining the existing drainage flows and patterns. A number of additional existing draintiles were discovered during construction that were either removed (when appropriate), connected to the new storm sewer system, or reconnected to the existing draintile system. The Engineer and Contractor measured and computed the additional lengths and sizes of draintile needed as well as the number of connections made for the additional draintiles discovered. Existing unit prices were used for all 4" and 8" draintile placed. Negotiated unit prices were agreed upon with the Contractor to pay for the additional 6" and 12" draintile pipe as well as the field connections and connections to the storm sewer new manholes. A few sewer structures required adjustments as draintile was discovered or finish grading was completed which is being paid for as a Lump Sum. A detailed tabulation of the extra work is located in the Engineer's Project File Per the contract, items that exceeds +25% of the contract quantity may be renegotiated. Additional suitable fill was necessary to construct the project as designed. Design quantities depicted an excess of material for the site and only a small amount (1000 CY) of Common Borrow was estimated to be needed. Additional unsuitable material was encounter across the site as topsoil was thicker than determined by the soil borings. More material was also rendered unsuitable due to the wet weather and the inability to dry material to be used as road embankment. This excess unsuitable material resulted in needing and additional 19,174 CY of Common Borrow as well as needing to haul away 14,134 CY of excess material. The contractor has requested that the unit price for the Common Borrow exceeding 125% of the contract amount (i.e. more than 1,250 CY) be paid at a unit price of $6.60/ CY instead of the contract price of $4.00/CY. Additional cost for the material is to cover fees paid to the property owner for the material and increase in cost for trucking of material due to no existing haul route available and cutting across the construction site required additional time with the wet subgrades. The Haul & Dispose of the excess material unit price will not be adjusted. MISCELLANIOUS Bituminous lot densities were tested per MnDOT 2360.D. and failures were present. Table 2360-22 of Special Provisions 2360 and Table 2360-23 of MnDOT Standard Specifications 2360, Plant Mixed Asphalt Pavement provides for reduced payment for bituminous pavement not meeting minimum densities. The above -mentioned tables indicate that the Contractor shall receive reduced payments in the amount of $5,694.38 for wear course pavement. The bituminous coring testing results and tabulation of deductions are located in the Engineer's Project File. An 18" hydrant extension was required to bring an existing hydrant along Maciver Avenue up to new finished ground. Conduits were installed