Loading...
09-19-1990 Workshop Meeting MinutesSTATE OF MN The Town Board of the Town COUNTY OF WRIGHT of Otsego held a Workshop TOWN OF OTSEGO Meeting this 19 day of September, 1990 at 7:00 PM to discuss the Comprehensive Plan being prepared by Planner, Dave Licht and what direction to take concerning Sewer Planning. Norman Freske, Chairman, Floyd Roden and Douglas Lindenfelser, Supervisor, Elaine Beatty, Deputy Clerk, Judy Hudson, Secretary, Jerome Perrault, Clerk, Larry Koshak, Engineer, Bill Radzwill, Attorney, and Dave Licht, Planner, were present. Also present were Planning Commission Members Ing Roskaft, Larry Fournier, Carl Swenson, Jim Kolles, Nancy Duerr and Bruce Rask. The Workshop was called to order by Chairman Norman Freske. Dave Licht stated that he started working on the Township Comprehensive Plan about a year ago. About last May however the questions arose that in order to complete the Comprehensive Plan he would need to know what direction the Town Board wished to take in regard to Sewer Planning. A Sewer Study would need to be made or complete the Plan without a sewer study and restrict future to lots of 10 acres or more. Recent meetings with the DNR indicate they are becoming more concerned about ground water levels in the developed Northeast part of the Township. In view of this, Mr. Licht said he thought the Town Board should consider having Engineer Larry Koshak do some ground water level checks and preliminary sewer studies. Further meetings would need to be held with the City of Elk River concerning connecting to their Sewage Treatment Plant on at least a prelimary basis. A feasibility study on this possibility has already been made. Mr. Licht said he is projecting an increase of 325 households in the next 10 years and this growth should be to fill in the open areas in the Northeast rather than expanding into the Agricultural areas. This would further increase the need for sewer. Mr. Licht also stated the need to identify areas for non-residential development, commerical and industrial. The rebuilding of 101 to a four lane highway is going to increase the demand for commerical and industrial development. Service road planning will be important as future plans of MnDot could restrict access to Hwy 101 to just 2 places, CO. 39 and Co. 122. Larry Koshak said topography maps of the about $44,040. Ground additional $9,750.00. all the information on that to do aerial contour and Eastern part of Township would cost control for mapping would cost an Preparing a Township map and putting AutoCadd computer disks would bring the total cost of the contour and topography mapping to around $100,000. Chairman Norman Freske replied that the Board was aware of the need for the mapping but funds were not budgeted for this and the fact that the Township was under levy limitations made it difficult to budget for it. Larry Koshak replied that prelimary sewer studies could be STATE OF MN COUNTY OF WRIGHT TOWN OF OTSEGO The Town Board of Otsego Workshop Meeting of September 19, 1990. - Page 2 - done without aerial maps and a more complete and accurate study could be done later when the aerial maps are available. Dave Licht replied that for now to complete the Comprehensive Plan he would need a ball -park figure as to where and what sewer lines would be needed and a potential sewer plant site. Larry Koshak said that sewer and storm drain lines are compatible and sewer plants are usually located to provide gravity flow toward it. The consensus opinion of the people in attendance was that Larry Koshak should proceed with a preliminary sewer study. The Board requested Larry Koshak to prepare a cost estimate of the preliminary study by the Oct. 1, 1990, Town Board Meeting. On Motion the Workshop Meeting adjourned. ,Norman Freske, Chairman uglas Lindenfelser, Supervisor 14loyd Roden, Supervisor Attest: Jerome Perrault, Clerk jeh