Loading...
3.4 Public Works Trench DrainTY 06eOF o MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works Street Operations Manager Lamson March 23, 2020 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.4 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council accept quotes for repairs to the Public Works Building trench drain. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKG RO U N D/J U STI FI CATI O N : The 2020 CIP includes funding for the repairs to the trench drain in the vehicle storage portion of the public works building. There are several sections where the grates have completely collapsed and City staff has had to cover the trench drain with sheets of plate steel to avoid vehicles dropping into the drain. City staff has requested quotes from three separate contractors to assist in the completion of this project. There will be a contractor for each of the following stages of this project: 1) concrete cutting and utility locating, 2) materials provider, and 3) installation and concrete replacement. Once the concrete is cut, City staff will be doing the removal of the existing drain and concrete materials. Quoted pricing for the project is: • Central MN Concrete Cutting $5,800.00 • Duinick Concrete $11,423.16 • R&D Concrete Construction $17,000.00 Total $34,223.16 The quoted price is $2,123.16 in excess over the 2020 budgeted amount of $32,100. Staff is recommending that the City proceed with this project through the recommended contractors. The Public Works Subcommittee was presented with this information at the March 18 meeting and recommended that it be placed on the consent agenda for City Council approval. Daininck Concrete SOLD TO CASH SALE - DC CONSTRUCTION DC Construction Supply 605 Lakeland Drive NE PO Box 1867 Willmar, MN 56201 320-235-0870 Fax:320-235-0492 JOB ADDRESS Brad OTSEGO PUBLIC WORKS DEPT 1-763-238-5817 QUOTE 2002-632562 R2 PAGE 1 OF 1 ACCOUNT JOB 00040 0 CREATED ON EXPIRES ON 02/10/2020 03/10/2020 BRANCH 0040 CUSTOMER PO# STATION PUBLIC WORKS 110 CASHIER BRIMS SALESPERSON BRIFIS ORDER ENTRY 1 MODIFIED BY BRIFIS BRIMS Item Description D Quantity U/M Price Per I Amount NSIDRAIN Misc Drain Items 1 EA 11323.1600 EA 11323.16 165' OF U- DRAIN 2 24"X24" Sumps FIR Freight N 1 EA 100.0000 EA 100.00 Subtotal 11,423.16 Exempt 0.00% Sales Tax 0.00 Total 11,423.16 Buyer: Signature 18474 17th Avenue East Clearwater, MN 55320 320-980-2363 Co.t%.cretc, Cons1triactio n Name / Address Brad Estimate Date Estimate # 3/4/2020 1451 Description Cost Total Otsego Job - Trench Drain Pour Back 8' x 170' x 8" with 44 Bars 24" OC EW Set 162' U-Drain Drill and Epoxy Dowels at Perimeter T OC Price Includes: Concrete, Rebar, Labor and Mobilization 19,000.00 19,000.00 Alt # I -Pour 6" Floor Deduct $2000 G P / '7, p 00 Excludes: Sawcutting, Demo, Plumbing, Trench Drains, and Misc Drain Parts Total $19,000.00 Customer Signature Capital Improvement Plan City of Otsego, Minnesota 'roject # BLDG-2020-01 'roicct Name Public Works Building - Trench Drain Repairs Type City Buildings & Property Useful Life Category City Buildings & Property Description Repairs to the cold storage trench drain system. 2020 thru 2029 Department City Buildings & Property Contact Street Operations Manager Priority n/a Total Project Cost: $32,100 Justification The trench drain in the cold storage portion of the Public Works facility is in need of replacement. There are several sections where the drain has completely collapsed and staff has had to cover the sections with sheets of plate steel to avoid vehicles dropping into the drain. There are other sections that are nearing this condition as well. Expenditures 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total & Property 32,100 32,100 Total 32,100 32,10D Funding Sources 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total 439 - Building & Property 32,100 32,100 Maintenance Total 32,100 32,100 8 /� Friday, December 20, 2019 Brad Sherrill From: Sent: To: Subject: Quote Bid to City of Otsego troyj@centralmncc.com Wednesday, March 4, 2020 3:55 PM Brad Sherrill Bid for otsego Public Works Central MN Concrete Cutting PO Box 428 Clearwater MN 55320 (320) 248-1662 email: traya@centralmncc.com Project: Otsego Public Works Buiding Work to be completed slab saw only 4-165'x6" 42-8'-6" to 12" 2-4'x6' Total $4,800.00 I