Loading...
08-15 1983 Town Board MinutesState of Minnesota The Town Board of the Town of Otsego met this County of Wright 15th day of August, 1983, at 8:30 p.m. Floyd Town of Otsego Roden, Chairman; Douglas Lindenfelser and William Schulz, Supervisors; Lani Will, Deputy Clerk; Lewis Pouliot, Treasurer; and Jerome Perrault, Clerk, were present. The meeting was called to order by Chairman Floyd Roden. The minutes of the August 1, 1983, Town Board meeting were approved as read. Gilbert Darkenwald appeared to request a permit to move a house and garage onto a 13.9 acre parcel he owns in Section 22, Range 23 (the North 393 ft of the West 13.3 rods of lot 3 and the North 393 ft of the NE 4 of the SEk of Section 22, Range 23) . He showed pictures of the house he intends to move to the Town Board. Motion by Douglas Lindenfelser to grant Gilbert Darkenwald a permit to move a house and garage onto a 13.9 acre parcel. Seconded by William Schulz, passed unanimously.: The Town Board discussed the rate the Township is charging for mowing weeds with Township equipment for private parties. The present rate is $25.00 per hour for man, tractor and mower. Motion by Douglas Lindenfelser to raise the rate for mowing to $35.00 per hour for man, tractor and mower, retro -active to June 1, 1983. Seconded by Floyd Roden, passed unanimously. Motion by William Schulz to raise the building permit fee from $15.00 to $30.00 for accessory use permits. Seconded by Douglas Lindenfelser, passed unanimously. A resident of Otsego Acres inquired as to when the road shoulder would be repaired in Otsego Acres. The Board replied that Buffalo Bituminous, Inc. (the contractor that did the bituminous road surfacing project in Otsego Acres) had agreed to furnish the black dirt to re- pair the shoulder but the material they provided was unsatisfactory so the Township will secure the black dirt themselves and complete the project as soon as work schedule permits. The Town Board will table action on paying the balance due on the 1981 Fire Contract with the City of ElkRiver until Lani Will can obtain the figures on the 1980 Assessment payable in 1981. Lani Will will also review the assessed valuation figures for the area served by the Monticello and Albertville Fire Departments. The Board discussed with Pete Raatikka the overlay project to repair 62nd Lane. The Board will clean out the exsisting culvert and apply a 12 bituminous overlay and will delay the project until next year unless an acceptable bid can be received for doing the project this fall. There are 2 mobile homes on Lot 5, Block 1, Vasseurs Oak Grove Estates and only a permit for one mobile home. The Board will take action to have one of the mobile homes removed. A complaint also has been received about having horses, goats and chickens on the above mentioned lot, also dogs running loose. The Town Board will have the County Zoning Administrator notify the owner of the lot that he is in violation of the County Ordinance which permits z animal unit per acre. Motion by William Schulz to postpone the first meeting in Sept- ember until Tuesday, September 6, because of the Labor Day Holiday. Seconded by Douglas Lindenfelser, passed unanimously. On motion, the meeting adjourned. Attest: State of Minnesota Continuation of the August 15, 1983 Town Board County of Wright meeting, page 2. Town of Otsego David Cecka appeared before the Board to say that he now has a full time job and does not feel he has time to adequately perform as dog catcher. The Board requested him to serve on a part time basis until they can obtain a new dog catcher. Lani Will will send notices to the 2 top applicants for the position to see if they are still interested. Motion by William Schulz to pay Robert Berning a fee of $10.00 for serving as moderator at the continuation of the Annual Town Meeting on August 15, 1983. Seconded. by Floyd Roden, passed unanimously. Proceeding as a Board of Audit, the Town Board audited and allowed verified accounts Nos. 235 to 273 inclusive. On motion the meeting adjourned. Attest: Jerome Perrault, Clerk.