at various locations so power lines for street lights could cross streets and/or trails after final grading has occurred. The conduits were supplied by Wright -Hennepin Page 1 of 2 M STATE AID FOR LOCAL TRANSPORTATION ANSIC- A �I 7wCHANGE ORDER ART 11TN,. Rev. February 2018 SAP(s) 217-102-009 & 217-113-001 1 MN Project No.: I Change Order No. 5 Electric but were installed by R.L. Larson. This method is preferred to having Wright -Hennepin Electric installing the conduits as their subcontractors would not be able to provide the required density and compaction efforts and installation coordination would be difficult. Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.) Item Spec. + or — + or — No. No. Description Unit Unit Price Quantity Amount $ EXTRA DRAINTILE WORK 1 2502.503 6" PVC Pipe Drain LF $11.00 24 $264.00 2 2502.503 12" PVC Pipe Drain LF $40.00 499 $19,960.00 3 Draintile Connection at Manhole EA $120.00 11 $1,320.00 4 Connect to Existing Field Draintile EA $500.00 11 $5,500.00 5 Misc. Storm Structure Adjustments LS $2,545.00 1 $2,545.00 $29,689.00 EXTRA TOPSOIL DEPTH 6 2105.507 Common Borrow (LV) CY $6.60 19,174 $126,548.40 7 2105.607 Haul & Dispose Excess Material (LV) CY $2.50 14,135 $35,337.50 $161,885.90 MISCELLANEOUS 8 2360.509 Type SP 9.5 Wearing Course Mixture (3,C) — Density Deduction LS -$5,694.38 1 ($5,694.38) 9 2611 18" Hydrant Extension EA $1,200.00 1 $1,200.00 10 Electrical Conduit Installation LF 1 $9.93 756 $7,507.08 $3,012.70 Net Change this Change Order $194,487.60 Approved by Project Engineer: Print Name: Approved by Contractor: Print Name: Date: Phone: Date: Phone: DSAE Portion: The State of Minnesota is not a participant in this contract. Signature by the District State Aid Engineer is for FUNDING PURPOSES ONLY and for compliance with State and Federal Aid Rules/Policy. Eligibility does not guarantee funds will be available. This work is eligible for: — Federal Funding District State Aid Engineer: _ State Aid Funding _ Local funds Date: PAY ESTIMATE #10 - DRAFT CITY OF OTSEGO 85thStreet and MaciverAvenue Improvements Project 17-03 S.A.P.217-102-009 and S.A.P.217-113-001 December 23, 2019 Honorable Mayor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 RE: 85th Street and Maciver Avenue Improvement Project, Improvement Project 17-03 SAP 217-102-009 and 217-113-001 Contractor: RL Larson Excavating, Inc. Contract Amount: $5,199,858.37 Award Date: June 10, 2018 Completion Date: August 15, 2019 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by RL Larson Excavating, Inc. ITEM NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2021.501 Mobilization 0.81 LS $185.000.00 $ 149,850.00 0.61 $ 149,850.00 2 2101.505 lClearing 7.14 ACRE $3,675.00 $ 26.239.50 7.98 $ 29,326.50 3 2101.505 Grubbing 7.14 ACRE $3,400.00 $ 24,276.00 7.98 $ 27,132.00 4 2104.502 Remove Concrete Structure 5 EACH $250.00 $ 1,250.00 5 $ 1,250.00 5 2104.502 