Loading...
Item 4.1 Project Ollie3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT   TO:  Otsego Planning Commission  FROM:  D.Daniel Licht, AICP REPORT DATE:  3 March 2022  60‐DAY DATE:  N/A  RE:  Otsego – Endeavor Development  TPC FILE:101.02  BACKGROUND  Endeavor Development has submitted an application for development of an industrial  distribution warehouse on 80 acres located east of Queens Avenue and south of 65th Street.   The proposed development consists of one lot with a 401,544‐square foot principal building.   The submitted plans indicate potential for future expansion of the building by 343,200‐square  feet for a total building area of 744,744‐square feet.  The proposed development requires  consideration of an Environmental Assessment Work Sheet, Zoning Map amendment, site and  building plan review, and preliminary and final plat.  A public hearing to consider the  applications has been noticed for 7 March 2021 at 7:00PM.  Exhibits:  Site Location Map Draft EAW findings and responses to comments Architecture plans (4 sheets) Civil Plans dated 12/29/2022 (22 sheets) Final Plat EAW dated (available at www.ci.otsego.mn.us/publicnotice) Item 4.1 2 ANALYSIS    Zoning.  The subject site is zoned A‐1, Agriculture Rural Service District in accordance with the  Interim Land Use policies of the Comprehensive Plan.  The proposed development of the  warehouse distribution facility requires consideration of a Zoning Map amendment to rezone  the subject site to I‐1, Limited Industrial District.  The proposed Zoning Map amendment is to  be evaluated based upon (but not limited to) the criteria established by Section 11‐3‐2.F of the  Zoning Ordinance:  1. The proposed action's consistency with the specific policies and provisions of the Otsego  Comprehensive Plan.    Comment:  The 2012 Otsego Comprehensive Plan guides the subject site for future  industrial land uses within the East Sewer District in the form of large‐scale industrial  buildings to accommodate manufacturing, assembly, warehouse, and office uses.   Industrial development is a goal of the Comprehensive Plan so as to diversify the tax  base and lessen dependance on residential properties as well as to create employment  opportunities within Otsego and the proposed development advances the City’s efforts.    2. The proposed use's compatibility with present and future land uses of the area.     Comment:  The table below summarizes existing and planned land uses in the area  surrounding the subject site:    Direction Land Use Plan Zoning Map Existing Use  North Industrial A‐1 District Undeveloped  Rural residential  East LD Residential A‐1 District Undeveloped  Rural residential  South LD Residential R‐5 District Harvest Run  West Industrial I‐2 District Gateway North Industrial Park     The proposed development is characteristic of the existing industrial uses developed to  the west within the Gateway North Industrial Park.  Additional development of this type  is planned to the north.  The primary compatibility concern with the proposed use is with  the Harvest Run neighborhood to the south, which must be addressed through site  design, landscaping, and screening.       3. The proposed use's conformity with all performance standards contained within the  Zoning Ordinance and other provisions of the City Code.    Comment:  The proposed development will comply with all requirements of the Zoning  Ordinance, Subdivision Ordinance, and Engineering Manual.      3 4. Traffic generation of the proposed use in relation to capabilities of streets serving the  property.     Comment:  The subject site will access to Queens Avenue, which the Transportation Plan  of the 2012 Otsego Comprehensive Plan designates as a Commercial/Industrial Collector  and is improved with two traffic lanes and a center turn lane.  The streets serving the  subject site have adequate capacity to accommodate the traffic generated by the  proposed development.     5. The proposed use can be accommodated by existing public services and facilities and  will not overburden the City's service capacity.     Comment:  The subject site is located within the East Sewer District established by the  2012 Otsego Comprehensive Plan.  Sewer and water utilities are available at the subject  site with sufficient capacity to accommodate the proposed use.  The City has the ability  to provide all other required municipal services to the subject site within the East Sewer  District.     EAW.  The developer, at the direction of the City as the Responsible Government Unit,  prepared an EAW in accordance with Minnesota Rule 4410.4300, Subp. 14 to evaluate the  potential environmental effects of the proposed development.  The EAW document was posted  to the City website on 4 January 2022, noticed in the City’s official newspaper on 8 January  2022, and published by the Environmental Quality Board (EQB) on 11 January 2022.  The EAW  was also distributed for review and comment to stakeholders and agencies identified by the  EQB.   The mandatory 30‐day comment period for the EAW ended on 10 February 2022.   Comments were received from the Minnesota Pollution Control Agency (MPCA), Minnesota  Department of Natural Resources (DNR), and State Historic Preservation Office (SHPO).   The  comments received also with draft responses to the comments and findings of fact that the  project will not have significant environmental effect are attached to this report for  consideration by the Planning Commission.    Lot Area.  Section 11‐85‐7.A of the Zoning Ordinance requires lots within the I‐1 District to have  a minimum area of 1.0 acre.  The area of the property as shown on the preliminary plat is 78.5‐ acres.  The preliminary plat must be revised to indicate the area of Lot 1, Block 1 less the right‐ of‐way dedication for 65th Street.   The area of the proposed lot will comply with the  requirements of the Zoning Ordinance even after dedication of right‐of‐way.     Lot Width.  Section 11‐85‐7.B of the Zoning Ordinance requires lots within the I‐1 District to  have a minimum width of 200‐feet at the front setback line.   The proposed lot measures 1,200‐ feet at the setback line from Queens Avenue, which is the front lot line as defined by the Zoning  Ordinance.  The width of the proposed lot complies with the requirements of the Zoning  Ordinance.      4 Site Coverage.   Section 11‐85‐8 of the Zoning Ordinance establishes a maximum building  coverage limit of 50‐percent and maximum impervious surface coverage limit of 85‐percent for  lots within the I‐1 District.  The proposed Phase 1 building covers 11.7‐percent of the lot area,  which complies with the requirements of the Zoning Ordinance.  Total area and percentage of  lot area for all impervious surfaces must be identified.      Setbacks.  The table below outlines the setbacks applicable to the proposed building as shown  on the site plan.  The proposed building complies with the setback requirements of the I‐1  District established by Section 11‐85‐7.C of the Zoning Ordinance.        Queens  Ave.  65th   St.  East South Wetland  Required 30ft. 30ft. 20ft. 30ft 40ft.  Proposed 92ft. 200ft. 1,826ft. 490ft. 160ft.    Building Materials. Principal buildings within the I‐1 District are to utilize exterior finishes that  comply with the requirements Section 11‐17‐4.E.1 of the Zoning Ordinance.  The submitted  building elevations for the proposed building indicate that the building is constructed with  exposed aggregate precast concrete panels with.  Changes in color, large glass area at the entry  and horizontal banding add detailing to the public.  The proposed exterior materials of the  principal building comply with the requirements of the Zoning Ordinance.    Building Height. The submitted plans indicate that proposed building, which has a flat roof, has  a height of 44 feet to the top of the precast panel wall.  Section 11‐85‐9 of the Zoning  Ordinance allows principal buildings within the I‐1 District to have a maximum height of 48‐feet  measured to roof line of a flat roof.  The proposed building complies with the allowed building  height within the I‐1 District.    Landscaping and Screening.  The submitted plans include a landscape plan to provide for  plantings along Queens Avenue and 65th Street and along the south property line abutting the  Harvest Run neighborhood.       The plantings along the south property line are upon a berm that is nine to 17 feet above the  floor elevation of the building and 15 to 25 feet above the rear line of the semi‐tractor parking  stalls.  The proposed trees provided for screening along the berm are Northern Pin Oak and  Common Hackberry.  City staff recommends that the proposed plantings be revised to  incorporate evergreen trees as a majority of the trees in the screening row.   We also  recommend that a 14‐foot screening wall be constructed along the south line of the semi‐ tractor/trailer parking stalls, which is the same condition required for R+L Carriers to the north.    The sizes of the proposed plantings included on the landscape plan comply with Section 20‐19‐ 2.B.3 of the Zoning Ordinance.      5 Section 5‐2‐3.B.4.b of the City Code requires an irrigation system be provided for maintenance  of the plantings, which is indicated to be installed on the landscape plan details.    Right‐of‐Way.  The subject site abuts Queens Avenue on the east and 65th Street to the north.   Queens Avenue is an improved Industrial/Commercial Major Collector Street in accordance  with the Transportation Plan of the 2012 Comprehensive Plan.  No right‐of‐way dedication or  improvement of Queens Avenue is required with the preliminary and final plat.  The  Transportation Plan also designates 65th Street as an Industrial/Commercial Major Collector  Street, but it exists as a rural section gravel roadway within prescriptive easement.  The  preliminary and final plat provide for dedication of 50‐feet of right‐of‐way for the south half of  the roadway.  No improvements to 65th are planned with the proposed development.  All right‐ of‐way dedication is to be subject to review and approval of the City Engineer.    Access.  The Phase 1 building is proposed to be accessed via two driveways to Queens Avenue.   The location of the proposed driveways are aligned with existing driveways on the west side of  Queens Avenue to minimize conflicts from turning vehicles.  The south access is 110‐feet north  of 62nd Street, which is a local residential street.  The north access is 110‐feet south of the 65th  Street, which is a future Industrial/Commercial Collector Street.  The location of the driveways  complies with Section 11‐21‐6 of the Zoning Ordinance.    Off‐Street Parking.  Section 11‐21‐8 of the Zoning Ordinance requires 1 parking stall per 200  square feet of office and 1 parking stall per 1,000‐square feet of warehouse net floor area.  The  office portion of the building is 4,000‐square feet and the warehouse 397,544‐square feet.  The  number of required off‐street parking stalls is 376.  The site plan provides 126 passenger  parking stalls, plus 52 semi‐tractor/trailer parking stalls.   The ratio of proposed off‐street  parking is consistent with requirements imposed for similar large footprint distribution  warehouses in Otsego.      Parking stalls are shown to be 9‐feet wide by 18‐feet deep (with available two‐foot overhang)  accessed by 24‐foot wide drive aisles.  The dimensions of the off‐street parking stalls comply  with the provisions of Section 11‐21‐7.A and B of the Zoning Ordinance.     The off‐street drive aisles and parking areas are to be surfaced with asphalt and surrounded by  perimeter concrete curb as required by Section 11‐21‐7.C.3 and D of the Zoning Ordinance.  The  construction of the off‐street parking area is subject to review and approval of the City  Engineer.    The off‐street parking stalls, drive aisles, and loading areas are all setback more than 15‐feet  from public rights of way and more than five‐feet from the side lines as required by Section 11‐ 21‐5.B of the Zoning Ordinance.    Pedestrian Access. There is an existing trail on the east side of Queen Avenue abutting the  subject site.  A five‐foot wide concrete sidewalk should be added to the side of each of the  driveway accesses to Queens Avenue to provide for pedestrian access to the proposed building.  6 Exterior Lighting.  No information is included in the submitted plans regarding exterior lighting.   Section 11‐16‐6 of the Zoning Ordinance establishes performance standards for exterior  lighting.  All exterior light fixtures are to have a 90‐degree horizontal cut‐off and not cast more  than 0.4 foot‐candles of light at the property lines as required by Section 11‐16‐6.C of the  Zoning Ordinance.  An exterior lighting plan including photometric measurements of light  intensity and indicating the type, location, and height of all exterior light fixtures must be  submitted and is subject to review and approval of the Zoning Administrator.      Signs.  Information regarding proposed signs is indicated only generally on the submitted plans.   Section 11‐37‐5.C of the Zoning Ordinance allows one freestanding sign with an area not to  exceed 100‐square feet or height of 20‐feet and wall signs not exceeding 100‐square feet up to  15‐percent of the area of the walls facing public streets.  Installation of any signs upon the  subject site will require issuance of a sign permit subject to review and approval of the Zoning  Administrator in accordance with Section 11‐37‐7.A of the Zoning Ordinance.      Waste Storage. The site and building plans do not indicate either an exterior or interior area for  trash and recycling container storage.  Section 11‐18‐4.C of the Zoning Ordinance requires that  any outdoor storage of waste and recycling containers is to be enclosed within a solid wall with  minimum height of six feet constructed of materials complementary of the principal building.  If  any waste containers are to be stored outdoors, plans for the construction of the required  enclosure must be submitted to verify compliance the performance standards of the Zoning  Ordinance at the time of application for a building permit.  Any exterior enclosure for waste  storage is subject to review and approval of the Zoning Administrator.     Utilities.  There are existing sewer and water utilities available to the subject site within Queens  Avenue.  The developer has submitted plans for connection of the proposed development to  sewer and water services for the proposed use.  The connection to sewer will require  installation of a temporary lift station until gravity sewer is extended to the subject site from  the east.  All utility plans are subject to review and approval of the City Engineer.  The  developer will be required to pay Utility Availability Charges with final plat approval and Utility  Connection Charges at the time a building permit is issued.     Grading.  The developer has submitted plans for grading of the subject site, including  information required regarding stormwater management and erosion control.  The proposed  development impacts wetlands within the subject site that are subject to review by a Technical  Evaluation Panel of agency staff.  All grading, drainage, wetland impacts, and erosion control  issues are subject to review and approval by the City Engineer.    Easements.  Section 11‐8‐12.A of the Subdivision Ordinance requires 10 foot wide drainage and  utility easements to be dedicated at the perimeter of Lot 1, Block 1, which are shown on the  final plat.  Additional drainage and utility easements are to be dedicated over portions of Lot 1,  Block 1 for wetlands, wetland buffers, public utilities, or stormwater management facilities  related to the site plan.  All drainage and utility easements are to be subject to review and  approval of the City Engineer.  7 Park Dedication.   The Parks System Master Plan does not identify acquisition of land from the  subject site for park purposes.  The City does not require payment of a cash fee in lieu of land  for park dedication for industrial uses in order to facilitate the economic development goals of  the 2012 Comprehensive Plan.    Development Contact.  A development contract is required with final plat approval by Section  10‐10‐4.A of the Subdivision Ordinance to provide for completion of public improvements,  establishment of required securities, and payment of applicable fees related to the subdivision  of the subject site.  Section 11‐9‐7 of the Zoning Ordinance also requires that the developer  enter into a performance agreement with the City to provide for construction of the project  improvements within the subject site.  The development contract and performance agreement  requirements will be combined with into a single document to be executed by the developer  prior to approval by resolution of the City Council and recorded with the property.         RECOMMENDATION    The proposed development is consistent with the 2012 Comprehensive Plan with regards to  land use and economic development. The proposed development further complies with the  requirements of the Zoning Ordinance and Subdivision Ordinance.  City staff recommends  approval of the applications subject to the conditions outlined below.      POSSIBLE ACTIONS    A. Motion to recommend approval of a Zoning Map amendment rezoning the subject site  to I‐1 District; adoption of findings of fact that the project will not have potential for  significant environmental effects; and approval of a preliminary/final plat and site and  building plans for Phase 1, subject to the following conditions:     1. Approval of the preliminary plat shall not guarantee access to sanitary sewer  service.  The City shall only allocate sanitary sewer capacity to approved final plats  with signed development contracts to assure the City of timely development.    2. The landscape plan shall be revised to incorporate 8‐foot coniferous trees as a  majority of the trees in the screening row along the south property line, subject  to review and approval of the Zoning Administrator.    3. A 14‐foot screening wall shall be constructed along the south line of the semi‐ tractor/trailer parking stalls, subject to review and approval of the Zoning  Administrator.     4. The preliminary plat shall be revised to state the area of Lot 1, Block 1 less right‐ of‐way dedication.  8  5. Impervious surfaces within the lot shall not exceed 85 percent of the lot area.     6. Right‐of‐way dedication for 65th Street shall be subject to review by the City  Engineer.    7.  The design and construction of the off‐street parking area shall be subject to  review and approval of the City Engineer.     8. A five‐foot wide concrete sidewalk shall be constructed to the side of each of the  driveway accesses to Queens Avenue, subject to review and approval of the City  Engineer.     