06-21-1988 Town Board MinutesState of Minnesota County of Wright Town of Otsego Supervisors, and Jer The meeting was Freske. Engineer Peter Raatikka presented the Board with the Feasibility Study he had prepared for the upgrading and bituminous surfacing of Kadler Avenue from Co. Rd. #39 to 85TH Street and 92ND Street West of Kadler Avenue. The The Town Board of the Town of Otsego met this 21st day of June, 1988 at 2:00 P.M. Norman Freske, Chairman, Floyd Roden and Douglas Lindenfelser ome Perrault were present. called to order by Chairman Norman estimated cost for the improvements follows: Bituminous surfacing - 2350 Ton Class 5 gravel Shaping & grading on Kadler Avenue are as ESTIMATED CONST COST CONTINGENCIES ENGINEERING & ADMINISTRATION ESTIMATED PROJECT COST The estimated costs for the improvements follows: Bituminous surfacing - 530 ton Class 5 gravel Shaping & Grading on ESTIMATED CONST COST CONTINGENCIES ENGINEERING & ADMINISTRATION $ 58,700.00 38,700.00 9,800.00 92ND 107,200.00 26,800.00 134,000.00 ST. are as 13,250.00 8,750.00 3,500.00 25,500.00 6,375.00 ESTIMATED PROJECT COST 31,875.00 There are seven (7) assessable units on 92ND Street. If the project were fully assessed, this cost per unit for 92ND Street would $4,553.57 Kadler Avenue has 12 assessable units. Applying that same rate of assessment $4,553.57 per unit would generate $54,642.86, which would leave the Township share of Kadler Avenue at $79,357.14. If the Township were to assume half the cost of 92ND Street, the cost per unit for the 7 units would be $2,276.78. Applying this rate of assessment to Kadler Avenue, $2,276.78 per unit for 12 units would generate $27,321.36, leaving the Township share for Kadler Avenue at $106,678.64. The Town Board will schedule a Public Hearing on the project. Attorney William Radzwill and Appraiser Don Leuer appeared at the meeting to discuss the upcoming trial on June 27th of the Flora Kolles Estate versus the Town of Otsego protesting the Storm Drain Assessment. Mr. Radzwill requested that Mr. Leuer be present at the trial in case information would be requested as to how he arrived at the assessments. Mr. Radzwill also requested Engineer Peter Raatikka be present at the trial with any information he had in his files concerning the Kolle.®> property such as State of Minnesota County of Wright Town of Otsego Town Board Special Meeting June 21, 1988 - page 2 topography, elevation and the amount of the property that was flooded before the storm drain was installed. Mr. Radzwill, Mr. Leuer, Mr. Raatikka and the Board Members then did a Site Inspection of the Kolles Property. On Motion the meeting adjourned. CHAIRMAN: Norman F. Freske SUPERVISOR: Douglas Lindenfelser SUPERVISOR: Floyd Roden ATTEST: Jerome Perrault, Clerk JP/eb