Remove Sign 6 EACH $40.00 $ 240.00 6 $ 240.00 6 2104.502 Salvage Casting 5 EACH $100.00 $ 500.00 4 $ 400.00 7 2104.502 Salvage Sign 4 EACH $40.00 $ 160.00 4 $ 8 2104.503 Remove Curb & Gutter 1983 LF $2.00 $ 3,966.00 2,153 $ 4,306.00 9 2104.503 Remove Fence 2840 LF $1.50 $ 4,260.00 6,215 $ 9,322.50 10 2104.503 Remove Pipe Culverts 432 LF $7.00 $ 3,024.00 304 $ 2,128,00 11 2104.503 Remove Pipe Drain 880 LF $6.00 $ 5,280.00 1,260 $ 7,560.00 12 2104.503 1 Sawing Bit Pavement (Full Depth) 292 LF $2.00 $ 584.00 267 $ 534.00 13 2104.504 Remove Bituminous Pavement 765 SY $4.50 $ 3,442.50 770 $ 3,465.00 14 2105.507 Common Borrow (LV) 1000 CY $4.00 $ 4,000.00 1,250 $ 5,000.00 15 2105,507 Common Excavation (EV) 130838 CY $4.00 $ 523,352.00 131,664 $ 526,656.00 16 2105.507 Subgrade Excavation (EV) 6724 CY $2.35 $ 15,801.40 7,144 $ 16,788.40 17 2105.607 Haul & Dispose Excess Material (LV) 6289 CY $2.50 $ 15,722.50 6,289.00 $ 15,722.50 18 2105.607 Salvaged Topsoil From Stockpile (LV) 34653 CY $3.90 $ 135,146.70 27,725 $ 108,127.50 19 2211.509 Aggregate Base Class 3 or 4 47178 TON $8.00 $ 377,424.00 47,178 $ 377,424.00 20 2211.509 Aggregate Base Class 5 Mod 32761 TON $12.60 $ 412,788.60 31,163.9 $ 392,665.14 21 2215.504 Full Depth Reclamation 6967 SY $2.00 $ 13,934.00 7,723 $ 15,446.00 22 2221.509 Shoulder Base Aggregate Class 2 69 TON $35.00 $ 2,415.00 55.59 $ 1,945.65 23 2232.504 Mill Bituminous Surface (2.0") 42 SY $30.45 $ 1,278.90 42 $ 1,278.90 24 2357.506 Bituminous Material For Tack Coat 2914 GAL $2.10 $ 6,119.40 3,160.0 $ 6,636.00 25 2360.509 Type SP 12.5 Non Wear Course Mixture (3,C) 8195 TON $65.00 $ 532,675.00 7,703.76 $ 600,744.40 26 2360.509 Type SP 12.5 Wearing Course Mixture (2,B) (Trail) 2128 TON $74.00 $ 157.472.00 1,867.0 $ 138,155.04 27 2360.509 Type SP 9.5 Wearing Course Mixture (3,C) 6556 TON $74.00 $ 485,144.00 6,533.15 $ 483,453A0 28 2502.502 4" Precast Concrete Headwall 4 EACH $400.00 $ 1,600.00 $ 29 2502.503 4" Perf PVC Pipe Drain 3028 LF $6.00 $ 18,168.00 2,070 $ 12,420.00 30 2502.503 8" PVC Pipe Drain 400 LF $15.00 $ 6,000.00 553 $ 8,295.00 31 2521.518 4" Concrete Walk 15744 SF $3.50 $ 55,104.00 13,122 $ 45,927.00 32 2531.503 Concrete Curb & Gutter Design B418 34971 LF $11.60 $ 405,663.60 26,711 $ 309,847.60 33 2531.503 Concrete Curb & Gutter Design Sumnountable 628 LF $14.45 $ 9,074.60 631 $ 9,117.95 34 2531.504 6" Concrete Driveway Pavement 677 SY $56.00 $ 37,912,00 879.0 $ 49,224.00 35 2531.618 Truncated Domes 120 SF $59.00 $ 7,080.00 184 $ 10,856.00 36 2640.602 Salvage & Install Mail Box Support 6 EACH $200.00 $ 1,200.00 5 $ 1,000.00 37 1 2657.603 1 Barbed Wire Fence 950 LF $6.00 $ 5,700,00 $ 38 1 2563.601 TrafricControl 2 LS $6.450.00 $ 12,900.00 2.00 $ 12,900.00 S:\Municipal\AOTSEGO\396\PAY ESTIMATES\OT396 PE.xisx PE - 1 PAY ESTIMATE #10 - DRAFT CITY OF OTSEGO 85th Street and Maciver Avenue Improvements Project 17-03 S.A.P. 217-102-009 and S.A.P. 217-113-001 Rod "A„ . sr.aat. in-fl.