Item 4.2 Hunter Hills 2nd,1
OtCI�egoF
MINNESOTA V
DEPARTMENT INFORMATION
Request for
City Council Action
ORIGINATING DEPARTMENT
REQUESTOR: MEETING DATE:
Planning
City Planner Licht 24 May 2021
PRESENTER(s)
REVIEWED BY: ITEM #:
City Planner Licht
City Administrator/Finance Director Flaherty 4.2 — Hunter Hills 2nd Addition
City Engineer Wagner
City Attorney Kendall
STRATEGIC VISION
MEETS:
I THE CITY OF OTSEGO:
execution of a development contract for Hunter Hills Second Addition.
Is a strong organization that is committed to leading the community through innovative
communication.
IS A PUBLIC HEARING REQUIRED?
Has proactively expanded infrastructure to responsibly provide core services.
Yes, Council will hold on 24 May 2021.
Is committed to delivery of quality emergency service responsive to community needs and
expectations in a cost-effective manner.
X
Is a social community with diverse housing, service options, and employment opportunities.
Street. Tamarack Land Development — Hunter Hills, LLC has submitted a final plat application for approval
Is a distinctive, connected community known for its beauty and natural surroundings.
AGENDA ITEM DETAILS
RECOMMENDATION:
City staff recommends vacation of existing drainage and utility easements, approval of a final plat, and
execution of a development contract for Hunter Hills Second Addition.
ARE YOU SEEKING APPROVAL OFA CONTRACT?
IS A PUBLIC HEARING REQUIRED?
Yes
Yes, Council will hold on 24 May 2021.
BACKGROUND/JUSTIFICATION:
The preliminary plat for Hunter Hills was approved on 13 July 2020 for development of 59 single family lots
as the first phase to subdivide 207.59 acres located east of Labeaux Avenue (CSAH 19) and north of 801h
Street. Tamarack Land Development — Hunter Hills, LLC has submitted a final plat application for approval
of 39 single family lots and a replat of two existing lots.
■ Zoning. The subject site is zoned R-5, Residential Single and Two Family District. Single family lots
are a permitted use within the R-5 District.
■ Preliminary Plat Consistency. The final plat consists of 39 single family lots accessed by public
streets in a configuration consistent with the preliminary plat. Lots 1-2, Block 3 Hunter Hills are to
be replatted as Lot 1-2 Block 1, Hunter Hills Second Addition with this final plat to adjust the side
lot lines and increase the width of the building envelope in consideration of the side yard setback
required from 81st Lane.
■ Lot Requirements. The preliminary plat and PUD -CUP approval establishes averaged minimum lot
area requirements for Hunter Hills. The minimum lot width requirements shown in the table
below for the lots within the final plat. All of the proposed lots within the final plat comply with
these minimum lot width requirements.
Lots Min. Lot
Width
Lots 1-2, Block 1 55ft.
Lots 1-7, Block 2 65ft.
Lots 1-17, Block 3
Lots 1-8, Block 4
Lots 1-4, Block 5
Lots 1-2, Block 6
Lot 1, Block 7
■ Setbacks. The lots within the final plat are subject to the principal building setbacks listed in the
table below as required within the R-5 District by Section 11-66-6.0 of the Zoning Ordinance and
the wetland setback established by Section 11-16-5.F.4.b of the Zoning Ordinance. All of the
proposed lots have adequate building envelopes within required setbacks for a single family
dwelling.
■
80thSt./ Interior Interior Wetland Registered
Local St. Side Rear Feedlot
25ft. house 7ft. 20ft. 40ft. 1,OOOft.
30ft. garage
Streets. Most of the proposed lots will be accessed by local public streets entering the
development from 80th Street to be newly constructed. The proposed local streets are to be 28
feet wide with concrete curb and gutter within a 60 foot wide right-of-way. A temporary cul-de-
sac overlaid by temporary easement will be required at the terminus of 8111 Street. A 5 foot
concrete sidewalk is to be constructed on one side of all streets.
Lots 11-17, Block 2 have frontage to 80th Street, which is an existing street designated as a minor
collector street by the Transportation Plan. The developer is required to improve the section of
80th Street within the Hunter Hills Preliminary Plat to an urban design with concrete curb and
gutter and 10 foot wide trail on the north side with this final plat based on the proposed access.
All street construction plans are subject to review and approval by the City Engineer.
Street names shown on the final plat are consistent with Section 10-8-10.B.13 of the Subdivision
Ordinance and the Wright County grid system.
The preliminary plat approval for Hunter Hills stipulated that that 193 dwellings can be developed
within the subject site using the existing access via 80th Street based on current traffic volumes.
The developer is required to microsurface 80th Street between Labeaux Avenue (CSAH 19) and the
west plat line and from the east plat line to MacIver Avenue as a condition of approval for the
preliminary plat after the initial approval of 64 lots to accommodate the traffic being generated
within the subject site.
Section 8-8-4 of the City Code specifies installation of street lighting for new subdivisions at the
corners of intersecting streets and midblock locations for blocks longer than 900 feet within the
final plat. The number and location of proposed street lights is subject to review and approval of
the City Engineer. The development contract provides for payment of the street light operation
fee of as established by the City Code.
Landscaping. Sections 11-19-2.6 of the Zoning Ordinance requires installation of two shade trees
per lot. Builders will install the required landscaping as construction of houses on each lot
progresses. The security for the landscaping will be collected at the time of building permit for
each lot.
Easements. The application includes a request to vacate the existing drainage and utility
easements within proposed Lots 1 and 2, Block 1 (which are existing Lots 1 and 2, Block 3 Hunter
Hills being replatted to adjust the interior side lot line). The final plat illustrates drainage and utility
easements at the perimeter of each single family lot and overlaying stormwater facilities as
required by Section 10-8-12.A of the Subdivision Ordinance. All drainage and utility easements are
subject to approval of the City Engineer.
Grading and Drainage Plans. The developer has submitted grading and drainage plans for the
proposed final plat. The developer is required to pay a Stormwater Impact Fee for Otsego Creek as
a conditional of approval as stated in the development contract. All grading, drainage, and erosion
control plans are subject to review and approval by the City Engineer.
■ Utilities. The developer has submitted utility plans for the proposed final plat that are subject to
review and approval by the City Engineer. The developer is required to pay Utility Availability
Charges at the time of final plat approval as outlined in the development contract. Utility
connection charges are to be paid when a building permit is issued for each lot in accordance with
the fee schedule in effect at that time.
Park Dedication. The preliminary plat does not include dedication of land for public parks. Park
dedication requirements for the proposed final plat are to be met as a cash fee in lieu of land. The
park dedication fee in lieu of land in accordance with the City's current fee schedule for the final
plat is included in the development contract.
Homeowners Association. The developer has established a homeowner's association for the
preliminary plat. Documents incorporating the Hunter Hills Second Addition within the
homeowner's association are to be subject to review and approval by the City Attorney.
Development Contract. The City Attorney drafted a development contract related to the proposed
final plat to provide for completion of all public improvements, establishment of required
securities, and payment of applicable fees. The Development Contract is to be adopted by
resolution of the City Council concurrent with the final plat approval and executed prior to
recording of the final plat. Section 11-5-3-13.8 of the Subdivision Ordinance requires recording of
the final plat within 100 days of City Council approval.
