05-16-1989 Special Meeting MinutesState of Minnesota A Special Town Board Meeting was County of Wright held this 18TH day of May 1989 at Town of Otsego 7:30 P.M. to discuss the drainage problem in Vasseur's 3RD and 4TH Additions and farm land just West of the 4TH Addition. Norman Freske, Chairman, Douglas Linenfelser and Floyd Roden, Supervisors, Elaine Beatty, Deputy Clerk, and Jerome Perrault, Clerk were present. Norman Freske, Chairman called the meeting to order. He said the purpose of the meeting was to get the opinion of the people involved as to whether they wished to take care of the drainage themselves or if they wanted the Township involved and assess the cost back to the benefiting property owners. Mr. Freske explained that if the Township is involved the project would be more expensive as Engineering and Attorney fees would be involved. Tiling Contractor Pete Schmitz has done a preliminary study of the area and has given the Township an estimate for installing a ten (10) inch tile line to drain the area. To install a ten (10) inch line to 85TH Street, the estimated cost would be $6,165.03. If he continued the line beyond 85TH Street, the estimated cost would be $9,711.65. The Township Engineer has also done a preliminary study of the drainage for the area. He has recommended installing a fifteen (15) Inch storm drain commencing at Needham Avenue and running West on the lot line between Lots 3 and 4, Vasseur's Fourth Addition, and then North along the West lot line of lots 1 and 3, Vasseur's Fourth Addition, to 85TH Street where it would empty into an eighteen (18) inch culvert under 85TH Street and into a ditch on the North side of 85TH Street. This would require 780' of 15" line and also 300 feet of 6 inch plastic drain tile that would extend into the farm land West of Vasseur's Fourth Addition and connect to the 15 inch line. The cost of this proposal is as follows: 780' of 15" storm sewer @ $15.00 one man hole - 2 pipe end sections @ $250.00 Turf establishment 300' of 6" drain tile @ $6.00 50' of 15" Culvert @ $10.00 TOTAL ESTIMATED CONST. CONST Engineering, Legal, Administritive and Finance costs TOTAL PROJECT COSTS $11,700.00 $ 1,000.00 $ 500.00 $ 750.00 $ 1,800.00 1 500.00 $16,250.00 1 4,875.00 $21,125.00 Chairman Norman Freske asked for a show of hands of the property owners present as to which proposal they were in favor of: 5 - were in favor of the Engineer's proposal 1 - was in favor of Pete Schmitz Proposal 2 - did not want to do anything State of Minnesota County of Wright Town of Otsego Special Otsego Town Board Meeting May 18, 1989 - 7:30 P.M. Page 2 - The Board advised the residents that another alternative would be to dig up that existing tile line where it is thought to be plugged and attempt to restore it to a usable condition. The residents were requested to be present at another meeting at 7:30 P.M. on June 5, 1989 to further consider the project. On motion the meeting adjourned. No. C A -/Ahr orman F. Freske, Chair -Sup. oug Lindenfelser, Sup. Floyd Roden, Sup. ATTEST: JEROME PERRAULT, CLERK JP/eb