Loading...
ITEM 2.1I-rEhA 2--1 3601 Thurston Avenue N, Suite 100 Anoka, MN 66303 Phone: 763.231 .6840 Facsimile: 763.427.0520 Tim COPIanningCoream PLANNING REPORT TO: Otsego Planning Commission FROM: Daniel Licht, ATP RE: Otsego — Zimmer Farms NW; Preliminary Plat REPORT DATE: 27 November 2013 ACTION DATE: 11 January 2014 TPC FILE: 101.02 BACKGROUND D.R. Horton Inc. has submitted application for preliminary plat approval to subdivide 26.8 acres at the southeast corner of Maclver Avenue and 70th Street into 53 single family lots. The subject site consists of two outlots established for future phases with previous additions to Zimmer Farms and one buildable lot from Zimmer Farms 3rd Addition. The application also includes a PUD -CUP to allow for development of the proposed subdivision within a Shoreland Overlay District and proposed lot standards. A public hearing has been noticed for the Planning Commission meeting on 2 December 2013 to consider the application. Exhibits: A. Site Location B. Zimmer Farms Development Plan dated 07/15/03 G. Preliminary Plat Submittal dated 11/11/2013 (8 sheets) ANALYSIS Previous Approvals. D.R. Horton received initial approvals for Zimmer Farms from the City Council on 25 August 2003 that included a Zoning Map amendment, an Environmental Assessment Worksheet (SAW), preliminary plat and PUD -CUP applications for the project. A final plat for Zimmer Farms was approved by the City Council on 22 December 2003 that included the majority of the subject site as an outlot planned to be subdivided as a future phase for townhouse dwelling units, Environmental Review, An EAW was prepared with the review of the Phase I applications and its scope included the planned development of future phases of ZirnmerFarms. The plan for the subject site reviewed as part of the EAW was for townhouse development of 158 dwelling units. The City Council adopted findings on 25 August 2013 that the proposed project did not have potential for significant environmental effects and that an Environmental Impact Statement was not to be required. The current preliminary plat application requires no additional environmental review given the substantial decrease in the number of dwelling units now being proposed. Comprehensive Plan. The 2012 Otsego Comprehensive Plan includes the subject site within the West Sewer District and guides the area for low to medium density residential uses. The proposed subdivision of single family lots based on the lot requirements of the R-6 District is consistent with the future land use designation of the Comprehensive Plan. City staff has completed an analysis of available sanitary sewer capacity within the West Sewer District and determined that sufficient capacity exists to provide service to the proposed preliminary plat in accordance with the policies of the Comprehensive Plan. Sanitary sewer service is only reserved however for subdivisions with approved final plats that have paid utility availability charges. Zoning. The subject site was zoned R-6, Residential Medium Density Residential District with the Phase 1 application approved on 25 August 2003. The R-6 District allows for single family dwellings as proposed on the current preliminary plat application as a permitted