SUPPORTING DOCUMENTS ATTACHED:
■ Site location map
■ Engineering Review dated May 12, 2021
■ Resolution 2021-42 vacating existing drainage and utility easements
■ Findings of Fact and Decision
■ Resolution 2021-43 approving a development contract
■ Development contract
■ Approved preliminary plat
■ Final plat
POSSIBLE MOTION
PLEASE WORD MOTION AS YOU WOULD LIKE ITTO APPEAR IN THE MINUTES:
Motion to adopt Resolution 2021-42 vacating existing drainage and utility easements, approve the final
plat for Hunter Hills Second Addition subject to the conditions stated by the Findings of Fact and Decision
as presented and adopt Resolution 2021-43 approving a Development Contract.
BUDGET INFORMATION
FUNDING: BUDGETED:
N/A N/A
BOaCOCITM Wright County, MN
Overview
Legend
Roads
^— CSAHCL
CTYCL
— MUNICL
— PRIVATECL
— TWPCL
Highways
— Interstate
— State Hwy
— US Hwy
City/Township Limits
ac
❑t
❑� Parcels
Torrens
Review No. 1
Hakanson
11-11]Anderson
ENGINEERING REVIEW
Residential Subdivision
Final Plat
for the City of Otsego
by
Hakanson Anderson
Submitted to: Honorable Mayor and City Council
cc: Adam Flaherty, City Administrator
Audra Etzel, City Clerk
Dan Licht, City Planner
Dave Kendall, City Attorney
Dale Willenbring, Tamarack Land -Hunter Hills, LLC
Marty Campion, P.E., Campion Engineering Services, Inc
Reviewed by: Ronald J. Wagner, P.E.
Brent M. Larson, P.E.
Date: May 12, 2021
Proposed
Development: Hunter Hills 2nd Addition
Development
Location: Portions of the S 'h of Section 24, T121, R24. Generally North of 80`x' St
NE and East of CSAH 19
Applicant: Dale Willenbring
Developer: Tamarack Land Development -Hunter Hills, LLC
1536 Beachcomber Blvd
Waconia, MN 55387
Owners of Record: Tamarack Land Development -Hunter Hills, LLC
Purpose: Hunter Hills 2nd Addition is a proposed 39 lot (plus 2 replatted from 15`
Addition) single-family, residential development on approximately 10.8
acres in the City of Otsego, Wright County, Minnesota. The proposed
development will be served with municipal water, sanitary sewer, storm
sewer, and public streets typical of an urban setting.
Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of
(but not limited to) Health, Minnesota Department of Natural Resources, Minnesota
Pollution Control Agency, Wright Soil and Water Conservation District.
Permits Required: NPDES, Minnesota Department of Health (water),
(but not limited to) Minnesota Pollution Control Agency (sanitary sewer), and Wright County
TABLE OF CONTENTS
INFORMATION AVAILABLE
FINAL PLAT
CONSTRUCTION PLANS
COVER SHEET
EXISTING CONDITIONS
SANITARY SEWER AND WATERMAIN PLAN
STREET AND STORM SEWER PLAN
SWPPP
DETAILS
GRADING PLANS
COVER SHEET
EXISTING CONDITIONS
GRADING PLAN
yv...
DETAILS
SURFACE WATER MANAGEMENT
WETLANDS
OTHER CONSIDERATIONS
SUMMARY AND/OR RECOMMENDATION
PAGE 2
S:\Municipal\Aotsego23xx\2350.02\A-REVIEW PHASE\OT2350.02 RVW1.docx
INFORMATION AVAILABLE
Final Plat for Hunter Hills, received 5/12/2021, by Wenck Associates
Construction Plans for Hunter Hills 2nd Addition, dated 3/8/2021, by Campion Engineering
Services, Inc
Grading Plans for Hunter Hills, dated 9/1/2020, by Campion Engineering Services, Inc.
Storm Sewer Design for Hunter Hills 2nd Addition, dated 3/7/2021, by Campion Engineering
Services, Inc.
Storm Water Management Plan for Hunter Hills, dated 8/31/2020, by Civil Methods.
Preliminary Plat for Hunter Hills, dated 7/8/2020, by Campion Engineering Services, Inc.
Preliminary Plans for Hunter Hills, dated 5/12/2020, by Campion Engineering Services, Inc.
Technical Memo for Supplemental Traffic Engineering Information for Hunter Hills Residential
Development Traffic Impact Study, dated 6/30/2020, by Wenck
Geotechnical Report for Hunter Hills, dated 9/4/2019, by Haugo Geotechnical Services.
Wetland Delineation Notice of Decision dated 12/20/2019
Environmental Assessment Worksheet dated 5/18/2020
Additional Information
Minnesota Rules, Chapter 4410 — EAW Requirement
City of Otsego Engineering Manual
City of Otsego Zoning and Subdivision Ordinances
National Wetland Inventory Map
PAGE 3
S:\Municipal\Aotsego23xx\2350.02\A-REVIEW PHASE\OT2350.02 RVW1.docx
FINAL PLAT
1. A minimum 10' wide easement along the rear lot line is required for all lots.
2. A minimum 20' wide easement centered on the storm pipe adjacent to Lot 1, Block 4 shall be
provided. Please verify this the easement is sufficient.
Landau Avenue NE shall be Langley Avenue NE. 811t Street NE shall be 82nd Street NE. An
overall street naming sketch is attached for all future streets as well.
4. A temporary easement (separate document) is required to cover the temporary cul-de-sac at
the west end of 82nd Street NE.
CONSTRUCTION PLANS
COVER SHEET
5. It is difficult to read/see the project location on the overall area map.
EXISTING CONDITIONS/CERTIFICATE OF SURVEY
6. The certificate of survey does not work any longer as an existing conditions plan. Show all
existing utilities and streets within 150' of construction limits with pipe sizes, types and
elevation information. Street widths shall be labeled as well.
7. The NWL and HWL 100 -year flood elevations (for existing storm basins and wetlands) shall
be shown on the plan. (21-6-2.B.9.)
SANITARY SEWER AND WATERMAIN PLAN
8. Provide a "construction limit" line on the overall plan as well on the following sheets. It is
not clear where 1St Addition and 2nd Addition start and stop.
9. Lot and Block numbers shall match the Final Plat.
10. The sanitary sewer invert at approximate station 4+25 along 80th Street, out of Existing MH 1
and west invert of MH 1 appear to be incorrect. Please verify and revise.
11. The storm sewer along 80th Street shall be shown in the plan and profile in the background.
Verify sufficient separation between the storm and sanitary/water crossings.
12. An 8" gate valve is needed at the connection point along 80th Street watermain extension.
13. The 8" gate valve on the east side of Langley Avenue shall be eliminated.
14. There should be an 8" gate valve where connecting to existing watermain on 81St Lane NE,
station 4+10.
PAGE 4
S:\Municipal\Aotsego23xx\2350.02\A-REVIEW PHASE\OT2350.02 RVW1.docx
15. There appears to be a conflict between the hydrant and storm sewer located at approximate
station 8+25 along 801h Street.
16. We recommend a testing "blow off' be installed at the east end of the watermain stub along
80th Street for testing purposes.
17. All sanitary or water crossings with storm sewer with less than 24" of separation shall have a
minimum 4" of insulation.
18. The sanitary sewer service to Lot 4, Block 4 appears to conflict with the watermain at this
location.
19. The connection to the existing watermain along 81St Lane shall be done with a valve or the
contractor shall agree to test against the existing valve.
20. The stationing of the plan view and profile view are opposite for 82nd Street (sheet 7).
STREET AND STORM SEWER PLAN
21. NWL 2 -yr, 10 -yr and 100 -yr HWL shall be shown on plans.
22. The wetland buffers around each wetland shall be shown.
23. Show the existing storm sewer in the profile for 80th Street. Show all required insulation at
water/sanitary crossings (all sheets).
