07-31-1990 Public Hearing MinutesSTATE OF MN The Public Hearing on the proposed COUNTY OF WRIGHT construction of 85th St. from Page. TOWN OF OTSEGO Avenue to Co. 42 was continued this 31 day of July, 1990 at 2:00 PM. Norman Freske, Chairman, Douglas Lindenfelser and Floyd Roden, Supervisors, Elaine Beatty, Deputy Clerk, Jerome Perrault, Clerk, Larry Koshak, Engineer, and Bill Radzwill, Attorney, were present. The Hearing was called to order by acting Chairman Douglas Lindenfelser. Engineer Larry Koshak explained the revised feasibility study he had completed for 85th St. The cost of construction the driveway for Lefebvre Farm No. 2 has been removed and the total estimated cost has been reduced to $123,750. If Wright -Hennepin Electric moves their poles at no cost, the cost would be further reduced by an estimated $4,000.00. The top will be removed from River Road during the construction of 85th St. and black dirt placed on River Road up to 6 inches if available. The assessment on each of the four parcels involved will be $15,467.00 and the 87th St. part of the project will be eliminated. The Township will require an 80 ft. easement for 85th St. plus an additional slope easement where there is a cut thru a hill. Wright -Hennepin Electric will require additional easement for their power line. Rollie Christian asked if River Road would be stripped this fall. Larry Koshak replied that if everything goes as planned 85th St. will be constructed this fall and probably blacktopped next year. In the assessment agreement the interest on the 2 parcels owned by John Lefebvre will be deferred for 2 years from the time the Assessment Roll is adopted. The Town Board set the interest rate on the assessments at 9%. Rollie Christian asked for some assurance that the 40 acres South of 85th St. will be rezoned to R-1. Bill Radzwill said that all four parcels involved are now zoned Ag and the Town Board can not assure the re -zoning as the County Board has the final say on re -zoning. Steve Scharber asked if NSP had been approached regarding moving the power line along River Road. Bill Radzwil replied that they had gotten an easement from the Lefebvre Family to leave the power line there and would probably not consider moving it, The Town Board said they could ask NSP, perhaps they would consider using the same poles as Wright -Hennepin along 85th St. Rollie Christian asked if it was necessary for the Developer to sign the "Agreement to Be Assessed." Bill Radzwill replied that he will be involved in the project and he should sign as well. Motion by Douglas Lindenfelser to approve the "Agreement to Be Assessed" contingent that all parties involved sign the agreement. Seconded by Floyd Roden, all Board Members STATE OF MN COUNTY OF WRIGHT TOWN OF OTSEGO The Public Hearing Meeting on the proposed construction of 85th St. from Page Ave. to Co. 42, July 31, 1990, 2:00 PM. - Page 2 - voted in favor of the motion. On motion the Hearing adjourned. y. glas Lindenfelser, Acting Chairman , Norman Freske, Chairman loy Roden, Supervisor Attest: Jerome Perrault, Clerk jeh