9. A plan detailing the type, location, and height of all proposed exterior lighting  shall be submitted and is to comply with Section 11‐16‐6 of the Zoning  Ordinance, subject to review and approval of the Zoning Administrator.     10. All signs shall comply with Chapter 37 of the Zoning Ordinance and require a sign  permit approved by the Zoning Administrator prior to installation.     11. Any outdoor storage of waste and recycling containers shall comply with Section  11‐18‐4.C of the Zoning Ordinance, subject to review and approval of the Zoning  Administrator.     12. All utility plans shall be subject to review and approval of the City Engineer.      13. The developer shall pay Utility Availability Charges as provided for by the City  Code upon approval of the final plat.    14. The developer shall pay Utility Connection Charges in accordance with the City  Code at the time a building permit is issued.    15. All drainage and utility easements shall be subject to review and approval of the  City Engineer.    16. The developer shall execute development contract as drafted by the City  Attorney, subject to approval of the City Council.     B. Motion to recommend the application be denied based on a finding that the request is  inconsistent with the Comprehensive Plan and does not comply with the requirements  of the Zoning Ordinance and Subdivision Ordinance.    C. Motion to table.      9 c. Adam Flaherty, City Administrator/Finance Director   Audra Etzel, City Clerk   Ron Wagner, City Engineer   David Kendall, City Attorney  921 ft Overvi ew Legend Roads C SAHC L C TYC L MUNIC L PRIVATEC L TWPC L Highw ays Intersta te State Hwy US Hwy City/T ow nship Limits c t Parcels PROJECT OLLIE EAW FINDINGS OF FACT, CONCLUSIONS, AND RESPONSE TO COMMENTS For: City of Otsego Prepared by: Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763.412.4000 Anderson Engineering Project No. 16604 March 1, 2022 TABLE OF CONTENTS ADMINISTRATIVE BACKGROUND ............................................................................................................................... 1 FINDING OF FACTS AND CONCLUSIONS ..................................................................................................................... 1 PROJECT DESCRIPTION ....................................................................................................................................... 1 PROJECT HISTORY ............................................................................................................................................... 2 CRITERIA FOR DETERMINING THE POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL EFFECTS .............................. 2 TYPE, EXTENT, AND REVERSIBILITY OF ENVIRONMENTAL EFFECTS ....................................................................... 2 CUMULATIVE POTENTIAL EFFECTS OF RELATED OR ANTICIPATED FUTURE PROJECTS ......................................... 5 THE EXTENT TO WHICH ENVIRONMENTAL AFFECTS ARE SUBJECT TO MTIGIATION BY ONGOING PUBLIC REGULATORY AUTHORITY ...................................................................................................................................... 5 THE EXTENT TO WHICH ENVIRONMENTAL EFFECTS CAN BE ANTICIPATED AND CONTROLLED AS A RESULT OF OTHER AVAILABLE ENVIRONMENTAL STUDIES UNDERTAKEN BY PUBLIC AGENCIES OR THE PROJECT PROPOSER, INCLUDING OTHER EISs. ...................................................................................................................... 6 CONCLUSIONS ............................................................................................................................................................ 7 COMMENTS AND CITY OF OTSEGO RESPONSES..................................................................................................... 7 1 | Page ADMINISTRATIVE BACKGROUND Pursuant to Minnesota Administrative Rules 4410.4300 Mandatory EAW Categories. Subpart 14. Industrial, Commercial, and Institutional facilities. A.(2); the City of Otsego has prepared an Environmental Assessment Worksheet (EAW) for the proposed Project Ollie. Endeavor Development is the project proposer and the City of Otsego is the Responsible Government Unit. In accordance with Minnesota Rule 4410.1700, this Record of Decision addresses the State of Minnesota environmental review requirements. In accordance with Minnesota Rule 4410.1500, a copy of the EAW was provided to the Environmental Quality Board (EQB) and subsequently filed in the EQB Monitor on January 11, 2022. The EAW was posted on the City of Otsego website on January 4, 2022 and notice published in the Star News on January 8, 2022. The EAW was also provided for comment and review to the listed stakeholders and agencies on the EQB distribution list. The 30-day comment period for Project Ollie EAW ended on February 10, 2022. Comments were received from the Minnesota Pollution Control Agency (MPCA), Minnesota Department of Natural Resources (DNR) and State Historical Preservation Office (SHPO). All comments were considered when determining the potential for significant environmental impacts. The comments and subsequent responses can be viewed in Appendix A below. FINDINGS OF FACT AND CONCLUSIONS In determining the need for an Environmental Impact Statement (EIS) for the proposed Project Ollie and based on the record presented, including the EAW and comments received, the City of Otsego makes the following Findings of Fact and Conclusions: PROJECT DESCRIPTION The facility will be used as an industrial warehouse, with associated employee parking located to the west of the building, and trailer parking to the south. The proposed Phase 1 building will have 75 full time employees (FTEs) with the future Phase 2 addition adding another 50 FTEs, for a total of 125 FTEs. The proposed Phase 1 building would construct 126 employee parking spaces and 52 trailer stalls. The tenant’s (Blu Dot) existing warehouse space, located immediately west across Queens Avenue NE from the proposed project site, is too small for current and future operations. The proposed Phase 1 building would be 401,544 square feet and the future Phase 2 addition would add 343,200 square feet, for a total buildout of 744,744 square feet. The total disturbed area for the proposed project is approximately 36.45 acres including staging and stockpiling. Utilities, stormwater infrastructure and management basins are also proposed. 2 | Page PROJECT HISTORY • The project was subject to mandatory EAW Pursuant to Minnesota Administrative Rules 4410.4300 Mandatory EAW Categories. Subpart 14. Industrial, Commercial, and Institutional facilities. A.(2). • The EAW was filed in the EQB Monitor on January 11, 2022 and the necessary addresses on the EQB distribution list were sent a copy on January 6, 2022. • The EAW was posted on the City of Otsego website on January 4, 2022 and notice published in the Star News on January 8, 2022. • The public comment period ended on February 10, 2022. Comments were received from SHPO, MPCA and the DNR. Copies of these comments and the responses are incorporated for reference in Appendix A below. CRITERIA FOR DETERMINING THE POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL EFFECTS. Minnesota Rule 4410.1700, subp. 1, states “An EIS [Environmental Impact Statement] shall be ordered for projects that have the potential for significant environmental effects.” In deciding whether a project has the potential for significant environmental effects, the City of Otsego must consider the four factors set out in Minnesota Rule 4410.1700, subp. 7. With respect to each of these factors, the City of Otsego finds the following: 1) MINNESOTA RULE 4410.1700, SUBP. 7.A – TYPE, EXTENT, AND REVERSIBILITY OF ENVIRONMENTAL EFFECTS a) The type of environmental impacts and mitigation efforts anticipated as part of this project include: Land Use: The proposed project follows the City of Otsego 2012 Comprehensive Plan, as amended, future land use plan guided for the site and is similar to the surrounding land uses for the area. No adverse effects are anticipated in relation to land use. Geology, soils, and topography/landforms: No adverse effects in relation to geology, soils or topography/landforms are anticipated. Soil Disturbance The proposed phase 1 building and associated grading within the Phase 2 area would require approximately 140,000 cubic yards of cut and 206,000 cubic yards of fill. As such, approximately 67,000 cubic yards of import would be needed to complete the grading. The fill generated from the Phase 1 building earthwork will be used to fill in wetlands and build up the Phase 2 addition. A Stormwater Pollution Prevention Plan (SWPPP) will be implemented during construction as part of the National Pollutant Discharge Elimination System (NPDES) permit requirements and will outline 3 | Page site-specific erosion control best management practices (BMPs). The project will require a grading permit from the City of Otsego. Water Resources: Stormwater The Project site is located within one mile of a Mississippi River segment considered a Scenic and Recreational River segment and a restricted water under the National Pollutant Discharge Elimination System/State Disposal System Construction Stormwater Permit. Additional erosion control BMPs will need to be utilized, including immediately stabilizing soils in temporarily or permanently inactively worked areas and completing the stabilization within seven days and providing temporary sediment basins where 5 or more acres drain to a common location. A Stormwater Management Plan and SWPPP have been produced to make sure no adverse impacts to downstream resources occur. The impervious runoff will be collected in storm sewer piping, and prior to entering the stormwater ponds, a sump manhole will act as the pre-treatment. Within each pond is a sand filtration basin that will filtrate the water and discharge through drain tile into the outlet control structure. Filtration basins were used as existing clay soils are not ideal for infiltration. Post-construction rate control was either matched or decreased compared to pre- development conditions. As described below in Surface Waters and MPCA responses in Appendix A; much of the site will be improved with native prairie seeding, wetland vegetation, and trees will be planted along the facility, stormwater basins, and berm to benefit stormwater quality and soil infiltration. Wastewater The City of Otsego East Wastewater Treatment Facility has the capacity to accept the 1,700 gallons a day of wastewater anticipated to be produced by the proposed project. No adverse effects are anticipated. Surface Waters The proposed project would impact a total of 3.55 acres of wetland, 2.47 acres are regulated by the United States Army Corps of Engineers (USACE) under Section 404 of the Clean Water Act (See wetland impacts on site plan in Appendix A). As well, the MPCA 401 Program regulates all Waters of the State as defined in Minn. Stat. § 115.01 subp. 22. Surface waters that are determined to be U.S. Army Corp of Engineers non-jurisdictional, or exempt from the Wetland Conservation Act, are regulated by the MPCA. Consultation with the City of Otsego, Minnesota Board of Water and Soil Resources (BWSR), MPCA and the USACE is ongoing to achieve the proper permit authorizations and mitigation requirements for the proposed wetland impacts. Currently, mitigation includes cessation of row-crop agricultural activities, seeding the upland with native prairie grasses, onsite mitigation of wetlands 8 and 9 and portions of wetland 6, the 4 | Page purchase of wetland bank credits at 2:1 replacement ratio within Bank Service Area 7 and creation of multiple engineered stormwater management basins that would ensure no water quality degradation and provide flood water volume and rate control. Contamination/Hazardous Materials/Waste: An abandoned farmstead is present on site, with three empty metal outbuildings and a wood barn. These structures will need to be demolished and disposed of as part of the proposed project. An inspection will be completed to verify the absence of any hazardous materials and the waste generated from disposal will be recycled or disposed of according to state and local regulations and guidelines. If hazardous materials are present in these structures, the necessary procedures will be followed, and any necessary permits obtained to ensure proper handling and disposal of hazardous materials/waste. A 10-day Notice to Demolish a Structure will need to be completed for the MPCA as well prior to demolition. Fish, Wildlife, Plant Communities, and Sensitive Ecological Resources (Rare Features): While sections of fencerow trees and patches of timber around the abandoned farmstead would be removed for the proposed project, the proposed project would plant numerous trees along the berm to the south, the stormwater ponds and as landscaping around the building. As well, the project would reseed several farmed wetlands on site and convert approximately 25 acres of land currently in agricultural use to native prairie. The SWPPP will be followed to prevent the spread of invasive species on and off the site. The proposed project is not anticipated to impact the listed species or birds of conservation concern. Historic Properties: Based on the recommendation of the MN SHPO; a qualified archeologist will conduct a survey of the project site spring 2022 when field conditions are adequate to verify no unrecorded archeological sites are present onsite. If resources are found, further coordination with the MN SHPO will occur. Noise: The proposed project would create typical levels and types of construction noise expected with a warehouse development. Construction noise for the building permit regulated activities will be limited to the days and times allowed in the City of Otsego City Code 9-1-3: Days and Hours of Construction: Monday through Saturday 7:00 am – 10:00 pm and Sunday 8:00 am – 10:00 pm. Site grading and utilities construction are regulated by the Engineering Manual. These hours are Monday through Friday 7:00 am - 7:00 pm, Saturday 8:00 am - 5:00 pm, and no work on Sunday. Construction equipment will be fitted with mufflers that would be maintained throughout the construction process to limit negative impacts to the community. 5 | Page The proposed project is not anticipated to exceed the standards laid out in Minnesota Administrative Rule 7030.0040 for noise conformity and is similar to the existing warehouse conditions across the street and surrounding land uses. No adverse impacts are anticipated. Visual: Much of the surrounding area land uses are currently industrial, with agricultural fields and low- density single-family homes to the south and east. As the surrounding area already contains industrial buildings, the proposed project would match the current view scape. To avoid any adverse effects to the residential areas to the south, a berm, fencing, and landscaping will be placed on the south property line to minimize noise and light impacts and provide visual screening. Air: Because much of the area surrounding the proposed project is already developed with industrial and residential uses and with existing MN Trunk Highway 101 and Queens Avenue NE so close to the site, an increase in vehicle emissions that would exceed air quality standards is not anticipated. To minimize excessive construction vehicle emissions, best management practices of avoiding idling vehicles and maintaining engines and exhaust systems will be utilized to the best extent possible during construction. Transportation: Because Queens Avenue NE already has been developed to support several industrial warehouses (including the current Blu Dot warehouse) and surrounding residential traffic, traffic congestion because of the project isn’t anticipated. TH-101 is the principal artery to the area that already sees existing industrial use for several warehouses in the immediate area and further industrial to the north and south. Therefore, TH-101 should need no improvement to handle the proposed project generated traffic. 2) MINNESOTA RULE 4410.1700, SUBP. 7.B – CUMULATIVE POTENTIAL EFFECTS OF RELATED OR ANTICIPATED FUTURE PROJECTS a) The surrounding land uses have been planned as part of the City’s Comprehensive Plan, which addresses natural environment, land use, transportation, infrastructure, and capital improvements. Such development is required to be consistent with the City Comprehensive Plan; City Zoning Ordinance, Subdivision Ordinance, and Engineering Manual; as well as State and Federal regulations. The City does not see surrounding uses as a cumulative environmental effect related to any single project that is not covered by regulations already in place. 3) MINNESOTA RULE 4410.1700, SUBP. 7.C – THE EXTENT TO WHICH ENVIRONMENTAL AFFECTS ARE SUBJECT TO MITIGATION BY ONGOING PUBLIC REGULATORY AUTHORITY 6 | Page a) The following permits and approvals will be required for the proposed project: Unit of Government Type of Application Status Federal US Army Corp of Engineers 404 Permit To be obtained Approved Jurisdictional Determination Completed State Department of Natural Resources Water Appropriation Permit To be obtained, if needed Pollution Control Agency NPDES Construction Permit and SWPPP To be Obtained Sanitary Sewer Extension Permit To be Obtained 10-Day Notice of Demolition of a Structure To be Obtained Construction Stormwater Permit To be Obtained CWA Section 401 Water Quality Certification To be Obtained Department of Health Watermain extension/Plan Review To be Obtained Well Maintenance Permit/Well Abandonment To be obtained if onsite domestic well is not sealed Local City of Otsego WCA Wetland Boundary Type Confirmation Completed WCA Replacement Plan To be obtained Building Permit To be obtained Electrical Permit To be obtained Fire Sprinkler and Fire Alarm Permit To be obtained, if needed Mechanical Permit To be obtained Plumbing Permit To be obtained Fence Permit To be obtained, if needed Right of Way Excavation/Work Permit To be obtained Grading Permit To be obtained b) The potential impacts identified as part of the proposed project can be addressed through the regulatory agencies as part of the permitting process. 4) MINNESOTA RULE 4410.1700, SUBP. 7.D – THE EXTENT TO WHICH ENVIRONMENTAL EFFECTS CAN BE ANTICIPATED AND CONTROLLED AS A RESULT OF OTHER AVAILABLE ENVIRONMENTAL STUDIES UNDERTAKEN BY PUBLIC AGENCIES OR THE PROJECT PROPOSER, INCLUDING OTHER EISs. a) The City of Otsego finds that the proposed project includes various measures to reduce adverse impacts to the environment and existing natural resources; The project is subject to local, regional, state, and federal requirements; The developer will secure all necessary permits and will adhere to all requirements of the permits; Considering the results of environmental review and permitting processes for similar projects, the City of Otsego finds that the environmental effects of the project can be adequately anticipated, controlled, and mitigated. 