24. Provide a PVI elevation and station between the 3% and 1.32% grade break near station
0+12.
25. The vertical curve information at station 9+50 along 80th Street cannot be read.
26. The vertical curve at station 7+65 along 81St Lane does not meet a 30 mph design speed and
shall be revised.
27. Draintile is required at most if not all catch basins. None is currently being shown.
DETAILS
28. A typical section for 80th Street is required. This section of street will not match the City's
Standard Plate.
29. Indicate road and trail section thicknesses that will be constructed.
GRADING
30. Provide new grading plan for 2nd Addition. Plans shall match the current Final Plat's Lot
and Block numbers and show current easements and storm sewer structures.
PAGE 5
S:\Municipal\Aotsego23xx\2350.02W-REVIEW PHASE\OT2350.02 RVW1.docx
31. Provide a clear line defining 2nd Addition Lots.
32. The 20' average wetland buffers around each wetland shall be shown.
SURFACE WATER MANAGEMENT
33. The approved Storm Water Management Plan submitted for 1St Addition includes the 2nd
Addition lots.
34. Provide a drainage area map to accompany the storm sewer design calculations.
WETLANDS
35. No comments.
OTHER CONSIDERATIONS
36. No comments.
SUMMARY AND/OR RECOMMENDATION
We recommend approval contingent upon the above items being addressed.
PAGE 6
S:\Municipal\Aotsego23xx\2350.02\A-REVIEW PHASE\OT2350.02 RVW1.docx
CITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO: 2021-42
APPROVING VACATION OF EXISTING DRAINAGE AND UTILITY EASEMENTS
WITHIN THE PLAT OF HUNTER HILLS
WHEREAS, Tamarack Land Development — Hunter Hills, LLC has initiated vacation of all those existing
drainage and utility easements dedicated over the properties legally described as Lots 1 and 2, Block 3,
Hunter Hills, City of Otsego, County of Wright, State of Minnesota; and,
WHEREAS, the City Engineer has reviewed request and determined that the existing drainage and utility
easements are unnecessary for public purposes; and,
WHEREAS, the City Council held a public hearing at their regular meeting on 24 May 2021 to consider
the vacation, preceded by required published and mailed legal notice; and,
WHEREAS, the City Council heard all parties interested therein and closed the public hearing; and,
WHEREAS, the City Council having considered all information received finds that the existing drainage
and utility easements serve no useful public purpose and vacating the existing drainage and utility
easements would be in the public interest; and,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA:
1. That the existing drainage and utility easements dedicated over Lots 1 and 2, Block 3, Hunter
Hills, City of Otsego, County of Wright, State of Minnesota are hereby vacated.
The City Council hereby determines that the vacation of said existing right-of-way and drainage
and utility easements shall cause no damage to any abutting or nearby property owners and
therefore no damages are awarded to any such property owners.
ADOPTED by the Otsego City Council this 24th day of May, 2021.
MOTION BY:
SECONDED BY:
IN FAVOR:
OPPOSED:
2
CITY OF OTSEGO
Jessica L. Stockamp, Mayor
ATTEST:
Audra Etzel, City Clerk
13 May 21
0 1 r y 0
hSI HIIE r; [ITh `�
FINDINGS OF FACT AND DECISION
APPLICANT: Tamarack Land Development— Hunter Hills, LLC
APPLICATION: Request for final plat approval of Hunter Hills Second Addition.
CITY COUNCIL MEETING: 24 May 2021
FINDINGS: Based upon review of the application and evidence received, the City Council of the City of
Otsego now makes the following findings of fact:
A. The legal description of the property described by as Lots, 1 and 2, Block 3 and Outlot E, Hunter Hills,
City of Otsego, Wright County, Minnesota.
B. The property lies within the West Sewer Service District and is guided for low density residential land
uses by the 2012 Otsego Comprehensive Plan, as amended.
C. The property is zoned R-5, Single and Two Family Residential District, which allows single family
dwellings as a permitted use.
D. The City Council approved application for preliminary plat approval and a PUD -CUP on 13 July 2020.
E. The applicant is proposing a final plat of 39 single family lots and replat of two existing lots.
F. The Request for Council Action dated 24 May 2021 prepared by the City Planner, The Planning
Company LLC, is incorporated herein.
G. The Engineering Review dated May 12, 2021 prepared by the City Engineer, Hakanson Anderson Inc.,
is incorporated herein.
H. Final plat applications are processed in accordance with Section 10-3-3 of the Subdivision Ordinance
and do not require a recommendation by the Planning Commission.
DECISION: Based on the foregoing information and applicable ordinances, the application is hereby
APPROVED subject to the following conditions:
The applicant shall execute a development contract as drafted by the City Attorney and subject to
approval of the City Council.
2. All of the lots within the Hunter Hills Second Addition Final Plat shall comply with the following
minimum width requirements:
Lots Min. Lot
Width
Lots 1-2, Block 1 55ft.
Lots 1-7, Block 2 65ft.
Lots 1-17, Block 3
Lots 1-8, Block 4
Lots 1-4, Block 5
Lots 1-2, Block 6
Lot 1, Block 7
3. All of the lots within the Hunter Hills Second Addition Final Plat shall comply with the following
minimum setbacks:
80th St./
Interior
Interior
Wetland
Registered
Local St.
Side
Rear
Feedlot
25ft. house
7ft.
20ft.
40ft.
1,OOOft.
30ft. garage
4. Construction plans for all streets shall be subject to review and approval by the City Engineer.
5. Street lighting shall be installed within the final plat in accordance with Title 8, Chapter 8 of the City
Code with payment of charges as established in accordance with the City Fee Schedule, subject to
review and approval of the City Engineer.
6. All easements shall be subject to review and approval of the City Engineer.
7. All grading, drainage, and erosion control plans shall be subject to review and approval by the City
Engineer.
8. All utility plans shall be subject to review and approval of the City Engineer.
9. The applicant shall pay applicable utility availability charges upon approval of the final plat and pay
utility connection charges at the time a building permit is issued for each lot based on the current fee
in effect at that time.
10. The developer shall satisfy park and trail dedication requirements as a cash fee in lieu of land as set
forth in the development contract.
11. Documents incorporating the final plat within the Hunter Hills HOA shall be subject to review and
approval by the City Attorney.
12. The final plat shall be recorded within 100 days of City Council approval as required by Section 10-5-
3.13.8 of the Subdivision Ordinance.
2
MOTION BY:
SECOND BY:
ALL IN FAVOR:
THOSE OPPOSED:
ADOPTED by the City Council of the City of Otsego this 24' day of May, 2021.
CITY OF OTSEGO
By:
Attest:
3
Jessica L. Stockamp, Mayor
Audra Etzel, City Clerk
CITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO: 2021-43
APPROVING A DEVELOPMENT CONTRACT FOR
HUNTER HILLS SECOND ADDITION
WHEREAS, Tamarack Land Development — Hunter Hills, LLC (the "developer") is proposing development of
Hunter Hills Second Addition; and
WHEREAS, a final plat for the development was approved on 24 May 2021 by the City Council; and
WHEREAS, Section 10-10-4.A of the Subdivision Ordinance requires the developer to enter into a
development contract to provide the City construction and warranty securities for the public and private
improvements and to provide the City various remedies in the event that the developer breaches the
terms and conditions of said agreement; and
WHEREAS, those obligations are outlined and memorialized in the attached Development Contract.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA THAT:
1. The Development Contract attached hereto between the City of Otsego and Tamarack Land
Development Company—Hunter Hills, LLC is hereby approved in form subjectto modification of fees,
charges, and securities as approved by City staff.