-dl ITEM NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 39 2564.518 Sign Panels, Type C 472 SF $47.25 $ 22,302.00 495.5 $ 23,412.38 40 2573.501 Stabilized Construction Exit 1 LS $9,000.00 $ 9,000.00 1 $ 9,000.00 41 2573.502 Storm Drain Inlet Protection 96 EACH $125.00 $ 12,000.00 81 $ 10.125.00 42 2573.503 Sediment Control Log Type Straw 145 LF $3.15 $ 456.75 340 $ 1.071.00 43 1 2573.503 ISM Fence, Type MS 25392 LF $1.68 $ 42,656.56 21.462 $ 36,056.16 44 2574.508 Fertilizer Type 1 1726 LB $0.68 $ 1,173.68 900 $ 612.00 45 2575.504 Erosion Control Blanket- Category 3 169.00 SY $2.10 $ 396.90 7,808 $ 16.396.80 46 2575.505 Seeding 14.4 ACRE $265.00 $ 3,816.00 10.1 $ 2,676.50 47 2575.508 Seeding Mixture -25-141 751 LB $4.46 $ 3,349.46 360 $ 1,605.60 48 2575.508 Seeding Mixture -25-151 204 LB $5.25 $ 1,071.00 50 $ 262.50 49 2575.509 Mulch Material Type 1 29 TON $280,00 $ 8,120.00 11.7 $ 3,276.00 50 2580.501 Interim Pavement Marking 1 LS $0.01 $ 0.01 $ 51 2582.503 4" Solid Line White - Paint 26179 LF $0.09 $ 2,356.11 25,800 $ 2,322.00 52 2562.503 4" Solid Line Yellow - Paint 3220 LF $0.09 $ 289.80 3,261 $ 293.49 53 2582.503 8" Solid Line White - Paint 253 LF $1.58 $ 399.74 254 $ 401.32 54 2582.503 12" Slop Line White - Paint 125 LF $3.80 $ 475.00 40 $ 152.00 55 2582.503 24"Solid Line Yellow -Paint 537 LF $4.00 $ 2,148.00 781 $ 3,124.00 56 2582.503 8" Dotted Line White - Paint 196 LF $3.15 $ 617.40 90 $ 283.50 57 2582.503 4" Double Solid Line Yellow - Paint 15543 LF $0.17 $ 2,642.31 14,218 $ 2,417.06 58 2582.518 3'x6' Crosswalk Blocks White - Paint 144 SF $4.00 $ 576.00 360 $ 1,440.00 59 2582.518 Pavement Message Paint 652 SF $5.80 $ 3,781.60 433 $ 2,511.40 Total Bid Schedule "A" $ 3,684,378.02 $ 3,402,682.89 Rid Cnharhnra "R" . Rf- Snwnr ITEM NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 60 2501.502 18" GS Pipe Apron 1 EACH $300.00 $ 300.00 1 $ 300.00 61 2501.502 24" GS Pipe Apron 2 EACH $500.00 $ 1,000.00 2 $ 1,000.00 62 2501.502 12" RC Pipe Apron 2 EACH $700.00 $ 1,400.00 4 $ 2,800,00 63 2501.502 15" RC Pipe Apron 6 EACH $700.00 $ 4,200.00 4 $ 2,800,00 64 2501.502 18" RC Pipe Apron 3 EACH $800.00 $ 2,400.00 4 $ 3,200.00 65 2501.502 21" RC Pipe Apron 3 EACH $850.00 $ 2,550.00 3 $ 2,550.00 66 2501.502 24" RC Pipe Apron 4 EACH $900.00 $ 3,600.00 6 $ 5,400.00 67 2501.502 27" RC Pipe Apron 2 EACH $1,000.00 $ 2,000.00 2 $ 2,000.00 68 2501.502 36" RC Pipe Apron 3 EACH $1,500.00 $ 4,500.00 3 $ 4,500.00 69 2501.502 72" RC Pipe Apron 2 EACH $3,200.00 $ 6,400.00 2 $ 6,400.00 70 2501.503 15" RC Pipe Culvert Design 3006 CL III 48 LF $45.00 $ 2.160.00 48 $ 2,160.00 71 2501.503 36" RC Pipe Culvert Design 3006 CL III 136 LF $100.00 $ 13,800.00 120 $ 12,000.00 72 2501.503 72" RC Pipe Culvert Design 3006 CL III 138 LF $320.00 $ 44,160.00 128 $ 40,960.00 73 2501.603 Outlet Structure 31 LF $665.00 $ 20,748.00 31.00 $ 