Loading...
3.11 City Project 20.04Z Ilk 0 tSITYle F o MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner March 23, 2020 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.11 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council approve accepting bids and awarding the contract for the Well #9 and Pumphouse #1 Improvements, City Project No. 20-04. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKG RO U N D/J USTI F I CATI ON: Bids were opened for the Well #9 and Pumphouse #1 Improvements on March 17, 2020. A total of two bids were received as shown on the attached Bid Tabulation. Municipal Builders, Inc. of Andover, Minnesota is the apparent responsible low bidder. This project was originally budgeted within the 2019 CIP at an estimated cost of $1,100,000. The exploratory well was completed in 2019, as was numerous grant applications to offset the project costs. Since construction did not occur in 2019, the project was again included in the 2020 CIP at an estimated cost of $800,000. The engineers estimate for construction costs was $562,510. City staff recommends awarding a contract to the low bidder, Municipal Builders, Inc. Municipal Builders, Inc has not completed work within the City of Otsego to our knowledge but their main subcontractors have done extensive work within the City (Taut Wells and Omann Brothers). SUPPORTING DOCUMENTS ATTACHED: 0 Bid Tabulation Bids opened 2:00 p.m., Tuesday, March 17, 2020. There were 2 bids received, as shown herein. BID TABULATION CITY OF OTSEGO Well #9 and Pumphouse #1 Improvement Project Municipal Builders, Inc. I Vinm, Inc. I Engineers Estimate REM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 1 Mobilization 1 LS $27 000.00 $27 000.00 $17,000.00 $17 000.00 $40 000.00 $40 000.00 2 Remove Watermaln Pressure Valve Manhole 1 EA $1 200.00 $1 200.00 $5 000.00 $5 000.00 $20 000.00 $20 000.00 3 Removal & Disposal of Existing Antenna, Transformer, Electrical Meter 1 LS $1 150.00 $1 150 00 $300600 $300.00 $3 000.00 $3 000.00 4 Cut Ott and Dispose Existing Abandoned Well Pipe 1 LS $1 500.00 $1 500.00 $750.00 $750.00 $1 000.00 $1 000.00 5 Abandon Existing 6" Pipe Inplace and Cap at Main 1 LS $1 800.00 $1 800.00 $2 500.00 $2.500.00 $2 000.00 $2 000.00 6 Mill Bituminous Surface (1.5" Thick) 14 SY $30.00 $420.00 $100.00 $1400.00 $10.00 $140.00 7 Sawing Bituminous Pavement (Full Depth) 40 LF $3.50 $140.00 $5.00 $200.00 $10.00 $400.00 8 Remove Bituminous Pavement 35 SY $8.00 $280.00 $5.00 $175.00 $10.00 $350.00 9 Remove Chain Llnk Fence 120 LF $10.00 $1200,00 $3.00 $360.00 $100.00 $12000.00 10 Salvage Aggregate Base Class 5 28 CY $12.00 $336.00 $2.00 $56.00 $25.00 $700.00 11 Site Grading 1 LS $2 500.00 $2 500.00 $5 000.00 $5 000.00 $7,500.00 $7 500.00 12 Class 5 Aggregate Base 122 TON $28.00 $3 416.00 $30.00 $3 660.00 $25.00 $3 050.00 13 Type SP 12.5 Non Wearing Course Mature (2,B) 66 TON $145.00 $9 570.00 $170.00 $11 220.00 $100.00 $6 600.00 14 Concrete Pad with Conduits (6" Thick) 48 SF $60.00 $2,880.00 $40.00 $1,920.00 $50.00 $2 400.00 15 Install Bollards (City Supplied) 4 EA $400.00 $1 600.00 $250.00 $1 000.00 $150.00 $600.00 16 Connect To Existing watermaln 1 LS $1 200.00 $1 200.00 $10 000.00 $10 000.00 $1 750.00 $1 750.00 17 Install 10" Gate Valve and Box 1 LS $3 800.00 $3 800.00 $10 000.00 $10 00a00 $2 500.00 $2 500.00 18 Ductile Iron Fittings 285 LBS $6.00 $1710.00 $16.00 $4275.00 $10.00 $2850.00 19 10" Watermaln Ductlie Iron CL 52 120 LF $137.00 $16 440.00 $300.00 $36 000.00 $75.00 $9 000.00 20 Site Cleanup, Establishment Turf and Controlling Erosion 1 LS $3 500.00 $3 500.00 $5 000.00 $5 000.00 $5,000woo $5 000.00 21 Testing (Pressure and Bacteria) 1 LS $750.00 $750.00 $4,000.001 $4 000.00 $1 750.00 $1 750.00 Total Bid Schedule "A" OT535 - bid tabBID TABULATION BT - 1 OF 3 $82,392.00 $119,816.00 $122,590.00 BID TABULATION CITY OF OTSEGO Well #9 and Pumphouse #1 Improvement Project Bid Schedule "B" -Well #9 Municipal Bullders, Inc. Vinco, Inc. Engineers Estimate ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 22 Drill & Drive 24" Casing 80 LF 195.00 $15 600.00 $195.00 $15 600.00 $245.00 $19 600.00 23 Drill 23" Open Hole 253 LF $165.00 $41 745.00 $165.00 $41 745.00 $100.00 $25 300.00 24 Furnish & Install 18"casing 255 LF $95.00 $24225.00 $95.0o $24225.00 $60.00 $15,300,00 25 Furnish & Install Grout 20 CY $650.00 $13 000.00 1 $650.00 $13 000.00 $500.00 S10.000.0c 26 Drill 17" Open Hole 83 LF $125.00 $10 375.00 $125.00 $10 375.00 $90.00 $7 470.00 27 Plumb and Alignment 1 LS 500.00 500.00 $500.00 $500.00 500.00 $500.00 28 Furnish, Install and Remove Development Equipment 1 LS $3 500.00 $3 500.00 3 500.00 $3 500.00 $15 000.00 15 000.00 29 Well Development 60 HRS S395.00 523700.00 $395.00 $23700.00 225.00 $13500.00 30 Haul Standstone Away 25 CY $14.00 $350.00 $14.00 $350.00 $20.00 $500.00 31 Furnish and Install Well Screen & Gravel Pack 75 LF $325.00 S24 375.00 $325.00 $24 375.00 $1 000.00 $75 000.00 32 PRless Adapter $1.00 LS $64 500.00 $64 500.00 $44.500.001 $44 500.00 $25 000.00 S25 000.00 33 Discharge Piping 10" Dia 250 LF $6.00 $1 500.00 $6.00 $1 500.00 $12.00 $3 000.00 34 Discharge Tee on 16" Casing, Flge Cap 1 LS 825.00 $825.00 $825.00 $825.00 $0.00 $0.00 35 Furnish and Install 125 HP Pump and Motor 1 LS 89 252.00 $89 252.00 $75 075.00 $75 075.00 $40 000.00 $40 000.00 36 Furnish, Install and Remove Test Pump Equipment 1 LS $6500.00 $6500.00 $6,500.00 $6500.00 $5600.00 $5500.00 37 Test Pumping 200 KW & 150 HP Pump 50 HRS 195.00 $9.750.00 $195.00 S9 750.00 $200.00 $10 000.00 38 Water Analysis STD Menu With Radionuculicide 1 LS 1 850.00 $1 850.00 $1 850.00 $1 850.00 $1 000.00 $1.000.00 39 Data Logger For Test Pump Recording 1 EA 325.00 $325.00 $325.00 $325.00 $1 000.00 $1 000.00 40 Video Log 1 LS $1 400.00 $1 400.00 $1 400.00 $1 400.00 $2 000.00 $2 000.00 41 Gamma Log 1 LS 1800.00 $1800.00 $1800.00 $1800.00 $2000.00 $2000.00 42 O&M manualNVell Report 1 LS $175.00 $175.00 $175.00 $175.00 $250.00 $250.00 Total Bid Schedule "B" OT535 - bid tabBID TABULATION BT - 2 OF 3 $335,247.00 $301,070.00 $271,920.00 BID TABULATION CITY OF OTSEGO Well #9 and Pumphouse #1 Improvement Project Bid Schedule"C" -Pumphouse #1 Municipal Builders, Inc. Vince, Inc. Engineers Estimate ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION Remove Existing Pumphouse Pipe and Appuurtenances 1 LS $q 000.00 4 000.00 10 000.00 $10 000.00 $3 000.00 $3 000.00 r4-:'M Furnish and Install Ductile Iron Pipe and Appurtenances 1 LS $20 000.00 20 000.00 $22100.00 $22 100.00 $20 000.00 $20 000.00 Install 8" Badger Mag Meter (City supplied) 2 EACH $400.00 $800.00 7 50jL]1�4,00.... 000.00 $1 000.00 $2 000.00 Painting And/Or Repaint All Ductile Iron Pipe 1 LS $3 000.00 $3 000.00 $8 00 000.00 9 500.00 $9 500.00 Testing (Pressure and Bacteria) 1 LS $1.000.00 $1 000.00 S4 00 $1 500.00 $1 500.00 Total Bid Schedule "C" $28,800.00 $59,100.00 $36,000.00 Bid Schedule "D" -Electrical Municipal Builders, Inc. Vince, Inc. Engineers Estimate ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 48 Control Panel w/ VFD and Controls+ Instruments 1 LS $80 000.00 $80 000.00 $69 000.00 $69 000.00 $86 000.00 $86 000.00 49 Panel Disconnect SW 1 LS $5960.00 $5960,00 $5000.00 $5000.00 $3500.00 $3500.00 50 Generator Receptacle 1 LS $1933.00 $1933.00 S2500.00 $2500.00 $5000.00 $5000.00 51 Electrical Mob, Circuitry, and Install/ mist. 1 LS $8 110.00 $8 110.00 $5 000.00 $5 000.00 $15 000.00 $15 000.00 52 Furnish and Install Antenna Pole 1 LS 1 800.00 1 800.00 7 500.00 7 500.00 $5 000.00 $5 000.00 53 Electrical Main 300A Feeder in Conduit 175 LF $51.00 $8 925.00 $57.00 $9 975.00 $100.00 S17 500.00 Total Bid Schedule "D" $106,728.00 $98,975.00 $132.000.00 TOTAL BID SUMMARY Total Bid Schedule "A" E82,392.00 $119,816.00 E122,590.00 Total Bid Schedule "B" E335,247.00 E301,070.00 E271,920.00 Total Bid Schedule "C" E28,800.00 §59,100.00 $36,000.00 Total Bid Schedule "D" E106.728.00 E98.975.00 E132,000.00 TOTAL BID $553,167.00 $578,961.00 $562,510.00 OT535 - bid tabBID TABULATION BT - 3 OF 3