2. The Mayor and City Clerk are hereby authorized to execute the Development Contract on behalf of
the City of Otsego.
ADOPTED by the City Council of the City of Otsego this 24th day of May, 2021.
MOTION BY:
SECONDED BY:
IN FAVOR:
OPPOSED:
2
CITY OF OTSEGO
Jessica L. Stockamp, Mayor
ATTEST:
Audra Etzel, City Clerk
(reserved for recording information)
DEVELOPMENT CONTRACT
AND PLANNED UNIT DEVELOPMENT AGREEMENT
HUNTER HILLS SECOND ADDITION
CONTRACT dated , 2021, by and between the CITY OF OTSEGO, a
Minnesota municipal corporation ("City"), and TAMARACK LAND — HUNTER HILLS, LLC, a Minnesota
limited liability company (the "Developer")
1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a plat
for HUNTER HILLS SECOND ADDITION (referred to in this Contract as the "plat"). The land is situated in
the County of Wright, State of Minnesota, and is legally described as:
Lots 1 and 2, Block 3, and Outlot E, Hunter Hills, Wright County,
Minnesota, according to the recorded plat thereof.
2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on condition that
the Developer enter into this Contract, furnish the security required by it, and record the plat with the
County Recorder or Registrar of Titles within 100 days after the City Council approves the final plat.
3. RIGHT TO PROCEED. Within the plat or land to be platted, the Developer may not grade
or otherwise disturb the earth or remove trees, unless a grading permit has been approved by the City
Engineer following approval of a preliminary plat by the City Council, construct sewer lines, water lines,
streets, utilities, public or private improvements, or any buildings until all the following conditions have been
1
2151050
Hunter Hills Second Addition
satisfied: 1) this contract has been fully executed by both parties and filed with the City Clerk, 2) the
necessary security has been received by the City, 3) the necessary insurance for the Developer and its
construction contractors has been received by the City, and 4) the plat has been filed with the Wright
County Recorder or Registrar of Titles' office.
4. PHASED DEVELOPMENT. If the plat is a phase of a multi -phased preliminary plat, the
City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract
and the breach has not been remedied. Development of subsequent phases may not proceed until
Development Contracts for such phases are approved by the City. Park dedication charges referred to in
this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved
preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed
when the outlots are final platted into lots and blocks.
5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi -phased preliminary plat,
the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into
lots and blocks and outlots, within two (2) years after preliminary plat approval.
6. CHANGES IN OFFICIAL CONTROLS. For five (5) years from the date of this Contract, no
amendments to the City's Comprehensive Plan or official controls shall apply to or affect the use,
development density, lot size, lot layout or dedications of the approved plat unless required by state or
federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in
this Contract to the contrary, to the full extent permitted by state law, the City may require compliance with
any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following
plans. The plans shall not be attached to this Contract. The plans may be prepared, subject to the City
Engineer's approval, after entering the Contract, but before commencement of any work in the plat. The
City Engineer may approve minor amendments to Plans without City Council approval. If the plans vary
from the written terms of this Contract, the written terms shall control. The plans are:
2
2151050
Hunter Hills Second Addition
Plan A - Plat
Plan B - Final Grading, Drainage, and Erosion Control Plan
Plan D - Plans and Specifications for Public Improvements
Plan E - Street Lighting Plan
Plan F - Landscape Plan
8. IMPROVEMENTS. The Developer shall install and pay for the following:
A. Sanitary Sewer System
B. Water System
C. Storm Sewer System
D. Streets
E. Concrete Curb and Gutter
F. Street Lights
G. Site Grading, Stormwater Treatment/Infiltration Basins, and Erosion Control
H. Underground Utilities
I. Setting of Iron Monuments
J. Surveying and Staking
K. Sidewalks and Trails
L. Retaining Walls
M. Landscaping
The improvements shall be installed in accordance with the City subdivision ordinance; City
standard specifications for utility and street construction; and any other ordinances including Chapter 6 of
the City Code concerning erosion and sediment control. The Developer shall submit plans and
specifications which have been prepared by a competent Minnesota registered professional engineer to the
City for approval by the City Engineer. The Developer shall instruct its engineer to provide adequate field
inspection personnel to assure an acceptable level of quality control to the extent that the Developer's
engineer will be able to certify that the construction work meets the approved City standards as a condition
3
2151050
Hunter Hills Second Addition
of City acceptance. In addition, the City may, at the City's discretion and at the Developer's expense, have
one or more City inspectors and a soil engineer inspect the work on a full or part-time basis. The
Developer, its contractors and subcontractors, shall follow all instructions received from the City's
inspectors. The Developer's engineer shall provide for on-site project management. The Developer's
engineer is responsible for design changes and contract administration between the Developer and the
Developer's contractor. The Developer or its engineer shall schedule a pre -construction meeting at a
mutually agreeable time at the City with all parties concerned, including the City staff, to review the
program for the construction work. Within thirty (30) days after the completion of the improvements and
before the security is released, the Developer shall supply the City with a complete set of reproducible "as -
constructed" plans and an electronic file of the "as -constructed" plans in an AutoCAD .DWG file or a .DXF
file, all prepared in accordance with City standards.
In accordance with Minnesota Statutes 505.021, the final placement of iron monuments for all lot
corners must be completed before the applicable security is released. The Developer's surveyor shall also
submit a written notice to the City certifying that the monuments have been installed following site grading,
utility and street construction.
9. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, and
City Planning Commission members, and corporations, partnerships, and other entities in which such
individuals have greater than a 25% ownership interest or in which they are an officer or director may not
act as contractors or subcontractors for the public improvements identified in Paragraph 8 above.
10. PERMITS. The Developer shall obtain or require its contractors and subcontractors to
obtain all necessary permits, which may include:
A. Wright County for County Road Access and Work in County Rights -of -Way
B. MnDot for State Highway Access
C. MnDot for Work in Right -of -Way
D. Minnesota Department of Health for Watermains
E. MPCA NPDES Permit for Construction Activity
F. MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal
G. DNR for Dewatering
4
2151050
Hunter Hills Second Addition
H. City of Otsego for Building Permits, Retaining Walls, Irrigation
I. MDH for water permits
J. MPCA for sewer extension
11. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it
will be the Developer's and the Developer's contractors and subcontractors responsibility to satisfy
themselves with regard to the elevation of groundwater in the area and the level of effort needed to
perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all
applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations
permits shall also be strictly followed.
12. TIME OF PERFORMANCE. The Developer shall install all required public improvements
by November 30, 2021.
13. STREETS. The Developer agrees to maintain the streets within the Plat until the base
course bituminous surfacing has been accepted by the City. Should the City be required to grade the street
prior to paving, the cost of such grading shall be paid by the Developer and draw from the Developer's letter
of credit. Should the City determine that snowplowing is necessary prior to street paving, the City will plow
the street(s) prior to acceptance of the streets. The Developer shall hold harmless and indemnify the City
from any and all liability related to this snow plowing and shall pay all costs associated with this snow
plowing. Any plowing undertaken by the City shall constitute no acceptance or evidence of acceptance of
the street(s) in question. The final wear course shall not be constructed until at least one construction
season after the base construction is completed and shall be delayed one more construction season if at
least 75% build out is not achieved. However, the final wear course shall not be delayed for a period longer
than two years after the base course is paved, regardless of build out; in which case, the Developer shall
provide an escrow for fog sealing the streets in the event the final wear course is placed prior to 75% build
out. Upon final completion of streets and acceptance by the City as a City street rather than a private drive,
the Developer shall guarantee to the City for a period of two (2) years the streets have been constructed to
City standards. The warranty period shall not commence until such time as street construction is completed
6i
2151050
Hunter Hills Second Addition
and the streets are accepted as City streets by the City. The two (2) year warranty period set forth above
commences upon the date on which the City accepts the streets by resolution.
