ITEM 3.7 Page Ave Reclamation Project 20.06OtkgoF MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner April 27, 2020 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.7 STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council accept bids and award the contract for the Page Avenue Reclamation, City Project No. 20-06. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/J USTI FICATI ON: Bids were opened for the Page Avenue Reclamation, City Project No. 20-06 on April 21, 2020. A total of five bids were received as shown on the attached Bid Tabulation. Knife River Corporation — North Central of Sauk Rapids, Minnesota is the apparent responsible low bidder. This project was included in the Capital Improvement Plan (CIP) as a mill & overlay project; however due to the reoccurrence of the tenting issue along Page Avenue, City staff previously recommended that this overlay project be revised to a reclaim project. This project is included within the CIP at an estimated project of approximately $333,400 for the original mill and overlay project. Upon completion of the plans and specifications, the estimated project costs for the Reclaim Project was approximately $844,266. The project costs as bid, $720,759 and engineering of $108,114 bring the current project cost to $828,873. City staff recommends awarding a contract to the low bidder, Knife River Corporation — North Central. Knife River Corporation has completed multiple street and utility projects across the City in the past with the most recent being the Mississippi Shore Reclamation and 85th Street Reclamation projects in 2017 and 2018 respectively. The work was completed to specifications and in a timely manner. SUPPORTING DOCUMENTS ATTACHED: • Resolution 2020-25 • Bid Tabulation • Engineer's Estimate POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to adopt Resolution 2020-25 accepting bids and awarding a contract for the Page Avenue Reclamation Project, City Project No. 20-06 to Knife River Corporation — North Central of Sauk Rapids, MN in the amount of $720,758.95. BUDGET INFORMATION FUNDING: BUDGETED: Fund 209 — Collector Streets Yes, but as a mill and overlay project. Fund #209 does have sufficient cash balances to absorb the additional costs for the reclaim project. CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2020-25 ACCEPTING BIDS AND AWARDING CONTRACT WHEREAS, pursuant to an advertisement for bids for the construction of Page Avenue Reclamation, City Project No. 20-06, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement; and Total Base Bid Knife River Corporation — North Central' $720,758.95 Northwest $729,954.72 North Valley, Inc. $799,969.61 Meyer Contracting Inc $832,989.23 Park Construction Company $880,942.13 WHEREAS, it appears that Knife River Corporation - North Central of Sauk Rapids, Minnesota is the lowest responsible bidder; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: 1. The Mayor and City Clerk are hereby authorized and directed to enter into a contract with Knife River Corporation - North Central of Sauk Rapids, Minnesota in the name of the City of Otsego for Page Avenue Reclamation, City Project No. 20-06, according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. ADOPTED by the Otsego City Council this 27th day of April, 2020. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: 2 CITY OF OTSEGO Jessica Stockamp, Mayor ATTEST: Tami Loff, City Clerk 0 0 (!) F LU 03 w Fa O m a�Qa. F3 m mU a mm $ 8 8 8 8 vm mg 8 mI� 8$$ A$ 8 R S E o ib i6 aS gr $ FS g 5f o c^iv g 2f x� 3 9 U x 8 8 8 d a 8 v $ 82 R m$ 8$ 8$ $ 0$ 8 8 m s$ m$ 8 z N a 8$ R 8 8 8 m A 8 5N m o r SR' 8 RG kd �dzolS R w 8 q S w R e "m; �NN" �+ u � `� N •� w 14ggi8�y, " `� �w � m A g C5 w w w 4'y g z 88 8 N. w o �81 S m X'i 8^ A R'i 7n Ti k Ei N n aSS 8 $'n Z = w 8 8 8$$$ m$% and $$ 8 8 A 5$ 8 8 8 8 8 8 8 8 8 8 8 8 o il V I l A 8 Z; A 8 3 , If I $ 8 8 8 S 8 m w 8 8 8 8 R" A 8 8 8 S A 