20,615.00 74 2503.503 12" RC Pipe Sewer Design 3006 CL V 88 LF $36.50 $ 3,212.00 88 $ 3,212.00 75 2503.503 15" RC Pipe Sewer Design 3006 CL V 5059 LF $41.30 $ 208.936.70 5,104 $ 210,795.20 76 2503.503 18" RC Pipe Sewer Design 3006 CL V 1661 LF $44.30 $ 73.582.30 2,226 $ 98,611.80 77 2503.503 21" RC Pipe Sewer Design 3006 CL III 1802 LF $48,00 $ 86,496.00 1.868 $ 89,664.00 78 2603.503 24" RC Pipe Sewer Design 3006 CL III 869 LF $59.00 $ 51,271.00 869 $ 51,271.00 79 2503.503 27" RC Pipe Sewer Design 3006 CL III 1837 LF $69.50 $ 127,671.50 1,149 $ 79,855.50 80 2503.503 30" RC Pipe Sewer Design 3006 CL III 292 LF $78.30 $ 22,863.60 339 $ 26,543.70 81 2503.503 36" RC Pipe Sewer Design 3006 CL III 114 LF $105.00 $ 11,970.00 239 $ 25,095.00 82 2503.503 44" Span RC Pipe -Arch Sewer CL III 65 LF $155.00 $ 10,075.00 65 $ 10,075.00 83 2503.503 18" CP Pipe Sewer 766 LF $35.50 $ 27.193.00 766 $ 27,193.00 84 2503.5,3 24" CP Pipe Sewer 2057 LF $64.00 $ 131,648.00 2,057 $ 131,648.00 S:\Munldpa]\AOTSEGO\396\PAY ESTIMATES\OT396 PE.xisx PE-2 PAY ESTIMATE #10 - DRAFT CITY OF OTSEGO 85th Street and Maciver Avenue Improvements Project 17-03 S.A.P.217-102-009 and S.A.P.217-113.001 Bid Schedule "B" - Storm Sewer (continued) ITEM NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 85 2503.503 27" CP Pipe Sewer 1052 LF $54.00 $ 56.808.00 1,052 $ 56,608.00 86 2503.503 36" CP Pipe Sewer 1770 LF $66.50 $ 117,705.00 1,760 $ 117,040.00 87 2506.503 Construct Drainage Structure Design 2'x3' 121 LF $500.00 $ 60,500.00 125.50 $ 62.750.00 88 2506.503 Construct Drainage Structure Design 48-4020 322 LF $425.00 $ 136,722,50 325.00 $ 138.125.00 89 2506.503 Construct Drainage Structure Design 60-4020 91 LF $565.00 $ 51,471.50 91.00 $ 51,415.00 90 2506.503 Construct Drainage Structure Design 72-4020 41.4 LF $560.00 $ 23,184.00 42.47 1 $ 23,783,20 91 2506.503 Construct Drainage Structure Design 84-4020 26.5 LF $785.00 $ 20,802.501 26.48 1$ 20,786.80 92 2506,503 Construct Drainage Structure Design H 8.8 LF $500.00 $ 4,400.001 6.50 1 $ 3,250.00 93 2515.504 Articulated Interlocking Block Open Cell, Type A 295 SY $60.00 $ 17,700.00 295 1 $ 17,700,00 Total Bid Schedule"B" $ 1,363,430.60 $ 1,362,307.20 ALTERNATE Bid Schedule "C" - Watermain ITEM NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED T DATE I EXTENSION 94 2021.501 Mobilization (Watennaln) 0.09 LS $185,000,00 $ 16,650.00 0.09 $ 16,650.00 95 2611 Connect To Existing 16" DIP Watermain 2 EA $1,250.00 $ 2,500.00 2 $ 2,500.00 96 2611 6" Gate Valve & Box 6 EA $1,200.00 $ 7,200.00 1 $ 1,200.00 97 2611 8" Gate Valve & Box 9 EA $1,600.00 $ 14,400.00 1 $ 1,600.00 98 2611 12" Butterfly Valve & Box 1 EA $2,200.00 $ 2,200.00 $ 99 2611 16" Butterfly Valve & Box 15 EA $3,000.00 $ 45,000.00 2 $ 6,000.00 100 2611 Hydrant 6 EA $4,200,00 $ 25,200.00 1 $ 4,200.00 101 1 2611 6" Ductile Iron Pipe CL 52 30 LF $30.00 $ 900.00 6 $ 180.00 102 2611 8" Ductile