use. The subject site is also with in a Shoreland Overlay District of a Natural Environment lake located west of MacIver Avenue. A PUD -CUP is processed concurrent with the preliminary plat application to allow for the proposed subdivision under R-6 District standards based upon the density analysis done with the initial preliminary plat applications approved 25 August 2003 that included the subject site being developed as townhouse dwelling. The current preliminary plat application for subdivision of 53 single family lots likewise complies with the density allowed with in the Shoreland Overlay District. Surrounding Land Uses, The subject site is surrounded by the following existing and/or planned land uses. The single family lots proposed to be subdivided within the subject site are compatible with existing and planned land uses in the area, Direction Land Use Plan Zoning Map Existing Land Use North MD/HD Residential R-6 District A riulture East LID Residential LDIMD Residential R-6 District R-4 District Single family dwellings South LD/MD Residential LD Residential R-6 District Single family dwellings 1f' eSt Albertville Albertville Single family dwellings 2 Access. The City is proceeding with plans to improve and construct 70th Street as a collector street from Martin Farms Avenue to Oakwood Avenue in 2014-2015. When complete, this project gill provide a much needed east -gest connection across Otsego and allow residents in the western part of the city greater access to commercial areas and TH 10 1 for em plo meat commuting. Flo access to MacIver Avenue or 70#x' Street i allowed from the subject site based on these roadways beim designated as residential collector streets by the Comprehensive Plan and the access spacing requirements applicable to streets with this designation. The applicant is required to pay a collector street access fee as a condition of final plat approval. The proposed preliminary plat will be accessed via connections to exiting 67th Street and Marlowe Avenue within the developed areas of Zimmer Farms. The access points are consistent with the locations identified on the original Zimmer Farms development plan for the subject site. Streets. All of the lots within the preliminary ,plat will be accessed via public streets. The proposed public streets are 28 feet wide with concrete curb and gutter within 60 foot rights-of-way. The pians for the proposed public streets are consistent with the requirements of the Engineering Manual and are subject to review and approval by the City Engineer. There is one cul-de-sac street shown on the preliminary plat with a 200 foot length and 60 foot radii for the right-of-way at the tura around in compliance with Section 21-7-6 f the Subdivision Ordinance. A five foot concrete sidewalk is provided on one side of all through streets consistent with the Engineering Manual. Street names will be established at the time of final plat approval in accordance with Section 21-7-7.Q of the Subdivision Ordinance and the Wright County grid system. Lot Requirements. The -6 [district establishes the following minimum lot requirements. The proposed single family lots shown on the preliminary plat all conform to these minimum requirements. The initial preliminary