Loading...
Item 3.1 - Due North Car Wash S:\Municipal\Aotsego25xx\2500\OT2522.04 Due North car wash Main Office: 3601 Thurston Avenue, Anoka, MN 55303 Phone: 763/427-5860 Fax: 763/427-0520 www.haa-inc.com MEMORANDUM TO: Honorable Mayor and City Council CC: Adam Flaherty, City Administrator Audra Etzel, City Clerk Daniel Licht, City Planner Dave Kendall, City Attorney Cory Kampschroer, CN Otsego Properties, LLC Jessica Kampschroer, CN Otsego Properties, LLC Scott Dahlke, Civil Engineering Site Design FROM: Ronald Wagner, P.E. City Engineer Abdullah Alqwaizani, E.I.T. DATE: August 26, 2022, updated August 29, 2022 with other staff input RE: Due North Otsego We have reviewed the following information provided by Civil Engineering Site Design on behalf of Scott Dahlke regarding the Due North Otsego. Civil Plan Set for Due North Otsego, dated 8/15/2022 by Due North Otsego The submittal is to be considered for preliminary acceptance. We would offer the following comments: Cover Sheet 1. Provide an approval signature line for Ronald J. Wagner, P.E., City Engineer. 2. Provide benchmark(s) and datum listed (should be NGVD 1929 Adj. Datum). Preliminary Plat & Site Plan 3. A few existing utilities are missing. All existing sewer, watermain, culverts, and other underground facilities within 150’ shall be shown. 4. Provide a stop sign on the east and south entrance. 5. Provide cross walk paint and signage on Parson Ave. a. Key note 18 to signify 10’ trail (City Standard Plate 707). 6. Add key note 19 to the ped ramp west side of Parson Avenue and south side of 85. August 26, 2022, revised August 29, 2022 Page 2 S:\Municipal\Aotsego25xx\2500\OT2522.04 Due North car wash 7. Verify if there is a push button crossing the traffic signal at 85th Street and Parrish Avenue intersection. 8. Provide drainage & utilities easement for storm sewer on west of the site. 9. Provide a one-way signage across the south entrance on median strip and raised concrete traffic median “pork chop” at 85th Street access to guide right in, right out only movements. Grading and Drainage Plan 10. Provide the normal, 2-year, 10-year, and 100-year water level for the proposed pond. Sanitary Sewer & Water Plan 11. The hydrant coverage is insufficient for the building. Storm Sewer Plan 12. No comments. SWPPP 13. No comments. Existing Conditions & Removal Plan 14. No comments. Details 15. Remove standard plat: 300, 301, 304, 307, 309, 314, and 408 16. Verify standard plat 407, 48” diameter outlet structure is needed. Plan shows 27” outlet structure. 17. Standard plate 409 will also be used as pond outlet structure. Landscape Plan 18. No comments. Summary and/or Recommendation We recommend approval contingent on the above comments being addressed.