Iron Pipe CL 52 430 LF $40.00 $ 17,200.00 48 $ 1,920.00 103 2611 12" Ductile Iron Pipe CL 52 40 LF $52.00 $ 2,080.00 $ 104 2611 16" Ductile Iron Pipe CL 52 4092 LF $60.00 $ 245,520.00 278 $ 16,680.00 105 2611 16" Ductile Iron Pipe CL 52 (Extra Depth) 560 LF $66,00 $ 36,960.00 $ 106 2611 4" Insulation 192 Sy $40.00 $ 7,680.00 $ 107 2611 Ductile Iron Fittings 7865 LB $2.60 $ 20,449.00 893 $ 2,321.80 108 1 2611 Testing Watermain 1 LS $500.00 $ 500.00 1 $ 500.00 Total Bid Schedule "C" $ 444,439.00 $ 63,761.80 Al TFRNATF Rid Schedule "D" - Sanitary Forcemain ITEM SPEC. ESTIMATED CONTRACT T T USED T NO, NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT DATE EXTENSION 109 2021.501 Mobilization (Forcemain) 0,07 LS $185.000.00 $ 12,950.00 0.07 $ 12,950.00 110 2621 Connect To Existing Forcemain 2 EA $1,500.00 $ 3,000.00 2 $ 3,000.00 111 2621 8" HDPE DR-13.6 Forcemain Pipe - Horizontal Directional 837 LF Drilling $48.00 $ 40,176.00 837 $ 40,176.00 112 2621 8" HDPE DR-13.5 Forcemain Pipe 4546 LF $21,50 $ 97,739.00 920 $ 19,780.00 113 2621 10" HDPE DR-13.5 Forcemain Pipe - Horizontal Directional 837 LF Drilling $54.00 $ 45,198.00 837 $ 45,198.00 114 2621 10" HDPE DR-13.5 Forcemain Pipe 4551 LF $24.00 $ 109,224.00 920 $ 22,080.00 72" Diameter Air Valve Manhole 115 2621 Includes Combination Air Valve, Bali Valve, fittings and 3 EA labor $17,500.00 $ 52,500.00 1 1 $ 17,500.00 72" Diameter Cleanout Manhole 116 2621 Includes all DIP pipe, fittings and labor (exterior valves paid 3 EA separately) $19,500.00 $ 58,500.00 1 $ 19,500.00 117 2621 Forcemain DIP Fittings 2680 LB $5.75 $ 15,410.00 808 $ 4,646.00 118 2621 Testing Forcemain 1 LS $4,000.00 $ 4,000,00 1 $ 4,000.00 119 2611 8" Gate Valve & Box 6 EA $1,600.00 $ 9,600.00 2 $ 3,200.00 120 1 2611 10" Gate Valve & Box 6 EA $2,400.00 $ 14,400,00 2 $ 4,800.00 Total Bid Schedule"D" $ 462,697.00 $ 196,830.00 Chnnne Order Kin 1 - Street and Storm Sewer ITE V NO. SPEC. NO. ITEM DESCRIPTION ESTIMATE D QUANTITY UNIT CO TRA T UNIT PRICE CONTRACT TRA T AMOUNT D T DATE EXTENSION 1 12021.501 IMobilization 1 0.14 1 LS 1 $185,000.001 $ 25,900.001 0.14 1 $ 25.900.00 Change Order No.1 - Street and Storm Sewer $ 26,900.00 $ 26,900.00 S:\MunidpaMOTSEGO\396\PAY ESTIMATES\OT396 PE.xisx PE-3 PAY ESTIMATE #10 - DRAFT CITY OF OTSEGO 85th Street and Maciver Avenue Improvements Project 17-03 S.A.P. 217-102-009 and S.A.P. 217-113-001 Chan Order No 4 - Wn ITEM NO. SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED T DATE EXTENSION 2 2021.501 Mobilization (Watermain) -0.08 LS $185,000.00 $ (14,800.00) -0.08 $ (14,800.00) 3 2611 Connect To Existing 16" DIP Watermain 0 EA $1,250.00 $ $ 4 2611 6" Gate Valve & Box -5 EA $1,200.00 $ (6,000.00) $ - 5 2611 8" Gate Valve & Box -6 EA $1,600.00 $ (12,800.00) $ 6 2611 12" Butterfly Valve & Box -1 EA $2,200.00 $ (2,200.00) $ - 7 2611 16" Butterfly Valve & Box -12 EA $3,000.00 $ (36,000.00) $ - 8 2611 1 