ITEM 5.1 Streets Project 20-06OtSegF o MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner January 27, 2020 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 5.1 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council approve the preparation of plans and specifications for the Page Avenue (79th Street to 85th Street) Reclaim Project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J U STI FI CATI O N : Page Avenue between 78th Street and 85th Street and 78th Street between Page Avenue and 76th Street are paved streets consisting of 4 1/2" of bituminous surface 44' wide. The pavement is 17 years old and is experiencing thermal cracking (transverse and longitudinal) due to its age. These thermal cracks have allowed water to rehydrate the recycled concrete base. The trapped water has caused these cracks to heave or tent in recent years and severely in winter months creating a very poor profile and very poor rideability. The City attempted to address the issues by providing weep holes through the recycled concrete base allowing water to drain downward away from the pavement. A premium crack sealer was placed over the tenting cracks and up to 12" wide to seal the primary and secondary cracks to minimize water penetration to the base. This solution was completed in the summer of 2019 with a project cost of $35,556.80. Currently, the tenting issue has returned to Page Avenue during the 2019-2020 winter. Though not as severe it is still a bumpy ride along Page Avenue. It appears that the crack sealing material has re -cracked and the water that is getting below the pavement is freezing before reaching the drilled holes as planned. A mill & overlay of Page Avenue from 78th Street to 85th Street and along 78th Street from 76th Street to Page Avenue was planned as part of the 2020 Street Renewal CIP. The CIP estimate is approximately $333,400. Due to the reoccurrence of the tenting along Page Avenue, City staff is recommending that this overlay project be revised. Overlaying the streets in their current condition will not resolve the problems as the cracking and tenting are very likely to reflect through the new surface within a year or two. In lieu of the mill and overlay project, City staff recommends Page Avenue from 79th Street to 85th Street be reclaimed to a depth of 10.5" to combine all the existing pavement and concrete/aggregate layer below creating a move permeable class 5 layer. In addition, the project will involve excavating a portion of the subgrade material and adding a 6" thick clean sand drainage layer with drain tile, then replacing 6" of the reclaim material as aggregate base and paving 4 %" thick. Damaged existing curb and gutter will be replaced as part of the project with a few existing storm structures being rehabbed as needed. The 6" excavated subgrade material (^2580 CY) can be used to fill one of the three City owned commercial/industrial lots in Great River Centre or Waterfront East. The project will also produce excess reclaim aggregate material (-2690 CY) which can be stockpiled at the Public Works yard for use on other projects around the City. We estimate the project construction costs to be approximately $560,000 with a total project cost of $644,000. With approval to complete the plans and specification, the City Council should expect plans and specifications available for approval and authorization for advertisement for bid on February 24, 2020. The project could potentially be awarded to the lowest responsible bidder at the March 23, 2020 City Council meeting. SUPPORTING DOCUMENTS ATTACHED: • Project Location Map • Photos • Engineers Estimate • Typical Section Detail POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve preparation of plans and specifications by Hakanson Anderson for the Page Avenue Reclaim Project from 791h Street to 851h Street, City Project No. 20-06. RIIIIC;FT mmPMATinKi FUNDING: BUDGETED: Fund 201 - Pavement Management —Yes LOCATION MAP FOR 2020 STREET RENEWAL PROJECT (PAGE AVENUE RECLAIM) CITY OF se o MINNESOTA 85TH STREET y r •r t f je; ��� 4 r" 14 X' ' m 83RD STREET t+ + : m i'- Z Ld J' CL t r tu . 