Loading...
ITEM 3.5B Needham AveCITY OF ot go MINNESOTA DEPARTMENT INFO TIO Request for City Council Action mol I 11111 _....... ..................... :................. .......... .... ..................N...._ .... ...n ........... ....ry.....................x............. _..... ............ ............:....:....... :.........-..................... ....................._................... ._......... ............................ ..................... .... .... ........ ................. ... ....... .... ........ ... .. . RI I[ TIN DSP F�Th-IE ]T; REQUE TOR: MEETING DATE: Pudic Works City Engineer Wagnr December 9,, 2013 PRE E TER(s),- REVIEWED BY: ITEM ; Consent Agenda City Administrator Johnson Ar.,FNnA ITFM FTA11 _ RECOMMENDATION: City Staff Recommends approval of Final Payment in the amount of $4,065.55 for the Needham Avenue Drainage Improvements — Phase 1 Project to Dawe Perkins Contracting, Inc. ARE YOU SEEKING APPROVAL of A CONTRACT? 13 A PUBLIC HEARING REQUIRED? No No BA}BACKG ROUND/JU TiFI ATION: Dago Perkins Contracting has completed all improvements and site restoration for the Needham Avenin Drainage Improvements —Phase 1 Project. Needham Avenue torm Sewer is a private system which had failed and needed improvements to alleviate flooding and improve quality of life in the area. The existing i system had a section which has collapsed and the existing culverts and ditches were at grades which did not promote drainage. The City held a public hearing on this project and at the May 1 , 20 .3, Council meeting. ting. Tho Council authorized requests for quotes for the project. Needham Av nu Storm Sewer Improvement is in the 2013 CIP for ars estimated amount of $44,000. The quotes carne in above that estimate. A phasing option was determined to be an alternative which may work. Phase entailed re-grardirng the ditches, resetting culverts and replacing the outlet pipe to just beyond its current break and attached to the remaining existing section. Phase 2 would be needed if any additional portion of the existing pipe collapsed or could be completed its conjunction when the street is reconstructed. The section of the pipe remaining in a future Abase 2 was televised and deemed structurally intact. The Council opted to r q ote for Needham Aven e Storlmwat r Improvements - Phase I only. This project was completed for a total of $33,317.00 or approximately 1% below the bid price of $39.t234.00 SUPPORTING DOCUMENTS. 0 A17A HED NON • Finan Payment (Pay Estimate #2) POSSIBLE MOTION ............ ................. ....... ....... ....................................... lea �r rd r tion a..... s your would Ills It to appear In t minutes, Motion to approve Final Payment to Dave Perkins Contracting, Inc. in the amount of $4,065.55 for the Needham Avenur Drainage Improvements — Phase 1 Project. BUDGET INFORMATION I i � 11 110111111;! . ... .... . ..... .. . . ... . .. ... .... ......... ....... ... ......... .............. .. . .. . ... .. .. .... ....... .... ........ .... ...... ...... ... .... .... ............... .. ....... . .. ... .. ... . . . . ... ............. .... . ... . ... ..... .. .. ... ............. .... . ......... .. ..................... .......... . I ........... .... .. ........ .. ...... ....... ... ..... .... ...... ....................... .. .. .......... ......... ...... .. ..... ......... ... ..... ... .. ....... . ... ... .. ... ....... .... ...... .... ... .... ............. .. ......... .... FUNDING: BUDGETED: xYES Assessment 220 -Storm Water — 0 ut of D ist r! ct ij NO ACTION TAKEN .. .. ... . .. . ......... . . ......... ....... . ...... . . .. ..... : ........... ........ .. I.-...-....