Loading...
Item 3.7 - Landscaping Quotes0 OtCI�egoF MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Parks & Recreation Parks and Recreation Director Demant April 26, 2021 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.7 STRATEGIC VISION MEETS: THE CITY OF OTSEGO: improvements in the roundabouts and medians of the CSAH 39 improvement project. Is a strong organization that is committed to leading the community through innovative communication. IS A PUBLIC HEARING REQUIRED? Has proactively expanded infrastructure to responsibly provide core services. No Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. With the initial phase of the roundabouts and medians on CSAH 39 complete, the project is ready for Is a social community with diverse housing, service options, and employment opportunities. X Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council accept and approve quotes for landscaping and irrigation improvements in the roundabouts and medians of the CSAH 39 improvement project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: With the initial phase of the roundabouts and medians on CSAH 39 complete, the project is ready for landscaping and irrigation. The City worked with TPC to put together a landscape plan for both roundabouts and medians. These plans include irrigation and landscaping improvements of the roundabout and medians at the intersection of CSAH 39 and CSAH 42; and for just landscaping improvements at the intersections of Page and Odean Avenues. Quotes were then sought for the projects with JK Landscape Construction submitting the lowest quote of $100,872 for the landscaping and CareFree Lawn submitting the lowest quote of $55,565 for irrigation. The Administration Subcommittee reviewed the quotes and the landscaping and irrigation designs at their April 14, 2021 meeting where it was recommended to be included on the April 26, 2021 consent agenda. If this project is approved, construction would tentatively begin at the end of April or the beginning of May. SUPPORTING DOCUMENTS ATTACHED: • Landscaping Plans • Quotes: Carefree Lawn • Quotes: X Landscape Construction POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to accept and approve the quotes from JK Landscape Construction for landscaping in the amount of $100,872.00 and the quote from Carefree Lawn for irrigation in the amount of $55,565.00 for improvements in the roundabouts and medians of the CSAH 39 Improvement Project. R111)rFT INFORMATION FUNDING: BUDGETED: Fund 414 —Capital Improvements Yes 2020 CIP Budget - $1,800,634 2020 Payments - $1,224,601.70 2021 CIP Budget - $386,716 CITY OF tSQ 0 MINNESOTA TFC The Planning Company -- January 2021 88-90 foot diameter landscaped area CSAH 39 & CSAH 42 Landscaping Plan (4) Crabapple, Gladiator 10' W x 20' H Pink flowers, red leaves and purple fruit (186) Salvia, Perennial Purple 24-36" H x 3'W Bright green leaves, yellow flower, purple fall color "— (132) Daylily, Stella d'Oro 24" W x 12-18" H Yellow flowers, repeat bloomer (210) Karl Foerster Grass 24 W x 5 H Upright habit with showy seed heads a (105) Blue Oat Grass, Sapphire 24-36" H x 28" W W Steel blue foliage, tan flowers, likes dry soil Mulch: 81 CY Shredded Hardwood Mulch ® Rock: 50 tons 3-6" River Rock Edging: 250 feet Permaloc 12 inch East -facing, in alignment with Cty. Rd. 39 approach and future sign Edging separates mulch types 0 10 20 feet Detail Showing Color Key ` ot§e o MINNESOTA City of Otsego CSAH 39 East and West Medians West Median - 320 ft. long A AL w 0 3,900 SF JRK Super Salt Tolerant Mix January 2021 � � 2,_ 0 18 L1 6, Cq 15 22 18 AL w 0 3,900 SF JRK Super Salt Tolerant Mix January 2021 2,782 SF JRK Super