Loading...
Item 3.4C Pay Estimate #2 Water Tower #4ip TY OtSe F o MINNE50TA <_ DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner December 14, 2020 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.4 (C) STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff is recommending City Council approval of Pay Estimate #2 to Widmer Construction, LLC. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FICATION: All work for the 70th Street Trunk Watermain to Otsego Water Tower #4 project has now been completed. All testing has also passed. Pay Estimate #2 includes payment for the remainder of the watermain, traffic control, turf establishment and site restoration including the paving of the bituminous trail near Martin Farms. This pay estimate includes Change Order #1 for adding impact attenuator systems to the end of the concrete jersey barriers along CSAH 38 as required by Wright County right-of-way permit. In accordance with Minnesota Statute, the City is withholding the maximum of 5% retainage of work completed, which accounts to $17,812.67 at this time until final acceptance in the spring of 2021. SUPPORTING DOCUMENTS ATTACHED: • Pay Estimate #2 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES: Motion to approve Pay Estimate #2 in the amount of $151,018.43 to Widmer Construction, LLC for work completed on the 701h Street Trunk Watermain to Otsego Water Tower #4. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601— Water Utility Yes PAY ESTIMATE #2 CITY OF OTSEGO 701h Street Trunk Watennaln t0 Ot6 ego Water Tower #4 City Improvement Project No. 20"09 December 7, 2020 Honorable Mayor & City Council any of Otsego 13400 9011 Street Otsego, MN 66330 RE: 701h Street Trunk Watermain to Otsego Water Tower N4, City Project 20-09 Contractor, Widmer Construction, LLO ContraotAmouM; $362,042.99 Award Data: October27, 2020 Completion Data; Dacamber 31, 2020 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Widmer Constructon, LLC ITEM NO, MNDOT SPEC, NO, REM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACTUNIT PRICE CONTRACT AMOUNT USEOTO DATE EXTENSION 1 2021.601 MOBILIZATION 1 LS 415,526.00 S 16.526.00 1.00 S 15,526,00 2 2104,502 SALVAGEAND REINSTALLCONCRFTE STORM CATCH BASIN 1 EA 57,600,00 5 1,600.09 3_ 3 2104,604 MVAGEAND REINSTALL CONCRETE CABLE MAT 10 BY $76.00 $ 750.00 10 S 750.00 4 2104,610 REMOVE AND REPLACE GRAVEL ROAD)FIELD DRIVEWAY_ 1430 SF $1.26 $ 1,787.50 1,740 $ 2,176.00 5 2104.618 — REMOVEAND REPLACE 3•01TUMINOU6 TRAIL(FULL ( 1976 SF $3,00 5 3,228,00 1,220 ._3,669.0060.00 $ 6 2503,603 24°6TEEL CASING PIPE(JAOKEO) u 120 LF $466,00 $ 66,920.00 125 $ 68,290.00 7 2503,8o0 DIP FITTINGS $725 LSS $5,25 $ 30,058.25 6,025 $ 31,631.25 a 9 2504,eD2 2504.602 CONNEOTTO EXIOTNGWATERMAIN 6°GATE VALVE 1 EA 57,000,0o 5 7.000.00 1.00 3 7,000.00 4 EA $1,400.00 3 6,80moo 4 $ 6,600.00 10 2504.602 4W BUTTERFLY VALVE 4 EA 53,250.0a 3 13,000,00 4 $ 13,000.00 11 2604.602 HYDRANT 4 EA $3,6T7.00 $ 14,300,00 4 S 14,308.00 12 2504.003 WERMN GL 6'ATA62 DIP . W T � M A DIP 62 16 — 2065..... LF LF $38.03 i84.46 $ 670.46 $ 174,380.25 _ 20 .2062 ...5 $ 760.60 174,135.80 14 2563.a01 TRAFFIC CONTROL — 1 —L,�,y. LS $3,318.00 S 3,31e,00 .�,., 1,00 k, S 3,318.00 15 2563.602 PORTABLE CONCRETE JERSEY BARRIER 12D LF $16,60 3 1,980.00 720 _ $ S 1,980.00 16 17 2573.602 2673.603 _ STORM DRAIN INLET PROTECTION 61LT FENCE TYPE 3 2160 FA LF $260,00 52.25 S 750,00 5 4,8e0.00 3 $ 760,00 2,220 5 4,996.00 40 2574.600 FERTILIZ5R TYPE I, ANALYSES 22-10.1a 720 LB $1.00 S 720,00 400 5 400.00 19 2576.604 EROSION CONTROL BLANKET (CATEGORY 3) 4336 BY $1.58 3 2,110,08 1,032 3 2,894,69 20 2576.505 SEEDING 3 ACRE $4,300.00 S 13.140.00 0.06 $ 4,181.00 21 2576.608 SEEDINGMI66RE-26-i31 21 LB 54.48 S 03.66 21 3 93.68 22 2575.508 SEEDING MIXTURE -2626-__..,_ .141 .-_........_,_ EO LB $4,75 _0 3aU.00 3 .00 ..._ 100.00 $ 475,00 23 2576.608 HYDRAULIC MUMATRIX LCH 2750 La $1,60 $ 4,400,00 2,744 3 4,390,40 24 2 S 2611,000 2300.604 TESTING(PREBSURE BACTERIA, AND CONDUCTIVITY) — .__... TEMPORARYBITUMINOUBTRAIL, 20^THICK 1 L6 31,000.00 S 1,000.00 ._._.___ S 5,111,00 1.0 5 1000.90 ...... 9 _...._........ 107e SF 34,75 2ti 2104,819 REMOVE TEUPORARY BITUMINOUS TRAP, 20`THIOK 1078 _.,___.... AT,51.25 3 1,346,00 , ., S Tail BId Sched to "A^ $ 352,842,99 S 351.153.37 Chsnea Order #i REM MN00T F ESTIMATED CONTRAOTUNIT CONTRACT USED TO NO. SPEC.NO, ITEM DESCRIPTION QUAMATY UNIT PRICE AMOUNT DATE I EXTENSION 1 12663.602 JER6EY BARRIER IMPACTATTENUATOR BY6TEM 2 EA S2,500.00 is 5,000.00 Is 6,000.00 Total Bld Sohedulo'N' S 5,00D.00 $ 6.000.00 Did Schedule •A" S 362,.842,99 S 351,263.37 Change Order Ni S 6,000.00 ; 8,000.00 TOTAL _$ 362,042-99 _$„_,_ 358y25337 Total Work Completed to Date 356,263.37 LESS 5% RETAINAOE $ 17,81267 LESS PAY ESTIMATE #1 _ S 187,422.27 WE RECOMMEND PAYMENT OF: $ i51,01SA3 APPROVALS: CONTRACTOR: WIDMER CONSTRUCTION, LLC Ced18cQJbIPContrattar, /ejtify that all U.ama 9nde aunts ere correct for the work completed to date Signed; r^"^"dr-,_,:i` r';✓ ,✓ Tilto',.arif'� i"%'f✓!✓r,rr�r Dafa zo i' ""',..._✓,.i ENGINEER: HAKANSON ANDERSON Ceri6cel(On g Der, VV ocomme enI for work and quan illos as shown. Signed: !��/ry TWA:_ v�� Data I OWNER: CITY OF OTSEGO OT636,01 PE.,hx PE - 1