- .. .... . ................. ..... ... ..... . . . ..... .... . . .... . ..... ... ... ............. ...... .. . ... ......... ..... .... ..... .. ... ..... .. .. .. ............... ..... ....... . .. .............. .. ... . .......... ......... .. ..... ......... r -i APPROVED AS REQUESTED ❑DENIED u TABLED tj OTHER (List changes) COMMENTS: FINAL PAYMENT CITY OF OTSE O Needham Avenue Drainage Improvements - Phase I December 3, 2013 Honorable Magor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 B: Needham Avenue Drainage Improvements - Phase I Contractor: Dave Perkins Contracting, Inc. Contract Amount, $39,234.00 Award Data: August 16, 2013 Completion Date: September 9, 2013 Dear Honorable Mayor and Council Members: The following wort has been completed on the above -referenced project by Dare Perkins Contracting, Inc. Rld r-horhdo "A r . Afronfe anA P:rarlinn OWNE ITEM NO. I ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRIDE CONTRACT AMOUNT U ED T DAVE I EXTENSION I Mobllizetion I L $1 200.00 $ 1,200.00 1 $ 1,200.00 2 Remove ExIstIng PVC Storm Sevier Pipe 135 LF $10.00 $ 1,350.00 135 $ 1,350.00 20 Remove Eltum1nous Pavement 106 SY $5. DO $ 530.00 49 245.00 4 Bawer g Bltum1nous Pa ement Fu 11 Ike th) I60 LF $3.D0 450.00 154 462.00 5 Ditch Gradin 'I L $4 000.00 $ 4,000.00 1 4,000.00 23 Haul Excess Dirt to' St Ile 231 DY $12.00 $ 2,772.00 0 $ 1,748.00 7 Agg re g ate Base, class 6 37 T $28,00 -11036,00 37 1,036.04 8 Mill 13hur mous Surface (1,51 6 SY $25.00 150,00 10 250.00 9 Type LV4 Aloe oyrs q Mbdure 0 TN $200,DO 4,000.00 9 1'800.00 10 BltumInou s Material for Teck Coat 9 GAL $10.00 $ 90.00 0 $ - 11 Traffic control I LS s6w-m $ 600.00 1 $ 600.04 12 Sif# Fenc , Type MaGch1ne Sliced 62 LF $4.00 248,00 6 $ 248.00 13 SeedIng I Ac $1, 4.00 11500.00 1 $ 1500.00 14 Seed, Fixture 270 80 LBS $3.60 260,00 40 $ 140.00 16 Mulch Material, Type 1 1 T $W100. 350.00 0,4 $ 140.00 16 Erosion Control Blanket Cstegofy 3 225 SY $2,00 450.40 141 $ 282.00 17 Fertilizer, Type 3 264 LBS $1,00i $ 264.00 104 $ 100.00 Tota[ Bid Schedule „A" 19,270.03 - --- 13,363.00 PH r*hw ielo „Rrr - t^Fnt away ITEM iso{ ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT T UNIT PRICE CONTRACT AMOUNT USED T CRATE EXTENSION 18 15" CS Pipe Apron 'I EA $250.04 $ 250.00 1 $ 250.00 19 1" RD PJpe Apron 6 E $650.04 $ 3,900.00 5 $ 3,000.00 20 16" RG PI pe Aron 4 EA $700.04 2,500.04 4 2,600.00 21 24" RG Plpe Aron 2 EA $950.00 1,900.00 1,900.00 22 154 HDPE PI a Sewer 138 LF $30.00 $ 4,140.40 138 $ 4,140.00 23 12" RC Pipe Sever Des n 3006 CL 111 46 LF $38.00 $ 1,748.00 46 $ 1,748.00 24 15" RC Pipe Sewer Design 3006 CL 111 32 LF $38.00 1,216.00 32 $ 1,21 .00 25 24" RC Pipe Sewer Des n 3006 CL 111 32 LF $55.40 $ 1,760.00 32 $ 1.760.00 6 Catch Basin 'I EA $1,650.40 $ 'i,50.00 1 $ 1,650.00 27 Connect to Exis Ung 0ralna g a PI a i EA $600.04 600.40 1 $ 6W.00 Total Bid Schedule 1"B11 Bid Schedule "A" Bid Schedule "B" TOTAL Total Work Completed to Date LESS Pay Request #1: WE RECOMMEND FINAL PAYMENT OF: OT435 PE - Prase 1.xls PE - 1 $ 19,964.00 19,27 3.00 $ 19s964.00 19L964.00 3,7,0 33,31700 29,251.46 4,065.55 FINAL PAYMENT OWNER CITY OF OTSEGO Needham Avenue Drainage Improvements - Phase 1 Please verify the amount of previous payments, and the receipt of the following items prior to making payment. i. Certificate of claims payment (lien vralver), . Affidavit of payment of States takes (MN State TAX Form IC 134), APPROVALS: CONTRACTOR: DAVE PERKINS i TRA TIN , INC. Certification by Contractor: I certify that all iters and amounts are correct for the work completed to date, Signed: Title: Date ENGINEER: HAKANSON ANDERSON Cerfificaflon by Engfneer: We recommend payment forvrork and quantities ashown. Signed: T19e: Date OWNER: CITY OF OTSEGO Signed: TiVe: Date OT43 PE - Phase I.As PE -