14. LICENSE. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in
conjunction with plat development.
15. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall
be implemented by the Developer and inspected and approved by the City. The City may impose
additional erosion control requirements if they would be beneficial. All areas disturbed by the grading
operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall be in
accordance with the City's current seeding specification which may include temporary seed to provide
ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as
necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the
Developer does not comply with the MPCA Stormwater Permit for Construction Activity or with the erosion
control plan and schedule or supplementary instructions received from the City, the City may take such
action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance
of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or
obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such
work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development,
utility or street construction will be allowed and no building permits will be issued unless the plat is in full
compliance with the approved erosion control plan.
16. GRADING. The plat shall be graded in accordance with the approved grading development
and erosion control plan, Plan "B". The plan shall conform to City of Otsego specifications. Within thirty
(30) days after completion of the grading and before the City approves individual building permits (except
three (3) model home permits on lots acceptable to the Building Official), the Developer shall provide the
City with an "as -constructed" grading plan certified by a registered land surveyor or engineer that all storm
water treatment/infiltration basins and swales, have been constructed on public easements or land owned
6
2151050
Hunter Hills Second Addition
by the City. The "as -constructed" plan shall include field verified elevations of the following: a) cross
sections of storm water treatment/infiltration basins; b) location and elevations along all swales, wetlands,
wetland mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed
"conservation area" posts; and c) lot corner elevations and house pads, and all other items listed in City
Code. The City will withhold issuance of building permits until the approved certified grading plan is on file
with the City and all erosion control measures are in place as determined by the City Engineer. The
Developer certifies to the City that all lots with house footings placed on fill have been monitored and
constructed to meet or exceed FHA/HUD 79G specifications. The soils observation and testing report,
including referenced development phases and lot descriptions, shall be submitted to the Building Official for
review prior to the issuance of building permits.
Before a building permit is issued, a cash escrow shall be furnished to the City in accordance with
the City's current fee schedule to guarantee compliance with the erosion control and grading
requirements and the submittal of an as -built certificate of survey. Prior to the release of the required
individual lot grading and erosion control security that is submitted with the building permit, an as -built
certificate of survey for single family lots must be submitted to verify that the final as -built grades and
elevations of the specific lot and all building setbacks are consistent with the approved grading plan for the
development, and amendments thereto as approved by the City Engineer, and that all required property
monuments are in place. If the final grading, erosion control and as -built survey is not timely completed,
the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon
satisfactory completion of the grading, erosion control and as -built survey, the escrow funds, without
interest, less any draw made by the City, shall be returned to the person who deposited the funds with
the City.
A certified as -built building pad survey must be submitted and approved for commercial, industrial
or institutional developments prior to issuance of a building permit.
17. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from
construction work by the Developer, home builders, subcontractors, their agents or assigns. Prior to any
7
2151050
Hunter Hills Second Addition
construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion
control, street cleaning, and street sweeping.
18. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction
required by this Contract and final acceptance by the City, the improvements lying within public easements
shall become City property without further notice or action.
19. LATERAL STORM SEWER. The Developer shall post a security for lateral storm sewer
in the amount of $143,649.00 which is due upon final plat approval.
The Developer shall pay a cash fee in the amount of $39,263.24 for the Trunk Storm Water
Management Impact Fee due upon final plat approval which is calculated as follows:
10.76 Net Acres X $3,649.00/Net Acre = $39,263.24
20. LATERAL AND TRUNK SANITARY SEWER. The Developer shall pay to the City the
required water availability charges and sanitary sewer availability charges. The water and sewer
availability charges shall be collected according to Section 8-1-6-B of City Code including 9.0 RECs per
gross acre for multiple family uses and 3.5 RECs per gross acre for commercial, industrial, or institutional
uses. The Developer shall post a security in the amount of $190,963.00 for Lateral and Trunk Sanitary
Sewer which is due upon final plat approval.
The Developer shall pay a cash fee in the amount of $102,999.00 for the Sewer Availability Charge
("SAC') at the time of plat approval which is calculated as follows:
41 REC X $2,641/REC — 2 Lot Initial Plat Credit = $102,999.00
21. LATERAL AND TRUNK WATERMAIN. The Developer shall post a security in the
amount of $247,005.00 for the installation of lateral and trunk watermain and connection. The Developer
shall pay a cash fee in the amount of $71,916.00 for the Water Availability Charge ("WAC') at the time of
plat approval which is calculated as follows:
41 REC X $1,844.00/ REC — 2 Lot Initial Plat Credit = $71,916.00
22. SEWER CONNECTION CHARGE AND WATER CONNECTION CHARGE. The
Developer shall pay to the City required water and sewer connection charges. The water and sewer
8
2151050
Hunter Hills Second Addition
connection charges shall be collected per Section 8-1-6-C of City Code for all uses and must be paid prior
to the issuance of a Certificate of Occupancy based on the fee schedule in effect at the time of application
for the Certificate of Occupancy.
23. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, public
utility construction, and public street construction is restricted to access the subdivision as approved by the
City Engineer.
24. PARK DEDICATION. The Developer shall pay a cash contribution of $112,320.00 in
satisfaction of the City's park and trail dedication requirements. The charge is calculated as follows: forty-
one (41) lots at $2,880.00 per lot — 2 Lot Initial Plat Credit = $112,320.00
25. TRAFFIC CONTROL SIGNS. The Developer shall pay a cash fee to the City in the
amount of $6,500.00 for installation of traffic control signs. The fee is calculated as follows: twenty-six (26)
traffic signs at $250.00 per street sign.
26. STREET LIGHT OPERATION COSTS. The Developer shall be responsible for the cost of
street light installation consistent with a street lighting plan approved by the City. The Developer shall pay
to the City a cash fee in the amount of $1,500.00. The fee is calculated as follows: three (3) street lights
at $500.00 per street light.
27. LANDSCAPING. The Developer or lot purchaser shall plant least two (2) trees on every lot
in the plat, one of which must be planted in the front yard. Trees that are chosen by the Developer or
property owner cannot cause a public nuisance, such as cotton producing trees, or trees that may become
a public hazard due to insect infestation or weak bark. The minimum deciduous tree size shall be two and
one-half (2%) inches caliper, balled and burlapped. Evergreen trees must be at least eight feet (8') tall.
The trees may not be planted in the right-of-way. The Developer or lot purchaser shall sod the front
yard, boulevard, and side yards to the rear of the structure on every lot. Weather permitting, the trees,
sod, and seed shall be planted within sixty (60) days after a home has received a certificate of
occupancy. Before a building permit is issued, a cash escrow per each lot in the plat shall be furnished
the City in accordance with the City's current fee schedule to guarantee compliance with the landscaping
0
2151050
Hunter Hills Second Addition
requirements. If the landscaping is not completed in a timely manner, the City may enter the lot, perform
the work, and apply the cash escrow toward the cost. Upon satisfactory completion of the landscaping
the escrow funds, without interest, less any draw made by the City, shall be returned to the person who
deposited the funds with the City. All trees shall be warranted to be alive, of good quality, and disease
free for twelve (12) months after planting. Any replacements shall be warranted for twelve (12) months
from the time of planting. The Developer or property owner is responsible for contacting the City when
all the landscaping has been installed to set up an inspection. Fifty percent (50%) of the security will be
released when all the landscaping has been installed and inspected by City staff and the remaining fifty
percent (50%) will be released one year after the landscaping inspection and any warranty work has
been completed.