7 | Page CONCLUSIONS The Proposed Project Ollie EAW and the subsequent comments received have generated the necessary information to determine that the proposed project does not have the potential for significant environmental effects. The EAW has identified areas where the potential for environmental effects exist, but appropriate mitigation measures can be incorporated into the project plans and the required approvals and permits to mitigate these effects will be obtained. If the project cannot be approved by regulating agencies as currently conceptualized, the applicant may need to revise the plan to meet regulatory requirements. The project will comply with all local, state, and federal review agency requirements. Based on the criteria established in Minnesota Rule 4410.1700, and the Findings of Fact and Conclusions, the project does not have the potential for significant environmental effects to trigger the need for an Environmental Impact Statement (EIS). Therefore, an EIS is not required for Project Ollie. COMMENTS AND CITY OF OTSEGO RESPONSES The 30-day comment period for Project Ollie EAW ended on February 10, 2022. Comments were received from the Minnesota Department of Natural Resources, the Minnesota Pollution Control Agency and Minnesota Office of the State Archaeologist. All comments and subsequent responses to all comments received are contained within Appendix A. APPENDIX A Comments and Responses Letter 1 328 West Kellogg Blvd St Paul, MN 55102 OSA.Project.Reviews.adm@state.mn.us Date: 02/01/2022 D. Daniel Licht City of Otsego 763-441-4414 cityhall@ci.otsego.mn.us Project Name: Project Ollie Notes/Comments I appreciate being given the opportunity to comment on the above listed project. Although no archaeological site is currently recorded within the proposed project area, it is located near Crow River and Mississippi River confluence, and numerous sites have been found in the region. Because of this the project area has a moderate to high potential for containing unrecorded archaeological sites. I recommend that a qualified archaeologist conduct a survey to determine if the project could damage unrecorded archaeological sites. Recommendations ☐ Not Applicable ☐ No Concerns ☐ Monitoring ☐ Phase Ia – Literature Review ☒ Phase I – Reconnaissance survey ☐ Phase II – Evaluation ☐ Phase III – Data Recovery If you require additional information or have questions, comments, or concerns please contact our office. Letter 2 Sincerely, Jennifer Tworzyanski Assistant to the State Archaeologist OSA Kellogg Center 328 Kellogg Blvd W St Paul MN 55102 651.201.2265 jennifer.tworzyanski@state.mn.us Response to OSA EAW Comment(s): Based on the recommendation of the OSA; a qualified archeologist will conduct a survey of the project site when field conditions are adequate to verify no unrecorded archeological sites are present onsite. If resources are found, further coordination with the MN SHPO will occur. 1 Division of Ecological and Water Resources Transmitted by Email Region 3 Headquarters 1200 Warner Road Saint Paul, MN 55106 February 09, 2022 D. Daniel Licht, City Planner City of Otsego 13400 90th Street NE Otsego, MN 55330 Dear D. Daniel Licht, Thank you for the opportunity to review the Project Ollie EAW in Wright County. The DNR respectfully submits the following comments for your consideration: 1. Page 4, Cover Types; Page 9, Surface Waters. The proposed 3.55 acres of wetland impacts is unusually high, and the proposer should demonstrate that there is sufficient need for such impacts after attempts at minimization and avoidance have been made. Wetlands are a protected land type because of the valuable ecosystem services they provide , including: flood control, water filtration, groundwater recharge, carbon sequestration, and wildlife habitat. Purchasing wetland banking credits to replace these wetland impacts should be seen as a last resort after all other alternatives have been explored. 2. Page 9, Stormwater. Very little information is provided about what stormwater features and treatment methods are being proposed. Where will the stormwater pond ultimately discharge to, and how will this waterbody be affected by the change in water quality or flow? Is infiltration feasible at this site? What kind of pre-treatment or water quality can be expected as a result of the proposed stormwater BMP’s? This development will result in an additional 28 acres of impervious surfaces, which is a significant land conversion that requires more detailed analysis of stormwater management. 3. Page 10, Rare Features. This section should answer all of the questions within the EAW template including the subsections. The EAW does not describe the current habitat and wildlife within the project area or discuss how the project will impact these species and habitat. Wetlands are important wildlife habitat, and this project is proposing to eliminate 3.55 acres of wetlands as well as 8.41 acres of forest and trees. The EAW should fully consider the effect of these impacts and discuss them within this section. 4. Page 10, Rare Features. DNR concurs that state-listed species are unlikely to be impacted as a result of this project. We recommend that BWSR-approved, weed-free, native seed mixes be 2 used to the greatest degree possible in stormwater features and landscaping in order to provide pollinator habitat. Thank you again for the opportunity to review this document. Please let me know if you have any questions. Sincerely, Melissa Collins Regional Environmental Assessment Ecologist | Ecological and Water Resources Minnesota Department of Natural Resources 1200 Warner Road St. Paul, MN 55106 Phone: 651-259-5755 Email: melissa.collins@state.mn.us CC: Joshua Budish, Endeavor Development Equal Opportunity Employer Response to MN DNR EAW Comment(s): 1.) As part of the Wetland Conservation Act permitting process, Endeavor Development is coordinating with the appropriate local, State, and Federal agencies. The project as proposed includes cessation of row-crop agricultural activities, seeding the upland with native prairie grasses and seeding the farmed wetland with native wetland species, the purchase of wetland bank credits at 2:1 within BSA 7 and creation of multiple engineered stormwater management basins that would ensure no water quality degradation and provide flood water volume and rate control. These improvements and mitigation measures offer habitat biodiversity, floodwater attenuation, groundwater protection, soil quality and health, sediment and pollutant protection for downstream resources, and a unique habitat cover type to the area. As the site is currently guided for industrial development, and the surrounding area is quickly developing with residential and industrial uses, these areas of upland prairie and restored wetlands offer a unique opportunity to create a land cover type that is lacking in the area and preserve an area that otherwise would continue to be in agricultural row-production potentially contributing soil erosion and chemical pesticide/herbicide to downstream receiving waters. Impacts to downstream sensitive water resources would be beneficial, seeing greater sediment retention and floodwater attenuation than what the current wetland basins provide, improving soil health and habitat upstream with native vegetation plantings in wetlands and upland areas, reduce agricultural runoff directly into the ephemeral stream and Wetland 6, conserving and restoring upland native prairie and wetland area in the area and improving wildlife habitat particularly for pollinators and butterfly species. 2.) Two stormwater ponds are proposed. The impervious runoff will be collected in storm sewer piping, and prior to entering the stormwater ponds, a sump manhole will act as the pre- treatment. Within each pond is a sand filtration basin that will filtrate the water and discharge through drain tile into the outlet control structure. Filtration basins were used as existing clay soils are not ideal for infiltration. Post-construction rate control was either matched or decreased compared to pre-development conditions. A Stormwater Management Plan has been drafted and is in review with the City of Otsego as part of the project. 3.) The areas of the site not in active agricultural use are primarily previously degraded wetland basins that were historically farmed, several of which were excavated for agricultural use. The wetlands onsite are primarily dominated with invasive species such as reed canary grass and cattail. The forested areas on site are primarily fencerows with some hardwood forest around the abandoned farmstead, composed of various deciduous and coniferous tree species and an understory dominated by invasive European buckthorn. Wetlands 2 and 4 offer potential habitat for amphibian and other wildlife species; however, they are not unique to the surrounding landscape with over 50 open water wetlands within a single mile of the project area according to the National Wetland Inventory. The proposed project would re seed approximately 25 acres of agricultural land into native prairie and re seed portions of wetlands 6, 8 and 9 to restore wetland function and value. 4.) As described more thoroughly in comments 1 and 3 above, the restoration and reseeding done on site will be accomplished with BWSR and DNR approved weed free, native seed mixes. Response to MN MPCA EAW Comment(s): General Comment: All missing items identified by MPCA have been addressed within these responses to comments. Cover Types (Item 7): While sections of fencerow trees and patches of timber around the abandoned farmstead would be removed for the proposed project, the proposed project would plant numerous trees along the berm to the south, the stormwater ponds and as landscaping around the building. As well, the project would reseed several farmed wetlands on site to fresh wet meadow wetland and convert approximately 25 acres of land currently in agricultural use to native prairie; a habitat type not commonly preserved or found in the surrounding area. These improvements and mitigation measures offer habitat biodiversity, floodwater attenuation, groundwater protection, soil quality and health, sediment and pollutant protection for downstream resources, and a unique habitat cover type to the area. The deep-rooted vegetation found in native prairies are also efficient at storing carbon, balancing out the impacts the project would have on the forested areas. These areas are also densely populated with invasive European buckthorn, which would be removed as well. Water Resources Surface Waters: As part of the permitting for the project, coordination with the MPCA is underway to complete 401 water quality certifications. Water Resources Wastewater: The proposed project would generate 1,000 gallons per day for Phase 1 and 1,700 gallons per day after full buildout of both phases. The east wastewater treatment facility current specifications from the City of Otsego are: Therefore, the minimal increase would not adversely impact the facility. Water Resources Stormwater Bullet One: A Stormwater Pollution Prevention Plan has been prepared and is located within the Preliminary Plat submittal dated December 29, 2021 which highlights the stabilization and buffer zone requirements based on the proximity of the Mississippi and Crow Rivers. The appropriate stormwater requirements and measures will be utilized to avoid any adverse impacts to protected resources. Water Resources Stormwater Bullet Two: As part of the permitting process and discussion with the local, state, and federal agencies, all wetland credits will be purchased within BSA 7 for the proposed project. The restoration and mitigation described above will add greater function and value to the surrounding landscape than the historically degraded and invasive filled wetlands currently proposed to be impacted. Water Resources Stormwater Bullet Three: Wetland buffers will be utilized during and after construction to protect the resources onsite and avoid downgradient sediment erosion. If during construction the buffer must be encroached, double downgradient sediment controls will be utilized, and the disturbed buffer stabilized and restored. Water Resources Stormwater Bullet Four: The Draft Geotechnical Report by Vieau Associates, Inc. dated December 16, 2021 indicates that existing site soils are primarily clay-based soils, which are not ideal for infiltration. Therefore, filtration basins within wet NURP ponds were proposed for this site. As described above for the cover type comment and DNR responses, trees will be replanted around the entirety of the project footprint, stormwater ponds and berm and approximately 25 acres of agricultural fields will be planted to native prairie with several farmed wetlands re seeded with native weed free seed mixes. Contamination/Hazardous Materials/Waste (Item 12): The farmstead on site has been abandoned for several years with the main house being tore down and removed in 2018. The remaining structures on site are empty metal sheds and a wooden barn. As the farm has not been in active use for some time and the structures are empty and abandoned, agricultural chemicals are not anticipated to be found on site. If any hazardous materials are found during inspection, the proper permits will be acquired, and disposal procedures followed. The solid wastes generated during demolition will be recycled or disposed of at a state-permitted landfill. Construction of the proposed project will generate construction-related waste materials which will either be recycled or disposed of in the proper facilities in accordance with state and federal regulations and guidelines. A site safety spill prevention plan will be in place prior to construction starting to be used in the event of any hazardous material release. Proper equipment maintenance and spill prevention will be followed by contractors to minimize any potential impacts during construction. The proposed project is not anticipated to produce or store any hazardous waste or materials. Noise: The proposed project is not anticipated to exceed the standards laid out in Minnesota Administrative Rule 7030.0040, similar to the existing warehouse conditions across the street. Construction hours are regulated by the City Code and Engineering Manual to comply with MPCA regulations. Cumulative Potential Effects: The only current projects are new development of R+L Carriers at 70th Street (CSAH 38) and Queens Avenue and expansion of the Room & Board building to +/- 700,000 square feet. As described in the EAW, the surrounding land uses are planned as part of the City’s Comprehensive Plan, which addresses natural environment, land use, transportation, infrastructure, and capital improvements. Such development is required to be consistent with the City Comprehensive Plan; City Zoning Ordinance, Subdivision Ordinance, and Engineering Manual; as well as State and Federal regulations. The City of Otsego does not see surrounding uses as a cumulative environmental effect related to any single project that is not covered by regulations already in place. Other Potential Environmental Effects: The project did not identify any other potential environmental effects that were not addressed in Sections 1 through 19. Smart salting practices are discussed as part of the Water Resources section and additional detail is included in responses above. ϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗ&',/:<>d͘K͘WZWdϭϰϰΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗ͘K͘EKWzϭϭϮΖͲ ϲΗ><>/d,EE>&ZD'>^^WE>^;dzW͘ͿDd>^hE^,;dzW͘Ϳ^^,dϬϬϭWWͲϮ'>ͲϯWWͲϭWdͲϭWdͲϭWͲϭWWͲϭWWͲϭϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDd>ͲϭDd>Ͳϭϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗϮϯϰϱϲϳϴϵϭϬϭϭϭϮϭϯϭϰϭϱK<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗϭ͘K͘EKWzϭϭϮΖͲ ϲΗϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBWWͲϭDd>ͲϭWdͲϭWWͲϭWͲϭWdͲϭWWͲϭϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗϮϯϰϱϲϳϴϵϭϬϭϭϭϮϭϯϭϰϭϱd͘K͘WZWdϭϰϰΖͲ ϬΗK<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗϭ͘K͘EKWzϭϭϮΖͲ ϲΗϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDd>Ͳϭ'>ͲϯWWͲϮWͲϭDd>^hE^,͗^^,dϬϬϭ&KZ^W/&/d/KE^͘Dd>^hE^,͗^^,dϬϬϭ&KZ^W/&/d/KE^͘WdͲϭWdͲϭDd>Ͳϭϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗ&',/:<>>Z^dKZz^/>>ϭϯϬΖͲ ϬΗϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDd>ͲϭWWͲϭWdͲϭWWͲϭWdͲϭWWͲϭWͲϭWdͲϭϭϴϬϳϰdKDK,'E͕/͕EZ/,ZzZd/&zd,dd,/^W>E͕^W/&/d/KEKZZWKZdt^WZWZzDKZhEZDz/Zd^hWZs/^/KE͕Ed,d/Dh>z>/E^Z,/ddhEZd,>t^K&d,^ddK&D/EE^Kd͘Z'/^dZd/KEEhDZ͗'$7('5$:1%<&+(&.('%<352-(&7180%(57ZHOYH2DNV&HQWHU'U6XLWH:D\]DWD017HO)D['5$:,1*,1)250$7,213+$6(,668(5(&25'5(*,675$7,21 $5&+,7(&7352-(&71$0(&20387(5',5(&725<6+((7'(6&5,37,21d,Z,/dd^,>>Dd,hd,KZ^EKtEZ^K&d,/ZZ^Wd/s/E^dZhDEd^K&^Zs/E^,>>Zd/E>>KDDKE>t͕^ddhdKZzEKd,ZZ^ZsZ/',d^͕/E>h/E'KWzZ/',d^K&d,dd,KhDEd^͘&?5HYLW3URMHFWV?2WVHJR'&BWQLFKROLH#PRKDJHQKDQVHQFRPUYWϯϬϬydZ/KZh/>/E'>sd/KE^%+81.(71,&+2/,(2WVHJR'LVWULEXWLRQ&HQWHU?B6KHOODQG&RUHKE^dZhd/KEKhDEd^Kd^'K/^dZ/hd/KEEdZEtKE^dZhd/KEϭϲϳϬϱϲϱd,^d͘EKd^'K͕DEϱϱϯϯϬϯͬϲϰΗсϭΖͲϬΗϯϬϬϭt^d>sd/KEϯͬϲϰΗсϭΖͲϬΗϯϬϬϰEKZd,>sd/KEϯͬϲϰΗсϭΖͲϬΗϯϬϬϮ^Khd,>sd/KEϯͬϲϰΗсϭΖͲϬΗϯϬϬϯ^d>sd/KEydZ/KZ&/E/^,^,h>d' EKd^ ^DW>>hD/EhDKDWK^/dDdZ/>DͲϭ DEh&dhZZ͗>hKKEK>KZ͗>ZEK/^/͗^/E/dKE>sd/KE^,EE>'>^^'>Ͳϯ DEh&dhZZ͗E,/D^/E'>'>^,EE>'>^^Z/E^ZE^z^dD;^&ͲϲϬ^KZYh>Ϳ'>^^dydhZ͗WZ/^D^K>Z͕>Z>,DD>>/',d/E'dKh^͘^W,KdKDdZ/W>E͘;:/>>:KZEZ'ΛWh>^WZKhd^ͲϲϭϮ͘Ϯϭϵ͘ϵϯϭϮͿyWK^''Z'dWZ^dKEZdWWͲϭ DEh&dhZZ͗&KEK>KZ͗K&&Ͳt,/dϭϬϱϯ''Z'd^E͗ϬϬϭKEZd^EDEd͗ϭϬϬй'ZzDEdd/Ed͗ϴϬϯϬ>h'Zz^Eh^<zWWͲϮ DEh&dhZZ͗&KEK>KZ͗Z<'ZzϭϬϯϬ''Z'd^E͗Z<'ZzϬϬϰDEh&dhZ^EDEd͗ϭϬϬй'ZzDEdd/Ed͗ϵϮϬ,ZK>d/EdydZ/KZW/EdWͲϭ DEh&dhZZ͗^,Zt/Et/>>/D^K>KZ͗^tϳϲϯϮDKZE'ZzydZ/KZW/EdKEWZ^dKEZdWdͲϭ DEh&dhZZ͗^,Zt/EͲt/>>/D^K>KZ͗dDd>Dd>Ͳϭ DEh&dhZZ͗&/Z^dKEK>KZ͗KEt,/d12 '(6&5,37,21 '$7(&216758&7,21'2&80(176  &&'67$,5$1'&21&5(7(3$1(/83'$7(6ϭϭ ϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗ&'>Z^dKZz^/>>ϭϯϬΖͲ ϬΗ͘K͘EKWzϭϭϮΖͲ ϲΗDd>ͲϭWWͲϭWdͲϭWWͲϭWdͲϭWWͲϭWͲϭWE>ΖΖϭϯϮϬ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϮϬ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗ',/:<>d͘K͘WZWdϭϰϰΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗ͘K͘EKWzϭϭϮΖͲ ϲΗtϭtϰϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϯϯϮϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϰϯϮϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϮϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϮϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDd>ͲϭWWͲϭWdͲϭWWͲϭWdͲϭWWͲϭWͲϭDd>ͲϭWWͲϮWWͲϮWE>ΖΖWE>ΖΖϰΖͲϬΗϭϴϴϬϬ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBWE>ΖͲϮΖWE>ΖͲϭΖDͲϭϱϯϮϮBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗϮϯϰϱϲϳϴd͘K͘WZWdϭϰϰΖͲ ϬΗK<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗϭ͘K͘EKWzϭϭϮΖͲ ϲΗϭϯϮϭBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBtϱtϮtϯtϯϮϯϮϭBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϯϯϮϭBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϰϯϮϭBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBtϯtϯtϯtϯϮΖͲϲΗDd>ͲϭWWͲϮ'>ͲϯWWͲϮWͲϭWE>ΖΖWE>ΖΖϰϯϮϬ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDd>ͲϭϴΖͲϬΗϭϴϴϬϬ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBWE>ΖͲϮΖWE>ΖͲϭΖDͲϭϭϴϬϳϰdKDK,'E͕/͕EZ/,ZzZd/&zd,dd,/^W>E͕^W/&/d/KEKZZWKZdt^WZWZzDKZhEZDz/Zd^hWZs/^/KE͕Ed,d/Dh>z>/E^Z,/ddhEZd,>t^K&d,^ddK&D/EE^Kd͘Z'/^dZd/KEEhDZ͗'$7('5$:1%<&+(&.