Loading...
05-24-10 SCCCity of Otsego SWPPP Annual Meeting I. Introduction ➢ Required by National Pollutant Discharge Elimination System (NPDES) ➢ Regulated by Minnesota Pollution Control Agency ➢ City Adopted a Storm Water Pollution Prevention Program (SWPPP) ➢ Goal: Reduce the discharge of pollutants into receiving waters to the Maximum Extent Practicable (MEP) II. Six Minimum Control Measures 1. Public Education and Outreach Goal - Reduce pollutants and improve water quality by educating the public, city officials, and city staff about the impacts on stormwater runoff. Activity- Distribute literature on fertilizer, chlorinated pool discharges, automotive liquids, pet waste, construction activities, etc. 2. Public Participation and Involvement Goal —Allow public to provide input on the City's SWPPP Activity—Annual public meeting 3. Illicit Discharge Detection and Elimination Goal — Reduce / eliminate non-stormwater discharges into the storm sewer system and receiving waters. ➢ Create a comprehensive storm sewer system map to help gain a better understanding of the City's storm sewer system and assist in tracking illicit discharges. ➢ Identify illicit discharges through inspections of the storm sewer system (i.e. identify dry weather discharges, staining, odors) 4. Construction Site Stormwater Runoff Control Goal — Reduce sediment and erosion by implementing standards and enforcing through inspections. Require waste controls for site operators. City of Otsego SWPPP Annual Meeting 5. Post -Construction Stormwater Management Goal — Reduce pollutants in stormwater discharges by implementing permanent stormwater facilities, such as NURP ponds and treatment structures. Implement standards to ensure permanent BMP's are installed and maintained for new development and re -development. 6. Pollution Prevention / Good Housekeeping Goal — Reduce pollutants in stormwater discharges by employing good housekeeping practices for municipal/public works operations. Activity — Street sweeping, pond, outfall and structure inspections, stockpile and handling area inspections, maintenance, repairs, etc. III. Upcoming Challenges ➢ Current permit expires June 1, 2011. New permit application and SWPPP will be due in 2011 (MPCA permit will state timelines). ➢ Inventory of all lakes, ponds, wetlands, rivers, streams creeks, ditches, and ravines - due with submittal of new permit application. Includes determining surface area, ID numbers, and number of discharges. (Stage 1) ➢ Stage 2 will likely include a survey of all NURP ponds and evaluation of treatment capacity. City will eventually be required to dredge / maintain ponds as they fill up with sediment (expensive). ➢ Assessment of Discharges to Restricted Waters - due June 30, 2011 ➢ Impaired Waters / Total Maximum Daily Load (TMDL) — Requires implementation by City after TMDL Plan is approved. Mississippi River — Mercury in fish tissue, Polychlorinated biphenyls in fish Tissue (2011) Crow River — Fecal Coliform (2012), Fish bioassessments (2017), Turbidity (2012), Dissolved Oxygen (2015) ➢ Funding — Adjustments to Storm Water Utility Fee may be required as actual costs are calculated and potential additional costs are determined. ➢ Management — May want to evaluate regional ponding vs. small development ponds. Regional ponding could provide large future cost savings when the costs of inspections, maintenance, and dredging are considered.