Loading...
Item 4.1 - Norhart3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 MEMORANDUM   TO:  Otsego Planning Commission  FROM:  D.Daniel Licht DATE:  1 September 2022  RE:    Otsego – Norhart (R. Lefebvre Property); PUD Concept Plan  TPC FILE:101.02  BACKGROUND  Norhart has submitted a PUD Concept Plan for a 254 unit multiple family building as the first  phase of a mixed‐use development located between TH 101 and Parrish Avenue (CSAH 42)  north of 90th Street (CSAH 39).   The subject site consists of three parcels having an area of  33.69 acres.    PUD Concept Plan applications are processed in accordance with Section 11‐36‐4.C of the  Zoning Ordinance to provide comment to the developer as to the acceptability of the land use.    The City requires that PUD Concept Plan reviews include a public hearing before the Planning  Commission so that surrounding property owners have an opportunity to be informed about  the project and ask questions or provide comment.  A public hearing to consider the PUD  Concept Plan application was held at the Planning Commission meeting on 15 August 2022.    The Public Hearing was closed.  A concern raised during the public hearing and by the Planning Commission during discussion of  the PUD Concept Plan is traffic generation for the proposed use and impacts to existing and  planned roadways.   The Planning Commission discussion noted that the capacity of area  roadways to accommodate traffic generated by the proposed development would dictate their  response to the other issues related to density and building height and the overall acceptability  of the project.  Section 11‐3‐2.F.4 of the Zoning Ordnance establishes that the streets serving a  property must have adequate capacity to accommodate a proposed development as a criteria  for approval of a Zoning Map amendment necessary for the project to develop.    Item 4.1 2 As stated in the Planning Report dated 12 August 2022, which is available on the City website,  City staff and Wright County had jointly determined that a traffic study will be required should  the developer move forward with applications for a preliminary plat and PUD Development  Stage Plan to evaluate potential traffic impacts related to development of the entire property  and not just the apartment use.  Such a traffic study would evaluate the current capacity of the  existing street serving the property, including the functionality of intersections, estimate traffic  generated by the proposed development and surrounding regional increases in traffic over  time, and make recommendations as to any improvements that would be required concurrent  with the proposed development if approved to maintain capacity and functionality of the area  roadways.    The developer volunteered at the Planning Commission meeting on 15 August 2022 that they  had already engaged an engineering consultant to complete a traffic study for the proposed  development and that a preliminary report would be available within a few weeks.  Wanting to  consider the findings and recommendations of the traffic study report, the Planning  Commission tabled consideration of the PUD Concept Plan.  The developer has advised City  staff that the preliminary traffic study may be available as soon as 2 September 2022.   In order  to have the opportunity for City staff and Wright County to review the traffic study, it will be  necessary to delay consideration of the PUD Concept Plan to future Planning Commission  meeting.       CONCLUSION    This memorandum is provided for update purposes and no action is required regarding the PUD  Concept Plan application.  There will be no discussion of the PUD Concept Plan application at  the Planning Commission meeting on 6 September 2022.      c. Adam Flaherty, City Administrator/Finance Director   Audra Etzel, City Clerk   Ron Wagner, City Engineer   David Kendall, City Attorney   Sara Buermann, Wright County Traffic Engineer   Marybeth Wise, Norhart