('%<352-(&7180%(57ZHOYH2DNV&HQWHU'U6XLWH:D\]DWD017HO)D['5$:,1*,1)250$7,213+$6(,668(5(&25'5(*,675$7,21 $5&+,7(&7352-(&71$0(&20387(5',5(&725<6+((7'(6&5,37,21d,Z,/dd^,>>Dd,hd,KZ^EKtEZ^K&d,/ZZ^Wd/s/E^dZhDEd^K&^Zs/E^,>>Zd/E>>KDDKE>t͕^ddhdKZzEKd,ZZ^ZsZ/',d^͕/E>h/E'KWzZ/',d^K&d,dd,KhDEd^͘&?5HYLW3URMHFWV?2WVHJR'&BWQLFKROLH#PRKDJHQKDQVHQFRPUYWϯϬϭE>Z'ydZ/KZ>sd/KE^Ͳt^d%+81.(-.$3/$171,&+2/,(2WVHJR'LVWULEXWLRQ&HQWHU?B6KHOODQG&RUHKE^dZhd/KEKhDEd^Kd^'K/^dZ/hd/KEEdZEtKE^dZhd/KEϭϲϳϬϱϲϱd,^d͘EKd^'K͕DEϱϱϯϯϬϯͬϯϮΗсϭΖͲϬΗϯϬϭϭt^d>sd/KEͲ EKZd,EϯͬϯϮΗсϭΖͲϬΗϯϬϭϮt^d>d/KEͲ ^Khd,EϯͬϯϮΗсϭΖͲϬΗϯϬϭϯ^Khd,>sd/KEͲ t^dE12 '(6&5,37,21 '$7(&216758&7,21'2&80(176 ;; ϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗϴϵϭϬϭϭϭϮϭϯϭϰϭϱK<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗ͘K͘EKWzϭϭϮΖͲ ϲΗϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBtϯtϯtϯtϯtϯtϯDd>ͲϭWWͲϭWdͲϭWWͲϭWdͲϭDd>ͲϭWͲϭDd>ͲϭWE>ΖΖϯϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϰϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϰϯϮϮBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBd͘K͘WZWdϭϰϭΖͲ ϬΗ&',/:<>ϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBWE>ΖΖDd>ͲϭWWͲϭWdͲϭWͲϭWdͲϭWWͲϭd͘K͘WZWdϭϰϭΖͲ ϬΗ&K<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗDd>ͲϭWWͲϭWdͲϭWWͲϭWdͲϭWWͲϭWͲϭWE>ΖΖϭϯϮϮBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϮϮBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϯϯϮϮBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϴϬϳϰdKDK,'E͕/͕EZ/,ZzZd/&zd,dd,/^W>E͕^W/&/d/KEKZZWKZdt^WZWZzDKZhEZDz/Zd^hWZs/^/KE͕Ed,d/Dh>z>/E^Z,/ddhEZd,>t^K&d,^ddK&D/EE^Kd͘Z'/^dZd/KEEhDZ͗'$7('5$:1%<&+(&.('%<352-(&7180%(57ZHOYH2DNV&HQWHU'U6XLWH:D\]DWD017HO)D['5$:,1*,1)250$7,213+$6(,668(5(&25'5(*,675$7,21 $5&+,7(&7352-(&71$0(&20387(5',5(&725<6+((7'(6&5,37,21d,Z,/dd^,>>Dd,hd,KZ^EKtEZ^K&d,/ZZ^Wd/s/E^dZhDEd^K&^Zs/E^,>>Zd/E>>KDDKE>t͕^ddhdKZzEKd,ZZ^ZsZ/',d^͕/E>h/E'KWzZ/',d^K&d,dd,KhDEd^͘&?5HYLW3URMHFWV?2WVHJR'&BWQLFKROLH#PRKDJHQKDQVHQFRPUYWϯϬϮE>Z'ydZ/KZ>sd/KE^Ͳ^Khd,%+81.(-.$3/$171,&+2/,(2WVHJR'LVWULEXWLRQ&HQWHU?B6KHOODQG&RUHKE^dZhd/KEKhDEd^Kd^'K/^dZ/hd/KEEdZEtKE^dZhd/KEϭϲϳϬϱϲϱd,^d͘EKd^'K͕DEϱϱϯϯϬϯͬϯϮΗсϭΖͲϬΗϯϬϮϭE>Z'>sd/KE^Khd,Ͳ D/ϯͬϯϮΗсϭΖͲϬΗϯϬϮϮE>Z'>sd/KEͲ ^dϯϯͬϯϮΗсϭΖͲϬΗϯϬϮϯ^d>sd/KEE>Z'Ͳ EKZd,E12 '(6&5,37,21 '$7(&216758&7,21'2&80(176 ;; ϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗϴϵϭϬϭϭϭϮϭϯϭϰϭϱK<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗ͘K͘EKWzϭϭϮΖͲ ϲΗϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϮϯϭϬBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBtϯtϯtϯtϯtϯtϯDd>ͲϭWWͲϭWdͲϭWWͲϭWͲϭWdͲϭWWͲϭWE>ΖΖϯϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϰϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭ^d>s>ϭϬϬΖͲ ϬΗd͘K͘WZWdϭϰϭΖͲ ϬΗϮϯϰϱϲϳϴK<>s>ϵϲΖͲ ϬΗ>Z^dKZz^/>>ϭϯϬΖͲ ϬΗϭ͘K͘EKWzϭϭϮΖͲ ϲΗtϯtϯtϯtϯtϯtϯtϯDd>ͲϭWWͲϭWdͲϭWWͲϭWdͲϭWWͲϭWͲϭWE>ΖΖϮϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϯϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϰϯϮϭ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϯϮϬ^ŝŵBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBϭϴϬϳϰdKDK,'E͕/͕EZ/,ZzZd/&zd,dd,/^W>E͕^W/&/d/KEKZZWKZdt^WZWZzDKZhEZDz/Zd^hWZs/^/KE͕Ed,d/Dh>z>/E^Z,/ddhEZd,>t^K&d,^ddK&D/EE^Kd͘Z'/^dZd/KEEhDZ͗'$7('5$:1%<&+(&.('%<352-(&7180%(57ZHOYH2DNV&HQWHU'U6XLWH:D\]DWD017HO)D['5$:,1*,1)250$7,213+$6(,668(5(&25'5(*,675$7,21 $5&+,7(&7352-(&71$0(&20387(5',5(&725<6+((7'(6&5,37,21d,Z,/dd^,>>Dd,hd,KZ^EKtEZ^K&d,/ZZ^Wd/s/E^dZhDEd^K&^Zs/E^,>>Zd/E>>KDDKE>t͕^ddhdKZzEKd,ZZ^ZsZ/',d^͕/E>h/E'KWzZ/',d^K&d,dd,KhDEd^͘&?5HYLW3URMHFWV?2WVHJR'&BWQLFKROLH#PRKDJHQKDQVHQFRPUYWϯϬϯE>Z'ydZ/KZ>sd/KEͲ ^d%+81.(-.$3/$171,&+2/,(2WVHJR'LVWULEXWLRQ&HQWHU?B6KHOODQG&RUHKE^dZhd/KEKhDEd^Kd^'K/^dZ/hd/KEEdZEtKE^dZhd/KEϭϲϳϬϱϲϱd,^d͘EKd^'K͕DEϱϱϯϯϬϯͬϯϮΗсϭΖͲϬΗϯϬϯϭE>Z'>sd/KEEKZd,ϯͬϯϮΗсϭΖͲϬΗϯϬϯϮEKZd,>sd/KEͲ t^dE12 '(6&5,37,21 '$7(&216758&7,21'2&80(176 ;; PLOTTED:COMM. NO.DRAWING NO.----16604PROJECT OLLIE13605 1st Avenue N. #100Plymouth, MN 55441 | ae-mn.comP 763.412.4000 | F 763.412.4090Anderson Engineering of Minnesota, LLCDRAWING TITLECHECKED BY:DRAWN:DESIGNED:EBHKWHEBHDECEMBER 29, 2021REVISION LOGDESCRIPTION OF REVISIONSNO.DATE16705 65TH ST. NEOTSEGO, MN 55330ENDEAVORDEVELOPMENTPRELIMINARY PLATPRINT NAME:SIGNATURE:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATEOF MINNESOTA.DATE:LICENSE NO.ERIK B. HEDMAN, PE57177NOT FOR CONSTRUCTION12/29/2021CONSTRUCTION PLANSFORPROJECT OLLIE16705 65TH ST NEOTSEGO, MN 55330NSITE LOCATIONHIGHWAY 10HIGHWAY 101 65TH ST NEQUEENS AVE NE OWNER/DEVELOPERENDEAVOR DEVELOPMENT200 SOUTHDALE CENTERMINNEAPOLIS, MN 55435ATTN: JOSHUA BUDISH(952)-210-5870ENGINEER/SURVEYORANDERSON ENGINEERING OF MN13605 1ST AVE NORTH, SUITE 100PLYMOUTH, MN 55441ATTN: ERIK B. HEDMAN763-412-4000GOPHER STATE ONE CALLCALL 48 HOURS BEFORE DIGGING811 OR 1-800-252-1166NSITE VICINITY1SITE VICINITY MAPSCALE: 1" = 2000'2SITE LOCATION MAPSCALE: 1" = 500'PRINT NAME:SIGNATURE:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WASAPPROVED BY ME ON BEHALF OF THE CITY OF OTSEGO.DATE:1. THE HORIZONTAL DATUM AND BEARINGS AREBASED ON THE WRIGHT COUNTY COORDINATESYSTEM NAD83 (2011)2. THE VERTICAL DATUM IS NAVD 88. THE SITEBENCH MARK IS THE TOP NUT OF THE HYDRANTLOCATED 112 FEET NORTHWESTERLY OF THESOUTHWESTERLY PROPERTY CORNER (DEPICTEDHEREON). ELEVATION = 942.50 FEETMISSISSIPPI RIVERHIGHWAY 101RICE LAKE02000'4000'0500'1000'COVER SHEETG-1SHEET INDEXSheetNumberSheet TitleG-1COVER SHEETC-1PRELIMINARY PLATC-2DEMO PLANC-3OVERALL GRADING PLANC-4GRADING PLAN - WESTC-5GRADING PLAN - EASTC-6UTILITY PLAN - WESTC-7UTILITY PLAN - EASTC-8WATERMAIN PLAN & PROFILEC-9SANITARY PLAN & PROFILEC-10PAVEMENT PLANC-11EROSION CONTROL PLANC-12SWPPP - PAGE 1C-13SWPPP - PAGE 2C-14DETAILS 1C-15DETAILS 2C-16DETAILS 3C-17DETAILS 4C-18DETAILS 5L-1PLANTING PLAN - OVERALLL-2PLANTING PLAN - ENLARGEMENTS &DETAILSL-3PLANTING SCHEDULES & NOTES R.R.R.R.390,676 SF WAREHOUSE 1 474 SF MECH 2 N PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 100'200' PRELIMINARY PLAT C-1 65TH ST NE QUEENS AVE NELEGEND PROPERTY LIMITS CONSTRUCTION LIMITS ADJACENT PROPERTY BUILDING SETBACKS PARKING SETBACK DRAINAGE AND UTILITY EASEMENT PROPOSED CONCRETE C&G PROPOSED RETAINING WALL PROPOSED BITUMINOUS PAVEMENT PROPOSED CONCRETE PAVEMENT WETLAND IMPACT HANDICAP STALL DESIGNATION SITE DATA EXISTING CONDITIONS EXISTING LEGAL DESCRIPTION: SECT-35 TWP-121 RANGE-023 UNPLATTED LAND OTSEGO 78.50 AC THE NORTH HALF OF THE SOUTHEAST QUARTER OF SECTION 35, TOWNSHIP 121, RANGE 23, WRIGHT COUNTY, MINNESOTA. PID: 118500354100 FULL LOT AREA: 78.5 ACRES EXISTING ZONING: AGRICULTURAL PROPOSED CONDITIONS PROPOSED LEGAL DESCRIPTION: PROPOSED ZONING: I-1 INDUSTRIAL SETBACKS FRONT YARD = 65 FT FROM CENTERLINE, 30 FT FROM ROW SIDE YARD = 30 FT REAR YARD = 20 FT MAXIMUM SITE COVERAGE BUILDING AND STRUCTURE: FIFTY PERCENT (50%) IMPERVIOUS SURFACES: EIGHTY FIVE PERCENT (85%) PARKING REQUIRED (PHASE 1) WAREHOUSE (99%): 396,000 SF x 1 STALL/1,000 SF = 396 STALLS OFFICE (1%): 4,000 SF x 1 STALL/200 SF = 20 STALLS TOTAL = 416 STALLS PARKING PROVIDED (PHASE 1) CAR PARKING = 120 STALLS HANDICAP STALLS (VAN)= 6 STALLS SEMI-TRAILER PARKING = 52 STALLS PROPOSED BUILDING (PHASE 1) 401,544 SF FFE = 923.0 FUTURE ADDITION (PHASE 2) 343,200 SF FFE = 923.0 572.0702.060.070.060.070.010.0600.0 18.0 24.0 6.0 10.0 TRAILER PARKING 52 STALLS (55' L x 12' W) EMPLOYEE PARKING LOT 120 STALLS (18' L x 9' W) 6 HANDICAP STALLS (18' L x 8' W, VAN) FUTURE PAVEMENT EXTENTS 30.0 55.030.0 12.09.05' BERM WITH FENCE/LANDSCAPING DELINEATED WETLAND (TYP) DELINEATED WETLAND (TYP)50'DEDICATIONTO CITYPARKING SETBACK NEW PROPERTY BOUNDARY 55.0RETAINING WALL RETAINING WALL FUTURE TRAILER PARKING 5' BERM WITH FENCE/LANDSCAPING PARKING SETBACK BUILDING SETBACK BUILDING SETBACK STORMWATER POND (P1) NWL = 902.0 2YR HWL = 904.09 10YR HWL = 904.77 100YR HWL = 906.46 STORMWATER POND (P2) NWL = 899.0 2YR HWL = 900.15 10YR HWL = 901.08 100YR HWL = 902.10 30.0 15.0 EXISTING PROPERTY BOUNDARY 30.015.0R40.0R40.0 R30.0R100.0WATERMAIN D&U EASEMENT STORMWATER POND D&U EASEMENT STORMWATER POND D&U EASEMENT R40.0R40.0 30.053.530.0R30.0 R10.0 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 120'240' DEMO PLAN C-2 LEGEND PROPERTY LIMITS EXISTING WETLAND BOUNDARY EXISTING WATERMAIN EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING FENCE EXISTING GAS MAIN EXISTING OVERHEAD WIRES EXISTING TELEPHONE EXISTING UNDERGROUND ELECTRIC EXISTING HYDRANT AND GV EXISTING SANITARY MANHOLE EXISTING STORM SEWER INLET REMOVE EXISTING UTILITY LINE REMOVE EXISTING FENCE REMOVE EXISTING TREES AND WOODLAND BRUSH REMOVE EXISTING BUILDING STRUCTURE REMOVE EXISTING ASPHALT PAVEMENT REMOVE EXISTING ASPHALT BIKE PATH REMOVE EXISTING GRAVEL PAVEMENT WETLAND IMPACT AREA REMOVE EXISTING CONCRETE C&G REMOVE TREE 62ND ST NE 65TH ST NE QUEENS AVE NEREMOVE ASPHALT BIKE PATH REMOVE CONCRETE CURB REMOVE ASPHALT BIKE PATH REMOVE CONCRETE CURB REMOVE EXISTING FENCE, TYP. REMOVE GRAVEL PAVEMENT REMOVE EXISTING BUILDINGS EXISTING TREES AND WOODLAND BRUSH TO BE REMOVED REMOVE SEPTIC SYSTEM. CONTRACTOR TO CONFIRM LOCATION N REMOVE ASPHALT PAVEMENT R.R.R.R.A300 2 A3003 A300 A300 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A B C D E F G H I J K L 570' - 0"60' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"60' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0"50' - 0" 1 700' - 0" 390,676 SF WAREHOUSE 1 474 SF MECH 2 A400 1 CB-301 R 928.81 CBMH-206 R 926.79 CBMH-207 R 926.67 STMH-208 R 923.17 CB-201 R 921.79 CBMH-205 R 921.39 CB-101 R 920.87 CBMH-202 R 920.68 CBMH-203 R 920.54 CBMH-204 R 920.52 STMH-107 R 917.98 CBMH-103 R 917.18 CBMH-215 R 916.88 CBMH-105 R 916.74 CBMH-104 R 916.71 CBMH-102 R 916.70 CBMH-106 R 916.14 CBMH-210 R 915.81 CBMH-216 R 915.66 CBMH-213 R 915.63CBMH-209 R 915.36 CBMH-211 R 915.35 CBMH-214 R 915.32 CBMH-212 R 915.32 STMH-108 R 915.93 CB-102A R 914.57 STMH-109 R 915.00 STMH-217 R 914.44 STMH-218 R 912.58 STMH-219 R 910.39 STMH-110 R 909.27 STMH-111 R 905.48 FES-220 INV 902.00 FES-112 INV 899.00 FES-410 INV 899.00 FES-507 INV 895.00 FES-302 I-924.7 FES-301 I-925.2 FES-602 INV 902.00 FES-601 INV 905.60 FUTURE WAREHOUSE (PH 2) PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 120'240' N N OVERALL GRADING PLAN C-3 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR WETLAND BUFFER DELINEATED WETLAND EXISTING SPOT ELEVATION SOIL BORING LOCATION DRAINAGE ARROW PROPOSED RETAINING WALL PROPOSED CONCRETE C&G TIP OUT CURB SILT FENCE INLET SEDIMENT PROTECTION ROCK CONSTRUCTION ENTRANCE SPOT ELEVATION FLOW LINE OF CURB HIGH POINT / FLOW LINE OF CURB RIM ELEVATION TOP OF WALL BOTTOM OF WALL 966 965 966 965 F/H 800.1 F 800.1 R 800.1 800.1 T 800.1 B 800.1 65TH ST NE QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCK = 919.0 POND P-1 NWL = 902.0 2-YR HWL = 904.09 10-YR HWL = 904.77 100-YR HWL = 906.46 POND P-2 NWL = 899.0 2-YR HWL = 900.15 10-YR HWL = 901.08 100-YR HWL = 902.10 20' WETLAND BUFFER (TYP.) DELINEATED WETLAND (TYP.) WETLAND 6 100-YR HWL = 888.43 WETLAND 8 100-YR HWL = 903.39 WETLAND 7 100-YR HWL = 916.55 WETLAND 4 100-YR HWL = 908.83 WETLAND 3 100-YR HWL = 924.60 WETLAND 5 100-YR HWL = 919.97 R.R.R.R.A300 2 A3003 A300 A300 4 1 390,676 SF WAREHOUSE 1 474 SF MECH 2 A400 1 CB-301 R 928.81 CBMH-206 R 926.79 CBMH-207 R 926.67 STMH-208 R 923.17 CB-201 R 921.79 CBMH-205 R 921.39 CB-101 R 920.87 CBMH-202 R 920.68 CBMH-203 R 920.54 CBMH-204 R 920.52 STMH-107 R 917.98 CBMH-103 R 917.18 CBMH-215 R 916.88 CBMH-105 R 916.74 CBMH-104 R 916.71CBMH-102 R 916.70 CBMH-106 R 916.14 CBMH-210 R 915.81 CBMH-216 R 915.66 CBMH-213 R 915.63 CBMH-209 R 915.36 CBMH-211 R 915.35 CBMH-214 R 915.32CBMH-212 R 915.32 CB-102A R 914.57 STMH-217 R 914.44 ME 927.17 ME 928.13 FL 926.83 FL 926.00 FL 926.60 FL 925.06 FL 922.12 FL 923.46 FL 922.29 FL 922.30 FL 921.39 FL 921.25 FL 921.03 FL 921.87 FL 922.02 FL 922.26 FL 922.23 FL 921.93 FL 921.85 FL 921.85 FL 921.93 FL 922.23 FL 921.43 FL 921.43 FL 921.33 FL 921.33 FL 921.03 FL 921.03 FL 922.23 FL 921.93 FL 921.95 FL 921.85 FL 921.93 FL 922.23 FL 921.43 FL 921.43 FL 921.33 FL 921.03 FL 921.33 FL 921.03 FL 921.28 FL 921.03 FL 921.39 FL 919.23 FL 925.10 FL 932.06FL 932.18 FL 937.43 FL 936.31 FL 936.24 FL 937.43 ME 937.99 ME 938.65 FL 917.92 FL 916.35 FL 915.60 FL 915.60 FL 916.60 FL 916.70 FL 916.71 FL 916.60 FL 915.60 FL 915.60 FL 916.62 FL 916.75 FL 915.94 BW 922.43 BW 920.02 BW 918.92BW 919.50 BW 922.85 FL 916.76 PG 918.80 PG 919.00 PG 922.40 BW 918.10 BW 918.55 BW 919.05 TW 918.10 TW 919.25 TW 920.74 FL 917.19 FL 918.59 FL 921.61 FL 922.85 PG 922.85 PG 919.00 FFE 923.00 PG 922.82 PG 922.82 PG 922.82 FFE 923.00 FFE 923.00 PG 922.82 PG 922.82 PG 922.82 PG 922.82 FFE 923.00 PG 918.84 PG 918.10 FFE 923.00 FFE 923.00 PG 919.00 FFE 923.00 FFE 923.00 PG 918.84 PG 918.10 PG 919.00 FFE 923.00 5.0%1.5%2.0%1.5%2.0%7.8%9.4%5. 0 % 4.4% 2.6% 2.8% 2.8% 2.0%1.5%2.0%1.5%1.4%2.0% 2.0% 2.0% TW 922.82 BW 922.00 TW 922.85 TW 922.05 TW 921.18 TW 921.95 TW 922.85 PG 922.85 PG 918.10 FFE 923.00 FFE 923.00 FFE 923.00 FFE 923.00 FFE 923.00 FFE 923.00 PG 922.85 PG 918.10 PG 918.10 BW 912.00 BW 912.72 TW 912.00 TW 915.91 TW 915.57 BW 912.48 TW 914.84 BW 909.56 FES-302 INV 924.70 FES-301 INV 925.20 25.0% 25.0%25.0%25.0%R.R.R.R.A400 1 FL 922.23FL 922.01 FL 921.87 FL 921.68 FL 921.74 FL 918.12 FL 921.65 FL 922.79 PG 922.79 PG 922.86 PG 922.86 PG 922.34 PG 918.10 PG 919.00 FFE 923.00 PG 922.82 PG 922.82 FFE 923.00 10.1%2.8% 2.0% PG 918.10 PG 922.77 FFE 923.00 FFE 923.00 7.8%1.5%1.5%PG 922.80 PG 922.73 PG 922.73 PG 922.23 PG 922.73 PG 922.25 PG 921.92 PG 921.92 FL 922.23 PG 922.73 FL 922.23 PG 922.25 PG 922.82 PG 922.90 PG 923.00 PG 922.92 PG 922.93 PG 922.73 PG 922.73 PG 922.25 PG 922.23 PG 922.77 PG 922.44 PG 922.25 PG 922.23 PG 922.25 PG 922.25 PG 922.34 PG 922.34 PG 922.82 PG 922.81 PG 922.84 PG 922.79 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 60'120' N N GRADING PLAN - WEST C-4 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR EXISTING SPOT ELEVATION SOIL BORING LOCATION DRAINAGE ARROW PROPOSED RETAINING WALL PROPOSED CONCRETE C&G TIP OUT CURB SILT FENCE INLET SEDIMENT PROTECTION ROCK CONSTRUCTION ENTRANCE SPOT ELEVATION FLOW LINE OF CURB HIGH POINT / FLOW LINE OF CURB RIM ELEVATION TOP OF WALL BOTTOM OF WALL 966 965 966 965 F/H 800.1 F 800.1 R 800.1 800.1 T 800.1 B 800.1 65TH ST NE QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCKS = 919.0 1 GRADING PLAN - WEST SCALE: 1" = 60' 2 INSET A SCALE: 1" = 20' SEE INSET A FOR DETAILED GRADING WETLAND 4 100-YR HWL = 908.83 WETLAND 3 100-YR HWL = 924.60 WETLAND 5 100-YR HWL = 919.97 STMH-108 R 915.93 STMH-109 R 915.00 STMH-218 R 912.58 STMH-219 R 910.39 STMH-110 R 909.27 STMH-111 R 905.48 FES-220 INV 902.00 FES-112 INV 899.00 BW 911.00 TW 911.00 TW 913.00 BW 908.55 FES-410 INV 899.00 OCS-506 R 903.00 FES-507 INV 895.00 OCS-409 R 906.01 BW 914.74 TW 915.00 BW 914.41 BW 911.66 BW 914.12 TW 915.00 TW 915.00 TW 915.00 FES-602 INV 902.00 FES-601 INV 905.60 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 60'120' N N GRADING PLAN - EAST C-5 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR EXISTING SPOT ELEVATION SOIL BORING LOCATION DRAINAGE ARROW PROPOSED RETAINING WALL PROPOSED CONCRETE C&G TIP OUT CURB SILT FENCE INLET SEDIMENT PROTECTION ROCK CONSTRUCTION ENTRANCE SPOT ELEVATION FLOW LINE OF CURB HIGH POINT / FLOW LINE OF CURB RIM ELEVATION TOP OF WALL BOTTOM OF WALL 966 965 966 965 F/H 800.1 F 800.1 R 800.1 800.1 T 800.1 B 800.1 65TH ST NE QUEENS AVE NEFUTURE WAREHOUSE (PH 2) FFE = 923.0 LOADING DOCKS = 919.0 1 GRADING PLAN - EAST SCALE: 1" = 60' FUTURE PAVEMENT EXTENTS DELINEATED WETLAND (TYP) 20' WETLAND BUFFER (TYP) POND P-1 NWL = 902.0 2-YR HWL = 904.09 10-YR HWL = 904.77 100-YR HWL = 906.46 POND P-2 NWL = 899.0 2-YR HWL = 900.15 10-YR HWL = 901.08 100-YR HWL = 902.10 WETLAND 6 100-YR HWL = 888.43 WETLAND 8 100-YR HWL = 903.39 WETLAND 7 100-YR HWL = 916.55 WETLAND 4 100-YR HWL = 908.83 WETLAND 5 100-YR HWL = 919.97 STMH-107 RIM 917.98 I. 905.15(36" IN) I. 905.15(36" OUT) STMH-217 RIM 914.44 I. 905.15(42" IN) I. 904.75(48" OUT) CB-101 RIM 920.87 I. 911.95(16" OUT) CBMH-102 RIM 916.70 I. 911.45(16" IN) I. 911.19(20" OUT) I. 911.32(18" IN) CBMH-103 RIM 917.18 I. 910.71(20" IN) I. 910.44(24" OUT) I. 910.97(16" IN) CB-102A RIM 914.57 I. 911.47(18" OUT) CBMH-104 RIM 916.71 I. 909.62(24" IN) I. 909.62(24" OUT) CBMH-105 RIM 916.74 I. 907.97(24" IN) I. 907.57(30" OUT) I. 908.47(16" IN) CBMH-106 RIM 916.14 I. 906.29(30" IN) I. 905.89(36" OUT) RD-01 RIM 914.70 I. 913.24(16" OUT) RD-02 RIM 913.06 I. 911.59(16" OUT) CB-201 RIM 921.79 I. 917.13(16" OUT) CBMH-202 RIM 920.68 I. 916.54(16" IN) I. 916.54(16" OUT) CBMH-203 RIM 920.54 I. 915.60(16" IN) I. 915.47(18" OUT) CBMH-204 RIM 920.52 I. 914.37(18" IN) I. 913.97(24" OUT) CBMH-205 RIM 921.39 I. 913.26(24" IN) I. 913.26(24" OUT) STMH-208 RIM 923.17 I. 912.23(24" IN) I. 912.23(24" OUT) I. 912.77(16" IN) CBMH-207 RIM 926.67 I. 912.41(24" IN) I. 912.41(24" OUT) CBMH-206 RIM 926.79 I. 912.56(24" IN) I. 912.56(24" OUT) I. 913.09(16" IN) CB-301 RIM 928.81 RD-03 RIM 919.35 I. 917.88(16" OUT) CBMH-209 RIM 915.36 I. 910.81(24" IN) I. 910.41(30" OUT) RD-04 RIM 916.46 I. 915.00(16" OUT) CBMH-210 RIM 915.81 I. 909.96(30" IN) I. 909.56(36" OUT) I. 910.89(16" IN) CBMH-211 RIM 915.35 I. 909.01(36" IN) I. 909.01(36" OUT) CBMH-212 RIM 915.32 I. 908.39(36" IN) I. 908.39(36" OUT) CBMH-213 RIM 915.63 I. 908.06(36" IN) I. 907.66(42" OUT) I. 908.99(16" IN) RD-05 RIM 914.51 I. 913.04(16" OUT) RD-06 RIM 913.20 I. 911.74(16" OUT) CBMH-214 RIM 915.32 I. 906.99(42" IN) I. 906.99(42" OUT) CBMH-215 RIM 916.88 I. 906.46(42" IN) I. 906.46(42" OUT) I. 908.20(16" IN) CBMH-216 RIM 915.66 I. 906.16(42" IN) I. 906.16(42" OUT) SMH-02 RIM 927.65 I. 915.30(3" IN) 100 LF - 16" HDPE ST @ 0.50% 96 LF - 20" HDPE ST @ 0.50% 104 LF - 24" HDPE ST @ 0.79% 196 LF -24" HDPE ST@ 0.84%256 LF -30" HDPE ST@ 0.50% 148 LF - 36" HDPE ST @ 0.50% 125 LF - 16" HDPE PIPE ST @ 2.50% 125 LF - 16" HDPE ST @ 1.82%117 LF - 16" HDPE ST @ 0.50% 189 LF - 16" HDPE ST @ 0.50% 221 LF - 18" HDPE ST @ 0.50% 142 LF - 24" HDPE ST @ 0.50% 139 LF - 24" HDPE ST @ 0.50% 97 LF - 16" HDPE ST @ 10.13% 30 LF - 24" HDPE ST @ 0.50% 36 LF - 24" HDPE ST @ 0.50% 182 LF - 16" HDPE PIPE ST @ 2.81% 103 LF - 24" HDPE ST @ 1.37% 91 LF - 30" HDPE ST @ 0.50% 181 LF - 16" HDPE PIPE ST @ 2.27% 109 LF - 36" HDPE ST @ 0.50% 124 LF - 36" HDPE ST @ 0.50% 67 LF - 36" HDPE ST @ 0.50% 133 LF - 42" HDPE ST @ 0.50% 181 LF - 16" HDPE PIPE ST @ 2.24% 118 LF - 16" HDPE PIPE ST @ 3.00% 88 LF - 42" HDPE ST @ 0.60% 61 LF - 42" HDPE ST @ 0.50% 161 LF - 42" HDPE ST @ 0.62% I. 909.00(6" OUT) FES-302 RIM 926.17 I. 924.70(16" IN) FES-301 RIM 926.68 I. 925.20(16" OUT) 50 LF - 16" HDPE PIPE ST @ 1.00% STORM STRUCTURE SCHEDULE STRUCTURE NUMBER DIAMETER (IN) CASTING (NEENAH OR APPROVED EQUAL) CB-101 48 R-3067-V CBMH-102 54 R-3067-V CB-102A 48 R-4342 CBMH-103 54 R-3067-V CBMH-104 48 R-3067-V CBMH-105 48 R-3067-V CBMH-106 48 R-4342 STMH-107 48 R-1642 STMH-108 54 R-1642 STMH-109 54 R-1642 STMH-110 54 R-1642 STMH-111 60 R-1642 CB-201 48 R-3067-V CBMH-202 48 R-3067-V CBMH-203 48 R-3067-V CBMH-204 48 R-3067-V CBMH-205 48 R-3067-V CBMH-206 54 R-3067-V CBMH-207 48 R-3067-V CBMH-208 54 R-3067-V CBMH-209 48 R-3067-V CBMH-210 60 R-3067-V CBMH-211 48 R-3067-V CBMH-212 48 R-3067-V CBMH-213 66 R-3067-V CBMH-214 60 R-3067-V CBMH-215 66 R-1642 CBMH-216 66 R-4342 STMH-217 72 R-1642 STMH-218 108 R-1642 STMH-219 108 R-1642 CB-301 48 R-4342 OCS-409 48 HAALA 48-57 OCS-506 48 HAALA 48-57 SANITARY STRUCTURE SCHEDULE STRUCTURE NUMBER DIAMETER (IN)CASTING (NEENAH OR APPROVED EQUAL) SMH-02 48 R-1642 LIFT STATION 48 R-1642 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 60'120' N N UTILITY PLAN - WEST C-6 65TH ST NE QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCKS = 919.0 1 UTILITY PLAN - WEST SCALE: 1" = 60' LEGEND PROPERTY LIMITS EXISTING WATERMAIN PROPOSED WATERMAIN PROPOSED STORM SEWER DRAINAGE & UTILITY EASEMENT 1.ALL CONSTRUCTION SHALL COMPLY WITH 2018 EDITION OF MN/DOT STANDARD CONSTRUCTION SPECIFICATIONS (INCLUDING SUPPLEMENTS), AS APPLICABLE. ALL CONSTRUCTION SHALL COMPLY WITH STATE, COUNTY, AND CITY PERMIT REQUIREMENTS. 