28. SPECIAL PROVISIONS. The following special provisions shall apply to plat development:
A. Implementation of the conditions listed in the Findings of Fact approved by the City Council on
May 24, 2021.
B. Prior to City Council approval of the final plat, the Developer shall furnish a boundary survey of
the proposed property to be platted with all property corner monumentation in place and marked
with lath and a flag. Any encroachments on or adjacent to the property shall be noted on the
survey. The Developer's land surveyor certifies that all irons have been set following site
grading and utility and street construction. In addition, the certificate of survey must also
include a certification that all irons for a specific lot have either been found or set prior to the
issuance of a building permit for that lot.
C. The Developer shall pay a cash fee for the preparation of record construction drawings and City
base map updating. This fee is $100.00 per acre for a total charge of $1,076.00.
D. The Developer is required to submit the final plat in electronic format. The electronic format
shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g.,
grading, utilities, streets) shall be in electronic format in accordance with standard City
specifications.
10
2151050
Hunter Hills Second Addition
29. CONSTRUCTION ADMINISTRATION AND FEES FOR CITY SERVICES. The Developer
shall pay a fee for consulting engineering administration following approval of the Plat. City engineering
administration will include consultation with Developer and its engineer on status or problems regarding the
project, monitoring during the warranty period, general administration and processing of requests for
reduction in security. Fees for this service shall be the actual amount billed for those services, which are
estimated to be three percent (3%) of the estimated construction cost of the Improvements to be inspected,
assuming normal construction and project scheduling. The Developer shall pay for construction observation
performed by the City Engineer. Construction observation shall include part or full time observation, as
determined by the City Engineer, of proposed street, sanitary sewer, water and storm drainage construction
and will be billed on hourly rates actually required for said inspection, which are estimated to be five percent
(5%) of the estimated construction cost of the Improvements to be inspected. In the event of prolonged
construction or unusual problems, the City will notify the Developer of anticipated cost overruns for
engineering administration and observation services. Any amounts for engineering administration not
utilized from this escrow fund shall be returned to the Developer when all improvements have been
completed, all financial obligations to the City satisfied, and the required "as constructed" plans have been
received by the City.
The escrow and fee account shall also include estimated fees for Legal expenses actually
incurred (with any excess funds, if any, returned to Developer as indicated in this Contract), City
Administrative Fee (a flat fee due upon execution of this Agreement), Trunk Water and Sewer Access Fees
(a flat fee due upon execution of this Agreement), Transportation Infrastructure Costs (a flat fee due upon
execution of this Agreement), Park and Trail Dedication Fees (a flat fee due upon execution of this
Agreement), Street Light Maintenance and Operation Fee (a flat fee due upon execution of this Agreement)
and shall be as stated by the Financial Summary.
This escrow amount shall be submitted to the City prior to the City executing this Agreement.
All administrative and legal fees related to plan review, drafting of this Agreement and any other necessary
items shall be paid to the City prior to execution of this Agreement. Any amounts for legal and engineering
11
2151050
Hunter Hills Second Addition
not utilized from this escrow fund shall be returned to the Developer when all improvements have been
completed, all financial obligations to the City satisfied, and the required "as constructed" plans have been
received by the City.
All other amounts listed as flat fees are non-refundable and available immediately for City use
when posted.
30. SECURITY. To ensure compliance with the terms of this Contract, and construction of all
public improvements, and satisfaction of all other obligations, the Developer shall furnish the City with a
cash escrow or Irrevocable Standby Letter of Credit with automatic renewal provisions in the amount as
required under this Contract. The issuer and form of the security (other than cash escrow) shall be subject
to City approval in its reasonable discretion. The security shall be issued by a banking institution in good
standing as determined by the City and approved by the City Administrator. The City shall have the ability to
draw on the security at a bank or branch bank located within fifty (50) miles of the City Hall. The security
shall contain an automatic renewal provision and shall not expire until all the Development is complete and
fully and finally accepted by the City, and all terms of this Contract are satisfied.
The City may draw down the security, on five (5) business days written notice to the Developer, for
any violation of the terms of this Contract or without notice if the security is allowed to lapse prior to the end
of the required term. If the required public improvements are not completed at least thirty (30) days prior to
the expiration of the security, the City may also draw it down without notice. If the security is drawn down,
the proceeds shall be used to cure the default.
Upon receipt of proof satisfactory to the City that work has been completed and financial obligations
to the City have been satisfied, with City approval not to be unreasonably withheld or delayed, the security
shall be reduced from time to time in proportion to the work completed, but not below ten (10) percent which
is the amount of the warranty security. For purposes of this Section, the warranty period shall be a twelve
(12) month period after the applicable work has been completed, except with respect to streets, for which
the warranty period shall be two years as addressed elsewhere in this Contract.
12
2151050
Hunter Hills Second Addition
This security amount shall be submitted to the City prior to execution of the Contract. All
administrative and legal fees related to plan review, drafting of this Contract and any other necessary items
shall be paid to the City prior to execution of the Contract. Upon completion of the work contemplated
hereunder and expiration of the warranty period, the remaining security shall be promptly released to
Developer.
31. SUMMARY OF SECURITY REQUIREMENTS. The amount of the security described
above is calculated as follows:
CONSTRUCTION COSTS:
A. Sanitary Sewer — Lateral and Trunk $190,963.00
B. Watermain — Lateral and Trunk 247,005.00
C. Storm Sewer — Lateral 143,649.00
D. Streets 687,110.63
CONSTRUCTION SUB -TOTAL $1.268.727.63
OTHER COSTS:
A. Engineering & Surveying Construction Services (6.5%) $82,467.30
OTHER COSTS SUB -TOTAL $82,467.30
TOTAL — SUBTOTAL $1,351,194.93
TOTAL IRREVOCABLE LETTER OF CREDIT $1,688,993.66
FOR SECURITY (125% OF SUBTOTAL
ESCROW
A. City Legal Expenses (Est. 1.0% of $1,268,727.63) $12,687.28
B. City Construction Observation (Est. 8.0% of $1,268,727.63) 101,498.21
C. GIS Data Entry Fee 1,076.00
ESCROW TOTAL $115,261.49
DEVELOPMENT WARRANTY LETTER OF CREDIT
A. Sanitary Sewer $28,644.45
B. Watermain 37,050.75
C. Storm Sewer 21,547.35
D. Streets
E. Erosion & Sedimentation Control
TOTAL WARRANTY LETTER OF CREDIT
13
2151050
68,000.00
9,750.00
$164,992.55
Hunter Hills Second Addition
This breakdown is not a restriction on the use of the security.
32. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash
requirements under this Contract which must be furnished to the City prior to the City Council signing the
final plat:
A. City Administrative (Est. 1.0% of $1,268,727.63)
B. Trunk Sewer Access Fee (SAC)
C. Trunk Water (WAC)
D. Trunk Storm Water Management Impact Fee
E. Park And Trail Dedication
F. Traffic Control Signs
G. Street Light Operating Fee
TOTAL CASH REQUIREMENTS
$12,687.28
102,999.00
71,916.00
39,263.24
112,320.00
6,500.00
1,500.00
$347,185.52
33. WARRANTY. The Developer warrants all improvements required to be constructed by it
pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is
two years as specified in this Contract. The warranty period for underground utilities is two years and shall
commence following completion and acceptance by City Council. A minimum of 10% of the total security
required under this Contract shall be retained as warranty security as specified in the section of this
Contract.