plat approval for Zimmer Farms included a 1foot reduction in the required setback for the Dots backing up to MacIver Avenue. The reduction was allowed as D.R. Horton was required to dedicate additional right-of-way for the construction of the collector street, which was off -set from its original centerline for the portions of the roadway overlying the boundary between Otsego and Albertville. Proposed Lots -20, Block 1 abutting Maciver Avenue are a portion of the property from which D.R. Horton dedicated the additional right-of-way and the reduced setback will be applied to this area as well as part of the PUD -CUP. Grading and Drainage darns The applicant has submitted grading and drainage plans for the proposed preliminary plat. The grading and drainage plans are subject to review and approval by the City Engineer. The developer will also be rewired to pays a stormwater impact fee at the time of final plant approval. 3 Lot Area Lot Width Lot Depth Setbacks Front Side Rear Interior 9,000sf, (ret) 60ft. 100ft, 35ft. 7ft. 35ft. loft. interior 6 5ft. collector street corner 90ft. The initial preliminary plat approval for Zimmer Farms included a 1foot reduction in the required setback for the Dots backing up to MacIver Avenue. The reduction was allowed as D.R. Horton was required to dedicate additional right-of-way for the construction of the collector street, which was off -set from its original centerline for the portions of the roadway overlying the boundary between Otsego and Albertville. Proposed Lots -20, Block 1 abutting Maciver Avenue are a portion of the property from which D.R. Horton dedicated the additional right-of-way and the reduced setback will be applied to this area as well as part of the PUD -CUP. Grading and Drainage darns The applicant has submitted grading and drainage plans for the proposed preliminary plat. The grading and drainage plans are subject to review and approval by the City Engineer. The developer will also be rewired to pays a stormwater impact fee at the time of final plant approval. 3 Drainage and Utility Easements. Section 21-7-15 of the Subdivision requires that stormwater basins and wetlands be included within outlots platted and deeded to the City, although the City may at its option elect to require only drainage and utility easements. The stormwater basin for the subject site is to be located at the northwest corner of the preliminary plat and is to be platted as Outlot A. Drainage and utility easements are also shown to be dedicated at the perimeter of all lots as required by Section 21-7-15.A of the Subdivision Ordinance. Outlot A must be deeded to the City at the time of final plat approval and all drainage and utility easements are subject to review and approval by the City Engineer. Utility Plan. The applicant has submitted utility plans for extension of sanitary sewer and water utilities to serve the proposed single family lots. All utility plans and issues are subject to review and approval of the City Engineer. The developer will be required to pay the Sewer Availability Charge and Water Availability Charge in effect at the time of final plat approval. Landscaping. Landscaping to be required for the preliminary plat in accordance with Section 20-16-7.0 