Engineer Peter Raatikka presented the Board with the
Feasibility Study he had prepared for the upgrading and
bituminous surfacing of Kadler Avenue from Co. Rd. #39 to
85TH Street and 92ND Street West of Kadler Avenue. The
The Town Board of the Town of Otsego
met this 21st day of June, 1988 at
2:00 P.M. Norman Freske, Chairman,
Floyd Roden and Douglas Lindenfelser
ome Perrault were present.
called to order by Chairman Norman
estimated cost for the improvements
follows:
Bituminous surfacing - 2350 Ton
Class 5 gravel
Shaping & grading
on Kadler Avenue are as
ESTIMATED CONST COST
CONTINGENCIES ENGINEERING & ADMINISTRATION
ESTIMATED PROJECT COST
The estimated costs for the improvements
follows:
Bituminous surfacing - 530 ton
Class 5 gravel
Shaping & Grading
on
ESTIMATED CONST COST
CONTINGENCIES ENGINEERING & ADMINISTRATION
$ 58,700.00
38,700.00
9,800.00
92ND
107,200.00
26,800.00
134,000.00
ST. are as
13,250.00
8,750.00
3,500.00
25,500.00
6,375.00
ESTIMATED PROJECT COST 31,875.00
There are seven (7) assessable units on 92ND Street. If
the project were fully assessed, this cost per unit for 92ND
Street would $4,553.57 Kadler Avenue has 12 assessable
units. Applying that same rate of assessment $4,553.57 per
unit would generate $54,642.86, which would leave the
Township share of Kadler Avenue at $79,357.14. If the
Township were to assume half the cost of 92ND Street, the
cost per unit for the 7 units would be $2,276.78. Applying
this rate of assessment to Kadler Avenue, $2,276.78 per unit
for 12 units would generate $27,321.36, leaving the Township
share for Kadler Avenue at $106,678.64.
The Town Board will schedule a Public Hearing on the
project.
Attorney William Radzwill and Appraiser Don Leuer
appeared at the meeting to discuss the upcoming trial on June
27th of the Flora Kolles Estate versus the Town of Otsego
protesting the Storm Drain Assessment. Mr. Radzwill
requested that Mr. Leuer be present at the trial in case
information would be requested as to how he arrived at the
assessments. Mr. Radzwill also requested Engineer Peter
Raatikka be present at the trial with any information he had
in his files concerning the Kolle.®> property such as
State of Minnesota
County of Wright
Town of Otsego
Town Board Special Meeting June 21, 1988
- page 2
topography, elevation and the amount of the property that
was flooded before the storm drain was installed.
Mr. Radzwill, Mr. Leuer, Mr. Raatikka and the Board
Members then did a Site Inspection of the Kolles Property.
On Motion the meeting adjourned.
CHAIRMAN: Norman F. Freske
SUPERVISOR: Douglas Lindenfelser
SUPERVISOR: Floyd Roden
ATTEST: Jerome Perrault, Clerk