Salt Tolerant Mix ndllT AL N 02 1 t If East Median - 235 ft. long TPC The Planning Company 1 inch = 40 Feet 0 18 22 18 2,782 SF JRK Super Salt Tolerant Mix ndllT AL N 02 1 t If East Median - 235 ft. long TPC The Planning Company 1 inch = 40 Feet 0 SCITY OF 0 City of Otsego MINNESOTACSAH 42 North Median 9 512 SF JRK Super Salt Tolerant Mix 27 2 ♦ 23 19 } N 18 'F CO 1 ♦ ;` 9 21 23,E CD `x 27 - Edging Plant centers 3' back from curb 11 ♦ separates adjacent to drive lanes plantings from North Median - 173 ft. long grass Planting Schedule for the CSAH 39142 Medians O(3) Serviceberry, Allegheny 15'W x 15-20'H Native flowering tree, red in fall, purple fruit (3) Honeylocust, Northern Acclaim 35'W x 40'H Fine dark green leaves, yellow fall color O(3) Japanese Tree Lilac 20'W x 25'H Showy white flower plumes, dark red bark (339) Daylily, Stella d'Oro 24"W x 12-18"H Yellow flowers, repeat bloomer (177) Grass, Karl Foerster 24"W x 5'H Upright habit with showy seed heads TPC The Planning Company 1 inch = 40 Feet OtseF o MINNESOTA V TFC The Planning Company City of Otsego CSAH 42 South Median 3,300 SF JRK Super Salt Tolerant Mix separates plantings from grass 540 ft. long 1 inch = 40 Feet 30 — 19 Edging separates 2,700 SF JRK Super Salt Tolerant Mix plantings from grass Planting Schedule for the CSAH 39/42 Medians (continued) 4 " (117) Astilbe, Visions in White 24"W x 24"H Dark green fern -like foliage and white spiky flowers s ` (74) Russian Sage, Little Spire 30"W x 3'H r Blue-green foliage, purple flowers (space18-24" apart) Ak (151) Blue Oat Grass, Sapphire 3'W x 3'H Ornamental blue foliage, tan seed spikes ., i (72) Little Bluestem, Blue Heaven 2'W x 3'H Burgundy foliage, red -orange stems in fall (105) Echinacea, Pow Wow White 18"W x 18-24"H White Flowers with copper centers in mid -late summer y Shredded Hardwood Mulch: 155 CY *All planting beds mulched to min. 4-6" depth Edging: 105 Linear Feet of Permaloc 3/16" x 6" aluminum interlocking Notes: t All perennial plants & grasses spaced 18-24" apart. Keep plant centers back at least 3' from curbs adjacent to drive lanes. Grass seed should be hydro -seeded or broadcast spread and mulched using weed -free, MNDOT Type 3 mulch or MNDOT Type 7 or 8 Prairie Hay mulch. OF lam` O Otk� O _ MINNESOTA 0 000 O00 0 L TFC Tho Planning Company January 2021 68-70 foot diameter landscaped area City of Otsego CSAH 39 & Page Avenue Landscaping Plan 91ft (3) Crabapple, Gladiator 10'W x 20'H Pink flowers in spring, purplish berries Is(3) Viburnum, Arrowood 15'W x 15'H White flowers, blue berries (15) Dogwood, Isanti TW x 5'H Green foliage, red fall color and stems (30) Forsythia, Gold Cluster 4'W x 4' H Bright green leaves, yellow flower, purple fall color 0 (78) Daylily, Stella d'Oro 24"W x 18"H Yellow flowers, repeat bloomer (114) Karl Foerster Grass 24"W x 5'H Upright habit with showy seed heads ma=y, Mulch: 62 CY wood chips ® River Rock: 21 CY 3-6" Edging: 160 Linear Feet of Permaloc 3/16" x 12" Aluminum Interlocking Orient this point to the south, centered on the approach from Page Avenue CAREFREE LAWN 400 State Hwy 55 NW MAPLE LAKE, MN 55358 / 320-963-2178 4700 Osseo Rd. MINNEAPOLIS, MN 55430 / 612-588-4000 E-MAIL: INFO @ CAREFREESPRINKLERS.COM WEB: CAREFREELAWNMN.COM Carefree Lawn proposes to furnish all material and labor for the installation of an automatic underground sprinkler system for: City of Otsego Attn: Ross bemant 13400 90th Street NE Otsego, MN 763-235-3155 PROJECT NAME: CSAH 42 Roundabout PRODUCT & DESCRIPTION QUANTITY Total installed Irrigation system per Irrigation plans, $ 55,565.00 notes andspecs. Complete installation of irrigation system per given landscape plan, irrigation