of the Zoning Ordinance is limited to provision of two trees per lot. Additionally, Section 20-16-7.D requires a berm/landscaping be installed along the rear lot lines of Lots 1-20, Block 1 abutting 70th Street and Maelver Avenue. A landscape plan for this required buffer yard has been submitted and is consistent with the Zoning Ordinance requirements for the location and size of the plantings. Park and Trail Dedication, The Future Parks and Trails System Plan included in the Comprehensive Plan does not designate any area within Zimmer Farms for additional park land acquisition. As such, park and trail dedication requirements for the subject site will be satisfied by payment of a cash fee in lieu of land calculated on a per lot basis at the time of final plat approval. Final Plat approval. Upon approval of a preliminary plat, the developer must submit application for final plat, which is subject to City staff review, and approval by the City Council. The final plat approval includes execution of a development contract to memorialize all of the conditions of approval and provide for payment of applicable fees. RECOMMENDATION Zimmer Farms NW is consistent with the provisions of the Comprehensive Plan and requirements of the Zoning Ordinance and Subdivision Ordinance. The change in land use from townhouse dwellings proposed in 2003 to the current plan for single family lots reflects current market conditions and trends as well as indicating improving economic conditions, which is positive for the City. City staff recommends approval of the application subject to the stipulations outlined below. 4 POSSIBLE ACTIONS A. Motion to recommend City Council approval of the Zimmer Farms NW Preliminary Plat and PUD -CUP subject to the following conditions: Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. Street names shall be designated on the final plat in accordance with Section 21-7-7 of the Subdivision Ordinance and Wright County grid system, subject to approval by City staff. 3. All lots are subject to the following minimum requirements of the - District: 4. The design and construction of all streets is subject to review and approval of the City Engineer. 5. All grading, drainage and erosion control plans and issues are subject to review and approval of the City Engineer. 6. All drainage and utility easements are subject to review and approval by the City Engineer, 7. All utility plans are subject to review and approval by the City Engineer. 8. Park and trail dedication requirements shall be satisfied by payment of a cash fee in lieu of land calculated based on the fee in effect at the time of final plat approval. 9. The developer shall submit application for final plat approval and execute a development contract in accordance with the Subdivision Ordinance, 10. The comments of the Engineering Review dated November 27, 2013 are addressed subject to review and approval of the City Engineer. B. Motion to recommend the application be denied based on finding that the request is inconsistent with the Comprehensive Plan and does not comply with the City's official controls. 5 Lot Area Lot Width Lot Depth Setbacks Front Side Rear Interior 9,000sf. (net) 60ft. 100ft. 35ft, 7ft. Interior- 20ft. 35ft, 70, St.: 65ft. Iciver Ave.: Corner 90ft. 4. The design and construction of all streets is subject to review and approval of the City Engineer. 