2.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION, PRIOR TO BEGINNING THE WORK. 3.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS. 4.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. 5.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS REQUIRED TO PERFORM ALL THE WORK. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE ANY NECESSARY TRAFFIC CONTROL FOR THE WORK. 6.PROTECT EXISTING UTILITIES UNLESS OTHERWISE NOTED. 7.SUBSTITUTIONS FROM INFO. SHOWN HEREON SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. PROPOSED DRAINTILE PROPOSED WATERMAIN FITTING PROPOSED STORM INLETS FES W/ CABLE CONCRETE SHEET NOTES MATCH LINE SEE SHEET C-7 STMH-218 RIM 912.58 I. 903.75(48" IN) I. 903.75(48" OUT) FES-220 RIM 906.75 I. 902.00 STMH-219 RIM 910.39 I. 902.75(48" IN) I. 902.35(48" OUT) STMH-108 RIM 915.93 I. 904.15(36" IN) I. 903.35(48" OUT) STMH-109 RIM 915.00 I. 902.28(48" IN) I. 902.28(48" OUT) STMH-111 RIM 905.48 I. 899.18(48" IN) I. 899.18(48" OUT) STMH-110 RIM 909.27 I. 899.68(48" IN) I. 899.68(48" OUT)FES-112 RIM 903.75 I. 899.00 200 LF -48" HDPE ST@ 0.50%200 LF -48" HDPE ST@ 0.50% 64 LF - 54" RCP RCP ST @ 0.55% 200 LF -36" HDPE ST@ 0.50%200 LF -48" HDPE ST@ 0.53%400 LF -48" HDPE ST@ 0.65% 87 LF - 48" HDPE ST @ 0.57% 37 LF - 48" RCP ST @ 0.50% CO CO CO CO CO CO CO CO CO COCO CO CO CO CO CO CO COCO CO CO CO CO CO CO COCOCO CO FES-410 RIM 901.06 I. 899.00 FES-507 RIM 897.06 I. 895.00 CLEANOUT (TYP) RIM 900.50 INV 899.50 (4" DRAINTILE) OCS-409 RIM 906.01 I. 899.50(4" IN) I. 901.00(12" IN) I. 899.30(21" OUT) CLEANOUT (TYP) RIM 897.0 INV 896.0 (4" PVC) OCS-506 RIM 903.00 I. 898.00(12" IN) I. 895.27(21" OUT) I. 896.00(4" IN) 55 LF - 21" CONCRETE PIPE ST @ 0.55% 4" PVC PERF @ 0.0% (TYP) 54 LF - 21" CONCRETE PIPE ST @ 0.50% 4 " PVC PERF @ 0.0% (TYP) FES-601 RIM 907.12 I. 905.60 72 LF - 15" CONCRETE PIPE ST @ 5.00% FES-602 RIM 903.52 I. 902.00 26 LF - 12" CONCRETE PIPE ST @ 0.00% PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 60'120' N N 65TH ST NE 1 UTILITY PLAN - EAST SCALE: 1" = 60' LEGEND PROPERTY LIMITS EXISTING WATERMAIN PROPOSED WATERMAIN PROPOSED STORM SEWER DRAINAGE & UTILITY EASEMENT 1.ALL CONSTRUCTION SHALL COMPLY WITH 2018 EDITION OF MN/DOT STANDARD CONSTRUCTION SPECIFICATIONS (INCLUDING SUPPLEMENTS), AS APPLICABLE. ALL CONSTRUCTION SHALL COMPLY WITH STATE, COUNTY, AND CITY PERMIT REQUIREMENTS. 2.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION, PRIOR TO BEGINNING THE WORK. 3.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS. 4.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. 5.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS REQUIRED TO PERFORM ALL THE WORK. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE ANY NECESSARY TRAFFIC CONTROL FOR THE WORK. 6.PROTECT EXISTING UTILITIES UNLESS OTHERWISE NOTED. 7.SUBSTITUTIONS FROM INFO. SHOWN HEREON SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. PROPOSED DRAINTILE PROPOSED WATERMAIN FITTING PROPOSED STORM INLETS FES W/ CABLE CONCRETE SHEET NOTES UTILITY PLAN - EAST C-7MATCH LINE SEE SHEET C-6NEW POND (P1) NWL = 902.0 2YR = 904.09 10YR = 904.77 100YR = 906.46 NEW POND (P2) NWL = 899.0 2YR = 900.15 10YR = 901.08 100YR = 902.10 0+00 1+002+003+004+005+006+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+0027+0028+0029+0030+0030+15BP: 0+00.00PI: 1+09.38PI: 5+53.51 P I : 5 + 6 7 . 2 0 PI: 13+09.11PI: 13+26.10PI: 20+05.42 P I : 2 0 + 1 7 . 7 3 PI: 27+65.58PI: 27+75.62EP: 30+14.71 12" 135° BEND 12" 135° BEND 12" 135° BEND 12" 135° BEND 10 LF 12" DIP CL 52 WM 10 LF 12" DIP CL 52 WM 110 LF 12" DIP CL 52 WM 684 LF 12" DIP CL 52 WM 14 LF 12" DIP CL 52 WM 12" GATE VALVE 12" GATE VALVE 12x12x12 TEE 12x6x12 TEE 6" GATE VALVE 6" HYDRANT 12x6x12 TEE 12x6x12 TEE 6" GATE VALVE 6" HYDRANT 769 LF 12" DIP CL 52 WM 12x6x12 TEE 6" GATE VALVE 6" HYDRANT 17 LF 12" DIP CL 52 WM 12x6x12 TEE 12x6x12 TEE 680 LF 12" DIP CL 52 WM 6" GATE VALVE 6" GATE VALVE 12" GATE VALVE 12x6x12 TEE 6" GATE VALVE 12x6x12 TEE 6" GATE VALVE 772 LF 12" DIP CL 52 WM 6" HYDRANT 6" HYDRANT 12" GATE VALVE 6" GATE VALVE 6" HYDRANT 6" GATE VALVE 6" HYDRANT HYDRANT 1 STA. 2+53.26 OFFSET=31.670 N=197288.5852 E=585840.7885 HYDRANT 2 STA. 5+76.35 OFFSET=10.670 N=197587.8461 E=585827.9535 HYDRANT 3 STA. 8+49.69 OFFSET=53.997 N=197544.5187 E=586101.2901 HYDRANT 4 STA. 11+49.69 OFFSET=53.997 N=197544.5187 E=586401.2901 HYDRANT 7 STA. 21+86.51 OFFSET=53.995 N=196952.5109 E=586395.2874 HYDRANT 8 STA. 24+62.51 OFFSET=53.997 N=196952.5135 E=586119.2901 HYDRANT 9 STA. 28+62.93 OFFSET=31.670 N=196992.9267 E=585840.7885 6" HYDRANT 6" HYDRANT HYDRANT 5 STA. 16+11.10 OFFSET=-10.023 N=197301.5384 E=586582.7885 HYDRANT 6 STA. 18+42.18 OFFSET=-10.019 N=197070.4593 E=586582.7885 59 LF 12" DIP CL 52 WM 12x12x12 TEE 12" GATE VALVE 12" GATE VALVE N=196898.5161 E=586582.7885 12" GATE VALVE 12" GATE VALVE N=197598.5161 E=586582.7885 910 920 930 940 900 905 910 915 920 925 930 935 940 934.10+00 926.09930.2921.64929.31+00 921.83928.9921.83929.32+00 921.83929.4921.83928.53+00 921.81926.8921.83924.94+00 921.83922.6921.85920.95+00 922.30921.2921.61918.96+00 919.12916.1918.02914.37+00 918.02913.1918.02912.88+00 918.02914.4918.02917.19+00 918.02920.6918.02921.810+00 16" HDPE STATION=0+69.30 ELEV=914.744 12" DIP CL 52 STATION=0+69.37 ELEV=912.596 6" PVC SDR 35 STATION=9+49.83 ELEV=907.982 12" DIP CL 52 STATION=9+49.83 ELEV=909.520 12" GV STATION=1+12.28 ELEV=913.494 12" GV STATION=0+03.07 ELEV=924.403 910 920 930 940 900 905 910 915 920 925 930 935 940 918.02921.810+00 918.02921.9918.02921.111+00 918.02920.4918.02920.212+00 918.02920.5917.87920.613+00 918.84921.1921.34920.614+00 922.50920.2922.50918.315+00 922.50916.5922.50916.616+00 922.50912.6922.50913.617+00 922.50915.6922.50917.318+00 922.50919.5922.50919.219+00 921.91918.3919.53919.220+00 16" HDPE STATION=10+95.19 ELEV=910.062 12" DIP CL 52 STATION=10+95.19 ELEV=907.414 12" GV STATION=12+88.18 ELEV=907.215 12" GV STATION=12+94.18 ELEV=907.264 12" WM STUB STATION=12+91.17 ELEV=906.737 910 920 930 940 900 905 910 915 920 925 930 935 940 919.53919.220+00 918.72924.4918.02929.021+00 918.02929.1918.02925.522+00 918.02923.2918.02922.923+00 918.02921.2918.02919.924+00 918.02919.2918.02919.825+00 918.02921.9918.02925.026+00 918.02929.2918.67932.827+00 921.07934.6921.83934.228+00 921.87933.4921.86931.929+00 921.83930.4921.83929.430+00 921.83929.230+14 16" HDPE STATION=20+39.06 ELEV=909.915 16" HDPE STATION=22+35.01 ELEV=911.650 16" HDPE STATION=25+34.94 ELEV=913.577 16" HDPE STATION=27+29.15 ELEV=916.115 12" DIP CL 52 STATION=20+39.06 ELEV=907.839 12" DIP CL 52 STATION=22+35.01 ELEV=909.598 12" DIP CL 52 STATION=25+34.94 ELEV=910.521 12" DIP CL 52 STATION=27+29.15 ELEV=912.272 12" GV STATION=28+59.75 ELEV=913.422 12" GV STATION=30+11.42 ELEV=913.499 WATERMAIN LINE DATA LINE # L15 L16 L17 L18 L19 L20 L21 LENGTH 109.3752 444.1358 13.6852 741.9165 16.9840 679.3226 12.3119 BEARING S89° 45' 50.41"E N0° 00' 00.00"E N45° 00' 00.00"E N90° 00' 00.00"E S45° 10' 50.03"E S0° 00' 04.26"E S45° 00' 00.00"W START POINT (N.197145.1539), (E.585699.7442) (N.197144.7034), (E.585809.1185) (N.197588.8392), (E.585809.1185) (N.197598.5161), (E.585818.7954) (N.197598.5161), (E.586560.7119) (N.197586.5445), (E.586572.7592) (N.196907.2219), (E.586572.7732) END POINT (N.197145.1539),(E.585699.7442) (N.197144.7034),(E.585809.1185) (N.197588.8392),(E.585809.1185) (N.197598.5161),(E.585818.7954) (N.197598.5161),(E.586560.7119) (N.197586.5445),(E.586572.7592) (N.196907.2219),(E.586572.7732) PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 60'120' N N WATERMAIN PLAN & PROFILE C-8QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCKS = 919.0 1 UTILITY PLAN - WATERMAIN SCALE: 1" = 60' LEGEND PROPERTY LIMITS EXISTING WATERMAIN PROPOSED WATERMAIN PROPOSED STORM SEWER DRAINAGE & UTILITY EASEMENT PROPOSED DRAINTILE PROPOSED WATERMAIN FITTING PROPOSED STORM INLETS FES W/ CABLE CONCRETE SHEET NOTES 1 WATERMAIN PROFILE VIEW STA. 0+00 - 10+00 SCALE: H 1" = 60' V 1" = 5' 2 WATERMAIN PROFILE VIEW STA. 10+00 - 20+00 SCALE: H 1" = 60' V 1" = 5' 3 WATERMAIN PROFILE VIEW STA. 20+00 - 30+14 SCALE: H 1" = 60' V 1" = 5' 4 WATERMAIN HORIZONTAL GEOMETRY SCALE: NTS 7.5' MIN. COVER 7.5' MIN. COVER 7.5' MIN. COVER FINISHED GRADE EXISTING GRADE FINISHED GRADE EXISTING GRADE FINISHED GRADE EXISTING GRADE 1.ALL CONSTRUCTION SHALL COMPLY WITH 2018 EDITION OF MN/DOT STANDARD CONSTRUCTION SPECIFICATIONS (INCLUDING SUPPLEMENTS), AS APPLICABLE. ALL CONSTRUCTION SHALL COMPLY WITH STATE, COUNTY, AND CITY PERMIT REQUIREMENTS. 2.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION, PRIOR TO BEGINNING THE WORK. 3.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS. 4.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. 5.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS REQUIRED TO PERFORM ALL THE WORK. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE ANY NECESSARY TRAFFIC CONTROL FOR THE WORK. 6.PROTECT EXISTING UTILITIES UNLESS OTHERWISE NOTED. 7.SUBSTITUTIONS FROM INFO. SHOWN HEREON SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. 8.WATERMAIN SHALL BE DUCTILE IRON CLASS 52 PIPE. 9.SANITARY SEWER SHALL BE PVC SDR 35 PIPE. 10.ALL WATERMAIN SHALL HAVE 18" MIN. VERTICAL SEPARATION FROM STORM AND SANITARY LINES AT CROSSINGS. 10' D&U EASEMENT (TYP) TIE-IN TO EXISTING APPROX. INV. 924.5 (+/- 1') 0+001+002+003+00 4+0 0 4+9 2 BP: 0+00.00PI: 3+59.34EP: 4+92.09I 909.00 I 904.71 6" PVC SDR35 SAN 139 LF - @ 2.60% 1-14" PE SDR 11 SAN FORCEMAIN 133 LF - @ -5.67%1-14" PE SDR 11 SAN FORCEMAIN 359 LF - @ -0.30% 6" PVC SDR35 SAN 56 LF - @ 1.00% 0+001+002+003+00 4+0 0 4+9 2 BP: 0+00.00 EP: 4+92.09PI: 3+59.34LIFT STATION RIM 919.98 I. 905.28(6" OUT) I. 906.69(1-1/4" OUT) I. 905.38(6" IN) SMH-02 RIM 927.65 I. 915.30(1-14" IN)0+001+001+96BP: 0+00.00 EP: 1+95.68 PI: 1+39.33 910 920 930 900 905 910 915 920 925 930 918.93916.10+00 918.18920.4917.31920.81+00 919.6919.61+96LIFT STATIONINV 905.28 (6" OUT)INV 906.69 (1-1/4" OUT)INV 905.38 (6" IN)STA:1+39.33, 0.0'RIM 919.98139 L F @ 2 . 6 0 % 6" P V C S D R 3 5 S A N 56 LF @ 1.00% 6" PVC SDR 35 SAN 16" HDPE STATION=1+25.00 ELEV=909.121 6" PVC SDR 35 STATION=1+25.00 ELEV=906.267 12" DIP CL 52 STATION=0+59.00 ELEV=909.520 6" PVC SDR 35 STATION=0+59.00 ELEV=908.000 910 920 930 900 905 910 915 920 925 930 LIFT STATIONINV 905.28 (6" OUT)INV 906.69 (1-1/4" OUT)INV 905.38 (6" IN)2' SUMPSTA:1+39.33, 0.0'RIM 919.98SMH-02INV 915.30 (1-1/4" IN)STA:1+39.33, 0.0'RIM 927.65920.00+00919.4919.51+00918.1915.42+00914.0916.03+00920.0922.04+00927.4927.74+92 SANITARY (GRAVITY) LINE DATA LINE # L25 L26 LENGTH 139.3309 56.3535 BEARING N0° 00' 00.00"E N0° 23' 00.34"W START POINT (N.197539.5161), (E.586201.4300) (N.197678.8470), (E.586201.4300) END POINT (N.197539.5161),(E.586201.4300) (N.197678.8470),(E.586201.4300) SANITARY (FORCEMAIN) LINE DATA LINE # L27 L28 LENGTH 359.3402 132.7507 BEARING N89° 59' 59.79"W N67° 30' 00.00"W START POINT (N.197678.8470), (E.586201.4300) (N.197678.8474), (E.585842.0898) END POINT (N.197678.8470),(E.586201.4300) (N.197678.8474),(E.585842.0898) PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 60'120' N SANITARY PLAN & PROFILE C-9 FINISHED GRADE EXISTING GRADE 1.ALL CONSTRUCTION SHALL COMPLY WITH 2018 EDITION OF MN/DOT STANDARD CONSTRUCTION SPECIFICATIONS (INCLUDING SUPPLEMENTS), AS APPLICABLE. ALL CONSTRUCTION SHALL COMPLY WITH STATE, COUNTY, AND CITY PERMIT REQUIREMENTS. 2.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES IN THE AREA OF CONSTRUCTION, PRIOR TO BEGINNING THE WORK. 3.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS. 4.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. 5.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS REQUIRED TO PERFORM ALL THE WORK. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE, AND PROVIDE ANY NECESSARY TRAFFIC CONTROL FOR THE WORK. 6.PROTECT EXISTING UTILITIES UNLESS OTHERWISE NOTED. 7.SUBSTITUTIONS FROM INFO. SHOWN HEREON SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. 8.WATERMAIN SHALL BE DUCTILE IRON CLASS 52 PIPE. 9.SANITARY SEWER (GRAVITY) SHALL BE PVC SDR 35 PIPE. 10.ALL WATERMAIN SHALL HAVE 18" MIN. VERTICAL SEPARATION FROM STORM AND SANITARY LINES AT CROSSINGS. 65TH ST NE QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCKS = 919.0 3 SANITARY (FORCEMAIN) - PROFILE VIEW SCALE: H 1" = 60' V 1" = 5' LEGEND PROPERTY LIMITS EXISTING WATERMAIN PROPOSED WATERMAIN PROPOSED STORM SEWER DRAINAGE & UTILITY EASEMENT PROPOSED SANITARY PROPOSED WATERMAIN FITTING PROPOSED STORM INLETS FES W/ CABLE CONCRETE SHEET NOTES 1 SANITARY SEWER - PLAN VIEW SCALE: H 1" = 60' 4 SANITARY HORIZONTAL GEOMETRY SCALE: NTS SANITARY (GRAVITY) ALIGNMENTSANITARY (FORCEMAIN) ALIGNMENT 2 SANITARY (GRAVITY) - PROFILE VIEW SCALE: H 1" = 60' V 1" = 5' FINISHED GRADE EXISTING GRADE 512 LF 1-1/4" PE SAN FORCEMAIN 6' MIN.-0.3% -5 . 6 7 % 1.GRINDER PUMP LIFT STATION UTILIZING E-ONE EXTREME SERIES GRINDER PUMPS. 2.ELEVATION HEAD = 12.5 FT 3.FRICTION HEAD = 16 FT 4.TOTAL SYSTEM PRESSURE: 28.5 FT/2.31 PSI/FT = 12.33 PSI LIFT STATION DESIGN NOTES: R.R.R.R.390,676 SF WAREHOUSE 1 474 SF MECH 2 N PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 100'200' PAVEMENT PLAN C-10 65TH ST NE QUEENS AVE NELEGEND PROPERTY LIMITS CONSTRUCTION LIMITS ADJACENT PROPERTY BUILDING SETBACKS PARKING SETBACK DRAINAGE AND UTILITY EASEMENT PROPOSED CONCRETE C&G PROPOSED RETAINING WALL PROPOSED LIGHT DUTY BITUMINOUS PAVEMENT PROPOSED HEAVY DUTY BITUMINOUS PAVEMENT PROPOSED PEDESTRIAN CONCRETE PAVEMENT PROPOSED VEHICULAR CONCRETE PAVEMENT HANDICAP STALL DESIGNATION PROPOSED BUILDING (PHASE 1) 401,544 SF FFE = 923.0 FUTURE ADDITION (PHASE 2) 343,200 SF FFE = 923.0 FUTURE PAVEMENT EXTENTS 30.0 RETAINING WALL RETAINING WALL & FENCE. DESIGNED BY OTHERS FUTURE TRAILER PARKING STORMWATER POND (P1) NWL = 902.0 2YR HWL = 904.09 10YR HWL = 904.77 100YR HWL = 906.46 STORMWATER POND (P2) NWL = 899.0 2YR HWL = 900.15 10YR HWL = 901.08 100YR HWL = 902.10 6" 3" MIN. 11 2" MNDOT 2360 SPWEA240B BITUMINOUS WEAR (MIN.) 2" MNDOT 2360 SPWEB230B BITUMINOUS NON-WEAR (MIN.) 7" MNDOT 3138 CLASS 5 AGGREGATE BASE (MIN.) TIP OUT GUTTER WHERE PAVEMENT SLOPES AWAY MNDOT 2531 TYPE B612 CONCRETE CURB & GUTTER MNDOT 2357 TACK COAT MIN. NOTE: VERIFY PAVEMENT SECTION DESIGN AND SUBGRADE REQUIREMENTS WITH GEOTECHNICAL REPORT AND RECOMMENDATIONS PRIOR TO CONSTRUCTION. COMPACTED SUB-BASE 98% COMPACTED AGGREGATE BASE CIP CONCRETE BROOM FINISH SWEEP PERPENDICULAR TO DIRECTION OF TRAFFIC SEE 4"6"APPROVED SUBGRADE COMPACTED 98% 4000 PSI, 6% AIR ENTRAINED PLAN FOR WIDTH COMPACTED SUB-BASE 98% COMPACTED AGGREGATE BASE CIP CONCRETE BROOM FINISH SWEEP PERPENDICULAR TO DIRECTION OF TRAFFIC SEE 76"4000 PSI, 6% AIR ENTRAINED PLAN FOR WIDTH SCALE:5 PEDESTRIAN CONCRETE PAVEMENT SECTION N.T.S. SCALE:2 BITUMINOUS (LIGHT) PAVEMENT SECTION N.T.S. SCALE:6 VEHICULAR CONCRETE PAVEMENT SECTION N.T.S. SCALE:3 BITUMINOUS (HEAVY) PAVEMENT SECTION N.T.S. NOTE: VERIFY PAVEMENT SECTION DESIGN AND SUBGRADE REQUIREMENTS WITH GEOTECHNICAL REPORT AND RECOMMENDATIONS PRIOR TO CONSTRUCTION. 6" 3" MIN. 2" MNDOT 2360 SPWEA240B BITUMINOUS WEAR (MIN.) 2" MNDOT 2360 SPWEB230B BITUMINOUS NON-WEAR (MIN.) 8" MNDOT 3138 CLASS 5 AGGREGATE BASE (MIN.) TIP OUT GUTTER WHERE PAVEMENT SLOPES AWAY MNDOT 2531 TYPE B612 CONCRETE CURB & GUTTER MNDOT 2357 TACK COAT MIN. APPROVED SUBGRADE COMPACTED 98% MNDOT 3138 CLASS 5 AGGREGATE BASE KEYNOTES 1 CONCRETE PAVEMENT JOINT. 1/C-10 BITUMINOUS (LIGHT) PAVEMENT SECTION. 2/C-10 BITUMINOUS (HEAVY) PAVEMENT SECTION. 3/C-10 PIPE BOLLARD. 4/C-10 PEDESTRIAN CONCRETE PAVEMENT SECTION. 5/C-10 VEHICULAR CONCRETE PAVEMENT SECTION. 6/C-10 B612 CONCRETE CURB. SEE C-17 6" LANDSCAPE CURB WITH NO GUTTER. 2 3 4 6 6 6 3 2 2 3 3 6 Z Z 1/8 " D/4 Z Z 1/2 " CONTROL JOINT EXPANSION JOINT JOINT SEALER CONFORMING TO ASTM D 1850 PREMOULDED EXPANSION JOINT FILLER CONFORMING TO ASTM D1751 1/8 " R (TYP) NOTE - INSTALL JOINTS AS SHOWN ON PLAN OR: 15' (TYP) CURB AND GUTTER WITH EXPANSION AT 300' SPACING. 5' (TYP) SIDEWALK WITH EXPANSION AT 60' SPACING. SAWCUT OR PREMOLDED INSERT AND SEAL SCALE:1 CONCRETE PAVEMENT JOINT DETAIL N.T.S. 1 TYP. 1TYP. 5 5 5 5 MNDOT 3138 CLASS 5 AGGREGATE BASE NOTE: VERIFY PAVEMENT SECTION DESIGN AND SUBGRADE REQUIREMENTS WITH GEOTECHNICAL REPORT AND RECOMMENDATIONS PRIOR TO CONSTRUCTION. NOTE: VERIFY PAVEMENT SECTION DESIGN AND SUBGRADE REQUIREMENTS WITH GEOTECHNICAL REPORT AND RECOMMENDATIONS PRIOR TO CONSTRUCTION. 