Loading...
ITEM 3.11 Flooring Repair40 rY OF off ezo MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: 'MEETING DATE: Parks & Recreation Parks & Recreation Director Demant April 13, 2020 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/ Finance Director Flaherty 3.11 STRATEGIC VISION MEETS: THE CITY OF OTSEGO: - Is a strong organization that is committed to leading the community through innovative communication. Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council approve accept the quotes for the removal and installation of flooring at Prairie Center and City Hall. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTIFICATION: The 2019 Capital Improvement Plan (CIP) included a budget of $42,126 for facility improvements at the Prairie Center. City staff is proposing to replace the existing flooring in the Council Chambers, kitchen, southwest conference room and hallways leading to the south exit door and bathrooms with a vinyl mock wood tile. This product would allow for increased sanitation, durability, and cleaning efficiency. Also being proposed is replacing the existing flooring in the Prairie Center for the Fireside and northeast conference rooms, staff office areas, and the Lily Pond conference room and adjoining hallway at City Hall with carpet squares. These areas are either rentable spaces, meeting rooms, or highly visible by the public on a daily basis. City staff has obtained a quote from Commercial Flooring, Inc. in the amount of $42,155 for this project. The information was reviewed by the Administrative Subcommittee at both the March and April 2020 meetings, with recommendation for approval by the City Council. SUPPORTING DOCUMENTS ATTACHED: • Quote - Commercial Flooring, Inc. POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to accept the quote from Commercial Flooring, Inc., in the amount of $42,155 and to authorize the project for the removal and installation of flooring at Prairie Center and City Hall. BUDGET INFORMATION FUNDING: BUDGETED: Fund 439 - Building and Property Maintenance Yes U1 1141,1111111 0 1 .06 u1111eeruu111 • • 1112,j,j5d1181111 :9111111/111111111763-746-8902 FAX 11eou� unw unuuureuu 1111110111111 11nu1mnuu Native American, Woman -Owned Estimating Department Proposal Plymouth, MN Alternate #4 to Quote 18211 8443 Gortract # � Date 4/7/2Q20Sale Otsego City Hall -All Flooring 8899 Nashwa Ave. N.E. Person1> Gordon Otsego, MN 55330 Contact: Nick Jacobs Sale Perso 2-.__ Vinyl Tile (Luxury) Materials Armstrong Natural Creation -Arbor Art 6x48 D10 LVT TBD Labor Install - Luxury Vinyl Tile - TBD LVT-1 Notes PLEASE NOTE; NO TRAFFIC OR MOPPING IS ALLOWED ON THIS PRODUCT FOR 72 HOURS AFTER INSTALLATION. Adhesive Materials Armstrong S-288 SV Adhesive 4 Gal LVT-1 Carpet Tile Materials Carpet Tile Material Allowance TBD Labor Install Carpet Tile - TBD CPT-1 Labor Labor Cut around pipes @ conference room in City Hall Adhesive Materials Mannington 711 Infinity & Vinyl Backed Modular Adhesive 4G CPT-1 Wall Base Materials 4 1/2" Cove Rubber Base 1/8 Gauge DC-XX TBD Labor Install - Vinyl Base RB-1 Transitions Labor Supply & Install Transitions Accessories Materials Schonox SL Feather Finish 10 lb. Labor Floor Prep -Concrete Labor Labor Moisture Testing - Concrete Relative Humidity Testing of the concrete slab. Requires 5/8" holes to be drilled into the concrete and set for 24 hours. Labor Labor Remove & Dispose - Existing Carpet - Glue Down Labor Labor Remove & Dispose - Existing VCT Page 1 Q2-19 Continuation For: Estimating Department, Quote # 18443 Labor Labor Remove Existing Adhesive Transitions Labor Ramping - Supply & Install Information Total EXCLUSIONS; concrete repairs, unforeseen conditions, floor leveling, overtime, floor protection, finished floor repairs INCLUSIONS: MBE, WBE, SBE, DBE Certified, minor floor prep, moisture testing, material and adhesive removal i Grand Total $42,155.00 Date Ck # Deposit _ '�� -Terms: 50% Down / Balance on Invoice. ALL orders are Non -cancelable. -All material is factory ordered on a per project basis and non -cancelable from the manufacturers, consequently once a quote is accepted and approved for ordering, all material is non -cancelable. -Sales tax Is only charged on material only purchases. Unless bid documents state job is Tax Exempt, use tax will be included and sales tax is not required on Installed projects. Additional tax may be required if tax rates change. -Due to fluctuating material costs, we can only honor pricing on quotes for 30 days. -Work to be done M-F, 7AM-3PM, unless noted. -No take-up and disposal of existing flooring or adhesive is included, unless noted. -No cleaning, vacuuming, protection of carpet or washing and waxing of vinyl are included, unless noted. -Pricing is based on floors being ready to receive floor covering, unless otherwise noted. -Estimate does not include any floor preparation or repair, which will be billed at $100, 00 per hour, plus materials. -Reminder: Fresh paint marks easily. Some touchup may be required after flooring installation and is the responsibility of the customer. -It is the owner's responsibility to move all furniture, unless otherwise noted. -Estimate is per plans and specifications, sections 09650 & 09680, and blueprints dated and is subject to change upon a physical measure of site. -The use of low permeance vapor retarder is mandatory directly beneath any concrete slab that is to receive a directly adhered moisture sensitive finish. If an effective vapor retarder is not in place and intact directly beneath the slab, concrete dryness or moisture vapor emission testing is subject to significant variation AFTER the floor finishes are installed. Neither Absolute Commercial Flooring nor the manufacturer of the floor covering can be held responsible for moisture related distresses that develop after installation, when such damage Is the result of excessive concrete moisture vapor emission and pre -installation testing Indicated a suitably dry surface. This disclaimer applies to ALL moisture sensitive finishes and Includes all types of flooring as well as poured in place coatings or any other material applied to the slab that inhibits or impedes the passage of moisture from the slab surface. -All past due payments shall bear interest at a rate of eighteen percent (18%) per annum, but not to exceed the highest rate permitted by law, until paid in full. In accepting this quote, the customer agrees to pay all collection costs incurred, including reasonable attorney's fees. Me accept these terms. Buyer Date: Seller- Date Page 2 Q2-19