5. All grading, drainage and erosion control plans and issues are subject to review and approval of the City Engineer. 6. All drainage and utility easements are subject to review and approval by the City Engineer, 7. All utility plans are subject to review and approval by the City Engineer. 8. Park and trail dedication requirements shall be satisfied by payment of a cash fee in lieu of land calculated based on the fee in effect at the time of final plat approval. 9. The developer shall submit application for final plat approval and execute a development contract in accordance with the Subdivision Ordinance, 10. The comments of the Engineering Review dated November 27, 2013 are addressed subject to review and approval of the City Engineer. B. Motion to recommend the application be denied based on finding that the request is inconsistent with the Comprehensive Plan and does not comply with the City's official controls. 5 C. Motion to table. C. Lori Johnson, City Administrator Tarni Loff , City Clerk Andy MacArthur, City Attorney Ron Wagner, City Engineer Mike Sul, D.R. Horton Inc. Fran Hagen, Westwood Professional Services, Inc. R • Overview ^ 11'8502:' 1' I Y ■Ujr J■ -J 7f t p Legencl DZI a �- ■ -� T— , 5 Puffs ` . L� E�3 "• .f f irk r .' y p 'n■■f� CTYC L AW SJ E9 r L6 } J r ■., 4q�F�ji f T+++yyyPC ? }{ jr.y�{ .4 7.■! ' A. - tl e �� ..-.�. +fir L I] . ' , City/Township Limits - _ C t-. { -'' ! - -- Parcels 48i I uj EJ r= _ 1k ']Tol AD WT 344 ER 71 ' # i -,OT T '4.FV TH' T # '•yu• _#1Q.0,T���,i l ,. . LU ' 91, jlu ° IF - y 00 HS tN ui Co 'N.F. 'yy '14.4800,042. a-0 42. 2003 Legend Development Da to TOM sit AACA r�..� W-* are" � AC- PR'� : 4+3,#4-t III IRG10FtOLhl F•r%K1 F`14L dpi" # Power P# corST9112 zobw4xdb IE? CO sc;dAPI ,[ r" L F 3 "!;F, �3 Di•* PM mak. LLC 2w C IS V. 1.F � LWR!�� r � � tcpj P.ww (934) 9.cg- %3 QVCRA" 1 4,2"s I 2) g4g-.31 ro rAL F%iAw 1 r 143 NCRAES C ,#vrtl: %i sajw CLC FA.V0-If Ss *s 43 —4.4— 1� Cas L�rtLxt 13 xM *%LiIIIII; 1 Frgf t 4- dowl sph GM f"lr {R A�.I E40s AI UP -L X5344 Lor wor" d5 FT+— 300 Fr. P+- (431) 937--5150 cd':�* or w4vcxtd Lor cpqEFTH 125 -r'f, —3Z5 F F. - (9:5 2) S3 ?—saZz LOT ARICA 9a-331 SJr7?.01 " 561r* *l�c�k Q�: 'i ■ � Cd?Q c R W30di ,WRAC LCAT A -I 1 7.125 S.ir. reAcxIs (MWS) r YAA a 35, YARD 2V w kai'L 1500 MN ISM r r1 S 40 MACK S t Com) 35' ( YA rp 25' ���I I 35 ' ( f-OATE) 2.V RE AJR 20' . PVSUC A PF.VArE SFRZErS MC ZV SACK do L�t'. ra II �,�. w�N" AirlL S AcU 1 - -PHA I LOTNk k • o - Z ti laIF} F r e r , ALF U%Jj MW i f 1 r7 MI . J +_ i T fee jCLRtaT 41 If Xa _ r • - - F 1 °i r drir 1 i�4f J 4D L LZ } 1 q N t' ' - LF a ■ i} I9 AA t - , IE If 1 _ _- - " I IL ■ A IS— RL LU 25 do — --31W 415 — -� —Ip III III mdi IL 4 - - — - 0? Z- �+ Y F 2013 Aest%ood Profess-10nol Services, Inc. for Zimmer Farms NW Otsego, MN Prepared for: DR Horton, Inc. 20860 Kenbridge Court, Lakeville, MN 55044 Contact: Mike Suel Phone: 952-985-w-7823 Fax: 9,52-985-7800 Minnesota Suite 100 Sheet LiA Tabl-L- DON 1 Cover 2 Existing Conditions 3 prellire- �ncry f ot Prell im in 'I ry Grading, Drainage & Er -o- 5 Pr- ellirninory Utility Plan 6 Preliminary Lcindscop-e Rcn —7 Street Profiles h I I I p � e I A I I h sl I � � I � _ A I I M f I I 1 ..iF �t iE � : � fT �� - �--fly° ��.!!