01-10-1991 Public Hearing MinutesSTATE OF MINNESOTA The Public Hearing on the proposed
COUNTY OF WRIGHT upgrading and bituminous surfacing
CITY OF OTSEGO of 89TH ST and Parell Avenue in
Barthel Acres was continued this
10TH day of January, 1991 at 7:30PM. Douglas Lindenfelser,
Floyd Roden, Larry Fournier, and Ron Black, Council Members,
Jerome Perrault, Clerk, Elaine Beatty, Deputy Clerk, Judy
Hudson, Secretary, Larry Koshak, Engineer, and Bill Radzwill,
Attorney, were present.
The Hearing was called to order by Acting Mayor Douglas
Lindenfelser.
Engineer Larry Koshak then addressed the Hearing and
reviewed the Feasibility Study on the proposed upgrading and
bituminous surfacing of 89TH Street and Parell Avenue in
Barthel Acres. Estimated total cost of the project is
$43,810.00 for a nine ton (9) design with a thirty-two (32)
wide subgrade and a twenty-four (24) foot wide bituminous top
three (3) inches thick. The existing road bed would be cut
down and the material used to widen the road. The road bed
would be built back up to it's present height with base
gravel and the bituminous top. The existing twelve (12) inch
culvert under the road would be replaced with a fifteen (15)
inch culvert. Driveway culverts would not be disturbed.
Cost breakdown of the project is as follows:
BITUMINOUS SURFACE
AGGREGATE BASE
GRADING (topsoil stripping,
respreading, common esc. &
subgrade preparation)
CULVERT
RESTORATION (SEED & MULCH)
17,700.00
9,000.00
$ 5,000.00
800.00
$ 1,200.00
ESTIMATED CONSTRUCTION COST...$ 33,700.00
CONTINGENCIES, ENGINEERING,
ADMINISTRATION $ 10,110.00
TOTAL PROJECT COST $ 43,810.00
There are eleven (11) benefitting properties and the
fully assessed cost per unit would be $3,982.73 with an
annual cost of $620.51 per unit for ten (10) years based on
nine percent (9%) interest.
Floyd Roden advised the residents that if each lot was
assessed, two thousand five hundred dollars ($2,500.00) with
the city paying the rest of the project cost, their annual
cost would be about three hundred and seventy two dollars
($372.00) per lot. Larry Koshak suggested combining this
project with others and bonding at one time for all the
projects being considered. Parell Avenue and 89TH Street do
not qualify as an MSA Street Project because it is not
classified as a collector street.
STATE OF MN, CO OF WRIGHT, CITY OF OTSEGO. PUBLIC HEARING ON
UPGRADING 89TH ST & PARELL IN BARTHEL ACRES 1-10-91
-PAGE 2 -
Laverna Noll said the residents were concerned about
future development of the LeFebvre property just South of
Barthel Acres and how this would affect the streets in
Barthel Acres. The Council advised them there were no plans
to connect the streets in Barthel Acres to the proposed
streets in the LeFebvre property.
The residents were requested to be present at Monday
night's Council Meeting (January 14, 1991) to give their
opinion on whet:her they were in favor of proceeding with the
project based on a $2,500.00 per lot assessment.
Motion by Ron Black to close the Hearing, motion was
seconded by Floyd Roden, all Council Members voted in favor
of the motion.
'a a
Norman F. Freske, Mayor
Floyd
Larry Fo nl r, Council
Ron Black, Council
Doug Lindenfelser, Council
ATTEST: Jerome Perrault, Clerk
JP/eb