34. RESPONSIBILITY FOR COSTS.
A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City
in conjunction with the development of the plat, including but not limited to Soil and Water
Conservation District charges, legal, planning, engineering and construction observation
inspection expenses incurred in connection with approval and acceptance of the plat, the
preparation of this Contract, review of construction plans and documents, and all costs and
expenses incurred by the City in monitoring and inspecting development of the plat.
B. The Developer shall hold the City and its officers, employees, and agents harmless from claims
made by itself and third parties for damages sustained or costs incurred resulting from plat
14
2151050
Hunter Hills Second Addition
approval and development. The Developer shall indemnify the City and its officers, employees,
and agents for all costs, damages, or expenses which the City may pay or incur in
consequence of such claims, including attorneys' fees.
C. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract,
including engineering and attorneys' fees.
D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is
attached, all special assessments referred to in this Contract. This is a personal obligation of
the Developer and shall continue in full force and effect even if the Developer sells one or more
lots, the entire plat, or any part of it.
E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under
this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may
halt plat development and construction until the bills are paid in full. Bills not paid within thirty
(30) days shall accrue interest at the rate of eighteen percent (18%) per year. Additionally, the
Developer shall pay in full all bills submitted to it by the City prior to any reductions in the
security for the development.
F. In addition to the charges and special assessments referred to herein, other charges and
special assessments may be imposed such as but not limited to sewer availability charges
("SAC"), City water connection charges, City sewer connection charges, and building permit
fees.
35. DEVELOPER'S DEFAULT. In the event of default by the Developer as to any of the work
to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall
promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an
emergency as determined by the City, is first given notice of the work in default, not less than forty-eight
(48) hours in advance. This Contract is a license for the City to act, and it shall not be necessary for the
City to seek a Court order for permission to enter the land. When the City does any such work, the City
may, in addition to its other remedies, assess the cost in whole or in part.
15
2151050
Hunter Hills Second Addition
36. MISCELLANEOUS.
A. The Developer represents to the City that the plat complies with all city, county, state, and
federal laws and regulations, including but not limited to: subdivision ordinances, zoning
ordinances, and environmental regulations. If the City determines that the plat does not
comply, the City may, at its option, refuse to allow construction or development work in the plat
until the Developer does comply. Upon the City's demand, the Developer shall cease work until
there is compliance.
B. Third parties shall have no recourse against the City under this Contract.
C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building
permits, including lots sold to third parties.
D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for
any reason held invalid, such decision shall not affect the validity of the remaining portion of this
Contract.
E. Grading, curbing, and one lift of asphalt shall be installed on all public and private streets prior
to issuance of any building permits.
F. If building permits are issued prior to the acceptance of public improvements, the Developer
assumes all liability and costs resulting in delays in completion of public improvements and
damage to public improvements caused by the City, Developer, its contractors, subcontractors,
material men, employees, agents, or third parties. No sewer and water connections or
inspections may be conducted and no one may occupy a building for which a building permit is
issued on either a temporary or permanent basis until the streets needed for access have been
paved with a bituminous surface and the utilities are accepted by the City Engineer.
G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of
this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties
and approved by written resolution of the City Council. The City's failure to promptly take legal
action to enforce this Contract shall not be a waiver or release.
16
2151050
Hunter Hills Second Addition
H. This Contract shall run with the land and may be recorded against the title to the property. In
the event this Contract is recorded, upon request by Developer, the City covenants to provide a
recordable Certificate of Completion within a reasonable period of time following the request,
upon the completion of the work and responsibilities required herein, payment of all costs and
fees required and compliance with all terms of the Contract. A release of this Contract may be
provided in the same manner and subject to the same conditions as a Certificate of Completion
provided there are no outstanding or ongoing obligations of Developer under the terms of this
Contract. The Developer covenants with the City, its successors and assigns, that the
Developer is well seized in fee title of the property being final platted and/or has obtained
consents to this Contract, in the form attached hereto, from all parties who have an interest in
the property; that there are no unrecorded interests in the property being final platted; and that
the Developer will indemnify and hold the City harmless for any breach of the foregoing
covenants.
I. Insurance. Prior to execution of the final plat, Developer and its general contractor shall
furnish to the City a certificate of insurance showing proof of the required insurance required
under this Paragraph. Developer and its general contractor shall take out and maintain or
cause to be taken out and maintained until six (6) months after the City has finally accepted
the public improvements, such insurance as shall protect Developer and its general contractor
and the City for work covered by the Contract including workers' compensation claims and
property damage, bodily and personal injury which may arise from operations under this
Contract, whether such operations are by Developer and its general contractor or anyone
directly or indirectly employed by either of them. The minimum amounts of insurance shall be
as follows:
Commercial General Liability (or in combination with an umbrella policy)
$2,000,000 Each Occurrence
$2,000,000 Products/Completed Operations Aggregate
$2,000,000 Annual Aggregate
17
2151050
Hunter Hills Second Addition
The following coverages shall be included:
Premises and Operations Bodily Injury and Property Damage
Personal and Advertising Injury
Blanket Contractual Liability
Products and Completed Operations Liability
Automobile Liability
$2,000,000 Combined Single Limit— Bodily Injury & Property Damage
Including Owned, Hired & Non -Owned Automobiles
Workers Compensation
Workers' Compensation insurance in accordance with the statutory requirements of the
State of Minnesota, including Employer's Liability with minimum limits are as follows:
• $500, 000 — Bodily Injury by Disease per employee
• $500, 000 — Bodily Injury by Disease aggregate
• $500,000 —Bodily Injury by Accident
The Developer's and general contractor's insurance must be "Primary and Non -Contributory".
All insurance policies (or riders) required by this Contract shall be (i) taken out by and
maintained with responsible insurance companies organized under the laws of one of the
states of the United States and qualified to do business in the State of Minnesota, (ii) shall
name the City, its employees and agents as additional insureds (CGL and umbrella only) by
endorsement which shall be filed with the City and (iii) shall identify the name of the plat. A
copy of the endorsement must be submitted with the certificate of insurance.
Developer's and general contractor's policies and Certificate of Insurance shall contain a
provision that coverage afforded under the policies shall not be cancelled without at least
thirty (30) days' advanced written notice to the City, or ten (10) days' notice for non-payment
of premium.
An Umbrella or Excess Liability insurance policy may be used to supplement Developer's
or general contractor's policy limits on a follow -form basis to satisfy the full policy limits
required by this Contract.
J. Indemnification. To the fullest extent permitted by law, Developer agrees to defend, indemnify
and hold harmless the City, and its employees, officials, and agents from and against all
claims, actions, damages, losses and expenses, including reasonable attorney fees, arising
is
2151050
Hunter Hills Second Addition
out of Developer's negligence or its performance or failure to perform its obligations under this
Contract. Developer's indemnification obligation shall apply to Developer's general
contractor, subcontractor(s), or anyone directly or indirectly employed or hired by Developer,
or anyone for whose acts Developer may be liable. Developer agrees this indemnity
obligation shall survive the completion or termination of this Contract.
K. Each right, power or remedy herein conferred upon the City is cumulative and in addition to
every other right, power or remedy, express or implied, now or hereafter arising, available to
City, at law or in equity, or under any other agreement, and each and every right, power and
remedy herein set forth or otherwise so existing may be exercised from time to time as often
and in such order as may be deemed expedient by the City and shall not be a waiver of the
right to exercise at any time thereafter any other right, power or remedy.