79TH STREET T t`. �.�{ w a 5 r a r l; a =r- 75TH ST NE 5� 7 1'' 4i��j i I 1 p l,l,, ♦ t + c LEGEND STREETS TO BE RECLAIMED H 150 0 150 300 ✓- 21, 2020 - Uk5U. SCALE IN FEET K\MUNUPAL\OT392\2020\OT392-2020\E?40NEMINO\OT392-2020 LOCATION MPP.d.g 78TH ST NE EXHIBIT A PRELIMINARY COST ESTIMATE PAGE AVENUE (79TH STREET TO 85TH STREET) RECLAMATION PROJECT CITY OF OTSEGO Revision: 1/2012020 PARTIAL CURB REPLACEMENT, RECLAIM 10.5" DEEP, EXCAVATE SUBGRADE 6" BELOW RELAIM AND PLACE 6" RECLAIM MATERIAL AND 6" DRAINAGE AGGREGATE + DRAINTILE 50' FROM CATCH BASINS (NEW G.E. = 20.625) Rid Srhadula "A" - Streets Item No. Spec. Ref Description Unit Unit Price Roadway Estimated Quantity Cost Extension 1 2021.501 Mobilization LS $18,937.36 1 $18,937.36 2 2104.501 Remove Concrete Curb and Gutter LF $6.15 889 $5,467.35 3 2104.502 Remove Concrete Valley Gutter SF $2.00 794 $1,588.00 4 2104.513 ISawing Bit Pavement Full Depth) LF $3.00 340 $1,020.00 5 2106.507 Subgrade Excavation P CY $14.00 2578 $36,092.00 6 2211.506 Salvage Aggregate Reclaim to Stockpile P CY $3.50 2691 $9,418.50 7 2211.506 Salvage Aggregate Reclaim to Stockpile P CITY HALL CY $14.00 2691 $37,674.00 8 2211.506 Salvage Aggregate Reclaim from Stockpile P CY $3.50 2691 $9,418.50 9 2211.509 Aqqregate Base Class 3 or 4 P CY $15.00 2873 $43,095.00 10 2215.501 Full Depth Reclamation P SY $2.75 15673 $43,100.75 11 2232.501 IM111 Bituminous Surface 2.0" SY $14.50 54 $783.00 12 2357.502 Bituminous Material For Tack Coat GAL $2.15 823 $1,769.45 13 2360.501 Type SP 9.5 Wearing Course Mixture 3,C TON $70.00 1851 $129,570.00 14 2360.502 Type SP 12.5 Non Wear Course Mixture 3,C TON $65.00 2314 $150,410.00 15 2531.507 7" Concrete Driveway Pavement SY $85.00 91 $7,735.00 16 2502.503 4" Pert PVC Pipe Drain LF $6.00 1200 $7,200.00 17 2502.503 Draintile Connection to Existing Structure EACH $125.00 32 $4,000.00 18 2504.602 lAdmust Gate Valve and Box EACH $100.00 1 $100.00 19 2504.602 Adjust Sanitary Manhole Frame and Casting EACH $300.00 1 $300.00 20 2563.601 Traffic Control LS $5,000.00 1.00 $5,000.00 21 2573.530 Storm Drain Inlet Protection EACH $105.00 16 $1,680.00 22 2574.535 Stabilized Construction Exit LS $1,000.00 2 $2,000.00 23 2531.501 Concrete Curb & Gutter Design B618 LF $25.00 889 $22,225.00 24 2575.555 Turf Establishment LF $3.00 889 $2,667.00 25 2582.501 1 Pavement Message Arrow - Paint EACH $75.00 3 $225.00 26 2582.502 4" Double Solid Line Yellow- Paint LF $0.40 3348 $1,339.20 27 2582.502 4" Solid Line White - Paint LF $0.20 5963 $1,192.60 28 2582.502 12" Solid Line White - Paint LF $2.70 151 $407.70 29 2582.502 24" Solid Line White - Paint LF $3.75 30 $112.50 30 2582.502 24" Solid Line Yellow- Paint LF $3.50 17 $59.50 31 2582.502 Crosswalk Marking (3'X6' Blocks) White - Paint SF $2.75 270 $742.50 Total - Bid Schedule "A" Rid Rrhadule "B" - Storm Sewer $545,329.91 - - - Item No. Spec. Ref Description Unit Unit Price Roadway Estimated Quantity Cost Extension 32 2104.523 Salvage CastingEACH $450.00 16 $7,200.00 33 2506.516 CastingAssemblyEACH $815.00 5 $4,075.00 34 2506.602 Repair Drainage Structure EACH $425.00 8 $3,400 000 Total - Bid Schedule "B" $14,675.00 Bid Schedule "A" - Streets $546,329.91 Bid Schedule "B" - Storm Sewer $14,675.00 TOTAL CONSTRUCTION COST $560,004.91 15%Administration, Legal, & Engineering $84,000.74 TOTAL ESTIMATED PROJECT COST $644,005.65 S:\MunicipaMOTSEGO\392\2020\OT392-2020 EngEst.xtsx Page 1 of 1 NO SCALE 4 4" EXISTING BITUMINOUS 6" EXISTING CLASS 5 AGGREGATE BASE 10 1" RECLAIM DEPTH EXCAVATE TO 16 1" DEPTH EXISTING TYPICAL SECTION (16.125 G.E.1 BITUMINOUS ROLL OVER 1/8" MIN. - 3/8" MAXI m 4" PERFORATED SOLID PVC DRAINTILE I- 2.0" TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA240B) L L BITUMINOUS MATERIAL FOR TACK COAT 2.5" TYPE SP 12.5 NON WEARING COURSE MIXTURE (SPNWB2309) 6" SALVAGED RECLAIM MATERIAL (COMPACTED) 6" CLASS 3 OR 4 AGGREGATE BASE PROPOSED TYPICAL SECTION (20.625 G.E.)