7 7 7 7 7 RETAINING WALL RETAINING WALL 6 8 7 6" DIA. STEEL PIPE (PAINTED YELLOW) FILL W/ CONCRETE, CROWN TOP 1" 4'-0" 3'-6" 6" 12" x 12" x 48" CONC. FTG. SURFACE VARIES SCALE:4 PIPE BOLLARD N.T.S. 8 44 4 4 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 0 120'240' N N EROSION CONTROL PLAN C-11 65TH ST NE QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCK = 919.0 POND P-1 NWL = 902.0 2-YR HWL = 904.09 10-YR HWL = 904.77 100-YR HWL = 906.46 POND P-2 NWL = 899.0 2-YR HWL = 900.15 10-YR HWL = 901.08 100-YR HWL = 902.10 LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS DELINEATED WETLAND EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR DRAINAGE ARROW PROPOSED CONCRETE C&G SILT FENCE RETAINING WALL INLET SEDIMENT PROTECTION ROCK CONSTRUCTION ENTRANCE 966 965 966 965 KEYNOTES CONCRETE CABLE MAT. SEE C-16 INLET PROTECTION (TYP.) SEE C-17 ROCK CONSTRUCTION ENTRANCE. SEE C-16 DOUBLE ROW SILT FENCE. SEE C-16 1 2 3 4 1 1 4 4 4 2 TYP.1 1 4 4 4 4 4 4 4 3 3 2 TYP. PROJECT DESCRIPTION/LOCATION THE UNDEVELOPED SITE IS LOCATED IN THE CITY OF OTSEGO IN WRIGHT COUNTY BOUNDED ON THE WEST BY QUEENS AVE NE, SINGLE FAMILY HOMES TO THE SOUTH, CROPLAND TO THE EAST, AND 65TH ST NE TO THE NORTH. THE PROPOSED SITE ENCOMPASSES 78.50 ACRES. THE PLANNED SCOPE OF THE PROJECT INCLUDES: ·THE INSTALLATION OF EROSION CONTROL MEASURES AS REQUIRED FOR THE MASS GRADING OF THE SITE FOR THE CONSTRUCTION OF AN INDUSTRIAL WAREHOUSE, DRIVEWAYS AND PARKING LOTS. ·GRADING AS REQUIRED FOR THE INSTALLATION OF THE INDUSTRIAL WAREHOUSE, DRIVEWAYS AND PARKING LOTS. ·THE CONSTRUCTION OF TWO PERMANENT STORM WET PONDS. ·INSTALLATION OF SANITARY SEWER, WATERMAIN, AND STORM SEWER. ·PLACEMENT OF CONCRETE AS REQUIRED TO ESTABLISH CURB, GUTTER, AND SIDEWALKS THROUGHOUT THE SITE. ·CONSTRUCTION OF 9.2-ACRE INDUSTRIAL WAREHOUSE BUILDING, WITH FUTURE BUILD-OUT TO 17-ACRES. RECEIVING WATERS THESE WATERS ARE LOCATED WITHIN ON MILE (AERIAL RADIUS) OF THE PROJECT LIMITS AND RECEIVE RUNOFF FROM THE PROJECT SITE. DUE TO THE PROXIMITY OF THE RECEIVING WATERS, THE BMPS DESCRIBED IN APPENDIX A OF THE NPDES PERMIT MAY APPLY TO ALL AREAS OF THE SITE. DUE TO THE PROXIMITY OF THE CROW AND MISSISSIPPI RIVERS, THE FOLLOWING WILL BE IMPLEMENTED ACCORDING TO THE MPCA REQUIREMENTS FOR DISCHARGING INTO IMPAIRED AND/OR SPECIAL WATERS: 1.23.9: PERMITTEES MUST IMMEDIATELY INITIATE STABILIZATION OF EXPOSED SOIL AREAS, AS DESCRIBED IN ITEM 8.4, AND COMPLETE THE STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE TEMPORARILY OR PERMANENTLY CEASES. 2.23.10: PERMITTEES MUST PROVIDE A TEMPORARY SEDIMENT BASIN AS DESCRIBED IN SECTION 14 FOR COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE TIME. 3.23.10: PERMITTEES MUST INCLUDE AN UNDISTURBED BUFFER ZONE OF NOT LESS THAN 100 LINEAR FEET FROM A SPECIAL WATER (NOT INCLUDING TRIBUTARIES) AND MUST MAINTAIN THIS BUFFER ZONE AT ALL TIMES, BOTH DURING CONSTRUCTION AND AS A PERMANENT FEATURE POST CONSTRUCTION, EXCEPT WHERE A WATER CROSSING OR OTHER ENCROACHMENT IS NECESSARY TO COMPLETE THE PROJECT. PERMITTEES MUST FULLY DOCUMENT THE CIRCUMSTANCE AND REASONS THE BUFFER ENCROACHMENT IS NECESSARY IN THE SWPPP AND INCLUDE RESTORATION ACTIVITIES. THIS PERMIT ALLOWS REPLACEMENT OF EXISTING IMPERVIOUS SURFACE WITHIN THE BUFFER. PERMITTEES MUST MINIMIZE ALL POTENTIAL WATER QUALITY, SCENIC AND OTHER ENVIRONMENTAL IMPACTS OF THESE EXCEPTIONS BY THE USE OF ADDITIONAL OR REDUNDANT BMPS AND MUST DOCUMENT THIS IN THE SWPPP FOR THE PROJECT. SOIL TYPES PER ONLINE WEB SOIL SURVEY INFORMATION, SOIL TYPES TYPICALLY FOUND ON THIS PROJECT RANGE FROM B TO D, WITH LESTER AND ANGUS LOAMS MAKING UP THE MAJORITY OF THE SITE. OTHER LOAMS, ANGUS-CORDOVA COMPLEX'S AND CORDOVA CLAYS MAKE UP THE THE REMAINDER OF THE SITE. LONG TERM MAINTENANCE AND OPERATION ENDEAVOR DEVELOPMENT HAS ENTERED INTO A MAINTENANCE AGREEMENT WITH THE CITY OF OTSEGO THAT IDENTIFIES THE AGENCY THAT IS RESPONSIBLE FOR ONGOING MAINTENANCE, AND HOW RESPONSIBILITY WILL BE TRANSFERRED TO OTHER AGENTS OR IF IT WILL BE PRIVATELY MAINTAINED. PROJECT PERSONNEL AND TRAINING THIS SWPPP WAS PREPARED BY PERSONNEL THAT ARE VERIFIED IN THE DESIGN OF CONSTRUCTION SWPPP. COPIES OF THE CERTIFICATIONS ARE ON FILE WITH THE ENGINEER. PROVIDE A CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO IS KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES. THE EROSION CONTROL SUPERVISOR WILL WORK WITH THE PROJECT ENGINEER / SWPPP DESIGNER TO OVERSEE THE IMPLEMENTATION OF THE SWPPP AND THE INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS BEFORE, DURING, AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA. PROVIDE PROOF OF CERTIFICATION AT THE RECONSTRUCTION MEETING. WORK WILL NOT BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO THE PROJECT ENGINEER. PROVIDE AT LEAST ONE CERTIFIED INSTALLER FOR EACH CONTRACTOR OR SUBCONTRACTOR THAT INSTALLS THE PRODUCTS LISTED IN SPECIFICATION SECTION 2573.3.A.2 CERTIFIED INSTALLERS. PROVIDE PROOF OF CERTIFICATION AT THE RECONSTRUCTION MEETING. WORK WILL NOT BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO THE PROJECT ENGINEER. CHAIN OF RESPONSIBILITY THE OWNER AND CONTRACTOR ARE CO-PERMITTEES FOR THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION PERMIT. THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION PERMIT AT ALL TIMES UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA THE CONTRACTOR WILL DEVELOP A CHAIN OF COMMAND WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL THE CONSTRUCTION PROJECT IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL STABILIZATION, AND A NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MPCA. PROJECT CONTACTS THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS BEFORE, DURING, AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED. *CERTIFIED FOR DESIGN OF CONSTRUCTION SWPPP BY UNIVERSITY OF MINNESOTA, EXPIRES 5/31/23 MPCA DUTY OFFICER 24 HOUR EMERGENCY NOTIFICATION: 651-649-5451 OR 800-422-0798 SITE INSPECTION AND MAINTENANCE CONTRACTOR SHALL PROVIDE NAME, CONTACT INFO, AND TRAINING DOCUMENTATION FOR THE PERSON RESPONSIBLE FOR SWPPP IMPLEMENTATION AND INSPECTION/MAINTENANCE OF BMPS. INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES WITHIN A 24 HOUR TIME FRAME. INSPECT ALL TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT, EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL THE SITE HAS UNDERGONE FINAL STABILIZATION AND THE N.O.T. HAS BEEN SUBMITTED. INSPECT SURFACE WATER INCLUDING DRAINAGE DITCHES FOR SIGNS OF EROSION AND SEDIMENT DEPOSITION. INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING PROPERTIES FOR EVIDENCE OF OFF SITE SEDIMENT ACCUMULATION. RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24 HOURS. SUBMIT INSPECTION REPORTS IN A FORMAT THAT IS ACCEPTABLE TO THE PROJECT ENGINEER. FOR PROJECTS THAT DISCHARGE TO PROHIBITED WATERS, CONDUCT ROUTINE SITE INSPECTIONS AT A MINIMUM OF ONCE EVERY 72 HOURS (3 DAYS). INCLUDE THE FOLLOWING IN THE RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY: A.DATE AND TIME OF INSPECTIONS B.NAME OF PERSONS CONDUCTING INSPECTIONS C.FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS D.CORRECTIVE ACTION TAKEN, INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES E.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS F.DOCUMENTS AND CHANGES MADE TO THE SWPPP REPLACE, REPAIR OR SUPPLEMENT ALL NONFUNCTIONAL BMPS BY IN THE TIME PROVIDED BELOW: A.REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT BECOMES NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT OF THE DEVICE. COMPLETE REPAIRS BY B.THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVERY. C.REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT AND/OR DEPTH OF THE DEVICE. COMPLETE REPAIRS BY THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVER. D.DRAIN AND REMOVE SEDIMENT FROM TEMPORARY AND PERMANENT SEDIMENT BASINS ONCE THE SEDIMENT HAS REACHED 12 THE STORAGE VOLUME. COMPLETE WORK WITHIN 72 HOURS OF DISCOVERY. E.REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATER INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS. RESTABILIZED ANY AREAS THAT ARE DISTURBED BY SEDIMENT REMOVAL OPERATION. SEDIMENT REMOVAL AND STABILIZATION MUST BE COMPLETED WITHIN 7 DAYS OF DISCOVERY. PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR WORKING IN SURFACE WATERS. F.REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY. STREET SWEEPING MAY HAVE TO OCCUR MORE OFTEN TO MINIMIZE OFF SITE IMPACTS. LIGHTLY WET THE PAVEMENT PRIOR TO SWEEPING G.MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED TO THE MPCA. AREA SUMMARY SPECIAL SITE NOTES IF SITE REQUIRES PERMANENT STORMWATER MANAGEMENT HYDROLOGIC AND WATER QUALITY MODELING DATA IS AVAILABLE UPON REQUEST. THE SWPPP COORDINATOR MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA AND SHALL BE RESPONSIBLE FOR THE FOLLOWING: ·SUBMIT THE NPDES PERMIT APPLICATION AND COMPLY WITH ALL REQUIREMENTS ·IMPLEMENT THE SWPPP. ·OVERSEE INSTALLATION AND MAINTENANCE PRACTICES AND REPAIRS IDENTIFIED IN THE SWPPP. ·IMPLEMENT AND OVERSEE EMPLOYEE TRAINING AND RECORD IN OR WITH THE SWPPP. ·CONDUCT OR PROVIDE FOR INSPECTION AND MONITORING ACTIVITIES AND MAINTAIN LOGS AS PERMIT REQUIRES. ·IDENTIFY OTHER POTENTIAL POLLUTANT SOURCES NOT LISTED IN THE SWPPP AND ADD THEM. ·IDENTIFY ANY DEFICIENCIES IN THE SWPPP AND CORRECT THEM. ·ENSURE THAT CHANGES TO CONSTRUCTION PLANS ARE ADDRESSED IN THE SWPPP. ·FILE THE NOTICE OF TERMINATION UPON PROJECT COMPLETION. AFTER THE NOTICE OF TERMINATION HAS BEEN FILED, THE OWNER SHALL BE RESPONSIBLE FOR ASSIGNING RESPONSIBILITY FOR PERMANENT MAINTENANCE MEASURES. PERMITS THE FOLLOWING PERMITS APPLY TO THIS PROJECT: NOTE: IF THE 25' BUFFERS ARE MAINTAINED FORM THE WETLANDS, ADDITIONAL PERMITS WILL NOT BE REQUIRED. LOCATION OF SWPPP REQUIREMENTS THE REQUIRED SWPPP ELEMENTS MAY BE LOCATED IN MANY PLACES WITHIN THE PLAN SET. SWPPP AMENDMENTS A QUALIFIED INDIVIDUAL MUST COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS. PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECT PROBLEMS IDENTIFIED OF ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION OPERATION, MAINTENANCE, WEATHER, OR SEASONAL CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OR OPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER OR THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCE OR THE SWPPP IS NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL. STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 1 OF 2 PROJECT SITE 1-MILE RADIUS AROUND PROJECT RICE LAKE CROW RIVER CONTACT INFORMATION ORGANIZATION CONTACT NAME PHONE ENDEAVOR DEVELOPMENT JOSHUA J. BUDISH 952-210-5870 ANDERSON ENGINEERING (SWPPP DESIGN)MARKUS TOLKKINEN 763-412-4000 RJ RYAN JEREMY THOMAS 651-365-7009 ACREAGE SUMMARY AREA ACRES PROPERTY 78.50 DISTURBED 36.45 IMP. PRE-CONSTRUCTION 0.97 IMP. POST-CONSTRUCTION 16.73 NEW IMP.15.76 PERVIOUS AT COMPLETION 72.73 AGENCY TYPE OF PERMIT PERMIT # AND DATES MINNESOTA POLLUTION CONTROL AGENCY (MPCA) NPDES CONSTRUCTION PERMIT [#] CITY OF OTSEGO GRADING PERMIT [#] CITY OF OTSEGO BUILDING PERMIT [#] CITY OF OTSEGO WETLAND PERMIT [#] WATERS WITHIN 1 MILE RADIUS NAME OF WATER BODY TYPE (LAKE, RIVER, WETLAND, DITCH, ETC) APPENDIX A SPECIAL WATER (YES OR NO) IMPAIRED WATER WITHIN 1 MILE OF PROJECT SITE (YES OR NO) APPROVED TMDL RECEIVING WATERS (YES OR NO) MISSISSIPPI RIVER RIVER YES NO YES NO CROW RIVER RIVER NO YES YES NO RICE LAKE LAKE NO NO NO NO MISSISSIPPI RIVERMi s s i s s i p p i River PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 SWPPP - PAGE 1 C-12 STABILIZATION TIME FRAMES ALL AREAS DISTURBED BY CONSTRUCTION WILL RECEIVE SEED OR SOD ACCORDING TO THE PLANS AND SPECIFICATIONS AND WITHIN THE SPECIFIED VEGETATIVE TIME SCHEDULE. FINAL STABILIZATION WILL OCCUR WHEN THE SITE HAS A UNIFORM VEGETATIVE COVER WITH A DENSITY OF 70% OVER THE ENTIRE DISTURBED AREA COMPARED TO EXISTING CONDITIONS. ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED AS PART OF THE SITE FINAL STABILIZATION. ALL SEDIMENT MUST BE CLEANED OUT OF CONVEYANCES AND TEMPORARY SEDIMENTATION BASINS IF APPLICABLE. 1.INITIATE INLET STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS TEMPORARILY OR PERMANENTLY CEASED ON ANY PORTION OF THE SITE. COMPLETE STABILIZATION WITHIN THE TIME FRAME LISTED. IN MANY INSTANCES THIS WILL REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING THE COURSE OF THE PROJECT. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT CLAY OR SILT AND STOCKPILED AND CONSTRUCTED ROAD BASE ARE NOT APPROPRIATE AND THEREFORE EXEMPT FROM THE STABILIZATION REQUIREMENT. 2.APPLICATION OF MULCH, HYDROMULCH, TACKIFIER AND POLYACRYLAMIDE ARE NOT ACCEPTABLE STABILIZATION METHODS IN THESE AREAS. 3.STABILIZE ALL AREAS OF THE SITE PRIOR TO THE ONSET OF WINTER, ANY WORK STILL BEING PERFORMED WILL BE SNOW MULCHED, SEEDED, AND BLANKETED WITHIN THE TIME FRAMES IN THE NPDES PERMIT. 4.TOPSOIL BERMS MUST BE STABILIZED IN ORDER TO BE CONSIDERED PERIMETER CONTROL BMPS. USE RAPID STABILIZATION METHOD 2, 3, OR 4 AS DIRECTED BY THE ENGINEER. THE SEED MIX USED IN THE RAPID STABILIZATION MAY BE SUBSTITUTED AS FOLLOWS: A.SINGLE YEAR CONSTRUCTION BETWEEN MAY 1 - AUGUST 1, SEED WITH SEED MIXTURE 21.111 B.SINGLE YEAR CONSTRUCTION BETWEEN AUGUST 1 AND OCTOBER 31, SEED WITH SEED MIXTURE 21-112 C.MULTI YEAR CONSTRUCTION 22-111 5.KEEP DITCHES AND EXPOSED SOILS IN AN EVEN ROUGH GRADED CONDITION IN ORDER TO BE ABLE TO APPLY EROSION CONTROL MULCHES, HYDROMULCHES AND BLANKETS. GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY 1.CONTRACTOR SHALL AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO THE SWPPP AND ASSOCIATED PLAN SHEETS WITHIN 7 DAYS UPON IMPLEMENTATION. STORE THE SWPPP AND ALL AMENDMENTS ON SITE AT ALL TIMES. 2.PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE FOR CONCRETE MANAGEMENT, CONCRETE SLURRY APPLICATION AREAS, WORK IN AND NEAR AREAS OF ENVIRONMENTAL SENSITIVITY, AREAS IDENTIFIED IN THE PLANS AS "SITE MANAGEMENT PLAN AREA", ANY WORK THAT WILL REQUIRE DEWATERING, AND AS REQUESTED BY THE ENGINEER. SUBMIT ALL SITE MANAGEMENT PLANS TO THE ENGINEER IN WRITING. ALLOW ALL MINIMUM OF 7 DAYS FOR THE ENGINEER TO REVIEW AND ACCEPT SITE MANAGEMENT PLAN SUBMITTALS. WORK WILL NOT BE ALLOWED TO COMMENCE IF A SITE MANAGEMENT PLAN IS REQUIRED UNTIL ACCEPTANCE HAS BEEN GRANTED BY THE ENGINEER. THERE WILL BE NO EXTRA TIME ADDED TO THE CONTRACT DUE TO THE UNTIMELY SUBMITTAL. 3.IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD PONDS AND INSTALL EROSION CONTROL BMPS BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE MAXIMUM EXTENT PRACTICABLE. 4.BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY. 5.DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. DELINEATE AREAS NOT TO BE DISTURBED PRIOR TO STARTING GROUND DISTURBING ACTIVITIES. IF IT BECOMES NECESSARY TO DISTURBED AREAS OUTSIDE OF THE CONSTRUCTION LIMITS OBTAIN WRITTEN PERMISSION FROM THE PROJECT ENGINEER PRIOR TO PROCEEDING. PRESERVE ALL NATURAL BUFFERS SHOWN ON THE PLANS. 6.ROUT STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER FEASIBLE. PROVIDE EROSION CONTROL AND VELOCITY DISSIPATION DEVICES AS NEEDED TO KEEP CHANNELS FROM ERODING AND TO PREVENT NUISANCE CONDITIONS AT THE OUTLET. 7.DIRECT DISCHARGES FROM BMPS TO VEGETATED AREA WHENEVER FEASIBLE. PROVIDE VELOCITY DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION. 8.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS NECESSARY TO MINIMIZE EROSION FROM DISTURBED SURFACES AND TO CAPTURE SEDIMENT ON SITE. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF ANY REMOVAL WORK AND/OR GROUND DISTURBING ACTIVITIES COMMENCE. 9.ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND UP GRADIENT OF ANY BUFFER ZONES BEFORE AND UP GRADIENT LAND DISTURBING ACTIVITIES BEGIN. MAINTAIN SEDIMENT CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 10.LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND, LOW-VELOCITY SHEET FLOWS DOWN GRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE WATERS. PLACE J-HOOKS AT A MAXIMUM OF 100 FOOT INTERVALS. 11.PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM 5 FEET FROM THE TOE OF SLOPE WHERE FEASIBLE. DO NOT PLACE STOCKPILES IN NATURAL BUFFER AREAS, SURFACE WATERS OR STORMWATER CONVEYANCES. 12.FLOATING SILT CURTAIN IS ALLOWED AS PERIMETER CONTROL FOR IN WATER WORK ONLY. INSTALL THE FLOATING SILT CURTAIN AS CLOSE TO SHORE AS POSSIBLE. PLACE PERIMETER CONTROL BMP ON LAND IMMEDIATELY AFTER THE IN WATER WORK IS COMPLETED. 13.DITCH CHECKS WILL BE PLACED AS INDICATED ON THE PLANS DURING ALL PHASES OF CONSTRUCTION. 14.PLACE CONSTRUCTION EXITS, AS NECESSARY, TO PREVENT TRACKING OF SEDIMENT ONTO PAVED SURFACES BOTH ON AND OFF THE PROJECT SITE. PROVIDE CONSTRUCTION EXITS OF SUFFICIENT SIZE TO PREVENT TRACK OUT. MAINTAIN CONSTRUCTION EXITS WHEN EVIDENCE OF TRACKING IS DISCOVERED. REGULAR STREET SWEEPING IS NOT AN ACCEPTABLE ALTERNATIVE TO PROPER CONSTRUCTION EXIT INSTALLATION AND MAINTENANCE. CONSTRICTION EXITS ARE INCIDENTAL. 15.DISCHARGE TURBID OR SEDIMENT LADEN WATER TO TEMPORARY SEDIMENT BASINS WHENEVER FEASIBLE. IN THE EVENT THAT IT IS NOT FEASIBLE TO DISCHARGE THE SEDIMENT LADEN WATER TO A TEMPORARY SEDIMENT BASIN, THE WATER MUST BE TREATED SO THAT IT DOES NOT CAUSE A NUISANCE CONDITION IN THE RECEIVING WATERS OR TO DOWNSTREAM LANDOWNERS. CLEAN OUT ALL PERMANENT STORMWATER BASINS REGARDLESS OF WHETHER USED AS TEMPORARY SEDIMENT BASINS OR TEMPORARY SEDIMENT TRAPS TO THE DESIGN CAPACITY AFTER ALL UP GRADIENT LAND DISTURBING ACTIVITY IS COMPLETED. 16.PROVIDE SCOUR PROTECTION AT ANY OUTFALL OF DEWATERING ACTIVITIES. 17.PROVIDE STABILIZATION IN ANY TRENCHES CUT FOR DEWATERING OR SITE DRAINING PURPOSES. POLLUTION PREVENTION 1.PROVIDE A SPILL KIT AT EACH WORK LOCATION ON THE SITE. 2.STORE ALL BUILDING MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS, PESTICIDES, HERBICIDES, INSECTICIDES. FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS UNDER COVER WITH SECONDARY CONTAINMENT. 3.PROVIDE A SECURE STORAGE AREA WITH RESTRICTED ACCESS FOR ALL HAZARDOUS MATERIALS AND TOXIC WASTE. RETURN ALL HAZARDOUS MATERIALS AND TOXIC WASTE TO THE DESIGNATED STORAGE AREA AT THE END OF THE BUSINESS DAY UNLESS INFEASIBLE. STORE ALL HAZARDOUS MATERIALS AND TOXIC WASTE (INCLUDING BUT NOT LIMITED TO OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT, PETROLEUM BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS WITH SECONDARY CONTAINMENT. CLEAN UP SPILLS IMMEDIATELY. 4.STORE, COLLECT AND DISPOSE OF ALL SOLID WASTE. 5.POSITION ALL PORTABLE TOILETS SO THAT THEY ARE SECURE AND CANNOT BE TIPPED OR KNOCKED OVER. PROPERLY DISPOSE OF ALL SANITARY WASTE. 6.FUEL AND MAINTAIN VEHICLES IN A DESIGNATED CONTAINED AREA WHENEVER FEASIBLE. USE DRIP PANS OR ABSORBENT MATERIALS TO PREVENT SPILLS OR LEAKED CHEMICALS FORM DISCHARGING TO SURFACE WATER OR STORMWATER CONVEYANCES. PROVIDE A SPILL KIT AT EACH LOCATION THAT VEHICLES AND EQUIPMENT ARE FUELED OR MAINTAINED AT. 7.LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA OF THE SITE. CONTAIN RUNOFF FROM THE WASHING AREA TO A TEMPORARY SEDIMENT BASIN OR OTHER EFFECTIVE CONTROL. PROPERLY DISPOSE OF ALL WASTE GENERATED BY VEHICLE AND EQUIPMENT WASHING. ENGINE DEGREASING IS NOT ALLOWED ON THE SITE. 8.PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS. LIQUID AND SOLID WASHOUT WASTES MUST NOT CONTACT THE GROUND. DESIGN THE CONTAINMENT SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR CONTAINMENT AREA. 9.CREATE AND FOLLOW A WRITTEN DISPOSAL PLAN FOR ALL WASTE MATERIALS. INCLUDE IN THE PLAN HOW THE MATERIAL WILL BE DISPOSED OF AND THE LOCATION OF THE DISPOSAL SITE. SUBMIT PLAN TO THE ENGINEER. 10.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT DISCHARGE OR PLACEMENT OF BITUMINOUS GRINDINGS, CUTTING, MILLINGS, AND OTHER BITUMINOUS WASTES FROM AREAS OF EXISTING OR FUTURE VEGETATED SOILS AND FROM ALL WATER CONVEYANCE SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES. 11.