Loading...
Item 3.3D Pay Estimate #1 Widmer Construction1. OtkgoF MINNESOTA C DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner November 23, 2020 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.3 (D) STRATEGIC VISION MEETS: I THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff is recommending City Council approval of Pay Estimate #1 to Widmer Construction, LLC. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Pay Estimate #1 includes payment for 50% of the watermain installed and 75% of the traffic control and mobilization. As of Wednesday November 18, 2020, the majority of the watermain has been installed but no testing had been completed yet. Construction will continue to complete the watermain installation and testing. Site restoration including final grading and seeding is anticipated to be completed shortly thereafter. Replacement of the bituminous trail near Martin Farms Avenue is anticipated to be completed during the week of Thanksgiving. In accordance with Minnesota Statute, the City is withholding 5% retainage of work completed, which accounts to $9,864.33 at this time. SUPPORTING DOCUMENTS ATTACHED: 0 Pay Estimate #1 POSSIBLE MOTION PLEASE WORD MOTION xSYOU WOULD LIKE ITTOAPPEAR |NTHEM |NUTES: BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 —Water Utility Yes PAY ESTIMATE #1 CITY OF OTSEGO 70th Street Trunk Waterrnaln to Otsego Water Tower#4 City Improvement Project No, 20.09 November 18, 2020 Honorable Mayor & City Council City of 016000 13400 901h Street Otsego, MN 5633D RE:701h Street Trunk Watermain to Otsego Water Tower04, City Project 20-09 Contractor: Widmer Construction, LLC, Contract Amount: $362,842.99 Award Date: October 27, 2020 Completion Dale: December 31, 2020 Door Honorable Mayor and Council Members: The following work has been completed on the above-rateranced project by Widmer Construction, LLO Bid Schedule "A''-Siretls REM NO. SPEC. NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT I UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 2021,501 .....,_ rdOBILI7ATION 1 L6 ;16,625,00 E i6,525,00 0,75 $ 11,643.75 2 2104.502 SALVAGE AND REINSTALL CONCRETE STORM CATCH BASIN 1 EA � f1,600,00 S 1,500.00 ......____.. S 2104.604 SALVAGE AND REINSTALL CONCRETE CABLE MAT m.._.. 10 SY _ 576.00 3 760.00 $ " 4 21a4.61._ B .,". REhtOYE AND REPLACE GRAVEL ROADIFIELD DRIVEWAY _...,..._ 1430 SF _... $123 S 1,787.50 ......_ ,_, $ 5 �6 2104.618 REMOVE AND REPLACE 3- BITUMINOUS TRAIL (FULL SECTION) 1076 SF 53,Do S 3,228.00 § - 2503.603 24°STEEL CASING PIPE(JACKED) 120 LF $460,00 S 56,920.00 125 $ 50,250.04 7 2503,60E DIP FITTINGS 6725 LBS 45.26 S 30,o56,25 2,863 S 15,028.13 0 26SCS02 „ CONNECT TO EXISTING WATERMAIN 1 EA $7,000.00 ; 7,000.00 D.50 E 3,600.00 _ - TE VALVE 4 EA §7,400,00 $ 5,600.00 2 S 2,000,90 10 2504.602 is"BUTTERFLYVALVE 4 EA 33,25Dy00 S 13,tl0pµ� .00 2 S 5,500.00 11 2504.602 HYDRANT 4 EA 53,677.00 S 14,308.00 2 5 7,154.06 12 4SO4.903 WWATERMAINCL62DIP 15 LF S38.03 S 570.45 7.5 ; 206,23 13 2504,803 i6"WATERMAtN CL 52 DIP „ 2066 LF $04.46 S 174,389.25 1,0$2.5 S 87,194.63 14 2583.601 1TRAFFIC CONTROL PORTABLE CONCRETE JERSEY BARRIER 1 LS S3,3%00 $ 3.318.00 0.76 S 7,400.60 15 .2663.602 120 IF $16.50 $ 1,980.00 0.75 f 1238 16 2573.502 STORM DRAIN INLET PROTECTION mm 3 EA $280.60 ; 750,04 ; 17 2573.603 SILT FENCE, TYPE tdS .........,. 2160 _....._ LF E2.25 4,860.00 1,080.00 S 2,430.00 78 2574.508 FERTILIZER TYPE I, ANALYSIS 22-10.10 EROSION CONTROL BLANKET(CATE ._..m, OORY 3) 720 LB $1.00 _m,3 S 720,00 f 19 2675.E 94 133E 6Y f1.58 5 2,110.B8 '- ; - 20 267548 .5 6EEDING .._.... _...,,,, 3 ACRE $4,a60,00 S 13.140,00 § _ 21 2575.500 SE EDING MLYTURE-.25-0 21 LB31 - 22 2576.608 SEEDINGMXTURE-26-td1 DD LB ;4.75 S 380,00 .5 - 23 2576.500 HYDRAULIC MULCH MATRIX 2750 LB $1,80 S 4,400,00 § . 24 2611,004 (PRESSURE, BACTERIA; AND CONDUCTIVITY) { ,m -�� TEeTIORARY- 1 LS .«,.. S1,OOD.00 25 23D0 ,504 TEMP BII'UMINOUSTRAly 2,e'THICK T 1076 SF '� $4.75 S 5,111.00 ; - 26 2104.818 REMO„ VETEMPORARYBITUMINOU6TRAIL, 2,0'TNICK 78 10T8 6F 51.25 'S S 9,345.00 § Bid Schedule "A° TOTAL Total Work Completed to Data LESS 6°% RETAINAGE WE RECOMMEND PAYMENT OF: APPROVALS: Totalerd Sohed010"A' S 307942,89 ; 1B7,286.00 f 3,62°842.99 ; 197.288.60 {„ 36$842.99 S 197,286.60 { 1971288,60 9,084.33 f 187,422.27 CONTRACTOR: WIDMER CONSTRUCTION, LLC Cer9fl, tan by`C. fredo". I c ify that all Items and amounts are correct for the work completed to date. signed:✓'' ,71:r�/ Tltlo.��Dale_ ENGINEER: HAKANSON ANDERSON Certification gfnaec We rocommen -ant for work a nill'r'4les as shown, Slgnedl_r.. Title:,— Y/W1t'C7L___ +64, Data OWNER: CITY OF OTSE00 OT538,01 PE.3ft PE- 1