notes and or plans and specifications given to Carefree at time of bid. Plumbing for the backflow device and installation shall be done by Carefree subcontractor. Power for the irrigation controls shall be provided by others. Bid does not include an underground nderground boring sleeving is considered existing and usable. Sleeving to be marked and located prior to the start of installation. Bid does not include city main wet tap. Bid does not include locating private utilities. Carefree will not be responsible for any damages to unmarked private utilities. Bid does not include any Bonding or bond fees. Bid does not include Prevailing wage. Bid does not include any repairs to any existing system on or neighboring the property. Carefree Lawn Sprinklers guarantees all materials to be free of defect for 1 year or according to the manufactures warranty. Provided, that the owner properly maintains the system. All estimates are done in accordance with the available lot survey information. This constitutes the entire agreement and acceptance of the above proposal shall make this a legal contract to begin work. This contract must be signed within 15 days or the above price will be subject to any and all price increases. Accepted: Respectfully Submitted: 3/16/21 Date Brian Fieldseth Carefree Lawn Sprinklers Terms: Net 30 upon completion JkLANDSCAPE CONSTRUCTION — 19512 Hubble Road Clearwater MN 55320 Name / Address City Of Otsego 2021 Roundabout Scott 320-290-5351 .ttstacl:��a�e WNN7W.jkl Ship To Estimate Date Estimate # 3/11/2021 1006 Description Qty Cost Total Gladiator Crab 3 265.00 795.00 Honeylocust Northern Acclaim 3 340.00 1,020.00 Serviceberry 3 75.00 225.00 Japanese Tree lilac 3 245.00 735.00 Ar owood 3 50.00 150.00 Isanti Dogwood 15 50.00 750.00 Forsythia Gold Cluster 30 42.00 1,260.00 Stella D'Oro 549 19.00 10,431.00 Karl Foerster 501 19.00 9,519.00 Astilbe Visions in white 117 19.00 2,223.00 Russian Sage 260 19.00 4,940.00 Blue Oat Sapphire 256 19.00 4,864.00 Little Bluestein 72 19.50 1,404.00 Echinacea Pow Wow White 105 19.00 1,995.00 Grass seed hydro seeded 75 26.50 1,987.50 Hardwood Shredded mulch 298 54.00 16,092.00 River rock 2-6" 78.3 105.00 8,221.50 Permaloc Edging 6" 515 16.10 8,291.50 Permaloc Edging 12" 0.00 MNDOT topsoil 100 58.00 5,800.00 Excavation for 2-4" rock in both roundabouts 1 2,700.00 2,700.00 Payment Terms: 50% Prior to staring project. The Balance is due in full at the time of completion. Visa, Discover, and Mastercard are also accepted for payment. A 3% convenience fee will be added to all credit card payments. A mobilization charge may be applied if the estimate is picked thru. JK Landscape provides the first consultation at no charge. Additional trips will incur a fee. Total $83,403.50 r ANDSCAPE CONSTRUCTION Hubble Road ater MN 55320 Name / Address City Of Otsego 2021 Roundabout Scott 320-290-5351 --Fott�qjklandscapc WWW.'klarldsca e.coni Ship To Estimate Date Estimate # 4/8/2021 1035 Description Qty Cost Total Mobilization 1 1,850.00 1,850.00 Gladiator Crab 3 275.00 825.00 Viburnum 3 50.00 150.00 Isanti Dogwood 15 50.00 750.00 Forsythia 30 45.00 1,350.00 Stella 78 19.00 1,482.00 Karl Foerster 114 19.00 2,166.00 mulch 62 54.00 3,348.00 river rock 28.3 105.00 2,971.50 edging 6" 160 16.10 2,576.00 Payment Terms: 50% Prior to staring project. The Balance is due in full at the time of Total $17,468.50 completion. Visa, Discover, and Mastercard are also accepted for payment. A 3% convenience fee will be added to all credit card payments. A mobilization charge may be applied if the estimate is picked thru. JK Landscape provides the first consultation at no charge. Additional trips will incur a fee.