8 8 8 8 8 8 8 8 a » ig» � g gi I g m 0 A$ A t � 8$ 8 8 8 8 8 8 0 8 Si 8 8 8 8 S 8 8 m 8 R 8 8� 8 $ S 8 p$ 8 8 S R y 8 ai mvl 9 m g 9 0 m n R n o 8 8 S 8 g M 5 25 q i3 v. to o R w 12 6 Sd X3st o U � m w 8$ 8 8 8 S 8 8 8 8 8 8 8 8 m 8 8 m 8 8 $ 8 8 8 8 8$ 8 A m S m R u a 8 8 p R N w g� N 1 g g tl g g 8 A i U 3 2 Y t z R a W IJ Yl € a S E F u 5 E uaUi 9 — _ C E p m g 5 o r y y e_ E E E N E 3 S $' u c A i l � u u — m x — m= w c a 3 0 o S m u> E v u $ n _ _ E a m m Z m n o x ^ x m a n c R n 5 5 E nn C E E E 3 O E o c c m 3 ry i i m m m E a m m ` t m m E ^ E o m m t E E E E E U ci 2 C 5 mH S0 9d m z R A A r A R r A A A m A R R S 8 R A 0 O E r PaWZd J F Z mo 'o LL a�aa m U y T rnfJ a COST ESTIMATE PAGE AVENUE RECLAMATION PROJECT (78TH STREET TO 85TH STREET) CITY OF OTSEGO Revision: 3/1712020 Bid Schedule "A" - Streets Item No. Spec. Ref Description Unit Unit Price Roadway Estimated Quantity Cost Extension 1 2021.501 Mobilization LS $24,826.14 1 $24,826.14 2 2104.501 Remove Concrete Curb and Gutter LF $6.15 1272 $7,822.80 3 2104.502 Remove Concrete Valley Gutter SF $2.00 794 $1,588.00 4 2104.503 Remove Bituminous Walk SF $2.00 2522 $5,044.00 5 2104.513 Sawing Bit Pavement Full Depth) LF $3.00 600 $1,800.00 6 2105.607 Haul and Dispose of Subgrade Excavation Material E CY $8.00 3255 $26,040.00 7 2106.507 Subgrade Excavation E CY $7.00 3255 $22,785.00 8 2211,506 Salvage Aggregate Reclaim to Stockpile P CY $4.00 3397 $13,588.00 9 2211.506 Salvage Aggregate Reclaim to Stockpile P CITY HALL CY $14.00 3397 $47,558.00 10 2211.506 Salvage Aggregate Reclaim from Stockpile P CY $4.00 3397 $13,588.00 11 2211.509 lAggregate Base Class 3 or 4 P CY $15.00 3628 $54,420.00 12 2215.501 Full Depth Reclamation P SY $2.25 19788 $44,523.00 13 2232.501 Mill Bituminous Surface 2.0" SY $14.50 69 $1,000.50 14 2357.502 Bituminous Material For Tack Coat GAL $2.15 1039 $2,233.85 15 2360.501 Type SP 9.5 Wearing Course Mixture 3,C TON $65.00 2337 $151,905.00 16 2360.501 Bituminous Walk SP 9.5 Wearing Course Mixture 2,B Trail 3" Thick SY $40.00 141 $5,640.00 17 2360.502 Type SP 12.5 Non Wear Course Mixture 3,C TON $65.00 2922 $189,930.00 18 2502.503 4" Perf PVC Pipe Drain LF $6.00 575 $3,450.00 19 2502.503 Draintile Connection to Existing Structure EACH $125.00 18 $2,250.00 20 2504.602 Ad'ust Gate Valve and Box EACH $100.00 6 $600.00 21 2504.602 Adjust Sanitary Manhole Frame and Casting EACH $300.00 4 $1,200.00 22 2521.501 6" Concrete Walk SF $7.50 1698 $12,735.00 23 2531.507 7" Concrete Driveway Pavement(Valley Gutter SY $75.00 88.3 $6,622.50 24 2531.618 Truncated Domes SF $70.00 329 $23,030.00 25 2563.601 ITraffic Control LS $5,000.00 1.00 $5,000.00 26 2573.503 ISM Fence, Type MS LF $2.00 500 $1,000.00 27 2573.530 Storm Drain Inlet Protection EACH $106.00 18 $1,908.00 28 2574.535 Stabilized Construction Exit LS $1,000.00 2 $2,000.00 29 2531.501 Concrete Curb & Gutter Design B618 LF $25.00 1272 $31,800.00 30 2575.555 Turf Establishment LF $3.00 1332 $3,996.00 31 2582.501 Pavement Message Arrow - Paint EACH $75.00 2 $150.00 32 2582.502 4" Double Solid Line Yellow- Paint LF $0.40 3821 $1,528.40 33 2582.502 4" Solid Line White - Paint LF $0.20 7462 $1,492.40 34 2582.502 12" Solid Line White - Paint LF $2.70 148 $399.60 35 2582.502 12" Solid Line Yellow - Paint LF $3.70 26 $96.20 36 2582.502 24" Solid Line White - Paint LF $3.75 132 $495.00 37 2582.502 Crosswalk Markin 3'X6' Blocks White - Paint SF $2.75 396 $1,089.00 38 2104.523 Salvage Drainage Structure Frame and Casting EACH $450.00 18 $8,100.00 39 2506.516 Sanitary Frame and Casting Assembly EACH $815.00 4 $3,260.00 40 2506.602 Repair Drainage Structure EACH $425.00 18 $7,655.00 Total - Bid Schedule "A' $734,144.39 Bid Schedule "A" - Streets $734,144.39 15% Administration, Legal, & Engineering $110,121.66 TOTAL ESTIMATED PROJECT COST WITHOUT ALTERNATE $844,266.05 S:\MunicipaMOTSEGO\392\2020\&PROJECT DEVELOPMENT\3-DESIGMOT392-2020 EngEsl.)Asx Page 1 of 1