� a * a �- �a� � �! a% ��R �� fir• �� � a—!1. �� �F �� �" .. y��1� � �:a �ys� � if f s�� .ems � s� � e 5 • � -"_ _. - - - • "�` �r `. _ � r' - /�; � ilr R dye ^� - _ _ � - _ , - Ze - _ .. - � �- _ �. 1 " e 77 a � IL L • - - s-0IF I kkk 9 y oe del a e �a r T • r V- a -Y tiFY- . r h it y 1 ■ ' - y. _ - - - F -a - �• - _per-. _ : y r I il c:.� -iy�' -�� a t y+q _ — _ �,� y -,Ii �l�+J�-+IL P'' ! ,I- 1.• - _-7. I a ■ - - - - - - - r 9•il�L�r � 1 I .. de x IL _ 1 _ _ - tis - _ _ Iir- ol --- r / Cl Nib jer • P r L fp - - � • ; - '� F '�• cif, ~y � _ � �. _ � tj Ll IL � T•a _ • _, a • a ea �r if� L ti r fi ip �• it a .r T �' C •,r _ - -L— _ L - '" a. w + , jr jr IL I - • _ - _ - — -er- _ - - 4, -=rte-- _ _ - , ,: � it * � � _ _ a. +, a _ — a_• - t f may, , ; 'y s- �� •' ems... r y. � �. � .� � L •' - - � } _ _ �n .�, ,` I Jia-'��� -_ - —_--- - _ i t _ • ; ��� A•�- �.}- fir! - -` �=� .�� r+ -- �-- ! �,� ��� -� � .�- � L_ aA _ {• i -_ + L 14 jr 1. y ■ •F P he J 1'FA .t- * I I - }� 12 t Iry r' — ! d I IJ# P L P r J R. r / t IF 70TH i. E� �r- 782 449 _ � F 'rte �_. .'_� . J-� ': � r rF f F, E1_`! f �_' ' �� L.; Jz4f■i QIP 1� i# _ — i+ --- Ika jr 12 r �' �_ '.�• �r }� �� •� -ter i L y . k 1 p~ r? z _ __ / II> _ - _ J 14 • i , _ rr i _ may �. a #ice y - �I �- - LY-T. � �-f i } �' f . T I y ' — 19 } d x a A31 11 Ale I 1 ~ y - -- C y ! I II _ . r N - f* - -- -- - - cif . -- i acvp 4 J 17 49 fl EL e5 r I - 9 r ; 1 21 _. ■ LL 4.1 10 6 ✓ _ A ■ LI _ • �'� _ I ° 't F �, T ,f' � + f �''� fir 3 } 44��1 } 20 ,1 I t ff 51fI f _ .22 "4•r%T a £' Fi ■5 rcTP AFLF24 �7 .a 14 11 t3 CST ` _ IJjr ArtL F i� yrF1 12 f IL o 2 01.3 Wes t%gg ood Professionol Services, Inc. I 1 'LT FENCE TYP) _ `j,�a+rAw0S [EI - � - � �-� � � �� ,_ .��•T ��-.rte � � � -_ �. _ 1 - ' TSH T.CW OPEN *Bmq - .-. _2' � • - - - .: •k d7f 9 344— _ - Fes. 2 1 1 ! ■LET r "� aj3 -4 §42 EIL 1010 fl! ki %A .1 _ - ! — H WL 1 A,ell, W1 Ci %P 4 k �• � X � Irl a2 r �.�"� 5 y -- �� - __ - - 4 _ _ -_ _ _�_._z �, � � I t _7 r ! orif 2 2 _' , 'S `,.. _ , 5 __ • _ fes'' ��ti r d II '0 cn i, OCK CC _j , y r • , _•5 TR .5 d . '_-._ - - EN TAN � C J . I }: r, I LV ......... -Ij IL I. [�} cru .. 4 i ' -' _ _ _ CO t _% z '1, 11 :n I F 1 4 Q 1� un r 03 yy � • i T r _ CD I L LA , � : IA � � ems.. r+ .� � � .F �. �• �.. �`~ Y �Y - �1�, •�,�r _ _ � P _ _ a Com. ci ' I ps ■�. = _ :l -- , a ' ••i•• ` kIJ _54 54 IML -' _ r+isG _'tea-, 7;4 f I�l . q � s � _ , f f_ - a _ � • tea, �. r• s rT ^� � , •� � 1. X _ Ips- F ._ - •'- - j _ '_ .- r L, - �. :i S •. ' CV -42— w 31 • � J er jig 3, eZL _ `�_ �•;� iii r � +� �� � „`; �� �• � � I �f,.a � -� - i � �3. � � • _ _ ,. ,, �, k _ _ I - _ _ I s _ • I r1f, I -7 _ •�- I. - _ � � - . I �•-� �.'�.,. - r _ � � a p r - �. d �, I - ��� �`g I r ti _ ` ' _ .rr ,� - � fir' - d �' i.ei Qn s I 1 201 0 weestw%ood Pfof-ess'ortcl 'Sefv�ces, rnc. | / | OU TLE T i of 83 f IL 10 IF N IL IL —CO[Nb IEC t EXISTING IF PAH 13 14 IIE UF qL RE=1362LO %L 16 E M71.5 IE=960.2 RE 67.S3, - or ,re 9 _J 13 14 H Al KOH 22 2.3 �CONNF—CT TO EXISTING 8 WA fZRM Al N do Ar 24 45 Ir of 00 If P 14 do I jo 4e vk Jr, r oll �zm» u'est°oou P,ow,uo'o"m mv,vices. Inc, Coll 48m""n bemre o�g'"g^ 811 or C01181 I.Com Common Ground /u/m"cm 9 . / . | ' | � | ~~'�''^' --�� U �.