Loading...
3.3 Lift Station No. 3 Pump Replacement Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier October 24, 2022 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.3 – Lift Station No. 3 Pump STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. X Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends City Council approve procurement of equipment for Lift Station No. 3. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Lift Station No. 3 located at the West WWTF property pumps all wastewater flow from the West sewer district into the West facility. The station is a triplex pump site using two 40hp pumps and one 20 hp pump. The smaller of these pumps needs significant repairs, has exceeded life expectancies and approaching volume capacities. It is recommended to maintaining design consistency using the same manufacturers 40 HP pump within the station with its successful performance Quotes for a replacement pump matching the existing 40hp pumps were provided by the pump representative. The replacement pump, Fairbanks model 8D5434SMV Submersible sewage pump is $44,889 excluding freight and has an expected lead time of 14 to 16 weeks. The Public Works Subcommittee was presented this information at their October 19 meeting with recommendation to proceed for City Council consideration. SUPPORTING DOCUMENTS ATTACHED: • Quote POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve procurement of a Fairbanks 40HP pump for Lift Station No. 3 from WW Goetsch Associates, Inc. in the amount of $44,889.00 plus freight. BUDGET INFORMATION FUNDING: BUDGETED: Fund 602 – Sanitary Sewer Utility (49450-530) Yes; this will be included in the 2023 budget. 800-831-7914 5250 WEST 74TH STREET MINNEAPOLIS, MN 55439-2226 952-831-4340/FAX: 952-831-2357 7674 COLLEGE ROAD SUITE 105 BAXTER, MN 56425-7865 218-829-6890/FAX: 218-829-6972 SEPTEMBER 19, 2022 CITY OF OTSEGO ATTN: KURT NEIDERMEIER SUBJECT: LIFT STATION #3 PUMP WE RESPECTFULLY SUBMIT OUR QUOTATION ON THE FOLLOWING FAIRBANKS EQUIPMENT. 1 - FAIRBANKS MODEL 8”D5434SMV SUBMERSIBLE SEWAGE PUMP WITH 40 HP, 1185 RPM, 3/60/460 VOLT INVERTER MOTOR WITH 50’ POWER CORD, STAINLESS STEEL IMPELLER WEAR RING AND STAINLESS STEEL VOLUTE WEAR RING, AS-BUILT O&M MANUAL. YOUR COST F.O.B. FACTORY $44,889 EACH + FREIGHT *WE HAVE NOT INCLUDED ANY OTHER MATERIALS NOT MENTIONED ABOVE. WE HAVE NOT INCLUDED ANY APPLICABLE TAXES. PRICES ARE FIRM FOR 30 DAYS. TERMS ARE NET 30 DAYS AFTER SHIPMENT. SHIPMENT CAN BE MADE 14 - 16 WEEKS RECEIPT OF YOUR ORDER. YOUR CONSIDERATION AND ORDER WILL BE APPRECIATED. SINCERELY, BRYAN GOEHRING