Hydrant -5 EA $4,200.00 $ (21,000.00) $ - 9 2611 6" Ductile Iron Pipe CL 52 -25 LF $30.00 $ (750,00) $ - 10 2611 8" Ductile Iron Pipe CL 52 -382 LF $40.00 $ (15,280.00) $ 11 2611 12" Ductile Iron Pipe CL 52 -40 LF $52.00 $ (2,080.00) $ - 12 2611 16" Ductile Iron Pipe CL 52 -3802 LF $60.00 $ (228,120.00) $ - 13 2611 16" Ductile Iron Pipe CL 52 (Extra Depth) -560 LF $66.00 $ (36.960,00) $ 14 2611 4" Insulation -192 SY $40.00 $ (7,680.00) $ 15 2611 Ductile Iron Fittings -7220 LB $2.60 $ (18,772.00) $ 16 2611 Testing Watermain 0 LS $500.00 $ $ - Change Order NoA - Watermain $ (402,442.00) r`h.- nrrfor Mn 4 -coast+an, c ITEM�V SPEC. ESTIMATED CONTRACT CONTRACT USED T NO. NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT DATE EXTENSION 17 2021.501 Mobilization (Forcemain) -0.03 LS $185,000.00 $ (5,550.00) -0.03 $ (5,550.00) 18 2621 Connect To Existing Forcemain 0 EA $1,500.00 $ $ 19 2621 8" HDPE DRA3.5 Forcemain Pipe - Horizontal Directional 0 LF Drilling $48.00 $ _ $ _ 20 2621 8" HDPE DR-13.5 Forcemain Pipe -3644 LF $21.50 $ (78,346.00) $ 2621 10" HDPE DR-13.5 Forcemain Pipe - Horizontal Directional 0 LF 21 Drilling $54.00 $ - $ - 22 2621 10" HDPE DR-13.5 Forcemaln Pipe -3643 LF $24,00 $ (87,432.00) $ 72" Diameter Air Valve Manhole 23 2621 Includes Combination Air Valve, Ball Valve, fittings and -2 EA labor. $17,500.00 $ (35,000.00) $ - 72" Diameter Cleanout Manhole 24 2621 Includes all DIP pipe, fittings and labor (exterior valves paid -2 EA separately) $19,500.00 $ (39,000.00) $ - 25 2621 Forcemain DIP Fittings -1255 LB $5.75 $ (7,216.25) $ 26 2621 Testing Forcemaln 0 LS $4,000.00 $ $ - 27 2611 8" Gale Valve & Box -4 EA $1,600.00 $ (6,400.00) $ 28 2611 10" Gale Valve & Box -4 EA $2,400.00 $ (9,600.00) $ - Change Order No.1-Sanitary Sewer $ (268,644.25) $ (6,660.00) Total Change Order NoA $ (645,086.26) $ 6,660.00 Change Order No 2 -ITEM NO. PEC. NO. ITEM DESCRIPTION E T MATED QUANTITY UNIT O TRACT UNIT PRICE O TRA T AMOUNT ED T DATE EXTENSION 1 2211.509 Aggregate Base Class 5 Mod -11600 TON $12.60 $ (146,160.00) 1 $ - 2 2211.509 Aggregate Base Class 5 Mod (City Provided Reclaim Mated 11600 1 TON 1 $9.10 $ 105,560.00 1 10,065 1 $ 91,591.50 Change Order No.2 $ (40,600.00) $ 91,691.60 Channo Order No 3 ITEM NO, MnDOT SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2211.509 3" minus Aggregate Base Stabilization (CV) (8" thick) 3760 TON $25.25 $ 94,940.00 3.745 $ 94,572.87 2 2105.507 Common Excavation (EV) IT' removed) 1900 CY $4.00 $ 7,600.00 1.900 $ 7,600.00 3 2105.607 Haul & Dispose Excess Material (LV) 2240 CY $2.501 $ 5,600.00 2,240 $ 5,600.00 Change Order No.3 $ 108,140.00 $ 107,772.87 S:\MunidpaRAOTSEGO\396\PAY ESTIMATES\OT396 PE.xisx PE-4 PAY ESTIMATE #10 - DRAFT CITY OF OTSEGO 85th Street and Maciver Avenue Improvements Project 17-03 S.A.P. 217-102-009 and S.A.P.217-113-001 Channa r)rder Nnd ITEM NO. MnDOT SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2105.504 