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST, PARTICLES, CONCRETE WASH OUT, AND OTHER CONCRETE WASTES FROM LEAVING SITE, DEPOSITING IN EXISTING OR FUTURE VEGETATED AREAS, AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES. USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT SAW CUT SLURRY AND PLANING WASTE FROM LEAVING SITE AND FROM ENTERING STORMWATER CONVEYANCE SYSTEMS INCLUDING DITCHES AND CULVERTS. RECORD RETENTION THE SWPPP, ALL CHANGES TO IT AND INSPECTION AND MAINTENANCE RECORDS MUST BE KEPT ON-SITE DURING CONSTRUCTION. THE OWNER MUST RETAIN A COPY OF THE SWPPP ALONG WITH THE FOLLOWING RECORDS FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOTICE OF TERMINATION (NOT). 1.ANY OTHER PERMITS REQUIRED FOR THE PROJECT. 2.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION 3.ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENT THAT HAVE BEEN IMPLEMENTED INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND 4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER MANAGEMENT SYSTEMS. SWPPP SCHEDULE OF INSTALLATION & MAINTENANCE DESCRIPTION OF PERMANENT STORMWATER TREATMENT SYSTEMS [IF APPLICABLE, DESCRIBE PERMANENT STORMWATER TREATMENT SYSTEM] CALCULATIONS FOR TEMPORARY & PERMANENT STORMWATER TREATMENT SYSTEMS [INCLUDE CALCULATIONS FOR TEMPORARY / PERMANENT STORMWATER SYSTEM] ESTIMATED BMPS QUANTITIES STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 2 OR 2 AREA TIME FRAME NOTES LAST 200 LINEAL FEET OF DRAINAGE DITCH OR SWALE WITHIN 24 HOURS OF CONNECTION TO SURFACE WATER OR PROPERTY EDGE 1, 2, 3 REMAINING PORTIONS OF DRAINAGE DITCH OR SWALE 7 DAYS 1, 3 PIPE AND CULVERT OUTLETS 24 HOURS STOCKPILES 7 DAYS 1 ITEM INSTALLATION INSPECTION & MAINTENANCE REMOVAL SILT FENCE PRIOR TO COMMENCEMENT OF EARTHWORK OPERATIONS. INSPECT & MAINT. AFTER EACH RUN-OFF EVENT. REMOVE SEDIMENTS AS REQUIRED. AFTER TRIBUTARY DRAINAGE AREA IS RESTORED. ROCK CONST. ENTRANCE PRIOR TO COMMENCEMENT OF EARTHWORK OPERATIONS. INSPECT REGULARLY. MAINTAIN AS NEEDED.PRIOR TO PAVING. OUTLET SKIMMER STRUCTURE AFTER POND GRADING IS COMPLETED. INSPECT REGULARLY. MAINTAIN AS NEEDED.PERMANENT. RIP-RAP & FILTER UPON COMPLETION OF POND GRADING, CONC. SWALE CONST. AND OUTLET INSTALLATION. INSPECT & MAINTAIN AT LEAST ANNUALLY AND AFTER HEAVY RAINFALL EVENT. PERMANENT. DETENTION POND DURING EARTHWORK OPERATIONS. AFTER HEAVY RAINFALL EVENTS. REMOVE SEDIMENTS AS NEEDED.PERMANENT. SEED & MULCH AFTER POND GRADING IS COMPLETED. INSPECT & MAINTAIN AFTER HEAVY RAINS. REPLACE WASH-OUT AREAS IMMEDIATELY NO REMOVAL NECESSARY. INLET PROTECTION UPON INLET CONSTRUCTING WHEN 1/3 CAPACITY OF BMP IS REACHED AFTER TRIBUTARY AREAS ARE FULLY RESTORED BMP ORIGINAL ESTIMATE MODIFICATION DATE ENERGY DISSIPATER TEMP. DIVERSION DIKES CHECK DAMS TEMP SEEDING PERMANENT SEEDING PERMANENT SODDING MULCHES (SPECIFY TYPES) CAT 3 EROSION CONTROL BLANKET SOIL TACKIFIERS SILT FENCING EROSION CONTROL MATS STORM DRAIN INLET PROTECTION TEMPORARY OR PERMANENT SEDIMENTATION BASINS CONSTRUCTION ENTRANCE DEWATERING (TREATMENT LOCATION, SCHEMATIC, & SAMPLING PLAN REQUIRED CONCRETE TRUCK WASHOUT PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 SWPPP - PAGE 2 C-13 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 DETAILS 1 C-14 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 DETAILS 2 C-15 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 DETAILS 3 C-16 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 DETAILS 4 C-17 SEE C-18 FOR ORRIFICE SIZING DETAILS 5 C-18 PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. ERIK B. HEDMAN, PE 57177 NOT FOR CONSTRUCTION 12/29/2021 BOTTOM OF FILTRATION BASIN = 899.5 TOP OF BERM = 908.50 TOP OF SAND = 900.50 4 1 12" FILTER MIX B (SEE NOTE 1) 4" DRAINTILE SCH. 40 PVC (SEE PLANS FOR DETAILS) WITH CIRCULAR KNIT FABRIC PIPE SOCK INV = 899.5 (TYP) NOTE: 1.FILTER MIX B: - 70 TO 85% CONSTRUCTION SAND (ASTM C-33 WASHED) - 15 TO 30% ORGANIC MATTER (MNDOT GRADE 2 COMPOST) 4 1 4 1 1 POND FILTRATION BASIN DETAIL (POND P1 & OCS-506) NTS 4" PVC DRAINTILE INV. = 899.5 CORE-DRILL IN FIELD TOP OF BERM = 908.5 EOF = 907.5 TOP OF WEIR = 904.0 21" RCP INV = 899.3 12" RCP INV = 901.0 SKIMMER = 906.5 WATERQUALITY VOLUMENWL = 902.0 OCS-506 10.0' (TYP) 901.0 4" DIA. ORIFICE = 902.0 (NWL) BOTTOM OF FILTRATION BASIN = 896.0 TOP OF BERM = 904.50 TOP OF SAND = 897.0 4 1 12" FILTER MIX B (SEE NOTE 1) 4" DRAINTILE SCH. 40 PVC (SEE PLANS FOR DETAILS) WITH CIRCULAR KNIT FABRIC PIPE SOCK INV = 896.0 (TYP) NOTE: 1.FILTER MIX B: - 70 TO 85% CONSTRUCTION SAND (ASTM C-33 WASHED) - 15 TO 30% ORGANIC MATTER (MNDOT GRADE 2 COMPOST) 4 1 4 1 2 POND FILTRATION BASIN DETAIL (POND P2 & OCS-409) NTS TOP OF BERM = 904.5 EOF = 903.1 TOP OF WEIR = 901.1 21" RCP INV = 895.3 12" RCP INV = 898.0 SKIMMER = 902.1 WATERQUALITY VOLUMENWL = 899.0 OCS-409 10.0' (TYP) 897.5 6" DIA. ORIFICE = 899.0 (NWL) 4" PVC DRAINTILE INV. = 896.0 CORE-DRILL IN FIELD R.R.R.R.390,676 SF WAREHOUSE 1 474 SF MECH 2 915 920920 920 920920 925925925 930 930 93511 White Fir 6` HT. B&B 9259259259309359 0 0 900 900905 905905 905910 910 910915 915 920 925 925 925 930 92092 5930935935 940 9 2 0 895 895 895900900 900905 905 9 0 5 910 2American Hophornbeam 2 - 1/2" CAL. B&B 2 White Fir 6` HT. B&B 2 American Hophornbeam 2 - 1/2" CAL. B&B 2 Red Pine 6` HT. B&B 2 American Hophornbeam 2 - 1/2" CAL. B&B 2 Red Pine 6` HT. B&B 13Red Pine 6` HT. B&B 4 Spring Snow Crabapple 2" CAL. B&B 3 American Hophornbeam 2 - 1/2" CAL. B&B 2 Accolade Elm 2 - 1/2" CAL. B&B 3Common Hackberry 2 - 1/2" CAL. B&B 3American Hophornbeam 2 - 1/2" CAL. B&B 2Northern Pin Oak 2 - 1/2" CAL. B&B 1Northern Pin Oak 2 - 1/2" CAL. B&B 6White Fir 6` HT. B&B 3Red Pine 6` HT. B&B 3 Accolade Elm 2 - 1/2" CAL. B&B 29 Common Hackberry 2 - 1/2" CAL. B&B 30 Northern Pin Oak 2 - 1/2" CAL. B&B 3 American Hophornbeam 2 - 1/2" CAL. B&B 8 White Fir 6` HT. B&B 2 Northern Pin Oak 2 - 1/2" CAL. B&B 1 Common Hackberry 2 - 1/2" CAL. B&B 2 Common Hackberry 2 - 1/2" CAL. B&B 1 Northern Pin Oak 2 - 1/2" CAL. B&B 3Spring Snow Crabapple 2" CAL. B&B 6 White Fir 6` HT. B&B 3 Common Hackberry 2 - 1/2" CAL. B&B 3 Northern Pin Oak 2 - 1/2" CAL. B&B SCALE:1 PLANTING PLAN - OVERALL - TREES & GROUNDCOVER 1" = 100' PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. DEREK J. SEIFERT, PLA 56013 PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.12/29/2021 NOT FOR CONSTRUCTION 0 100'200' N PLANTING PLAN - OVERALL L-1 65TH ST NE QUEENS AVE NEPROPOSED WAREHOUSE FFE = 923.0 LOADING DOCK = 919.0 1 L-2 WASHED RIVER ROCK MULCH W/ WEED BARRIER FABRIC TURF W/ IRRIGATION - SOD OR SEED (OPTION) BASIS OF DESIGN - MnDOT MIX 25-131 NATIVE AREA SEED - MnDOT MIX 35-241 WET AREA SEED - MnDOT MIX 33-261 FILTRATION AREA SEED - MnDOT MIX 33-261 NEW TREES PROPERTY LINE CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR NATIVE SEED AREA EXISTING WETLAND 1.LANDSCAPE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID TO BECOME COMPLETELY FAMILIAR WITH SITE CONDITIONS. 2.ALL ROUGH AND FINISH GRADING TO BE DONE BY OTHERS. 3.NO PLANTING SHALL BE INSTALLED UNTIL ALL GRADING, BUILDING, CONSTRUCTION, UTILITY WORK & IRRIGATION (IF APPLICABLE) HAS BEEN COMPLETED IN THE AREAS TO BE PLANTED. 4.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY ALL UNDERGROUND CABLES, CONDUITS, WIRES, ETC., ON THE PROPERTY. 5.IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THE NUMBER OF PLANTS SHOWN IN THE PLANT LIST, THE NUMBER OF PLANTS SHOWN ON THE PLAN WILL TAKE PRECEDENCE. 6.ALL PROPOSED PLANT MATERIAL SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLAN. IF THE CONTRACTOR BELIEVES AN ERROR HAS BEEN MADE REGARDING SPACING OR LOCATION OF THE PLANT MATERIAL INDICATED ON THE PLAN, NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 7.THE CONTRACTOR IS RESPONSIBLE FOR COMPLETE MAINTENANCE OF THE PLANT MATERIAL (WATERING, SPRAYING, FERTILIZING, MOWING, ETC.) UNTIL THE WORK HAS BEEN ACCEPTED, BY THE OWNER. 8.THE CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO PROPERTY DAMAGE FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. 9.ALL NEWLY PLANTED PLANT MATERIAL SHALL BE GUARANTEED THROUGH ONE CALENDAR YEAR STARTING FROM THE DATE OF ACCEPTANCE ESTABLISHED BY THE OWNER. 10.THE CONTRACTOR SHALL MEET WITH THE OWNER OR OWNERS REPRESENTATIVE ON SITE WHEN THEY FEEL THE PROJECT IS COMPLETE ACCORDING TO THE CONTRACT DOCUMENTS. IF ALL WORK IS SATISFACTORY AND COMPLETE ACCORDING TO THE CONDITIONS OF THE CONTRACT DOCUMENTS, THEN THE OWNER MUST DECLARE THE PROJECT COMPLETE. THIS DECLARATION WILL CONSTITUTE AS THE BEGINNING OF THE ONE (1) YEAR WARRANTEE PERIOD FOR ALL PLANT MATERIAL. THE OWNER SHALL PROVIDE A LETTER WITH SIGNATURE STATING THE DATE OF ACCEPTANCE. 11.WIND BURN OR OTHERWISE DAMAGED PLANT MATERIAL WILL NOT BE ACCEPTED. 12.CONTRACTOR CAN SUBSTITUTE MACHINE MOVED MATERIAL USING APPROPRIATE SIZE TREE SPADE FOR B & B WITH OWNER APPROVAL. 13.THE PRACTICE OF STAKING SHOULD NOT ALLOW NAILS, SCREWS, WIRES, ETC. TO PENETRATE THE OUTER SURFACE OF THE TREES. 14.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL TREE STAKES, GUYS, STRAPS AND TRUNK PROTECTION MEASURES FOLLOWING THE COMPLETION OF THE WARRANTEE PERIOD OR AS DIRECTED BY THE OWNER. 15.LANDSCAPE CONTRACTOR IS REQUIRED TO PROVIDE THE OWNER WITH MAINTENANCE INFORMATION DURING THE GUARANTEE PERIOD RELATING TO WATERING, FERTILIZING, PRUNING, PEST CONTROL, AND RELATED ITEMS. THIS WILL BE PREPARED AND DELIVERED TO THE OWNER AFTER PROVISIONAL INSPECTION APPROVAL HAS BEEN GIVEN BY THE OWNER AND/OR LANDSCAPE ARCHITECT. 16.INSTALL CORRUGATED PLASTIC TREE GUARDS, WHITE IN COLOR, WITH THE SIZE OF TUBE 1" DIA. (MIN.) LARGER THAN THE CALIPER OF THE TREE TO BE PROTECTED. 17.CONTRACTOR TO FURNISH & STALL PLASTIC EDGING AS SHOWN ON THE PLANS & DETAILS. PLASTIC EDGING SHALL BE MEDIUM DENSITY POLYETHYLENE WITH U.V. INHIBITOR, BLACK IN COLOR, WITH A TOTAL DEPTH OF 5” (1” DIA. TOP AND 4” SHAFT WITH 1.5” V EVERY 3-1/2 FEET OF EDGING. INSTALL PER MANUFACTURER RECOMMENDATIONS. 18.LANDSCAPE FABRIC (FILTER MAT) TO HAVE A COMBINED WEIGHT OF 4.5-5.5 OZ. PER S.Y. FABRIC SHOULD BE U.V. STABILIZED AND HAVE A FIVE YEAR MINIMUM WEATHERABILITY FACTOR IN FULL SUNLIGHT. FABRIC TO BE PHILLIPS DUON R OR EQUIVALENT. SAMPLE REQUIRED FOR APPROVAL. 19.3" DEPTH SHREDDED HARDWOOD MULCH SHALL BE INSTALLED UNDER ALL TREES AND SHRUBS THAT ARE ISOLATED FROM GROUNDCOVER AREAS AND GENERAL SHRUB MASSES. 20.3” DEPTH 1”TO 1-1/2” WASHED RIVER ROCK SHALL BE INSTALLED OVER LANDSCAPED FABRIC AS INDICATED ON THE PANS & DETAILS. 21.CALIPER OF TREES UP TO AND INCLUDING 4" SHALL BE MEASURED AT 6" ABOVE GROUND LEVEL, AND 12" ABOVE GROUND LEVEL FOR LARGER SIZES. 22.CRABAPPLE TREES SHALL HAVE NO BRANCHES BELOW 36" ABOVE THE ROOT BALL, AND HAVE NO 'V' CROTCHES. 23.FOR BALLED & BURLAP PLANT MATERIAL, REMOVE THE TOP HALF OF THE BURLAP FROM THE ROOT BALL. WIRE CAGES, STRAPS, ETC. SHALL BE REMOVED FROM THE TOP HALF OF THE ROOTBALL BEFORE INSTALLATION. 24.ALL CONTAINER MATERIAL SHALL HAVE BEEN GROWN IN CONTAINER FOR A MINIMUM OF 6 MONTHS PRIOR TO INSTALLATION. 25.SHRUBS AND GROUNDCOVER SHALL BE PLANTED A MINIMUM OF ONE HALF THEIR ON-CENTER SPACING FROM PAVING EDGE UNLESS OTHERWISE NOTED. 26.DECIDUOUS SHRUBS SHALL HAVE MINIMUM OF FIVE (5) CANES AT SPECIFIED HEIGHT UNLESS OTHERWISE NOTED IN PLANT SCHEDULE. 27.LANDSCAPE CONTRACTOR SHALL PROVIDE AND INSTALL NURSERY GROWN PLANT MATERIAL CONFORMING TO THE REQUIREMENTS AND RECOMMENDATIONS OF THE LATEST EDITION OF ANSI Z60.1 STANDARDS UNLESS OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS. GENERAL LANDSCAPE NOTES: 3 L-2 2 L-2 FILTRATION BENCH, SEE CIVIL EXISTING WETLAND EXISTING WETLAND EXISTING WETLAND FILTRATION BENCH, SEE CIVIL EXISTING WETLAND 966 965 25' MAX. ALONG PROPERTY LINE 1.PLANTING SCHEDULES ON SHEET L-3. 2.SEE SHEET L-2 FOR SHRUB & PERENNIAL PLANTING PLANS. 3.IRRIGATION NOTES ON SHEET L-3. 4.TOPSOIL AND SEEDING NOTES ON SHEET L-3. 5.SEE CIVIL SHEETS FOR GRADING, UTILITY, AND FILTRATION BENCH DETAILS. SHEET NOTES:PLANTING PLAN LEGEND PROPERTY LINEWET SEED AREA WET POND, SEE CIVIL WET POND, SEE CIVIL R.R.R.R.920 920 925 925 925 925 930 935 20Blueberry Delight Juniper 2 GAL. CONT. 12Autumn Joy Sedum 1 GAL. CONT. 14 Autumn Magic Black Chokeberry 5 GAL. CONT. 23 Sunjoy Gold Pillar Japanese Barberry 5 GAL. CONT. 31Walker's Low Catmint 2 GAL. CONT. 5 Amber Jubilee Ninebark 5 GAL. CONT. 5 Blue Muffin Arrowwood Viburnum 5 GAL. CONT. 17 Blueberry Delight Juniper 2 GAL. CONT. 113 Walker's Low Catmint 2 GAL. CONT. 87 Sunjoy Gold Pillar Japanese Barberry 5 GAL. CONT. 12Gro-Low Fragrant Sumac 5 GAL. CONT. 45Karl Foerster Feather Reed Grass 2 GAL. CONT. 27 Sea Green Pfitzer Juniper 5 GAL. CONT. 20 Amber Jubilee Ninebark 5 GAL. CONT. 13Walker's Low Catmint 2 GAL. CONT. 14Sunjoy Gold Pillar Japanese Barberry 5 GAL. CONT. 7Blueberry Delight Juniper 2 GAL. CONT. 6Autumn Magic Black Chokeberry 5 GAL. CONT. 24 Blueberry Delight Juniper 2 GAL. CONT. 17 Walker's Low Catmint 2 GAL. CONT. 12 Autumn Joy Sedum 1 GAL. CONT. 31 Sunjoy Gold Pillar Japanese Barberry 5 GAL. CONT. 14 Autumn Magic Black Chokeberry 5 GAL. CONT. Blue Muffin Arrowwood Viburnum 930Walker's Low Catmint 10Amber Jubilee Ninebark 5 GAL. CONT. 10Blue Muffin Arrowwood Viburnum 5 GAL. CONT.92012 Autumn Magic Black Chokeberry 5 GAL. CONT. 4 Sea Green Pfitzer Juniper 5 GAL. CONT.92019Gro-Low Fragrant Sumac 5 GAL. CONT. PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. DEREK J. SEIFERT, PLA 56013 PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.12/29/2021 NOT FOR CONSTRUCTION 0 30'60'NPLANTING PLAN - ENLARGEMENTS & DETAILS L-2MATCHLINE - SEE 1A/L-2QUEENS AVE NE PROPOSED WAREHOUSE FFE = 923.0 LOADING DOCK = 919.0 MATCHLINE - SEE 1B/L-2SCALE:7 EVERGREEN TREE PLANTING (TYP.) N.T.S.SCALE:3 SHRUB BED SPACING (TYP.) N.T.S.SCALE:5 DECIDUOUS SHRUB PLANTING (TYP.) N.T.S. MIN. 6" 3' MIN. TO PAVED SURFACES PLANTING SOIL 3" DEPTH MULCH PAVED SURFACE, OR LAWN UNDISTURBED OR COMPACTED SOIL SCALE:6 DECIDUOUS TREE PLANTING (TYP.) N.T.S. EDGE OF GROUNDCOVER AREA/WALK EDGE DISTANCE FROM EDGE IS 1 2 THE SPECIFIED O.C. SPACING TRIANGULAR SPACE, AT SPECIFIED O.C. DISTANCE - EQUIDISTANT PLANT CENTER MULCH ROOTBALL PLANTING SOIL NATIVE SOIL NOTE: - KEEP MULCH APPX. 2" OFF PLANT TRUNK OR STEM - SEE PLANT SCHEDULE FOR EACH PLANT'S APPROPRIATE O.C. SPACING MIN. 6"1"LAWN SURFACE UNDISTURBED OR COMPACTED SOIL PLANTING SOIL LINE OF PLANTING PIT WHEN PLANTED INDIVIDUALLY UNDISTURBED OR COMPACTED SOIL 3" DEPTH MULCH PAVED SURFACE, IF APPLICABLE 2"12"-18"CENTER TREE IN HOLE, UPRIGHT NOTE: -3" DP. SHREDDED HARDWOOD MULCH SHALL BE USED IN ALL LANDSCAPE PLANTINGS AREAS AND UNDER TREES ISOLATED FROM PLANTING AREAS UNLESS IDENTIFIED OTHERWISE. 3x ROOT BALL SINGLE STRAIGHT LEADER TREE TIE SECURED TO STAKE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. WRAP TREE WITH TREE WRAPPING MATERIAL AS SPECIFIED TO 1ST BRANCH LAWN OR PLANTING BED EDGE (SPADE EDGE IN ALL LAWN AREAS) 6" MIN. DIA. EARTH SAUCER (2) TREE STAKES DRIVEN A MIN. 2' BELOW GRADE (NW & SW) 3" DEPTH MULCH 3" HEIGHT TAMPED WATER BASIN AT EDGE OF EARTH SAUCER FINISHED GRADE REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOTBALL PLANTING SOIL MOUND MIN. 6" UNDISTURBED OR COMPACTED SOIL AFTER EXPOSING TREE ROOT FLAIR, PLANT SO ROOT FLAIR IS AT 2" ABOVE ADJACENT FINISH GRADE SCALE:4 CONIFEROUS SHRUB PLANTING (TYP.) N.T.S. QUEENS AVE NE SCALE:1A PLANTING PLAN - SHRUBS 1" = 30' SCALE:1B PLANTING PLAN - SHRUBS 1" = 30' SCALE:2 PLANTING PLAN - SHRUBS 1" = 30' ALL PLAN VIEWS THIS SHEET SCALE:3 PLANTING PLAN - SHRUBS 1" = 30' WASHED RIVER ROCK MULCH W/ WEED BARRIER FABRIC TURF W/ IRRIGATION - SOD OR SEED (OPTION) BASIS OF DESIGN - MnDOT MIX 25-131 NATIVE AREA SEED - MnDOT MIX 35-241 WET AREA SEED - MnDOT MIX 33-261 FILTRATION AREA SEED - MnDOT MIX 33-261 NEW SHRUBS & PERENNIALS (W/ IRRIGATION) PROPERTY LINE CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR 966 965 1.PLANTING SCHEDULES ON SHEET L-3. 2.SEE SHEET L-1 FOR TREE LOCATIONS. 3.IRRIGATION NOTES ON SHEET L-3. 4.TOPSOIL AND SEEDING NOTES ON SHEET L-3. 5.SEE CIVIL SHEETS FOR GRADING, UTILITY, AND FILTRATION BENCH DETAILS. SHEET NOTES:PLANTING PLAN LEGEND SHRUBS QTY COMMON / BOTANICAL NAME CONT SIZE REMARKS 46 AUTUMN MAGIC BLACK CHOKEBERRY CONT.5 GAL. ARONIA MELANOCARPA 'AUTUMN MAGIC' 155 SUNJOY GOLD PILLAR JAPANESE BARBERRY CONT.5 GAL.MIN. 5 CANES @ 12" HT. BERBERIS THUNBERGII 'MARIA' TM 68 BLUEBERRY DELIGHT JUNIPER CONT.2 GAL. JUNIPERUS COMMUNIS DEPRESSA 'AMIDAK' TM 31 SEA GREEN PFITZER JUNIPER CONT.5 GAL. JUNIPERUS X PFITZERIANA 'SEA GREEN' 35 AMBER JUBILEE NINEBARK CONT.5 GAL.MIN. 5 CANES @ 12" HT. PHYSOCARPUS OPULIFOLIUS 'JEFAM' TM 31 GRO-LOW FRAGRANT SUMAC CONT.5 GAL.MIN. 5 CANES @ 12" HT. RHUS AROMATICA 'GRO-LOW' 15 BLUE MUFFIN ARROWWOOD VIBURNUM CONT.5 GAL.MIN. 5 CANES @ 12" HT. VIBURNUM DENTATUM 'CHRISTOM' TM PERENNIALS QTY COMMON / BOTANICAL NAME CONT SIZE REMARKS 45 KARL FOERSTER FEATHER REED GRASS CONT.2 GAL. CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' 174 WALKER'S LOW CATMINT CONT.2 GAL. NEPETA RACEMOSA 'WALKER'S LOW' 24 AUTUMN JOY SEDUM CONT.1 GAL. SEDUM X 'AUTUMN JOY' PLANT SCHEDULE CONIFEROUS TREES QTY COMMON / BOTANICAL NAME CONT.SIZE REMARKS 33 WHITE FIR B&B 6` HT.FULL FORM TO GRADE - 12" ABIES CONCOLOR MAX. LEADER LENGTH. SHEARED AND CLIPPED TREES WILL NOT BE ACCEPTED. 20 RED PINE B&B 6` HT.FULL FORM TO GRADE - 12" PINUS RESINOSA MAX. LEADER LENGTH. SHEARED AND CLIPPED TREES WILL NOT BE ACCEPTED. DECIDUOUS TREES QTY COMMON / BOTANICAL NAME CONT.SIZE REMARKS 38 COMMON HACKBERRY B&B 2 - 1/2" CAL.SINGLE STRAIGHT LEADER CELTIS OCCIDENTALIS - NO "V" CROTCHES. 15 AMERICAN HOPHORNBEAM B&B 2 - 1/2" CAL.SINGLE STRAIGHT LEADER OSTRYA VIRGINIANA - NO "V" CROTCHES. 39 NORTHERN PIN OAK B&B 2 - 1/2" CAL.SINGLE STRAIGHT LEADER QUERCUS ELLIPSOIDALIS - NO "V" CROTCHES. 5 ACCOLADE ELM B&B 2 - 1/2" CAL.SINGLE STRAIGHT LEADER ULMUS X `ACCOLADE`- NO "V" CROTCHES. ORNAMENTAL TREES QTY COMMON / BOTANICAL NAME CONT.SIZE REMARKS 7 SPRING SNOW CRABAPPLE B&B 2" CAL.SINGLE STRAIGHT LEADER MALUS X `SPRING SNOW`- NO BRANCHES BELOW 36" HT. PLANT SCHEDULE PLOTTED:COMM. NO. DRAWING NO. ----16604 PROJECT OLLIE 1 3 6 0 5 1 s t A v e n u e N . #1 0 0 P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C DRAWING TITLE CHECKED BY:DRAWN:DESIGNED: EBHKWHEBH DECEMBER 29, 2021 REVISION LOG DESCRIPTION OF REVISIONSNO.DATE 16705 65TH ST. NE OTSEGO, MN 55330 ENDEAVOR DEVELOPMENT PRELIMINARY PLAT PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO. DEREK J. SEIFERT, PLA 56013 PRINT NAME: SIGNATURE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE:LICENSE NO.12/29/2021 NOT FOR CONSTRUCTION 1.LANDSCAPE CONTRACTOR SHALL ENSURE THAT NEW TREES MOVED ONTO THE SITE ARE DUG FROM SIMILAR SITES WITH SIMILAR SOILS TO THE SOILS OF THIS PROJECT (HEAVY TO HEAVY, LIGHT TO LIGHT. HEAVY TO LIGHT SOILS). CONTRACTOR SHALL REVIEW SOIL CONDITIONS/TYPES WITH OWNER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 2.ALL NEWLY INSTALLED PLANT MATERIAL SHALL BE PLANTED IN WELL-DRAINED AREAS. NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION IF ANY PLANT MATERIAL IS LOCATED IN DRAINAGE SWALES OR WET & POORLY DRAINED AREAS. 