L. The Developer may not assign this Contract without the written permission of the City Council.
The Developer's obligation hereunder shall continue in full force and effect even if the
Developer sells one or more lots, the entire plat, or any part of it, until the City's issuance of a
Certificate of Completion and Release.
M. Retaining walls over four feet in height shall be constructed in accordance with plans and
specifications prepared by a structural or geotechnical engineer licensed by the State of
Minnesota. Following construction, a certification signed by the design engineer shall be filed
with the Building Official evidencing that the retaining wall was constructed in accordance with
the approved plans and specifications. All retaining walls identified on the development plans
and by special conditions referred to in this Contract shall be constructed before any other
building permit is issued for a lot on which a retaining wall is required to be built. All retaining
walls must comply with the City's engineering manual and the City's zoning ordinance.
N. Should the Developer convey any lot or lots in the Development to a third party, the City and the
owner of that lot or those lots may amend this Development Contract or other city approvals or
agreements for development or use of those lots without the approval or consent of the
19
2151050
Hunter Hills Second Addition
Developer or other lot owners in the Development. Private agreements between the owners of
lots within the Development for shared service or access and related matters necessary for the
efficient use of the Development shall be the responsibility of the lot owners and shall not bind
or restrict City authority to approve applications from any lot owner in the Development.
37. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand
delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the
following address: 1536 Beachcomber Boulevard, Waconia, Minnesota 55387. Notices to the City shall
be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by
certified mail in care of the City Administrator at the following address: Otsego City Hall, 13400 90th
Street NE, Otsego, Minnesota 55330.
[The remainder of this page has been intentionally left blank.
Signature pages follow.]
r. I
2151050
Hunter Hills Second Addition
CITY OF OTSEGO
(SEAL)
AND
STATE OF MINNESOTA )
)ss.
COUNTY OF WRIGHT )
Jessica L. Stockamp, Mayor
Audra Etzel, City Clerk
The foregoing instrument was acknowledged before me this day of
2021, by Jessica L. Stockamp and by Audra Etzel, the Mayor and City Clerk of the City of Otsego, a
Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its
City Council.
NOTARY PUBLIC
21
2151050
Hunter Hills Second Addition
DEVELOPER:
TAMARACK LAND — HUNTER HILLS, LLC
Its
STATE OF MINNESOTA )
)ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
2021, by the
Tamarack Land — Hunter Hills, LLC, a Minnesota limited liability company, on behalf of said entity.
NOTARY PUBLIC
DRAFTED BY:
CAMPBELL, KNUTSON
Professional Association
Grand Oak Office Center 1
860 Blue Gentian Road, Suite 290
Eagan, MN 55121
Telephone: 651-452-5000
DSK/smt
22
Hunter Hills Second Addition
2151050
of
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
U.S. HOME CORPORATION, a Delaware corporation, d/b/a LENNAR, fee owners of all or part of
the subject property, the development of which is governed by the foregoing Development Contract, affirm
and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to
that portion of the subject property owned by them.
Dated this day of )2021.
U.S HOME CORPORATION d/b/a LENNAR
13
STATE OF )
)ss.
COUNTY OF )
Its
The foregoing instrument was acknowledged before me this
by , the
Delaware corporation, d/b/a LENNAR, on behalf of said entity.
NOTARY PUBLIC
DRAFTED BY:
CAMPBELL KNUTSON
Professional Association
Grand Oak Office Center 1
860 Blue Gentian Road, Suite 290
Eagan, Minnesota 55121
651-452-5000
DSK/smt
[print name]
[title
day of , 2021,
of U.S. Home Corporation, a
23
Hunter Hills Second Addition
2151050
[BANK LETTERHEAD]
IRREVOCABLE LETTER OF CREDIT
TO: City of Otsego
City Hall
13400 90th Street NE
Otsego, Minnesota 55330
Dear Sir or Madam:
No. _
Date:
We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable
Letter of Credit in the amount of $ available to you by your draft drawn on sight on the
undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. dated 2
of (Name of Bank) ";
b) Be signed by the City Administrator or Finance Director of the City of Otsego.
c) Be presented for payment at (Address of Bank) on or before 4:00 p.m. on November 30,
2
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-five
(45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank delivers
written notice to the Otsego Finance Director that it intends to modify the terms of, or cancel, this Letter of Credit.
Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-
five (45) days prior to the next annual renewal date addressed as follows: Otsego Finance Director, Otsego City
Hall, 13400 90th Street NE, Otsego, MN 55330, and is actually received by the Finance Director at least thirty
(30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified,
amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred
to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may
be made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice
for Documentary Credits, International Chamber of Commerce Publication No. 600.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly
honored upon presentation.
[NAME OF BANK]
:'A
Its
Hunter Hills Second Addition
2151050
N
��$/ I � • I �Ra�9$ F- -----------
mo o
W
"a o
,T c a z
LJ
j w
IJ..JL..J L..J L..J L..J L..J L..J I
J
b� LI—J « L—JL—JL_JL—JL
„,[fZK
�` r, 'a / S� 9o -v — ¢ mco'f-v �ew•ty �tiw21 .oi .t� me' m+c (n
O
J L..J L..J I E Z
i a
j I
,2
-�
� �Nr a 19 Lr1 �� I li FB I fel _ "ESas
%
RL
-1 �p a5 a (�• o "-(7 $m I p�g�
r- "'
-
`\°g.JJI
����1\ \ /.�/ Ya ¢ q Ji 6• �.. L°� a 7�9 InIS I•Y C "R
SI I = KJL L _-�j �" I �....JII-..JL..AL..J
--- sr/t a
1 I I Jr I y q"Uw OOK OOti ro11
f�� �: � F k•Fii°FSI-poi "Foi"Fri"FP 8 Zww
1 /yy� <Z
to
c 'IC Cj
I - r 'I
j-----------
_ y,r
al I c
1 I __-_-_--_- m
� l a
Lm
f _____
I \ii ---.1 W o
4.
------
Z¢'Po2
-------------
21 __________ , I
----1 I I {tiI
I I 91 ll r---------- 4` I
91 I 91 'YI
C I _
I I I I
I -----SI------
f.____ai 1 I I I
Y LU
UW
a
Z O
>W o
l5 5 S F
s 5y
e5fi
IHa-��$o
HU
s Eo p2 = S la Ew�sa o 9§ J g oa 8 ➢ I ��� B � -
pga es o o ° 91 JP EcSya° s 3'
p l I j�e` a I I n I n I �
C (III Pi I al I SBI
th• 8.� I I � S I I 1 oks' I �'� I I I I J I I I aI
,
? $ 3N 3AV fIVUNV'I o
U
U c rPcc�tDm A .\�/ 0�y¢�qmr+ `/ ma/
------------ r SII
R
W N s r 2z
U) / 4 GGG 4I m m S°I
v J ap/ ry S
/ : 7E�� s � ��� �\ •4'�, J / `�' / /-7emnT/lsn-- r
V J / yb g$� 1888 e
JS¢9 S m 4 11 m `3LT6_J L_titl_ L--W1 U .k S E o _� v------mr�e
-----�
ry'o-y •� / a Y\ m n \ _ , `q.Y. __ate—ua�---J N
/ l 1 o
W --
f I
p
Zr
m "
m
-----------
F?
---------x
I m �y I C C II
__—_____—__
� I m�a� 31" s�,s osE,se s' n�cizc.,s as i � iC
n I
�o I
�z
$a _
H_o w . o �r
�Z—Q g