\ 70TR ST. RE%W91 944 A936 Jj 4 9.519 CO q WC 10 14 06 LIA VQ CO Cp 19 tu C" 9709 ir 33 V. bs 21 22 IF 24 Jp iLL �, I sr mp I c 2013 serv;ce��. rnc. 945 2 4 5 6 7 9,45 12 13 H.P. ELEV '365-'J-5 STREET 1 1000 Fi.P- STA 7+25-00 PVI STA 7+70.00 L CYT LO kr) LD Ln vq rl- Lo Ln Lo PM ELEV = S168.06 r-- w Lr� 9 9 Cd r-� Q3 Lrl o i I LO -f LO m I -i LA Ln ON cm C- 9+ lqt , U-3 Qn b Ul CFM m U-2 a] c- Cn L. Cn Cr CD 2 m r7. Gn �n (A 990 990 H. P. El E V 9 57.38 9190 -YC C)o P:5+.P, STA 15+1665 CO L -P- ELEV 955-39 985 fnVI STA 130-00 ELEV = 957m4g 985 KiD n m Lji c- L -R- P%vi 5TA 9+50-00 STA 8+75.00 P L-. )V FLEV 956 .69 A -0K- -2,5- LOLOD C'. ah -PVI ELEV = 956.84 L -.P- STA = 13+83.06 19m45 50.00, vc C�p + 00 :50. 00, vc A 0, 4-407. PM STA = 13+83.00 980 La CD to ui C6 L.P. ELEV 956-18 X 3 4.0 9 -30mcol vc P�A ELEV = 956.61 tn Li -r- + LO 1-50.()o, vc H.P. E L EV X57..39 A Dm 1.207 975 97 5 ti CD H. P. IS T A - 12+44-98 K 50-ooq 41.6 5 vc cn PY STA - 12+45,00 -0.60% La Zn PVI ELEV 957.44 --Ems--D- 970 C� 970 ? 4- ci fo CD cn K 10.42 LD C, to u- C3 ot CDPC) Ui (D rn K 24.97 cd C) C6 C3 r- LO 125-00' VC 4?. CD j.6 Ln PVC = 12+30-00 + ur) + tn Cn -t- LO 965 -3 ja EILEV 956-39 CD M P V f = 12+60-00 L.P. ISTA 3+65-47 H.P'. ELEV = 972- 35� 150.00, vc P\l STA 1+00.00 go.00, vc 9 60 ELEV 957.35 H. P. STA 5+33-00 It PV EILE V 970.34 HLP. ELEV = 971-96 9.60 0- La P" STA 5+33.00 ELEV 957L.35 L -P- STA +45"OQ, W La I--- > > 960 H -P. STA = 5+33-00 A.D. 4.03% PV E-LEV - 972,60 P�A STA 10+70.00 00 -.2- > Li wLJJ CL K 31.02 P%l STA = 5+78.00 P " SLEV - 957-92 Uj L 0- 6074; 955 C). 60% 50-00v VC P\A EILEV 971-69 50.000 C)-60% IN PVC = 4+88-00 9,55 H.P. ELEV = 973.Cr9 A.U. -4.40% L.P. ELEV mm 956-10 950 CLEV '970�71 PVT = 54-78.00 PVC 9+9500 PVT 11+45,00 M. P• STA = 3+38.45 K ;_- 20.4 5 L. P. 5 TA = 10+10.00 ELEV 970.69 ELEV 971,90 PV STA 12-+ 05-40 PV STA = 3+25.00 P VC 5+33-00 Phi STA 10+10.00 9-1 'kir Q'71 Qfl ELEV = 9 6 0.4 5 PM Fl FV 9E-38-494 9 5 0 PM ELEV = 97?3�21 PVT 6+23-00 P4'1H-EV SS6.03 • P% A-0. = -2�607o' ELEV - 971-195 A, D. 1. 2 6% Fl, K = 19-22 ELEV ;-- 969.4 41,67 945 PVC y 3+00.00 PVC 9+85.00 Phi3+50.00 PvT 10+35.00 ELEV 972-71 ELEV = 956.18 940 ELEV 973.06 ELEV = 956. 18 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 945 2 4 5 6 7 9,45 12 13 H.P. ELEV '365-'J-5 Fi.P- STA 7+25-00 PVI STA 7+70.00 PM ELEV = S168.06 A.D. ;_- -1-387. STREET 2 990 990 -YC C)o CO 985 985 Lji c- Up L: Up C7' LOLOD C'. ah 980 PM STA 1+00-00 C�p + 00 :50. 00, vc 980 P\l ELEV 974.82 CD to ui C6 L.P. ELEV 956-18 -r- + LO 16727 L.P. STA 1+ , 975 975 ti F\,l 5TA = 11+71.40 PV ELEV La A. 970 970Lo K 10.42 PVC = 11+46.40 125-00' VC P V -T = ll -+96.40 965 965 L -F. EUEV = 970-07 90 0' -3 ja EILEV 956-39 L.P. ISTA 3+65-47 H.P'. ELEV = 972- 35� 150.00, vc ELEV 956-59 9 60 P" ISTA 3+65.00 0-69.44 H. P. STA 5+33-00 L.P. ;ELEV = 9ELO-42 11 9.60 Phi ELEV = P" STA 5+33.00 L -P- STA +45"OQ, A.D. 4.03% PV E-LEV - 972,60 P�A STA 10+70.00 00 -.2- K 31.02 P " SLEV - 957-92 955 PVT = 4+2750 PVC = 4+88-00 K 10&85 950 CLEV '970�71 PVT = 54-78.00 PVC 9+9500 PVT 11+45,00 -- 950 ELEV 970.69 ELEV 971,90 PV STA 12-+ 05-40 9-1 'kir Q'71 Qfl ELEV = 9 6 0.4 5 PM Fl FV 9E-38-494 945 2 4 5 6 7 9,45 12 13 2013 Viestviaod Profcss-oncll IfIC. NOTE: ROCK CQt4STRUCTION F-1'4!TR4I`l%'CE 5HOULO t3 -C A HEIGHT (IF 1-0- A'� O CO3h-1TA'N MAX-VU1.1 57DE SLOPES OF 4-- 1. f 0164 ROCK CU45T-RUCTI . I E rA TR A14 CE STRAW OR AOCO FL13ER 15m OR 1240 DIA- ROLL Ery (A-0S:E0 I'Lli PLASTIC OR POL)'ESTF-114 t.ETTl.N'(3 4'' X 4" TRENCH DA FILLED 0,PIER IEROS10r4 COt4TRCIL 8 LANXE T (SPEC. 3 8 8 5) NOTE: CATEGORY 3 EROS!