07-27-1992 Public Hearing MinutesSTATE OF MINNESOTA The City Council of the City of COUNTY OF WRIGHT Otsego held a Public Hearing CITY OF OTSEGO this 27TH day of July, 1992 at 7.00PM on the proposed upgrading and bituminous surfacing of 87TH Street from O'Dean Avenue to O'Brian Avenue and O'Brian Avenue to 85TH Street. Norman F Freske, Mayor, Doug Lindenfelser, Floyd Roden, Larry Fournier, and Ron Black, Council Members, Jerome Perrault, Clerk, Elaine Beatty, Deputy Clerk/Zoning Administrator, Judy Hudson, Secretary, and Larry Koshak, Engineer, were present. The Public Hearing was called to order by Mayor Norman F Freske. Engineer Larry Koshak then addressed the Hearing. He said the project area is located in Vasseur's Oak Grove Estates and the existing streets range from 20 to 22 feet wide with a 3 to 4 inch gravel base. The project area is part of the Halls Drainage Area. The City Maintance crew cleaned out the ditch and the culverts on the South side of 87TH Street last year and this has improved drainage in the area. Mr Koshak explained that he is proposing a 9 ton design street with a 32 feet wide subgrade, a 26 feet wide bituminous top 3 inches thick and 6 inches of base gravel. The low area at the intersection of 87TH and O'Brian will be drained with storm drain piping. The drainage of the area can be improved when 85TH Street is upgraded and storm drain piping installed along it. The estimated cost of the project is as follows: BITUMINOUS SURFACE AGGREGATE BASE GRADING DRAINAGE RESTORATION (SEED, MULCH, DRIVEWAYS) $ 4,000. CONSTRUCTION COST $ 100,000. OVERHEAD $ 25,000. $ 45,000. $ 18,500. $ 10,500. $ 22,000. TOTAL ESTIMATED COST $ 125,000. There are 26 assessable units in the project and Mr Koshak said he is recommending an assessment of $2,750.00 per unit which would be $409.83 per unit per year for 10 years at 8% interest. The City share of the project would be $53,500.00. If the project is approved, the subgrade work could be done this fall and the bituminous top put on next spring. One resident asked if the project would be done in 1992 and 1993. Larry Koshak said that it would be up to the Council to approve or reject the project. Charles Butler, of 14186 87TH ST said that because of economic conditions he could not afford to have the project done. Marty Carol of 8710 O'Brian Ave said the project would improve the drainage of the Stellmach property, but said she could not afford the improvement at this time. Guy Rowe of 14031 87TH ST asked if O'Brian Ave would he CITY OF OTSEGO COUNCIL MEETING MINUTES OF PUBLIC HEARING ON JULY 27, 1992 AT 7PM ON 87TH AND O'DEAN FROM O'DEAN AVE TO O'BRIAN AVE AND O'BRIAN AVE TO 65TH ST - PAGE 2 - graded out to the line of Vasseur's Oak Grove and Mr Koshak replied that it would not. Mary Miller said she was opposed to the project. Mike Boyd also said he was opposed to the project because of economic reasons. Rita Peterson of 14333 87TH ST also said she was opposed to the project. Randy Thoreson said he was opposed to the project at this time because of the increase in taxes. Jacolyn Stellmach had called the City Office to say she was opposed to the project. Chuck Waknitze also said he was opposed to the project. Charles Butler said that he has a "Hill" sign near his driveway. The Council advised him to check with Dave Chase on this. Randy Thoreson asked if 86TH ST is planned to be built and Mr Koshak said no. The Council advised the residents that a decision on the project would be made at the next Council Meeting. Motion by Ron Black to close the Public Hearing. Seconded by Larry Fournier, all Council Members voted in favor of the motion. CITY OF OTSEGO COUNCIL MEETING MINUTES OF PUBLIC HEARING ON JULY 27, 1992 AT 7PM ON 87TH AND O'DEAN FROM O'DEAN AVE TO O'BRIAN AVE AND O'BRIAN AVE TO 85TH ST - PAGE 3 - NORMAN F FRESKE, MAYOR FLOYD RODEN, COUNCIL RONALD G BLACK, COUNCIL ATTEST: JEROME PERRAULT, CLERK JP/eb LARRY 'OUANIER, COUNCIL