ITEM 4.2 Jalger Aveots".'r o MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: Public Works REQUESTOR: Ron Wagner, City Engineer MEETING DATE: May 27, 2014 PRESENTER(5): REVIEWED BY: ITEM #: Ron Wagner, City Engineer Lori Johnson, City 4.2 Administrator AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends approval of Resolution 2014-36 Accepting Bid and Awarding the Jalger Avenue Street Improvement voiect. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/J USTI FICATI ON: The City Council accepted a Feasibility Report at their meeting on June 24, 2013 for improvement of Jagler Avenue and 100th Street. The City Council also ordered the City Engineer to prepare plans and specifications and has called for a public hearing for residents to be presented project scope and possible assessment costs. However, City staff has obtained waivers for individual assessments up to $14,259 from each of the ten owners of property proposed to be assessed as part of the improvement project, which eliminates the need for an improvement hearing. The City Engineer has prepared the plans and specifications for the project. The project includes shaping and paving of Jagler Avenue and 100th Street. Due to significant encroachment issues within existing ROW, we have had to modify the street to best provide access while still providing room for maintenance. The estimated construction cost of the project is $108,538.50. A conditional use permit will need to be initiated by the City after the contract for the project is awarded to allow vacation of a portion of existing right-of-way for the east 100th Street cul-de- sac. The vacation of the existing right-of-way as proposed will result in an existing lot of record having less than the minimum 150 feet of frontage to a public right-of-way, although the lot will maintain direct access to a public street. The $1,500 cost of processing the conditional use permit and right-of-way vacation will be included as part of the overall project. The lowest responsive bidder is Knife River of Sauk Rapids, MN with a bid of $121,343.50. This is $12,805.00 higher (12%) than the engineers estimate. An additional lot has signed an assessment waiver which increases the total amount waived for assessment to $142,590. Also, due to the waiving of assessment appeal, some soft costs have been eliminated. One additional cost saving measure can also be pursued. 400 CY of top soil borrow is proposed to be used to finish the shoulder along the newly paved street. The City has approximately 3000+ CY of topsoil in its old boneyard near the ball fields that will need to be moved for park expansion that may occur someday. Rather than move this material to behind public works, some of this could be offered to the contractor saving the cost of the top soil and possibly saving the contractor some hauling distance. We anticipate this change to save the project up to $4000. The project costs, with or without the negative change order, is projected to end up between the original estimate of $128,331 and the current waived assessment amount of $142,590. Therefore we recommend awarding the contract to Knife River of Sauk Rapids SUPPORTING DOCUMENTS: x ATTACHED ❑ NONE List: A. Resolution 2014-36 B. Engineers Estimate C. Bid Tabulation POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve Resolution 2014-36 accepting bids and awarding the City of Otsego Project #14-03 Jalger Avenue Street Improvement Project to Knife River Corporation of Sauk Rapids. BUDGET INFORMATION FUNDING: BUDGETED: x YES Assessment with a total waiver amount of $142,590 Ei NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: RESOLUTION NO. 2014-36 RESOLUTION ACCEPTING BID WHEREAS, pursuant to an advertisement for bids for the construction of City of Otsego, Jalger Avenue and 100th Street Improvements, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Total Base Bid Knife River Corporation $121,343.50 Hardrives, Inc. $146,323.21 Park Construction Company $176,996.20 AND WHEREAS, it appears that Knife River Corporation of Sauk Rapids, Minnesota is the lowest responsible bidder, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO MINNESOTA: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Knife River Corporation of Sauk Rapids, Minnesota in the name of the City of Otsego for the Jalger Avenue and 100th Street Improvements, according to the plans and specifications therefore approved by the city council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the city council this 21St day of May, 2014. Motioned By: Seconded By: All in Favor: Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk OT39CResACCEPT BID ENGINEER'S ESTIMATE JALGER AVENUE AND 100TH STREET IMPROVEMENTS CITY OF OTSEGO PROJECT #14-03 Schedule "A"- Road Construction ITEM NO. DESCRIPTION UNIT TOTAL ESTIMATED UNIT COST QUANTITY TOTAL ESTIMATED COST 1 MOBILIZATION LUMP SUM 1.0 $3,150.00 $3,150.00 2 CLEAR AND GRUB TREES LUMP SUM 1.0 $500.00 $500.00 3 SALVAGED TOPSOIL CU YD 20 $5.00 $100.00 3 REMOVE METAL CULVERTS LIN FT 32 $7.00 $224.00 4 REMOVE BITUMINOUS PAVEMENT SQ YD 93 $3.50 $325.50 5 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 60 $5.00 $300.00 6 MILL BITUMINOUS (1.5" DEEP) SQ YD 6 $5.00 $30.00 7 SALVAGE AND REINSTALL MAIL BOX AND SUPPORT EA 3 $65.00 $195.00 8 COMMON EXCAVATION (P) CY 170 $7.00 $1,190.00 9 TOPSOIL BORROW (LV) CU YD 400 $10.00 $4,000.00 10 GRANULAR BORROW (MnDOT 3149.281) (LV) CU YD 110 $15.00 $1,650.00 11 SUBGRADE PREPARATION ROAD STA 16.8 $100.00 $1,680.00 12 AGGREGATE BASE CLASS 5 TON 645 $15.00 $9,675.00 13 TYPE LV4 WEARING COURSE MIXTURE (B) TON 440.0 $65.00 $28,600.00 14 TYPE LV3 NON WEARING COURSE MIXTURE (B) TON 586.0 $55.00 $32,230.00 15 BITUMINOUS MATERIAL FOR TACK COAT GALLONS 250 $3.50 $875.00 16 SEEDING ACRE 0.49 $1,000.00 $490.00 17 SEED MIXTURE 270 LBS 60 $4.00 $240.00 18 SILT FENCE, TYPE MACHINE SLICED LIN FT 1,100 $3.50 $3,850.00 19 BIO -ROLL LIN FT 312 $3.00 $936.00 20 EROSION CONTROL BLANKET CATEGORY 1 SY 2,400 $2.00 $4,800.00 21 FERTILIZER TYPE 3 LBS 150 $1.00 $150.00 SCHEDULE "A" - ROAD CONSTRUCTION ESTIMATED TOTAL COST $ 95,190.50 Schedule "B" - Storm Sewer Construction ITEM NO. I DESCRIPTION UNIT TOTAL ESTIMATED UNIT COST QUANTITY TOTAL ESTIMATED COST 22 REMOVE METAL CULVERTS LIN FT 32 $6.50 $208.00 23 15" RC PIPE CULVERT DESIGN 3006 CLASS V LIN FT 136 $25.00 $3,400.00 24 15' RC APRON EACH 2 $250.00 $500.00 25 INSTALL TYPE N STRUCTURE EA 2 $1,000.00 $2,000.00 26 CASTING ASSEMBLY (NEENAH R-4342) EA 2 $500.00 $1,000.00 27 STORM WATER ENERGY DISIPATOR EACH 1 $2,000.00 $2,000.00 28 PERFORATED DRAINTILE LF 62.0 $20.00 $1,240.00 29 1ARTICULATED BLOCK MAT SF 150.0 $20.00 $3,000.00 SCHEDULE "B" -STORM SEWER CONSTRUCTION ESTIMATED TOTAL COST $ 13,348.00 TOTAL ESTIMATED COST $ 108,538.50 &\Municipal\AOTSEG0\390\OT390 EngEst � ) § IN I— \ � Cd 14 N { )\\\(\\\ \ � §§§ ci §\\»[\\�\14 � ± )\\� \ ) \§§5§§!5§§§§/!§§§!§§§§ \ ( ) d) , 7;(::=mm=22�= \))ales!®°J\);eE/)!§5`! \}\ ( j B eee 2 �)((� ) - \ )\ \{ ;\\\\)\\\)o \\\\\\ III \k§(\[}//\\§§\)/2)a)$ )j)§}(\\\§§-.V\:E )\\\\ ), m@: ; 2