Geotextile Fabric Type 5 1420 SY $3.25 $ 4,615.00 1,400 $ 4,550.00 2 2105.507 Common Excavation (EV) (12" removed) 470 CY $4,00 $ 1,880.00 472 $ 1,888.00 3 2105.607 Haul & Dispose Excess Material (LV) 610 CY $2,501 $ 1,525,00 565 $ 1,412.50 4 2211.509 3" Minus Clear Aggregate Base Stabilization 900 TON $48.59 $ 43.731.00 552.4 $ 26,841.12 5 2211.509 Aggregate Base Class 3 or 4 (10" thick) 710 TON $8.00 $ 5,680.00 $ 6 4" Precast Concrete Headwall 1 EACH $400.00$ 400,00 $ 7 �2102 4" Perf PVC Pipe Drain 120 LF $6.00 $ 720.00 $ Change Order No.4 $ 68,661.00 $ 34,691.62 Change Order No.5 ITEM NO. MnDOT SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2502.503 6" PVC Pipe Drain 24 LF $11.00 $ 264.00 24 $ 264.00 2 2502.503 12" PVC Pipe Drain 499 LF $40.00 $ 19,960,00 499 $ 19,960.00 3 Draintile Connection at Manhole 11 EACH $120.00 $ 1.320.00 11 $ 1,320.00 4 Connect to Existing Field Draintile 11 EACH $500.00 $ 6,500.00 11 $ 5,500.00 5 Misc. Storm Structure Adjustments 1 LS $2,545.00 $ 2,545.00 1 $ 2,545.00 6 2105.507 Common Borrow (LV) 19174 CY $6,60 $ 126,548.40 19,174 $ 126,648.40 7 2105.607 Haul & Dispose Excess Material (LV) 14135 CY $2,50 $ 35,337.50 $ 8 2360.509 Type SP 9.5 Wearing Course Mixture (3,C) - Density Decuctlon 1 LS $ (5,694.38) $ (5,694.38) 1 $ (5,694.38) 9 2611 18" Hydrant Extension 1 EA $1,200.00 $ 1,200.00 1 $ 1,200.00 10 Conduit Crossing Installation 756 LF $9,93 $ 7,507.08 756 1 $ 7,507.08 Change Order No.5 $ 194,487.60 $ 169,160.10 Bid Schedule "A" $ 3,684,378.02 $ 3,402,682.89 Bid Schedule "B" $ 1,353,430.60 $ 1,362,307.20 Bid Schedule "C" $ 444,439.00 $ 63,751.80 Bid Schedule "D" $ 462,697.00 $ 196,830.00 Change Order#1 $ (646,086.25) $ 5,560.00 Change Order#2 $ (40,600.00) $ 91,691.50 Change Order#3 $ 108,140.00 $ 107,772.87 Change Order#4 $ 58,651.00 $ 34,691.62 Change Order#5 $ 194,487.60 $ 159,150.10 TOTAL $ 6,620,436.97 $ 6,404,227.97 SAMunicipal\AOTSEGO\396\PAY ESTIMATES\OT396 PE.xisx PE-5 PAY ESTIMATE #10 - DRAFT CITY OF OTSEGO 85th Street and Maciver Avenue Improvements Project 17-03 S.A.P.217-102-009 and S.A.P.217-113-001 Total Work Completed to Date $ 6,404,227.97 LESS 5% RETAINAGE $ 270,211.40 LESS PAY ESTIMATE #1 $ 654,377.50 LESS PAY ESTIMATE #2 $ 1,048,322.86 LESS PAY ESTIMATE #3 $ 205,349.74 LESS PAY ESTIMATE #4 $ 78,332.39 LESS PAY ESTIMATE #5 $ 633,214.32 LESS PAY ESTIMATE #6 $ 456,886.86 LESS PAY ESTIMATE #7 $ 1,339,610.11 LESS PAY ESTIMATE #8 $ 604,264.72 LESS PAY ESTIMATE #9 $ 114,886.25 WE RECOMMEND PAYMENT OF: $ 98,782.83 APPROVALS: CONTRACTOR: RL LARSON EXCAVATING, INC. Certification by Contractor: I certify that all items and amounts are correct for the work completed to dale. Title: Date ENGINEER: HAKANSON ANDERSON Certification by Engineer: We recommend payment for work and quantities as shown. OWNER: CITY OF OTSEGO Signed: S:\Munic(pal\A0TSEG0\396\PAY ESTIMATES\OT396 PE.xlsx PE-6