3.ALL PLANTINGS SHALL RECEIVE FERTILIZER AS FOLLOWS: 3.1.SUMMER AND FALL PLANTING: 0-20-20 GRANULAR (IN SAUCER AROUND PLANT AT THE RATE OF 12 OZ. PER 2-3" CAL. TREE & 6 OZ. PER SHRUB). 3.2.SPRING PLANTING: 10-10-10 GRANULAR (APPLY ABOVE REFERENCED FERTILIZER AT A RATE OF 12 OZ. PER 1-1/2” CAL. TREE OR LARGER & 6 OZ. PER SHRUB & PERENNIAL. 4.ALL PLANTINGS SHALL RECEIVE AN AMENDED SOIL MIX CONSISTING OF THREE (3) PARTS: 4.1.45% APPROVED TOPSOIL (ONE SITE PREFERRED) 4.2.45% ORGANIC MATTER (TYPE 1 SPHAGNUM PEAT MOSS FINELY DIVIDED WITH A PH OF 3.1 - 5.0.) 4.3.10% SAND (FINE CLEAN MASONRY SAND) 5.AREAS CONFINED TO A MASS PLANTING AREA (PLANTING BED) SHALL RECEIVE THE AMENDED SOIL MIX AT MIN. 12" DEPTH THROUGHOUT THE PLANTING AREA. AMENDED SOIL MIX SHALL BE MIXED THOROUGHLY AND INSTALLED IN 6” LIFTS. 6.AREAS TO RECEIVE SOD OR SEED SHALL HAVE A 6” MINIMUM DEPTH OF TOPSOIL. TOPSOIL SHALL PROVIDE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY CLUMPS, BRUSH WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONE LARGER THAN 1” IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. 7.SOD (IF SELECTED) SHALL BE HIGHLAND SOD, 30" X 100' ROLLS PREFERRED WHERE APPLICABLE, TO BE LAID PARALLEL WITH THE CONTOURS AND HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR DRAINAGE SWALES, THE SOD SHALL BE STAKED INTO THE GROUND. SCARIFY THE EXISTING GRADES WITH FIELD CULTIVATOR PRIOR TO PLACING OF TOPSOIL AND FINISH GRADING FOR SOD. IMMEDIATELY PRIOR TO PLACING SOD, CONTRACTOR SHALL APPLY 10-6-4 FERTILIZER AT THE RATE OF 10 POUNDS PER 1000 SQ. FT. 8.ALL AREAS SPECIFIED AS 'TURF SEED' OR "MNDOT 25-131" TO BE SEEDED PER MNDOT RECOMMENDED APPLICATION RATES AND METHODS. "MNDOT 25-131" OR APPROVED EQUAL IS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL NEEDS TO ESTABLISH VIGOROUS GROWTH PER MNDOT 2014 SEEDING MANUAL STANDARDS. 9.ALL AREAS SPECIFIED AS 'NATIVE SEED' TO BE SEEDED WITH MNDOT MIX 35-241. BROAD CAST, DRILL AND/OR HYDROSEED AT A RATE OF 36.5 LBS./AC. WITH 2 TONS SHREDDED AND PUNCHED IN PLACE STRAW PER ACRE. SEED MIX SHALL BE ABLE TO WITHSTAND PERIODIC FLOODING. 10.ALL AREAS SPECIFIED AS 'WET AREA SEED,' 'FILTRATION AREA SEED,' OR "MNDOT 33-261" TO BE SEEDED PER MNDOT RECOMMENDED APPLICATION RATES AND METHODS. "MNDOT 33-261" OR APPROVED EQUAL IS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL NEEDS TO ESTABLISH VIGOROUS GROWTH PER MNDOT 2014 SEEDING MANUAL STANDARDS. REFER TO NOTE 11 BELOW FOR ADDITIONAL INFORMATION REGARDING FILTRATION BENCHES. 11.FILTRATION BASINS AND BENCH SHALL HAVE A 12" MINIMUM DEPTH OF FILTRATION MEDIA CONSISTING OF: 11.1.70-85% CONSTRUCTION SAND (ASTM C-33 WASHED) 11.2.15-30% ORGANIC MATTER (MnDOT GRADE 2 COMPOST) GENERAL SEEDING & TOPSOIL NOTES: 1.PRIOR TO CONSTRUCTION, VERIFY WITH THE GENERAL CONTRACTOR AND ALL LOCAL UTILITY COMPANIES TO LOCATE EXACT LOCATIONS OF UNDERGROUND UTILITIES. 2.ALL AREAS DENOTED AS 'TURF SEED' OR "MnDOT 25-131" SEED SHALL RECEIVE PERMANENT IRRIGATION SYSTEM FOR ESTABLISHMENT AND SUPPLEMENTAL WATERING PURPOSES. 3.THE IRRIGATION SHALL BE DESIGN/BUILD SYSTEM BY THE CONTRACTOR. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN IRRIGATION LAYOUT PLAN AND SPECIFICATIONS AS PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE OWNER PRIOR TO ORDER AND/OR INSTALLATION. 4.VALVE AND CIRCUITS SHALL BE SEPARATED BASED ON WATER USE, SO THAT TURF AREAS ARE WATERED SEPARATELY FROM SHRUB AND GROUND COVER AREAS. IRRIGATION HEADS IN TURF AREAS SHALL BE VALVED SPEARATELY FROM SHRUB AMD GROUND COVER AREAS. IT IS RECOMMENDED THAT FULL SUN AND SHADY AREAS TO BE VALVED SEPARATELY AS WELL AS HIGH RUN-OFF AND LOW RUN-OFF AREAS TO BE VALVED SEPARATELY. 5.CONFIRM LIMITS OF IRRIGATION, EXISTING AND FUTURE HARDSCAPE AND BUILDING LOCATIONS PRIOR TO THE DESIGN OF THE IRRIGATION SYSTEM. 6.CONTRACTOR SHALL VERIFY WATER SOURCE LOCATION AND PRESSURE AND SUPPLY A SYSTEM THAT PROVIDES FULL AND COMPLETE COVERAGE TO ALL AREAS TO BE IRRIGATED. 7.SYSTEM SHOULD BE DESIGNED TO COMPLETE WATER SCHEDULES WITHIN 12-HOURS MAXIMUM. 8.RAIN SENSORS AND OTHER WATER SAVING TECHNOLOGIES SHALL BE INCLUDED WITHIN THE IRRIGATION DESIGN. 9.PROVIDE THE OWNER WITH AN OPERATING SCHEDULE THAT WORKS WITH THE APPROVED LAYOUT PLAN AND IDENTIFY ANY FIELD ADJUSTMENTS PRIOR TO PROJECT COMPLETION. 10.AVOID OVER-SPRAY ONTO ROADS, SIDEWALKS, SIGNS AND PARKING AREAS. SPRINKLER ARCS SHALL BE DETERMINED ON SITE BY THE IRRIGATION INSTALLER TO PROVIDE THE MAXIMUM COVERAGE POSSIBLE. CAREFULLY ADJUST THE ARCS AND RADIUS OF EACH SPRINKLER TO PROVIDE HEAD-TO-HEAD COVERAGE. 11.WITHIN EXTREME SLOPED AREAS: 11.1.INSTALL STATIONS SEPARATELY FOR TOP AND BOTTOM OF SLOPED AREAS 11.2.INSTALL LATERAL PIPES PARALLEL TO SLOPE 11.3.IF SLOPE IS TOO EXTREME FOR MACHINERY, INSTALL LATERAL PIPES SAFELY AND TEE-FEED INDIVIDUAL SPRINKLERS VIA DOWNHILL PIPING PERPENDICULAR TO FEED LINE 12.LOCATE VALVE BOXES AWAY FROM ROAD/CURB SO THEY ARE LESS VISUAL WHERE APPLICABLE. 13.DO NOT TRENCH THROUGH THE ROOT BALLS OF NEW PLANTINGS. 14.MAINLINE PIPING BENEATH TRAFFIC AREAS SHALL BE INSTALLED WITH A MINIMUM EARTH COVER OF 30-INCHES FROM BOTTOM OF ROAD SUB-GRADE AND CONTAIN SLEEVES NOT LESS THAN TWO NOMINAL DIMENSIONS GREATER THAT THE PIPE PASSING THROUGH. 15.IRRIGATION INSTALLER SHALL FURNISH AND INSTALL SLEEVE MATERIAL UNDER ALL ROADWAYS, WALKS AND DRIVEWAYS WHERE NECESSARY. 16.TOP OF MAINLINES SHALL BE AT LEAST 30-INCHES BELOW GRADE IN TURF AREAS. 17.TOP OF LATERAL LINES SHALL BE AT LEAST 18-INCHES BELOW GRADE. 18.MAINLINE PRESSURE PIPE FITTINGS 3-INCHES AND LARGER SHALL BE PUSH ON GASKET JOINED AND SHALL HAVE MECHANICAL JOINT RESTRAINTS. MAINLINE PRESSURE PIPE FITTINGS 2.5-INCHES AND SMALLER SHALL BE GLUED AND SHALL HAVE CONCRETE THRUST BLOCKS AT FITTINGS THAT COMPRISE CHANGE IN DIRECTION. 19.OTHERS SHALL FURNISH, INSTALL AND BRING 24-INCHES ABOVE GRADE A MUNICIPAL POTABLE STUB FOR IRRGATION, COORDINATE WITH GENERAL CONTRACTOR. 20.INSTALLER IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE BACKFLOW PREVENTOR, WATER METER AND BOOSTER PUMP, IF APPLICABLE. 21.IRRIGATION CONTROL WIRE SHALL BE DIGITAL TWO-WIRE, UL LISTED FOR DIRECT BURIAL. 22.CONNECT ALL ELECTRICAL WIRING IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND ALL APPLICABLE LOCAL ELECTRIC UTILITY CODES INCLUDING: 22.1.ALL LOW VOLTAGE IRRIGATION CONTROL WIRE SHALL BE INSTALLED WITH THE MAINLINE PIPE WHERE POSSIBLE 22.2.DO NOT LOOP THE LOW VOLTAGE IRRIGATION CONTROL WIRE PATH. 22.3.SNAKE WIRE AT BOTTOM OF TRENCH BENEATH MAINLINE. 22.4.PROVIDE 18-INCH OF SLACK CONTROL WIRE AT ALL CHANGES IN DIRECTION. 22.5.PROVIDE 24-INCH OF SLACK CONTROL WIRE AT EACH REMOTE CONTROL VALVE COILED INSIDE VALVE BOX. 22.6.ALL WIRE SPLICES SHALL BE WATERTIGHT CONNECTORS AND CONTAINED IN VALVE BOX. 22.7.ALL WIRING BENEATH HARDSCAPES SHALL BE CONTAINED IN SLEEVING, SEPARATE FROM PIPING. ELECTRICAL SLEEVES ARE TO BE SIZED APPROPRIATELY FOR EASE OF WIRE INSTALLATION AND REPAIR. 22.8.ALL WIRING SHALL BE INDENTIFIED AT EACH END TO PROVIDE INDICATION AS TO WHICH LOCATION THE WIRE IS CONNECTED. 22.9.GROUNDING PER MANUFACTURER'S RECOMMENDATION OR LOCAL ELECTRICAL CODE. 23.SCHEDULE AND PROGRAM CONTROLLER AND VALVES FOR APPROPRIATE LANDSCAPE WATER REQUIREMENTS. IRRIGATION NOTESTREE SCHEDULE - FROM SHEET L-1 SHRUB & PERENNIAL SCHEDULE - FROM SHEET L-2 PLANTING SCHEDULES & NOTES L-3 ENGINEERINGARCHITECTURELAND SURVEYINGENVIRONMENTAL SERVICESLANDSCAPE ARCHITECTUREJACOBS PLAT Review No. 1 ENGINEERING REVIEW Residential Subdivision Preliminary Plat for the City of Otsego by Hakanson Anderson Submitted to: Honorable Mayor and City Council cc: Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Dan Licht, City Planner Dave Kendall, City Attorney Maren Lapham, Endeavor Development Joshua Budish, Endeavor Development Erik Hedman, Anderson Engineering Ben Hodapp, Anderson Engineering Reviewed by: Ronald J. Wagner, P.E. Brent M. Larson, P.E. Date: March 2, 2022 Proposed Development: Project Ollie Development Location: A portions of the N ½ of the SE ¼ Section 36, T121, R23. South of 65th Street and East of Queens Avenue Applicant: Josh Budish, Endeavor Investments XII, LLC Developer: Endeavor Development 200 Southdale Center Minneapolis, MN 55435 Owners of Record: Fae Jabobs Family Real Estate Trust Purpose: Project Ollie is a proposed industrial development on approximately 78.5 acres in the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer, and public streets typical of an urban setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency, Wright Soil and Water Conservation District. Permits Required: NPDES, Minnesota Department of Health (water), (but not limited to) Minnesota Pollution Control Agency (sanitary sewer), and Wright County PAGE 2 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx TABLE OF CONTENTS INFORMATION AVAILABLE ALTA/EXISTING CONDITIONS COVER SHEET PRELIMINARY PLAT DEMO PLAN GRADING PLAN UTILITY PLAN WATERMAIN PLAN AND PROFILE SANITARY PLAN AND PROFILE PAVEMENT PLAN EROSION CONTROL/SWPPP DETAILS STORM WATER MANAGEMENT OTHER CONSIDERATIONS SUMMARY AND/OR RECOMMENDATIONS PAGE 3 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx INFORMATION AVAILABLE ALTA/NSPS Existing Conditions Survey for Endeavor Development, dated 9/17/2021, by Anderson Engineering Preliminary Plans for Endeavor Development, dated 12/29/2021, by Anderson Engineering Preliminary Storm Water Management Plan for Project Ollie, dated 12/29/2021, by Anderson Engineering Additional Information Minnesota Rules, Chapter 4410 – EAW Requirement City of Otsego Engineering Manual City of Otsego Zoning and Subdivision Ordinances National Wetland Inventory Map PAGE 4 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx ALTA/EXISTING CONDITIONS 1. The developer is listed as Endeavor Development, Endeavor Holding Company, LLC, and Endeavor Investment XII, LLC on various documents. 2. The following existing condition information are required: A. Existing zoning classifications for land in and abutting the subdivision. B. Some existing owners within 150’ of the site are missing (west of Queens Ave and south of the east 40 aces labeled Harvest Run East 3rd Add, and outlot A in Harvest Run 2nd Add). C. NWL and 100-year flood elevations. D. Statement certifying the environmental condition of the site including the presence of any hazardous substance as defined in Minnesota Statutes 115B.02, Subd 8. 3. The existing storm sewer pipe from the pond north of 65th Street near Queens Avenue shall show the pipe flowing the to the south. This pipe is also mislabeled and is a 24” RCP. COVER SHEET 4. The plans submittal shall indicate these are “Preliminary” submittal. 5. The bench marks/plans are based on NGVD 1988 datum. All as-built plans provided by the City for Queens Avenue and related utilities and storm water information are based on NAVD 1929 datum. The existing conditions/ALTA survey the elevation difference between the datums appears to be approx. 0.33’ different. It shall be verified the difference in elevations has been accounted for. At a minimum an equation relating the datums in this area. 6. The 16705 65th Street address is incorrect. The address would be 6400 Queens Avenue with the current driveway access/configuration. PRELIMINARY PLAT 7. All wetlands shall have an average 20’ wide buffer (10’ wide minimum) shall be shown. The remaining wetlands and their buffers shall be entirely within outlots/easements. 8. Lot and Block lines and numbers shall be shown. 9. The storm pipe along the north side of the parking/driveway shall be a City owned utility and therefore shall have a minimum 20’ wide easement (centered on the pipe) covering it from the NW corner of the site to Pond 2. This pipe takes existing drainage from Queens Avenue and 65th Street that is being cut off by this project and redirects the water to Pond 2. We recommend providing a separate pipe for to direct this water and bypass Pond 2 and separate the clean water from the parking/driveway area water and avoid the need for the larger pipe and pond size required to treat the already clean water. PAGE 5 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx 10. There shall be a dedicated maintenance path to each storm basin and the outlets. These maintenance paths shall has egress easements provided. DEMO PLAN 11. The wetland impacts along the future retaining walls will likely be more than shown once these buffers are included. 12. The hatching indicating wetland impact for the wetland to the NE of the future building is incorrect. 13. The bike path will need to be removed to make the watermain connection. 14. The bituminous patch shall extend the entire width of Queens Avenue for the sanitary forcemain connection. GRADING PLAN 15. The drainage from wetland 4 shall be routed to bypass Pond 1 to avoid the need to treat clean water. 16. Wetland 3 drains to the north. An emergency overflow (EOF) shall be labeled for this wetland. The inlet pipe from the south into this wetland shall also be removed as it is not necessary. 17. The setback and right-of-way lines shall be labeled. 18. The pavement to the building in the SW of the building is show to be over 10% slope. Verify. 19. A bar scale for Inset A shall be provided. 20. Showing the proposed and existing storm sewer/culverts in the grading plans. 21. The TEP panel has indicated a swale out of Wetland 4 is not being shown. This swale shall be shown on the existing contours. This swale will also have a large impact on the stormwater models for the entire area. 22. Show all easements, specifically around the ponds and maintenance paths. UTILITY PLAN PAGE 6 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx 23. All easement lines shall be shown. 24. The proposed contours shall be shown darker than the existing. 25. Existing utilities along Queens Avenue and 65th Street shall be labeled (pipe sizes, types, inverts, etc). 26. Some storm pipe is labeled as 20” and 16” HDPE. Verify this is the correct size needed. 27. See comment #9. 28. All storm sewer pipe is considered private except storm sewer pipe along the north side of the parking area. This will be City owned pipe. This pipe shall be concrete (RCP) anywhere it is under pavement/curb and gutter. The pipe in green areas may be HDPE as shown. 29. The existing storm pipes under Queens Avenue and 65th Street currently discharge into the ditch in the SE quadrant of the 65th Street and Queens Avenue intersection. The plans propose to direct these drainages to a “beehive” storm sewer casting. It shall be verified that this will be sufficient to handle the existing drainage. Also, an EOF for this low are near the new casting will need to be identified as well as an overland overflow route. 30. A note to “see sheet C-18” shall be included next to both outlet control structures. The detail provides some information that is missing on sheet C-7. WATERMAIN PLAN AND PROFILE 31. All easement lines shall be shown. The easement label “10’ D&U Easement (TYP)” is shall be revised to 20’ wide. 32. Existing utilities along Queens Avenue and 65th Street shall be labeled (pipe sizes, types, inverts, etc). 33. Make the valve symbols larger in the plan view or provide a larger drawing scale. 34. Length of the watermain pipe shall be in the profiles. 35. The hydrants within the loading dock areas shall be protected with bollards. 36. All 12” valves shall be butterfly valves. 37. The two 45 degree bends at each corner of the building are labeled 135 degrees. 38. The storm crossing at station 8+00 is missing from the profile. 39. The watermain at the NE and SE corners of the building depict a pipe being stubbed to the east out of two 45 degree bends. We believe this should be done with a 12” x 12” tee in both locations for future expansion. PAGE 7 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx SANITARY PLAN AND PROFILE 40. Existing utilities along Queens Avenue and 65th Street shall be labeled (pipe sizes, types, inverts, etc). 41. This site is proposed to flow via gravity to a future lift station to the north of 65th Street and west of CSAH 42. Until this lift station is construction and gravity sewer is extended to service this property a small, privately owned and operated, lift station is proposed to discharge to the existing gravity sewer along Queens Avenue. For a future gravity connection, a 6” gravity sanitary sewer stub is being provided to the north out of the lift station. This stub ends at an elevation of 904.71 and this elevation still needs to be verified how it will fit with future gravity sewer per the Master Plan. 42. The storm sewer and watermain crossings shall be shown in the forcemain profile. 43. The 24” storm crossing at station 0+75 in the gravity sanitary profile is mislabeled 16”. 44. The forcemain appears to require a new sanitary sewer manhole be installed in Queens Avenue. This will not be allowed. The forcemain shall be directed to the existing manhole approximately 25’ south of the show new manhole. PAVEMENT PLAN 45. Soil borings or Geotechnical Reports have not been provided at this time. We recommend that the pavement section be based on a Geotechnical Engineers recommendation. 46. Based on the soils encountered while constructing Queens Avenue we recommend using a clean sand under the Class 5 aggregate for drainage. EROSION AND SEDIMENT CONTROL & SWPPP 47. Two rows of silt fence are required along the wetlands adjacent to the retaining walls. DETAILS 48. A detail of the lift station is required. 49. The top of the inlet pipes for both ponds shall be a minimum 12” below the NWL elevation to provide the required skimming. It appears that the filtration areas may need to be lowered or outlet pipes reconfigured to meet the requirements. 50. The pipe lengths, grades, and inverts shall be included in the details. PAGE 8 S:\Municipal\Aotsego25xx\2500\2021\Ollie Property\Ollie RVW1 Prel Plat.docx PRELIMINARY STORM WATER MANAGEMENT PLAN 51. There appears to be a missing swale from wetland 4 to the east. This has been acknowledged during TEP meetings. The TEP is also making additional comments that are likely to cause changes as well as the required redirection of wetland 4 water away from Pond 1 will require significant changes to the storm water plan therefore the stormwater management plans has not been reviewed at this time. OTHER CONSIDERATIONS 52. Wetland Impacts/Mitigation/Replacement is in process. 53. Please submit a Geotechnical Report for review. 54. Statement certifying the environmental condition of the site including the presence of any hazardous substance as defined in Minnesota Statutes 115B.02, Subd 8. SUMMARY AND/OR RECOMMENDATION Revised and Resubmit.