`,l C01UTROI.- HLAI`;KIFT (sqm z885) PC 14T ol A" PC -"A T .. 8' m 8", 11 GA- STAPLES SPAOED In- 0'4 ;7 0 N OE 14 T EA ir / 2"x Z ­x 18" Lei 'A001DU4 STAKES AT 2'-0" SPACJ'.NG- D.RoIE Ti-iROUGH �iETTI-NiG AM) Fli3:ER ROLL_ DIOROLL BLANKET SYSTEM (TFE .3 5,PEC. 3889) F0.'JT "A" ICU ST BE H'GHER THA!4 PONT "B" TO U45URE THAT WATER FL06S O'vER TtiE Oij D -KL E AINE) 1`40T AR IID THE EliDS. OtOROLL BLANKET I SYSTEM I POND OUTLET EL.E VA-nON= (SE -E GRAD:ING PLAN FOR E L E VA Ti ON) Poi R0 130TT0l-4=(SEE GRAD'r4AQUATIC -SAFETY EIENCH PLAN FOR ELIEVAT10-N) TYPICAL PON D SE CITN ON LOT BENCHING DETAIL CA P A &On R. 0- W- P IL 14-W E10C Icip 'O (T-.rp,) 2x 4V PER FT. (EVER Fir. SPECiFICATIUNS X'$ -D STAI DARQ AJ5C VA.O'UAL. OF STEEL CO',45TRUCT)071 . 9TH EDITION. AWS 5 TR UC TU R AL A'EL 1) "--G C - STEEL . D1.1 --a-;. 29 CFA 1926 - OSHA SAFIETY "I'D NEXLTI-A 'STAINDA.905 DESI G4 LOADS ALLOWAOLC AXLE %'EJGHT LOAD fl/o SAS ETY FACTOq n10 WATER FLOP' PA7F- 0-476 cts. 0 Y h".d (THl9CXJSFi FOLYE5TER 5L-EF%lE) MAX-LAUM 0�IERFLDK RATE 2.14 tfs 0 155 head 5TREET M47RACTOR TO I'NSTALL AFTER CURB & -CUTTER IS INSTALLF-0. k AJINTM'q Up'lTlL VTF- IS STAB LIHO- �Jl- - — TE.5 S %S 7A -7- A 7 S 7 :6Ez--r 2 % "m ir 'S T --,r C 7 'V �'-Z e -0 X- TL - :--E T.L L-2 A4 -3 -IN —E;i -3 :-;Uw � 3 't --r FL Z. -r- 4- F-1 T r-'. : V.!Lb%'l �bdl.—Esl —, 7r F .1 f-= �4-w E C% %I JL A N 3 ral"E.%ZZ" ,F i Z Ll 1 :wil -4 E -Nill 5 1 E VILW VID-v c sc k- El 3di.:%mmlEQ Ef c IE j--SD4AR`-E SYSTEM WITH DOUTLE- L 1-7 -J. T zz%. L S T N11 120 MT. V-PEA.R;NG CCkJuc UNDOT SPEC 2350. LVA'E45030B TCA COAT. LP! -.DOT 2357 2 1120 13lT-UV.N'.0US BASE C0U-R5;!E: V! -400T SPEC- 2350, L%,%W3503-09 Gm CjL-,45S 5 AG ELATE RASE (100% CRUSHED) -24" Mr -001- 2211 CLASS 3/4 AECATE SUU-SASE GEOTEXTILE FAUR-C. FOR CLAY 5-v$scti-s - M-R&Fl 50OX TYPICAL PAVEMENT SECTION w8'" NO SCALE NIBLY r ROAD ORA114 CG -23 -M.MCO' CL)RB INLET PRO TECTIOU —POS' Y-7 -7-7 6, — `oil STANOAFtD DETAIL T4t-%CH '&Th NATiVE E?,' NOTE: A C, y; ­ IG F1 T SHA' _1 E' S �', AN EZEA 'At eeLL SOT A B :D T je..% -3 CAN E3 E 12; 1! T ?t.. �T C�F F Y STAT L S T IF E% C E Smj o' --:L BE 1p _.A C ME U, C-4 P C -S TO Q Alp: V Z A, L rr­ 'S 'T FEE --%CF S- 73 L;7 K, SG -F G r T'- -P, EjOTTC nP MACHINE SLICED 5'LT FENCE w I I (HEAVY OU TY) .1 I- (YAR:ZS)— I ' El- OF (;l'R0LJND AT �NALKCJT 8.2' BELON GAI?Ai:�-: SLAB 0.50 TOPSO L U4LESS 01FIAERNSE I A L K C �T Z' B�ET LC) A? AC: IAI�3 4LE SS oj[j� R 6r BASE_ FLOOR -p PAL WATCH PROPOSED URI N: p S— RED FILL �SUITABILC DEAR -NG SOL (TY -P-) (VAR E'S) I I 4# 0,5* TORSO 1, ENG-%vEERIED Fltl­ Sli L T f -.BL E 0 E A.9 N G , 50'L (T -r -P.) 15 5b H CL OF GROLIND AT 1­00i<OUT .5 C)L BULD-N GARAGE SLAB UNIFL ESS 0THERf%-lSE NOTED- OTED- ----------_— �f ------------ BASEVER7 BASEVER7 FLOOR r-- 4 On (VAR -ES) 0 67' -7